Beruflich Dokumente
Kultur Dokumente
NATIONAL RURAL
EMPLOYMENT GUARANTEE
ACT (NREGA) 2005
User Manual
Table of Contents
1. Introduction 4
1.1 Audience 4
1.2 Purpose of the Application 5
1.3 Documentation Organization 6
1.4 Conventions 6-7
1.5 Problem Reporting 7
1.6 Product Features 7-8
1.7 Handling Instructions 9
1.8 Installation Instructions 9-11
2. Citizen 12-2 3
3. Panchayats
3.1 Gram Panchayats 28-103
3.2 Block Panchayats 104-105
3.3 Zilla Panchayats 106-107
4. Workers 109-112
6. District/Block Administrator
6.1 Programme Officer 116-144
6.2 District Project Coordinator 145-168
7. States 169-192
9. MoRD 197-204
1.1 Audience
The Audience of NREGA consists of the following: -
• Citizen: - The citizens are not required to have any prior experience nor any
training is required for them to use NREGA software. The users should only
know Internet surfing.
• Panchayats: -
1. Gram Panchayat
2. Block Panchayat
3. Zilla Panchayat
All the users in Panchayats must have some experience of using computer and
Internet surfing. Training is must for them before using this software. They
must have the clear understanding of the manual system and all the processes
within that system.
• Workers: - The Workers are not required to have any prior experience nor
any training is required for them to use NREGA software. The workers should
only be able to enter their Job card number.
• Banks or Post office: - The users are not required to have any prior
experience nor any training is required. They have to just enter the msr_no and
they can see the generation of payments.
• MORD: - MORD will be responsible for ensuring timely and adequate resource
support to states. It will undertake review, monitoring and evaluation of
Processes and outcomes. They will use this software to capture the data and
access the utilization of resources. So they must know flow of all stages and
processes involved in the implementation of NREGA and also training is
required for them. They must know the basic computer skills and Internet
surfing before using this software.
• Engineers:- There are three types of data entry system in this tab-
1. Enter schedule of rates
2. cost Estimation
3. MB Book
In this tab entry is done by the State engineer. Training is must for them before
using this software. They must have the clear understanding of the processes
and system.
ii.They can also send there valuable feedback to us through our website
http://nrega.nic.in. In the left panel of the site, there is section with
name Contact your government, under which there is a link with the
name Feedback. When a user click on it, a new screen will be displayed,
where they should enter their name, email address, feedback. After
entering all details click on Submit Button.
• Citizen: - Citizen can access online NREGA ACT 2005, Operation Guidelines,
Total NREGA Districts, Role Matrix, Name, address, Telephone No, email of
MoRD officials, D.P.C., P.O., Panchayat members / staff, Monthly Progress
Report, Employment Status, Work Status, Financial Statement, Available Fund
at Each Level, Expenditure Statement for Works, Registration Application
Register, Job Card / Employment Register, Muster Roll Issue Register, Muster
Roll Receipt Register, News, circulars. They can send their
feedbacks/complaints and can also check the status of their complaints.
• Panchayats: - At Panchayat level one can make data entry for registration,
creating new works etc and can generate there corresponding reports.
• Workers: - One can view Job Card, Demand for Job, Allocation of Job and
Employment Given.
• States: - One can directly make Data Entry and can generate corresponding
Reports.
• Banks or Post office: - One can directly see the generation of payments.
Whether it is done by Post office, Banks and by cash.
• MORD: - One can enter the data and see the reports regarding that data.
Enter data is related to the employment demanded/allotted, work generation
and financial progress on the actual basis.
• Engineers: - The state engineers can enter the data. They can enter the
estimated cost, expenditure and MB book entry.
• Screen shot of various Data Entry Screen and the reports generated at different
levels of users will also be placed.
1.4 Conventions
This section will explain the symbols as well as style such as bold, italic and there
usage in the Manual which is as below: -
Convention Description
• Visitor can also send there valuable feedback to us through our website
http://nrega.nic.in. In the left panel of the site, there is section with name
Contact your government, under which there is a link Feedback. When a
user click on it, a new screen will be displayed, where they should enter
their name, email address, feedback. After entering all the details click on
Submit button.
Software is linked with family survey known as BPL census 2002 where
information on rural household in rural area is available. It is a loose linking of
two databases in the sense that if a family is found in that database then all the
information regarding the persons in the family above 18 years of age can be
copied to NREGA database but if a family is not found then it can be added into
NREGA database.
• User Friendly
1. Any browser
1. Windows XP SP -2 OS
2. IIS Server Installed on Windows XP
3. MS Access
4. ODBC Drivers
5. WinZip
6. MSDE 2000 ,SQL Server 2000
i. Open browser
ii. Type http://localhost/nrega/home.asp
iii. Click DATA Entry option if it works properly then software is
working fine. If error comes showing problem in ConnectNrega.asp
then change the file Connectnrega.asp. Keep only two lines in
Connectnrega.asp specified below.
You can get name SQL Server by clicking sql server icon on right side of
task bar.
2. CITIZEN
By default the tab selected is citizen. First view of the web site is citizen page. Further
citizen page is divided into three columns. They are described below.
On the left hand side in first column there are state names which are the hyperlinks.
When user clicks on the hyperlinks it will displays the login page. In login page you can
see on left hand side it displays all the districts of the selected state which are further
hyperlinks. At the middle section NREGA bulletin is showing the statistics of the selected
state and at right side of the page there is login for the state.
User has to enter the user name and password then it will display the following page. In
this page all the reports of the state is displayed. These reports are related to employment
provided, analytical report, MPR Vs MIS and alerts etc.
The description of the reports and their formats are better discussed in the
“STATE TAB” For state page you can go to context no 7.2 for reporting and 7.1
for data entry.
This is the summary report showing total no. of households, total no. of person days, total
no. of works taken up, total no. of works completed, total no. of works in progress.
NREGA bulletin is keeping updated as the data in the server.
There are two types of report formats under National Bulletin.
¾ Employment Report
¾ Financial Report
MONITORING FORMATS FOR MONTHLY PROGRESS REPORT UNDER NATIONAL RURAL EMPLOYMENT
GUARANTEE ACT(NREGA)
FINANCIAL PERFORMANCE under NREGA DURING THE YEAR
Upto The Latest
2008-2009 Month
4 5 9
1 2 3 6 7 8
a b a b c a b c d e
O.B. Release of Release during current
Cumulative Cumulative Expenditure
as the last year year
Labour Budget
on received On
estimation of Administrative
1st during Center Misc. Total semi-
S.No State Total Expenses
April current year receipt Availability On skilled On Tota
State Expenditure(Till
of
the reporting Wages and Material Non
l
the Central State Sanctioned Reciept skilled Recurring
month) Recurring
year wages
This system helps the worker or any citizen to launch complain against Panchayats or
any other implementing agency. All the fields marked by * are mandatory.
As soon as the user will submit the data, complain will send to the Program Officer and
allot a complaint ID. The Program Officer can see all the complaints of his block.
This is report of the redressal system from where user can see the complaint attended
And their description when it is attended solution etc.
The information about latest updating in online as well as offline version of software is
displayed in this section.
Under this section, financial year wise reports from MIS are available.
By clicking on the link for any financial year, the state level & national level reports
are available :-
Up to serial no. 5, formats are same for National level reports and State level reports.
Serial no. 6 and 7 are extra in State level reports.
Employment Status
This report shows the No. of registration, No. of applicants, No. of Job cards issued,
Employment demanded, Employment offered, Employment provided, No. of Muster roll
filled, No. of ongoing works etc.
State :
No. of Employment Employment No. of No. of
Job Employment Provided On
Registered demanded offered filled Families Draw
District Card going
House House House House Muster Completed Graphs
Persons Issued Persons Persons Persons Persondays Roll works
Hold Hold Hold Hold 100 days
Phase I
[ Bar]
Phase II
Phase III
This report shows the status of works. Status of works means ongoing, on shelf,
completed and suspended. The report shows the status of the work category wise. There
are 9 categories of works. We have shown here only four categories, all other categories
are same as these
State:-
NO. OF WORKS
Water Conservation And Renovation of Traditional
District Flood Control Rural Connectivity
Water Herversting Water Bodies
S.No Name Work Work Work Work
In- Pro. In- Pro. In- Pro. In- Pro.
comp. in comp. in comp. in comp. in
prog. Work prog. Work prog. Work prog. Work
shelf shelf shelf shelf
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
This report shows the summary of fund available and expenditure done for districts. The
report format is as follows:-
(Rs. In
State:
Lakhs)
Release of Last Year
Release During
but Recieved during Cumulative Expenditure
Actual O.B Current Year
the Current Year
as on Ist Misc. Total Balance
S.No Districts On Semi-
April of the Receipt Availabilty On Left
Year skilled and On Adm.
Centre State Centre State Unskilled Total
Skilled Material Exp.
Wage
Wage
Phase I
Phase II
Phase III
This report shows the fund available for the districts. The format of this report is as
below:-
State:
Districts Available Fund(in Lakh)
Phase I
Phase II
Phase III
State:
On
Semi-
Money On
EXE Adm skilled On Adm
Centre State Total Centre State Total Centre State Total PO GP Refunded Total Balance Unskilled Total
AGE. .Exp. and Material .Exp
to DPC Wage
Skilled
Wage
Phase I
Phase II
Phase III
This report is state level report which shows the expenditure statement of works. This
report is based on all the 9 categories of works. The format of the report is as follows:-
Rs. in
Lakhs
NO. OF WORKS
District Water
Renovation of Irrigation
Name Flood Rural Conservation Drought Irrigation Land
S.No Traditional Facilities To Other works Total
Control Connectivity And Water Proofing Canals development
Water Bodies SC/ST/IAY/LR
Herversting
No. of Expen No. of Expen. No. of Expen. No. of Expen. No. of Expen. No. of Expen. No. of Expen. Expen. No. of Expen. No. of Expenditure
No. of Works
Works Amount Works Amount Works Amount Works Amount Works Amount Works Amount Works Amount Amount Works Amount Works Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Assets Created
This report is also a state level report in which, category wise total no. of completed
works are shown in all the three phases. The format of this report is:-
State:
Phase II
Phase III
2.3.2 Communication
Under this section the important letters, Agendas, meeting notices, circulars issued by
the Ministry are published for the users.
Under this section Muster roll report, Guidelines & formats of Muster roll verification,
Muster roll verification schedule and Social audit reports sent by different states, districts,
blocks all over the India are available for maintaining the transparency between the users
and the Ministry. Links for lodging the public grievance and report of the grievance is
available under ‘Public Grievance Redressal System’ Some other important information
like Transparency & Accountability Rules etc. is also published time to time in this section.
In Reference Center, first of all the annual report of NREGA is available in Hindi & English
languages. Links for Central Employment Guarantee Council rules, census 2001 & BPL
census 2002 are also there. NREGA logo can also be downloaded from this section. ICT
infrastructure reports at block level are there. and some other links are also available that
can be updated accordingly.
The screen of contact list for District level officials looks like:-
No. of No. of
No. of Phone Education Account
District Name Address Email Officers Officers
Blocks no Qualification Number
Permanent Contract
State:
3. PANCHAYATS
2. Tbil converter: - Here user can download to convert the local languages to
the Unicode.
Cost Estimation
1. Tbil converter: - Here user can download to convert the local languages to the
Unicode.
Through this link of Gram Panchayat users can perform the Data Entry for the
Registration, Demand for Work, Work Allocation, New Works, Muster roll, Updating of the
Registration Card Book at Gram Panchayat level and can also generate corresponding
Reports.
All the modules of Gram Panchayat will now be discussed in details which are as
follows: -
The links provided at this screen are divided into four sections, which will be discussed
below: -
About Registration:
Any Indian citizen of 18 years of age and above can be registered. Registration can be
done by the authorized users either from ‘Gram Panchayat Module’ or ‘Programme
Officer Module’ by using the following links:-
Note: Family-Id field will NOT be displayed if ‘BPL_Data_loaded’ column of the BLOCKS
table has the value ‘Y’ and at the time of saving the record, it will generate the Family-Id
automatically. BPL data should be used only to verify. This could not form basis for
registration as the definition of household under NREGA & BPL Survey is not same.
Field Description:
Panchayat: If the link is accessed from PO-Module, it’s a mandatory field and the
Panchayats of the selected Block will be displayed in the combo box. The user should
select the Panchayat for which he/she has to do registration.
Village: It’s a mandatory field. The Villages of the selected Panchayat will be displayed
in the combo box. The user should select the village for which he/she has to do
registration.
Otherwise, i.e. if ‘BPL_Data_loaded’ column has the value ‘Y’, then the input
box for Family_id will NOT be displayed and at the time of saving the record,
it will generate the Family-Id automatically by using the following formula.
House No.: It’s an optional field. If house no. data is available, the user can enter the
House No. Entry can be in Unicode.
Category: It’s an optional field. The user can select the caste ‘SC’ or ‘ST’ or ‘Others’ by
clicking the corresponding radio button. If the family is an IAY or/and a LR beneficiary,
they can click ‘IAY’ or/and ‘LR’.
Date of Registration: It’s a mandatory field. The date should be entered in dd/mm/yy
format. (Eg. 24/04/06 for April 24, 2006). It cannot be earlier than ‘02/02/06’ as the
NREGA Scheme was launched on 02/02/06 and cannot be future-date also. (For future
date, it will check the current system-date).
Epic No.: It’s abbreviation of “Elector’s Photo Identification Card No.”. It’s an optional
field. This no. is issued to the Voters by Election Commission of India. If this no. is
available, the user can enter the data.
Name of Applicant: It’s a mandatory field for the first applicant. ie. atleast one
applicant-name must be entered. Applicant-name (with same gender & same age)
cannot be duplicated within a family. Entry can be in Unicode.
Age: It’s a mandatory field if the applicant-name is entered. Only Numbers allowed.
The age cannot be less than 18.
After entering the mandatory fields, the user can save the record by clicking the ‘Save
Button’. After saving the record, the system will generate a Registration No. which is
unique to all the States.
If the family-photo is available in the system, by clicking of the ‘Browse’ button, the user
can select the image file and click the ‘Save’ button. Then the selected photo will be
uploaded in the server with the message displayed like ‘Photo has been uploaded for the
Reg. No: OR-09-012-004-001/24993.
Field Description:
Panchayat: If the link is accessed from PO-Module, it’s a mandatory field and the
Panchayats of the selected Block will be displayed in the combo box. The user should
select the Panchayat for which he/she has to do registration.
Village: It’s a mandatory field. The villages of the selected Panchayat will be displayed
in the combo box. The user should select the village for which he/she has to do
registration.
On selection of the Name of head of Household, the related data will be fetched into the
input boxes of Father/Husband’s Name, Family_id, House No., Category (Whether
SC/ST/Others) and Member_id (S.No.), Name of Applicant, Gender and age. The
Family-Id is NOT editable.
Family-Id: It’s a mandatory field. The user can’t change the Family-Id.
House No.: It’s an optional field. The data if exists, will be fetched from BPL-Table.
The users can enter/change the House No. Entry can be in Unicode.
Category: It’s an optional field. The data if exists, will be fetched from BPL-Table.
Otherwise the user can click the corresponding radio button based on the data available.
If the family is an IAY or/and a LR beneficiary, they can click ‘IAY’ or/and ‘LR’.
Date of Registration: It’s a mandatory field. The date should be entered in dd/mm/yy
format. (Eg. 24/04/06 for April 24, 2006). It cannot be earlier than ‘02/02/06’ as the
NREGA Scheme was launched on 02/02/06 and cannot be future-date also.
Epic No.: It’s abbreviation of “Elector’s Photo Identification Card No.”. It’s an optional
field. This no. is issued to the Voters by Election Commission of India. If this no. is
available, the user can enter the data.
S.No.: It’s a mandatory field. The S.No column will display the member-id of the
applicant fetched from BPL-data. The S.No need not to be in order. If some members in
a family are of age < 18, then that member will be skipped and so the S.No. will not be
in order. But note that each applicant in a family should have the distinct S.No. ie. The
S.No, Should NOT repeat for a household. In case, if it repeats, the S.No Should be
changed so that it should be unique for a family.
Name of Applicant: All the members of the selected household of age >=18 in 2006
will be fetched from the BPL-Table. If no member is available in the BPL-table, then the
name of head of household will be displayed in the input box of applicant-name with
S.No. 1 and the user have to select the Gender and age. Entry can be in Unicode.
It’s a mandatory field for one applicant. ie. Atleast one applicant-name must be entered.
Applicant-name (with same gender & same age) cannot be duplicate within a family.
The user can delete the applicant-name if the household doesn’t wish/apply to register a
particular member.
Gender: It’s a mandatory field if the applicant-name is entered. The data will be fetched
from BPL-Table.
After entering the mandatory fields, the user can save the record by clicking the ‘Save
Button’. After saving the record, the system will generate a Registration No. which is
unique to all the States.
If the family-photo is available in the system, by clicking of the ‘Browse’ button, you
select the file and click the ‘Save’ button. Then the selected photo will be uploaded in
the server.
In case, the photo is not available, the user can upload the photo later, through ‘Edit
Registration’ option.
Error Messages:
On clicking the ‘Edit Registration’ link, the following form will appear.
To edit the data, the user should select Village (if you logged-in PO Module, the user
should select Panchayat and then Village). On selecting a Village, the Registration nos.
corresponding to the selected village will be displayed in the comb box. The user should
select the Reg. no. for which the data has to be corrected. On selecting the Reg.no, the
data corresponds to that Reg. No. will be displayed in the input boxes. After editing the
data, the user should click the ‘Update’ button to save the changes made. The users can
add/edit/delete applicant(s). To delete an applicant, the user should delete the
applicant-name.
If the family-photo was not uploaded during Registration-Entry, the user can upload
after updating the form. If it is not uploaded then a link ‘Add Family-Photo’ will be
displayed. To upload family-photo, the user should click the ‘Browse’ button and select
the image-file to upload. Then click the ‘Save Photo’. On clicking the ‘Save Photo’
button, the image will be uploaded to the server and then a message ‘’ will be displayed.
If the family-photo was already uploaded, the link ‘View Existing Family-Photo’ will be
displayed. The user can view the photo by click of this link. The existing photo can also
be changed, in case it’s wrongly uploaded.
Error Messages:
On clicking the ‘Delete Registration’ link, the following form will appear.
To delete record, the user should select Village (if you logged-in PO Module, the user
should select Panchayat and then Village). On selecting a Village, the columns
Registration-Id, Name of Head of Household, Name of Father/Husband and Date of
Registration of the registered households for whom the job-card were NOT issued in that
selected Village will be displayed (as shown below). To delete a household record, the
user should click ‘Delete Record’ link displayed adjacent to Reg.No. On clicking the link,
it will delete the record of the household (with the applicants) and a message ‘Record
has been deleted for the Reg.No. <Reg.No.>’ will be displayed.
The authorized users at GP or Programme Officer in a Block can add an applicant using
this link.
To add the applicant, the user should select Village (if you logged-in PO Module, the user
should select Panchayat and then Village). On selecting a Village, the Registration nos.
corresponding to the selected village will be displayed in the comb box. The user should
select the Reg. no. for which the data has to be added. On selecting the Reg.no, the
data corresponds to that Reg. No. will be displayed below. After adding the data in given
input box the user should click add applicant button.
Field Description:
Village: It’s a mandatory field. The villages of the selected Panchayat will be displayed
in the combo box. The user should select the village for which he/she has to do add
applicant.
Registration ID: - It’s a mandatory field. The registration no of the selected village will
be displayed in the combo box. The user should select the reg_no for which he/she has
to do add applicant.
Field Description:
Village: It’s a mandatory field. The villages of the selected Panchayat will be displayed
in the combo box. The user should select the village for which he/she has to do add
applicant.
Registration ID: - It’s a mandatory field. The registration no of the selected village will
be displayed in the combo box. The user should select the reg_no for which he/she has
to do add applicant.
There are three options for job card issue that is for whole village, whole Panchayat and
individual basis. Check the radio button for which user want to see the job card
Field Description:
Village: All villages of the gram panchayat will come in the combo box.
Name of Head of Household: All registered head of household with family id of the
same village which is selected above will come in the combo box.
Job-Card issued: Either Yes or No. If yes, then put the job card issue date and issue
the job card/job slip. If No, then give the suitable comments over it.
Job Card Issue Date: If job card issued previously then it will display the job card
issue date otherwise if job card issued first time then it will display today’s date
After selecting the job card for as per user requirement click on the job card button and
it will disappear like:-
Field Description:
Village: All villages of the gram panchayat will come in the combo box.
Name of Head of Household: All registered head of household with family id of the
same village which is selected above will come in the combo box.
Field Description:
Village: All villages of the gram panchayat will come in the combo box.
Registration ID: All registered head of household with family id of the same village
which is selected above will come in the combo box.
Name of Applicant: All applicants of selected registration no. of the same village
which is selected above will come in the combo box.
Account No.: Account no. of each applicant is filled here. Once account no. is filled, it
cannot be display again
Date of Application: Date of application for the work demand will be in DD/MM/YYYY
format. It will be greater than date of registration date
Work Demand From: work demand from will be in DD/MM/YYYY format and it will be
greater than the Date of application
No. of Days: This field should be numeric and this field tells for how many days the
person demands the work
Work Demand to: work demand to will be in DD/MM/YYYY format and it will depend
upon the no of days (work demand days) including holidays.
Error Messages:
2 Please select registration ID... District has not been Select District
selected
3 Please select Job Seeker... Applicant has not Select Applicant
been selected
4 Please select Date... Date of Application Date of Application
is blank should not be
blank
5 Please write date of demanded Work demand from Work demand
work is blank from should not
blank
6 Demand should be more than 13 No. Of days is less No. of days should
days…. than 13 days not be less than 13
days
7 (Demand Date From) is not within (Demand Date (Demand Date
financial year From) is within From) should not
financial year be within financial
year
Field Description:
Expected mode of payment: This is a radio button field in which you have to chose
the mode of payment by clicking on radio button.
Village: All villages of the gram Panchayat will come in the combo box.
Field Description:
Expected mode of payment: This is a radio button field in which you have to chose
the mode of payment by clicking on radio button.
Village: All villages of the gram Panchayat will come in the combo box.
Field Description:
Village: All villages of the gram panchayat will come in the combo box.
Registration ID: All registered head of household with family id of the same village,
which is selected above, will come in the combo box.
Name of Applicant: All applicants of selected registration no. of the same village which
is selected above will come in the combo box.
Error Messages:
• Work Allocation
•
Field Description:
Proposal Date: The date on which this work is to be commenced by the panchayat. It
must be in DD/MM/YYYY format. It is a mandatory field.
Road Name: Road name should be in Unicode character. This is a mandatory field.
Start Location: The location from where the conception/upholding of the road are to be
started. It contains three parameters Village, Khata no. and Plot No.
End Location: Location of the destination of the road. It contains three parameters
Village, Khata no. and Plot No.
Total distance: It is the distance between source location and destination location. It
is a mandatory field.
Start status: The status of the road before work start. It is a mandatory field.
Start status: Status of the road after the completion of the work. It is a mandatory
field.
Execution Level: The execution level of the work is always GP (Gram Panchayat).
Executing Agency: Name of the agency that will execute the work. It is a mandatory
field.
Add new executing agency: - There is link near the Executing agency, where user can
enter the new executing agency. When user clicks on the link it will open the new
window and user have to enter the description of the executing agencies.
• New
• Approved
• On Going
• Suspended
• Completed
New: New works are ready for technical and financial approval.
Suspended: Details of the suspended work can be entered with this status.
Completed: Details of the completed work can be entered with this status.
It is a mandatory field.
Work Code: Work code for new work is auto generated. Work code for work other than
new is entered by the user. It is a mandatory field.
Error Messages:
4 Duplicate work and hence can Work code allotted to Always enter unique
not be entered some other work Work code
3.1.1.9.2. Water Conservation: - There are two types of works categories under the
water conservation i.e. Both have same type of entry forms but the work categories are
different for each.
• W.C. and Water Harvesting
• Renovation of Water Bodies
Field Description
Proposal Date: The date on which this work is anticipated by the panchayat. It must be
in DD/MM/YYYY format. It is a mandatory field.
Water Body Type: It is an obligatory field. It specifies the type of the water body like
Tank, Reservoir, well etc.
End status: Status of the water body after the completion of the work. It is a
mandatory field.
Execution Level: The execution level of the work is always GP (Gram Panchayat).
Executing Agency: Name of the agency that will execute the work. It is a mandatory
field.
Add new executing agency: - There is link near the Executing agency, where user can
enter the new executing agency. When user clicks on the link it will open the new
window and user have to enter the description of the executing agencies.
Work Status: Work can have any of the five statuses given below:
• New
• Approved
• On Going
• Suspended
• Completed
• New: New works are ready for technical and financial approval.
• Suspended: Details of the suspended work can be entered with this status.
• Completed: Details of the completed work can be entered with this status.
Work Code: Work code for new work is auto generated. Work code for work other
than new is entered by the user. It is an obligatory field.
Error Messages:
3 Work start date should be in Either work start Work start date
(DD/MM/YYYY) format and date is less should be greater
greater than the proposal than the proposal than the
date date or not proposal date
in the specified
format
4 Duplicate work and hence Work code allotted Always enter unique
can not be entered to some other work Work code
Field Description
Proposal Date: The date on which this work is anticipated by the panchayat. It must
be in DD/MM/YYYY format. It is a mandatory field.
Water Body Type: It is an obligatory field. It specifies the type of the water body like
Tank, Reservoir, well etc.
Present status: The status of the water body before work start. It is a mandatory field.
End status: Status of the water body after the completion of the work. It is a
mandatory field.
Execution Level: The execution level of the work is always GP (Gram Panchayat).
Executing Agency: Name of the agency that will execute the work. It is a mandatory
field.
Add new executing agency: - There is link near the Executing agency, where user can
enter the new executing agency. When user clicks on the link it will open the new
window and user have to enter the description of the executing agencies.
Work Status: Work can have any of the five statuses given below:
• New
• Approved
• On Going
• Suspended
• Completed
New: New works are ready for technical and financial approval.
Suspended: Details of the suspended work can be entered with this status.
Completed: Details of the completed work can be entered with this status.
Work Code: Work code for new work is auto generated. Work code for work other than
new is entered by the user. It is an obligatory field.
Error Messages:
2 Proposed Date must be in Either proposed date is greater Proposed date should
(DD/MM/YYYY) format and less than the current date or not be in (DD/MM/YYYY) format
than the current date in the specified format and less than the current
date
3 Work start date should be in Either work start date is less Work start date should
(DD/MM/YYYY) format and greater than the proposal date or not be greater than the proposal
than the proposal date in the specified format date
4 Duplicate work and hence can not Work code allotted Always enter unique
be entered to some other work Work code
Field Description
Proposal Date: The date on which this work is anticipated by the panchayat. It must
be in DD/MM/YYYY format. It is a mandatory field.
Present status: The status of the water body before work start. It is an obligatory field.
End status: Status of the water body after the completion of the work. It is a
mandatory field.
Execution Level: The execution level of the work is always GP (Gram Panchayat).
Executing Agency: - Name of the agency that will execute the work. It is a
mandatory field.
Add new executing agency: - There is link near the Executing agency, where user can
enter the new executing agency. When user clicks on the link it will open the new
window and user have to enter the description of the executing agencies.
Work Status: Work can have any of the five statuses given below:
• New
• Approved
• On Going
• Suspended
• Completed
New: New works are ready for technical and financial approval.
Completed: Details of the completed work can be entered with this status.
Work Code: Work code for new work is auto generated. Work code for work other than
new is entered by the user. It is an obligatory field.
Error Messages:
A work, which cannot be in any work category as described above, can enter under this
category.
Field Description
Proposal Date: The date on which this work is anticipated by the panchayat. It must be
in DD/MM/YYYY format. It is a mandatory field.
Execution Level: The execution level of the work is always GP (Gram Panchayat).
Executing Agency: - Name of the agency that will execute the work. It is a mandatory
field.
Add new executing agency: - There is link near the Executing agency, where user can
enter the new executing agency. When user clicks on the link it will open the new
window and user have to enter the description of the executing agencies.
Work Status: Work can have any of the five status given below :
• New
• Approved
• On Going
• Suspended
• Completed
New: New works are ready for technical and financial approval.
Suspended: Details of the suspended work can be entered with this status.
Completed: Details of the completed work can be entered with this status.
Work Code: Work code for new work is auto generated. Work code for work other than
new is entered by the user. It is an obligatory field.
Error Messages:
3 Work start date should be Either work start Work start date should
in (DD/MM/YYYY) format date is less than the be greater than the
and greater than the proposal date or not proposal date
proposal date in the specified format
4 Duplicate work and hence Work code allotted Always enter unique
can not be entered to some other work Work code
Field Description
Proposal Date: The date on which this work is anticipated by the Panchayat. It must
be in DD/MM/YYYY format. It is a mandatory field.
Execution Level: The execution level of the work is always GP (Gram Panchayat).
Executing Agency:- Name of the agency that will execute the work. It is a
mandatory field.
Add new executing agency: - There is link near the Executing agency, where user can
enter the new executing agency. When user clicks on the link it will open the new
window and user have to enter the description of the executing agencies.
Work Status: Work can have any of the five statuses given below:
• New
• Approved
• On Going
• Suspended
• Completed
New: New works are ready for technical and financial approval.
Suspended: Details of the suspended work can be entered with this status.
Completed: Details of the completed work can be entered with this status.
Work Code: Work code for new work is auto generated. Work code for work other than
new is entered by the user. It is an obligatory field.
Error Messages:
Field Description
Proposal Date: The date on which this work is anticipated by the Panchayat. It must
be in DD/MM/YYYY format. It is a mandatory field.
Execution Level: The execution level of the work is always GP (Gram Panchayat).
Executing Agency:- Name of the agency that will execute the work. It is a
mandatory field.
Add new executing agency: - There is link near the Executing agency, where user can
enter the new executing agency. When user clicks on the link it will open the new
window and user have to enter the description of the executing agencies.
Work Status: Work can have any of the five statuses given below:
• New
• Approved
• On Going
• Suspended
• Completed
New: New works are ready for technical and financial approval.
Suspended: Details of the suspended work can be entered with this status.
User Manual of NREGA Page 64 of 205
NIC-DRD User Manual Page 65 of 170
Completed: Details of the completed work can be entered with this status.
Work Code: Work code for new work is auto generated. Work code for work other than
new is entered by the user. It is an obligatory field.
Error Messages:
Field Description
Proposal Date: The date on which this work is anticipated by the Panchayat. It must
be in DD/MM/YYYY format. It is a mandatory field.
Present status: The status of the water body before work start. It is an obligatory field.
End status: Status of the water body after the completion of the work. It is a
mandatory field.
Execution Level: The execution level of the work is always GP (Gram Panchayat).
Executing Agency:- Name of the agency that will execute the work. It is a
mandatory field.
Add new executing agency: - There is link near the Executing agency, where user can
enter the new executing agency. When user clicks on the link it will open the new
window and user have to enter the description of the executing agencies.
Work Status: Work can have any of the five statuses given below:
• New
• Approved
• On Going
• Suspended
• Completed
New: New works are ready for technical and financial approval.
Suspended: Details of the suspended work can be entered with this status.
Completed: Details of the completed work can be entered with this status.
Work Code: Work code for new work is auto generated. Work code for work other than
new is entered by the user. It is an obligatory field.
Error Messages:
i) If the previous work status is other than Approved or On-Going and the current
work status is Approved or On-Going then after clicking the update button then it
will be asked whether to enter Technical and Financial details.
ii) If the previous work status Approved or On-Going and the current work status is
also Approved or On-Going then after clicking the update button then it will be
asked whether to update sanction details if it exist other wise to save the
sanction details
Also through edit option user can enter the technical estimates or update the estimates
previously entered.
All the above activities are followed by edit option for each category of work.
In Work module there is an option ‘Complete Work’ to make a work complete. Through
this program user can complete any work. In this first select the work category for which
work is to be completed. It will show all new works in that category. Select the
work_code that is for completion. After selecting the work_code enter the completion
date of that work and hit the save button. The UI will look like:-
In Work module there is an option ‘Delete Work’ to delete a work. Through this program
user can delete new work, which is not yet, sent by PO to DPC for approval i.e. no
proposal number is allotted to that work. Works other than new cannot be deleted. In
this first select the work category for which work is to be deleted. It will show all new
works in that category. Select the work code, which is to be deleted. After this the
details of the selected work will be flashed. Click ‘Delete’ button it will prompt you
whether you want to delete that work or not. If you click ‘yes’ the work will be deleted.
Field Description:
Work: All works that are ongoing or approved are shown here.
Date: This date is used as suspension date. From this date, a new
demand is generated for the persons who work on the Project
Reason: Here the specific reason for the suspension of work is entered.
Error Messages:
Work category: Work category for which user want to resume the suspended work.
This module of the work is used for changing the executing agency of the work. When
user click on the change executing agency link the following UI will appear.
Fields:-
Search key for work: - This field will help user to find the work easily, when user enters
Some words/number this field search for particular work and gives works on combo box.
Work: - select the work_code for which you want to change the executing agencies.
This module of the work is used for changing the start date of the work.
Fields:-
Work category: - This field is to select the work category choose the work category for
which user want to change the work start date.
Work code: - select the work_code for which you want to change work start date.
After clicking the submit query the following screen will reflect. Now user have to enter
the new work start date, by keeping in mind the current work start date and the
instruction date which is printed in work start date should be greater then or equal field.
This search work link is used for searching the works, User have to enter the some text
or number; it will show all the works regarding that pattern.
Work Allocation module allocates employment to workers, who have demanded for work.
Number of days allocated to a worker must be greater than 12 days i.e. allocation can’t
be done for less than 13 days. Also work allocation can be done for any period between
the employments demanded periods. Select the financial year for which allocation is to
be done. Now choose the work on which the allocation is to be done. Only Approved or
On-going works are available in this module. As default the work allocation period is
equal to the demand period of the applicant. But user can change the allocation period
as per requirement, but with in the demand period. Also allocation can be done for fewer
applicants from among all the applicants registered. If the allocation period is less than
the demand period of an applicant than a new demand of that applicant will be
generated automatically for the remaining period.
Error Messages:
Field Description:
Must roll No.: It contains the Must roll no. It is mandatory field.
Work Code: It will display the work code of the selected Must roll No.
Work Name: It will display the work name of the selected Must roll No.
Activity:- Here user have to select the activity and user can add an activity, which is
done by the must roll.
Unit cost: - Here users have to put the cost of hat activity.
Name/Reg No: it will display the names and registration no of the persons whose work
allocation in between the Must roll Starting and end dates.
Wage per Day: This field allows numeric values only and contains wage rate for a day
for a worker. It is Mandatory field.
Amt Due Acc to Attendance: This is numeric field and contains the amount payable to
a worker based on attendance. It is an elective field.
Amt Due Acc to Mea: It contains numeric values and amount payable according to
measurement of work done. It is an elective field.
Total Cash payment: It is numeric field with total wage payment to be made to
workers. It is Mandatory field.
Work Start Date: This is work start date for a particular Must roll. It should be in
dd/mm/yyyy format.
Error Messages:
Field Description:
Work Code: It will display the work code of that Panchayat at that financial year.
Must roll:- It will display the Must roll No under that work that you have selected.
Select Activity: It will display all the existing activity, as well as user can add new
activity.
No of times the Activity done:- Put How many times that activity is done.
Quantity: - Displays quantity according to your measurement and no of times the activity
done.
Material Procured detail also has edit option, through which one can edit the material
purchased details for a work, Bill no wise. Through edit option one can enter new
material or update an existing material or delete a previously entered material.
Error Messages:
2 Bill date should be greater Bill Date is less than Bill date must be
then the Financial sanction The Financial sanction greater or equal to
date of the work date of the work the financial
sanction date of the
work
3 Bill date cannot be greater Bill date is a future Bill Date always less
then the Current date date or equal
to the current date
4 Bill amount should be numeric Bill amount is Bill amount must be
non numeric numeric
5 Bill Amount Exceeded Sum of amount of all Sum of amount of all
the material is the material entered
greater equal to bill amount
than the Bill amount
6 Material is already present Material has been Don’t enter the
already entered for Material for a bill
this bill no which is already
present
Field Description:
Financial Year: It is a mandatory field. The user should select the financial year for
which he/she want to search the muster roll.
Enter the MSR No: It is a mandatory field. Full or part of the muster roll no. should
enter in this text box to get the description about muster roll no.
When you click on the proceed button it will displays the must roll no all its detail as
describe below:
Error Messages:
FUNDS:
Field Description:
Date of Fund Received: This field is used in fund received from DPC or PO Level. The
date on which this fund is received by the Panchayat. It must be in DD/MM/YYYY format.
It is a mandatory field.
Cheque/DD/TT Amt.: This field is used for miscellaneous receipt. The amount of
miscellaneous receipt is given here. The funds should be numeric and in Lakhs. It is a
mandatory field.
Cheque/DD/TT No.: This field is used for miscellaneous receipt. The No. of
miscellaneous receipt is given here. The number should be alphanumeric It is a
mandatory field.
Cheque/DD/TT Date.: This field is used for miscellaneous receipt. The date of
miscellaneous receipt is given here. It must be in DD/MM/YYYY format. It is a mandatory
field.
Amount.: This field is used for Closing Balance. The amount of Closing Balance is
given here. The funds should be numeric and in Lakhs. It is a mandatory field.
Radio button3:- Release of last year but received during the year.
This module is used for entering the detail of the administrator expenditure, fund drawn,
must roll, bills, expenditure of skilled and semiskilled labours. Although this module is
used for entering the opening balance and fund withdraw. When user clicks on the cash
book entry link it will display following form with given below fields:-
Date of cash-book Entry: - User have to enter the date of the cash book entry, this is
mandatory field.
There is six radio button given in the two blocks first block is Receipt and second is
payments of the financial year -
When user clicks on the O.B. radio button in first block it will show the opening balance,
the fields are
Field Description:
Amount: - This Will show the opening balance and user can enter the opening balance.
By clicking the proceed button it will insert/update the opening balance.
When user clicks on the Fund drawn button it will displays forms with field name:-
Field Description:
Amount: - Here user can enter the withdrawn amount, but withdrawn amount should
not be greater then available fund.
When user clicks on the Must roll radio button in second block it will show the must roll
payment list. All the rows containing must roll there is select field which contains check
box. For payment of must roll just check the check box against the must roll for which
user have to made payments. And the screen is displays like below...
When user clicks on the administrative expenditure radio button in second block. It will
displays with fields given below
Field Description:
Expenditure On - Here user have to select the list on which expenditure is done.
Expenditure may be salary on workers etc.
Amount: - Here user enters the amount to be paid under the selected expenditure.
Description: - Here user enters the description of amount paid under the selected
expenditure.
When user clicks on skilled and semiskilled labours radio button in the second block . It
will displays with fields given below
Field Description:
Work Category - Here user have to select the work category from the given list.
Work Code: - Here users have to select the work_code under selected work category.
Types of workers: - select the type of the workers i.e. Skilled or semiskilled.
Payment through: - User has to select the payment either must roll or voucher wise.
Msr_no or voucher no: - If the payment through must roll select the must roll no from
option box or if the payment is through voucher select the voucher no from dropdown.
This link is used for editing the detail of the administrator expenditure and fund drawn.
And deletion of administrator expenditure, fund drawn, must roll bills and expenditure of
skilled and semiskilled labours. This link is also used for the showing the reports of
expenditure that user has entered in cash book.
The edit of cash book UI displayed below with fields:-
Fields are:-
Payment of financial year: - Here user has to choose the financial year.
Date from: - User has to put the date from which he/she wants to see or edit the cash
book entries.
Date To: - User has to put the date to which he/she wants to see or edit the cash book
entries and date to should be greater then the date from.
Here is edit option in every row which containing date of cash book entry, Opening
balance and closing balance and edit option with respect to row.
By clicking on the edit option it will show the data to be edited, and then UI will look
like:-
Screen no 1:-
Screen no 2:-
User can see the edit and delete as well as delete/edit links in the edit cash book.
Field Description:
Cheque Amt.: The cheque amount should be numeric and in Rupees. It is a mandatory
field.
Error Messages:
Now select the state for which user want to login. On the click, the “ Login Screen” will
be displayed which is as below:
Select State, District, Block and Panchayat as shown in the above screen. If the above
fields remain unselected corresponding alert messages will get displayed. After selection,
click on the Proceed button which will take to the “Main Report Screen” from where any
desired report can be generated, the options are as follows : -
The format of print job card is as follows: - users have to select the
Village
Name of head
of household
jobcardissu
Jobcard/jobslip
Select the option print job card for then village and then select the name of head of house
hold and select the type of the job card to be shown and then issue the job card and enter
the date click the job card/job slip button to see the view of the job card.and job card is
displayed as given below:-
Job Card
National rural Employment Guarantee Act
Village
Name of head
of household
jobcardissu
Jobcard/jobslip
Select the village and then select the name of head of house hold and then issue the job
card and enter the date click the job card/job slip button to see the view of the job
card.and job card is displayed as given below:-
Job Card
National rural Employment Guarantee Act
Job Slip
National rural Employment Guarantee Act
Job Card No.
Applicant No.
Name of Applicant
Name of Head of Household
Age
Gender
Address
Village
Panchayat
Block
District
Demand
Registration Name of Actual
S.No Left No of Days
ID. Applicant Demand
From To From To
3.1.2.9 Alerts:
When user enters on the alerts it will appears like:-
There is two tabs on the page
1. Unemployment Allowances
2. 2. Alert on attendance
1 Unemployment Allowances: -
2 Alert on Attendance: -
ARMO
Financial Year
Position of Account During the Year 2008-2009
State : District: Block:
Opening Balance
Miscelleneous
Release Last Year
Amount Received(Amount in lakhs)
Date Received From Whom
Total
Expenditure(On Material)(In lakhs)
Bill No. Work Code Amount
Total
Expenditure(On Mustroll)(In lakhs)
MSR No. Work Code Amount
Total
Total Amount Received
Total Expenditure
Balance Left
(In
State : District: Block: Panchayat:
Rupees.)
Date-
Receipts Payment
Fund
Receipt No. A/C Receipt No. Fund Legder
Date Received Disc. Amount Date Work Code Amount
& Date No. & Date Spent On No.
From
Closing
Balance
For this report user have to enter the work category for which he/she want to see the
report.
Work ----select----
: Rural Connectivity
Work Name (Work Code):
Search work
Work Code* --select ----
State :
Work Name : Panchayat:
Block : District :
Date From : Date To :
Total Muster rolls (Muster Roll No.):
WorkStatus :
Job Total Cash
Name of Muster Date Date Wage Total
S.No card payment (In
Applicant Roll No. From To Per Day Attendance
No. Rupees)
Fortnight
Financial year Month Select Executing agency
First Second
Skilled/
Unskilled/ Sign./
Total Wage Amount Amt Due Acc to Travel and Total Cash A/C
S.No Name/RegNo Caste Village Semi- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Thumb
Attendance Per Day Due Measurement living exp. payment No.
Skilled/ Impression
Phy. Handi
Date of Reasons, if
No. &
receipt of Job Card
Head of IAY / LR Name of Father/Husband Date of
S.No. Caste Gender Age application/ NOT issued
HouseHold Beneficiary Applicant Name Job Card
Request for & any other
issued
Registration remarks
1 2 3 4 5 6 7 8 9 10 11
Village : No. of Registrants:
1
The report will display the name of the applicant with the job card no.
And the report will look as follows:-
Block Panchayat can enter the information / access the information from web site.
Data Entry: -
On the click of this link, “Data Entry Login” screen will be displayed which is
given below: -
Here user can select the state for which he/she want to enter the data, after selecting
The state the following screen is appears.
All the entry in the Block Panchayat level is same as the gram Panchayat level.
The data entry formats and rules are same as those for Gram Panchayats, which has
already been discussed in Gram Panchayat module
Reports: -
On the click of this link, “Generate Reports” screen will be displayed which is
given below: -
Reports are same as in gram Panchayat module. So refer to the gram Panchayat report
module.
Zilla Panchayat can enter the information / access the information from web site.
Data Entry: -
On the click of this link, “Data Entry Login” screen will be displayed which is
given below: -
Here user can select the state for which he/she want to enter the data, after selecting
The state the following screen is appears.
The data entry formats and rules are same as those for Gram Panchayats, which has
already been discussed in Gram Panchayat module
Reports: -
On the click of this link, “Generate Reports” screen will be displayed which is
given below: -
The data report formats and rules are same as those for Gram Panchayats, which has
already been discussed in Gram Panchayat module
1. Windows version: - here user can download the asp version of offline software.
User has to click on the link it will ask for the login name and password. In login name
user has to select the state name for which he/she wants to download the software and
then enter the password. Then the following screen will appear:-
Second one is download fast track data entry files. Here user can download the fast
track data entry software. From which user can enter the data directly through fast track
software.
Third one is download offline master database. Here user can download the master
database of the state.
2. Open source version: - Here user can download the php version of offline
software. Here user has to enter the username and password and download the
software.
3. Installation Procedure: - Here user can download the document for installing
the offline software. In the downloaded document there is information how to install the
software in your local machine.
4. WORKER
Worker: -
When clicked on this Link its “Main Screen” will be displayed, which is as below:-
In order to view information & Description about workers, the Job Card Number has to
be entered which is generated during the time of Registration.
After entering the Job Card Number, click SUBMIT button, then a message will be
displayed ‘JOB Card is Issued” (if job card is already issued), and if job card is not
already issued then it will flash a message that job card is not issued. CLEAR Button is
used to clear the JOB CARD Number.
After clicking VIEW button, the new screen will be open showing the details about the
workers.
5. Other IMPL.
AGENCIES
The other implementing agencies can be Intermediate and District Panchayats, line
department of the government, public sector undertaking of the central and state
government, and reputed NGOs having a proven track record of performance. In this
module after selecting the executing agency, data entry can be done through any
executing level i.e. (GP, BP, ZP)
On the click of this link, “Data Entry Login” screen will be displayed which is given
below: -
Here user can select the state for which he/she want to enter the data, after selecting
The state the following screen is appears.
5.1.2 Reports: -
On the click of this link, “Generate Reports” screen will be displayed which is given
below: -
The data entry formats and rules are same as those for Gram Panchayats, which has
already been discussed in Gram Panchayat module.
6.
DISTRICT/BLOCK
ADMINISTRATOR
Programme Officer receives demand for employment and further demand for employment.
This level is also responsible for maintaining adequate number of works on shelf of
Project. Programme Officer issues the muster roll to implementing agencies for the
approved work. Gram Panchayat maintains the muster roll, and filled muster rolls are
received by the Programme Officer. Complaints are also attended at this level.
On the click of this link the following screen will be displayed which is as below
On the click of this link, the “Data Entry Login” screen will be displayed which is as
follows
If the above fields remain unselected, corresponding alert messages will be displayed.
After selection and entering the correct password, user can start the data entry.
After clicking Proceed button if User Name and password are correct the main screen of
the Data Entry at Programme Officer level will be displayed, which is shown below.
If user name and password is wrong then a message will be displayed showing “user
name and password is wrong”.
Click the link and move to Login screen again and retry the user name and password.
The Button reset can be used to clear the data from all the fields and then can again re-
enter.
The change password button is used to change the password.
The links provided to this screen are divided in two sections, which are as follows
At the top of the PO data entry screen there is a tab named as “Fast Track Data
Entry”. This module is basically use for entering data as fast as possible, all the entry
that user have to do in different step can enter in one module.
When user click on the fast track data entry tab the following screen will appears.
This link is used for entering the must roll. When user clicks on the link the must roll
screen will appears like:-
Here user has to select the work from the combo box for which he/she want to enter the
must roll. If no work is existing then user can add the new work from the given link add
new work and make the new work. Clicking on add new work will pop up following UI.
All the rules for entry of the works are same as given in the gram Panchayat module. So
Please refer to the gram Panchayat module.
Then user can enter the must roll for that work and demand for that must roll by
entering the date from and date to columns. After that user has to select the Panchayat
and then user has to enter the payment date of that muster roll. By clicking proceeding
Button the following screen will appear. In which muster roll is filled.
Job card no: - Here in first column job card no is appears according to Panchayat and
village user have to just fill the second column i.e. family-id. So whole thing becomes
the registration no.
Name of the applicant: - In this field if the registration no is already existing the name
of the applicant is appears in the combo box other wise user has to enter the new
applicant for that registration no by clicking add new link on the page.
When user clicks on add new link following screen will appears.
This entry will same as the add applicant in gram Panchayat module, so please refer the
gram Panchayat module.
Wage per Day: This field allows numeric values only and contains wage rate for a day
for a worker.
Amt Due: This is numeric field and contains the amount payable to a worker based on
attendance and measurement of work done.
Travel and living exp: It also allows numeric values and contains any travel and living
expenditure.
Total Cash payment: It is numeric field with total wage payment to be made to
workers. It is Mandatory field.
Measurement Book No:- User has to enter the measurement book no.
Work Start Date: This is work start date for a particular must roll. It should be in
dd/mm/yyyy format.
Enter new muster roll: - This field is used for entering the new muster roll. When user
clicks on enter new muster roll it will save the previously entered data and go for the
new entry.
Add workers on the must roll: - This field is used for entering the workers on the
muster roll that user is entering for that work. When user clicks on add workers on must
roll it will save the previously entered data and go for the new entry of the workers for
hat must roll.
This fast track must roll gives user a fast entry of the
1. New work.
2. Registration .
3. New applicant
4. Entering must roll
4. Demand, allocation, and issue of must roll
6.1.1.3 Cash book entry: - Entry to this module is same as the described in the
gram Panchayat module, so please refer to the gram Panchayat module.
6.1.1.4 Received Fund- Entry to this module is same as the described in the gram
Panchayat module except the Execution level, executing agency and Panchayat, so
please refer to the gram Panchayat module. The fields that are not explained in the
gram Panchayat module are discussed below:
6.1.1.5 Funds Transfer: - Entry to This module is same as described in the gram
Panchayat module, so please refer to the gram Panchayat module.
6.1.1.6 Refund: - Entry to this module is same as the described in the gram
Panchayat module, so please refer to the gram Panchayat module.
Field Description
Bank: - It includes three parameters Bank Name, Branch Name, Branch Code
Error Messages
2 Phone number and Age should Non numeric value in Phone Enter numeric
be numeric Number and Age fields value in phone
number and
age field
3 Age should be equal to or Age entered is less than 18 Enter the age
greater than 18 years years equal to greater
than 18 years
Gram Panchayat Profile has an edit option. Through this user can edit the previously
entered profiles.
In Gram Panchayat Profile for editing, the user has to select Panchayat for which they
want to edit details. This will give the details of profile, which was entered previously. If
the Gram Panchayat has more than one Account for NREGA, they can select the Account
number for which they want to edit details. Now the user can change the details as per
requirement. As soon as the update button will be clicked the record will be updated.
A. Block Detail
Block detail: - Here user has to select the block detail i.e. state, district, block and
HQ.
PIN code: - This field accepts numeric value and it is an obligatory field.
Telephone (Direct): - This field accepts numeric value and it is an obligatory field.
Telephone (Common): - This field accepts numeric value and it is an obligatory field.
Here user has to select the Yes or no field as according to the instruction in the form.
D. ICT Infrastructure
In This Module user has to enter the ICT (Information and communication technology)
infrastructure of that block. Like how many desktops are there is there any internet
connection etc, Detail of the internet provider at the block headquarters as well as in
block office.
In This Module user has to enter the details of the manpower in the block office.
Enter the details of the persons at the block office. Whether the person is related to IT
field or NON-IT field, whether the person has professional qualification. Entry of the
regular staff and non regular staff are done in this block.
For adding more it persons click on add button.
In This Module user has to enter the details of the software application that are running
on the block office and the OS (platform) Used for that application.
For adding more applications click on the button it will add more text boxes for Entry.
In This Module user has to enter the details of the commercial banks at that block. User
has to enter the name of the bank, location of the bank, branch name and branch code
of that bank.
For adding more bank details click on the add buttons and it will add some text boxes
for entry of the bank detail.
2. Details of different Bank Accounts maintained for the Schemes of Ministry of Rural
Development;
No. of Officers Permanent:- This field accepts numeric value and it is an obligatory
field.
No. of Officers Contract:- This field accepts numeric value and it is an obligatory field.
Error Messages
Program Officer Profile has an edit option. Through this user can edit the previously
entered profiles.
In Program Officer Profile for editing, the user has to select name of Program Officer
from the Combo Box for whom they want to edit details. This will give the details of
profile, which was entered previously. As soon as the update button will be clicked the
record will be updated.
It displays a list of Projects (Work Code/Work Name with all details) which are pending
for clearance at Programme Officer. Work Code column has two Hyperlinks- Comment
and Send; A programme officer can use any one of them for sending the projects to
DPC. If user click on Comment hyperlink, then user must enter the comment in a text
field about the particular project and click on submit button. If user click on Send
hyperlink then a screen will be displayed that the project has been sent to DPC. This
module also contain a field named proposal Date, if a user want to generate the
proposal then he first has to enter the proposal date, then click on Click Here
Hyperlink.
Error Messages
Field Description
Mustroll No. :-It will accept only numeric values.It is mandatory field.
Work Name: - This combo box contains Work Code and Work Name, for issuing a
Mustroll, work Name selection is necessary. It is mandatory field.
Mustroll Date To:-It is Mustroll End Date. It is mandatory field and must be in
DD/MM/YYYY format.
Issue Date By Programme Officer:- This date will be given by Programme Officer on
which a Mustroll is issued. It is mandatory field.
3 Receive Fund
Receive fund module is used for receiving funds from DPC Level. It is also used for
miscellaneous receipt and Closing Balance... The funds would be received from DPC level
in the form of Cheque or Demand Draft or Tele Transfer. It is financial year based. In
case of fund received from DPC, only Date of receiving is entered manually. But in the
case of miscellaneous receipt and Closing Balance, all fields will enter manually. Once
closing balance has been entered, no one can transfer fund in the same financial year.
Field Description
Date of Fund Received:- This field is used in fund received from DPC Level. The date
on which fund is received by the panchayat. It must be in DD/MM/YYYY format. It is a
mandatory field.
Cheque/DD/TT Amt.:- This field is used for miscellaneous receipt. The amount of
miscellaneous receipt is to be entered here. The funds should be numeric and in Lakhs.
It is a mandatory field.
Cheque/DD/TT No.:- This field is used for miscellaneous receipt. The No. of
miscellaneous receipt is entered here. The number should be alphanumeric It is a
mandatory field.
Cheque/DD/TT Date.:- This field is used for miscellaneous receipt. The date of
miscellaneous receipt is entered here. It must be in DD/MM/YYYY format. It is a
mandatory field.
Amount.:- This field is used for Closing Balance. The amount of Closing Balance is
entered here. The funds should be numeric and in Lakhs. It is a mandatory field.
Error Messages
Fund transfer from PO module is used to transfer the funds to gram Panchayats, other
implementing agencies and administrative expenditures. Before its operation, fund
should be received by the PO. After receiving funds, funds should be shown in the
available funds field. More than available funds cannot be transferred. At a time, funds
can be transferred to one or more GP’s (or Executing agencies).But for this, Funds to be
transferred field value should be equal to the sum of all GP’s or executing agencies
Field Description
Amount Demanded: This field is used for Amount demanded by the GP’s or Executing
agencies. It is not a mandatory field.
Amount Cut: This field is used for Amount reduced by the PO. It is not a mandatory
field.
Cheque/DD/TT Amt.: The amount which is given to the GP’s or executing agencies is
entered here. The funds should be numeric and in Lakhs. It is a mandatory field.
Cheque/DD/TT No.: The cheque/dd/tt No. of funds which is given to the GP’s or
executing agencies is entered here. The number should be alphanumeric It is a
mandatory field.
Cheque/DD/TT Date.: The cheque/dd/tt date of funds which is given to the GP’s or
executing agencies is given here. It must be in DD/MM/YYYY format. It is a mandatory
field.
Reason of Cut: This field is used to record reasons for amount reduced by the PO
which is demanded by the GP’s or Executing agencies. It is not a mandatory field.
Error Messages
Field Description
Error Messages
6 Closing Balance:-
Through this module user can close the balance of the implementing agencies at the
different level whether agencies at GP, BP, ZP and other levels. User has to select the
financial year and the levels where he/she want to close.
1. PO (administrative office)
2. Impl. Agency (GP)
3. Impl. Agency (BP)
4. Impl. Agency other then PRI
User has to mark the check box where he/she want to close the balance.
7 Unemployment Allowances
Through this module user can record the information on unemployment allowance
demanded and given.
Unemployment allowances should be given for only those periods which are not fulfilled
i.e. the demand period for which allocation is not yet done and the period has been
expired. Also in case of allocation, worker has been allocated to the demanded period
but still not gone to the mustroll. All the periods which fulfill the above two conditions of
a worker will be shown on the screen as soon as the job seeker name will be selected.
Field Description
Financial Year: Select the financial year for which the unemployment allowance is to be
paid.
Job Seeker Name: Select the job seeker name who has demanded for unemployment
allowance of the above selected registration no.
Unemployment allowance demanded: Fill the from and to date of the period for
which the job seeker has demanded for the unemployment allowance.
Unemployment allowance given: Enter the from and to date of the period for which
the unemployment allowance is to be given. This period must be with in the above filled
period of Unemployment allowance demanded.
Amount Paid : Enter the amount of unemployment allowance which is to be paid for
the above mentioned period. It must be in rupees.
Error Messages
8 Attend Complaints
COMPLAINT REGISTER
9 Suspension
Field Description
Work: All the works that are ongoing or approved are shown here.
Date: This date is used as suspension date. From this date, a new demand is generated
for the persons who work on the Project
Reason: Here the specific reason for the suspension of work is to be mentioned.
Error Messages
All the other formats of Data entry are discussed in Gram Panchayat
Module.
6.2.5Generate Reports
On the click of this link, the following screen displayed which is as below: -
Now select the state for which user want to login. On the click, the “ Login Screen” will
be displayed which is as below:
After selection, click on the Proceed button it will take to the “Main Report Screen”,
from where any enlisted report can be generated
The reports that can be generated at PO level are categorized in two groups.
Approved works at Gram Panchayat level for the financial year 2005-2006
Work Category: Rural Connectivity
State: District: Block: Panchayat:
S.No. Work Name Road Location Executing
(Work Code) Name Agency
Village Khata Plot. Village Khata Plot
No. No. No. No.
Labour Projection:
The report is shown as below:-
Work Projection:
The report is shown as below:-
Flood Control
and Protection
Water
Conservation
and Water
Harvesting
Drought
Proofing
Micro
Irrigation
Works
Provision of
Irrigation
facility to Land
Owned by
Renovation of
Traditional
Water bodies
Land
Development
Any Other
activity
Approved by
MRD
Total
All the other formats of the reports are discussed in Gram Panchayat Module and
state Module.
On the click of this link its “Main Screen” will be displayed which is as below
Select state and district as shown in the above screen. You will get the following screen..
Section 1:- Section 1 contains the State names, when user takes the cursor over the
state name it will display the district name as per state. Then it will go for the login of that
district.
Section2:- Section 2 contains the NREGA bulletin and the Alerts and analytical report of
the MPR. In NREGA bulletin user can see the statistics of the district selected. It will
displays the employment generation, percentage of the SC’s, ST’s, Men, Women and the
expenditure of the district etc. It will always update as the data comes.
In analytical and alerts report it will displays the MPR reports of the district financial year
wise. All these reports are discussed in the state level, and Labour projection and work
projection are also there in PO level. So go for the PO level for all these formats of the
MPR reports.
Section 3:- It contains the data entry and reports at DPC level.
Through this link District project Coordinator can enter his Profile. It also enables the
authorized users to perform the Data Entry and edit works, which are technically
sanctioned. Funds Transfer from Districts to blocks, receipt of funds, and attending
complaints are other functions. This module can also generate implementation reports.
Field Description
Phone Number: This field accepts numeric value and it is an obligatory field.
No. of Officers Permanent: This field accepts numeric value and it is an obligatory
field.
No. of Officers Contract: This field accepts numeric value and it is an obligatory field.
DPC Profile has an edit option. Through this user can edit the previously entered profiles.
In DPC Profile for editing, the user has to select name of DPC from the Combo Box for
whom they want to edit details. This will give the details of profile, which was entered
previously. As soon as the update button is clicked the record will be updated.
After selecting the Technical Sanction – Entry option, the following screen will appear
The user can select following options displayed in the combo box:
1) Sanction/Comment Works
Sanction/Comment Works
On selection of the option ‘Sanction/Comment Works’ the following screen will appear.
Corresponding to the District selected in the login screen, the combo box will display the
Blocks of the selected District in which the works sanction by DPC. After selection of the
Block, a list of proposal no.(s) will be displayed and the DPC has to choose ‘proposal no.’
On selection of proposal no., a list of works of selected proposal no. will be displayed, for
Sanction/Comment of DPC.
The user should enter the Technical-Sanction-date which should be after the proposal-
date which was entered by the PO at the time of clearing the Projects or same as
proposal date.
To sanction a work, the user has to click the link ‘Sanction’ displayed in the right side
of the work-code. On clicking this link, the following screen will appear with two frames:
i) To enter the Technical-Sanction details.
ii) To enter the materials required for the selected Work.
Field Description
Est. Time of completion of Work: This is a mandatory field. The user should enter
the estimated no. of months to complete the work.
Avg. No. of Labours required per day: This is a mandatory field. The user should
enter the average no. of labours required per day.
Expected Mandays: This is a mandatory field. The user should enter the expected
mandays to complete the work.
Technical Sanction Amount: This is a mandatory field. The user should enter the
Technical sanction amount. The amount should be in lakh(s).
Estimated No. of Labours (in Nos.) & Cost Details (in Lakhs)
Labour-Skilled-No.: This is a mandatory field. The user has to enter the no. of skilled
labours estimated for the work.
Labour-Skilled-Cost: This is a mandatory field. The user has to enter the estimated
cost for the skilled labours.
Labour-SemiSkilled-No.: This is a mandatory field. The user has to enter the no. of
Semi-Skilled labours estimated for the work.
Labour-UnSkilled-No.: This is a mandatory field. The user has to the enter no. of
UnSkilled labours estimated for the work.
Labour-Unskilled-Cost: This is a mandatory field. The user has to enter the estimated
cost for the unskilled labours.
Labour-Total-No.: This is auto-calculated field summing the values entered in the field
of Skilled No. + Semiskilled No. + Unskilled No. The user need not to enter the value.
Material: This is a mandatory field. The user has to enter the estimated cost for the
Materials to be used for the work.
Contingency: This is a mandatory field. The user has to enter the estimated cost for
the Contingency(Administrative Expenses) for the work.
Note : The above fields should not be left blank. If the data is not available for any field,
the user should enter 0.
After entering the Technical-Sanction-Details, the user should save the record by clicking
the ‘Save’ button.
After saving the Technical-Sanction-Details only , the user should enter the details of
materials required. If the data is not available, the user may click the button ‘Click for
More works to Sanction/Comment’ to return to the main screen of the work-details, for
which the user may sanction/comment, if any.
Name of the Material: The user can select the materials required for the works. If the
material is not displayed in the combo box, the user can add the material by clicking
‘Add New’ link.
Quantity: It’s a mandatory field. The user should enter the quantity of the materials
selected.
Price: It’s a mandatory field. The user should enter the unit-price of the material
selected.
After entering the details, the user should click the button ‘Click for More works to
Sanction/Comment’ to return the main screen of the work-details, for which the user
may sanction/comment, if any.
The user can continue to sanction more works by entering the details as explained
above.
Field Description
Enter Comment for NOT sanctioning: It’s a mandatory field. The user should enter
the reason for not sanctioning the work selected.
After entering the reason, the user should save the record by clicking the ‘Submit’
button.
Generate Notesheet
After entering the sanction details, the user should generate the Notesheet by giving a
Technical Sanction No. which should be unique for Block level.
After clicking the ‘Generate Notesheet’ option, the following screen will be displayed
Field Description
Block: It’s a mandatory field. The user should select the Block for which the Technical
Sanction No. has to be entered.
Technical Sanction No.: It’s a mandatory field. It should be unique to Block, so that
the technical sanction no. cannot be same for two works of a Block. If it already exists,
an error message will be displayed like ‘The Technical Sanction No.’ already exists. The
user can use the ‘Back’ link to enter the correct details.
This option facilitates the user to view and print the notesheet already generated. On
selecting this option, the following screen will appear:
Block: It’s a mandatory field. The user should select the Block for which the notesheet
for Technical Sanction has be to be viewed/printed.
Technical Sanction No.: It’s a mandatory field. The user should select the technical
sanction no. for which the notesheet has to be viewed/printed. On selection of a
technical sanction no., the following screen will be displayed
This option facilitates the user to edit the technical sanction details entered for
the work(s). Note that the works are financially sanctioned cannot be edited.
Corresponding to the District selected in the login screen, the combo box will display the
Blocks of the selected District in which the works have been technically sanctioned by
DPC. After selection of the Block, a list of technical sanction no.(s) will be displayed and
the user has to choose the technical sanction no. to edit. On selection of technical
sanction no., the list of works with the selected technical sanction-no. will be displayed.
The user can edit the Technical-Sanction-date but it should be strictly later or same as
the proposal-date of all the works with the selected technical sanction no.
The user can edit the technical sanction details by clicking the ‘Edit’ link displayed in the
right side of the work-code.
Field Description
Est. Time of completion of Work: This is a mandatory field. The user should enter
the estimated no. of months to complete the work.
Average No. of Labour required per day: This is a mandatory field. The user should
enter the average no. of labours required per day.
Expected Mandays: This is a mandatory field. The user should enter the expected
mandays to complete the work.
Technical Sanction Amount: This is a mandatory field. The user should enter the
Technical sanction amount. The amount should be in lakh(s).
Estimated No. of Labour (in Nos.) & Cost Details (in Lakhs)
Labour-Skilled-No.: This is a mandatory field. The user has to enter the no. of Skilled
labour estimated for the work.
Labour-Skilled-Cost: This is a mandatory field. The user has to enter the estimated
cost for the skilled labour.
Labour-SemiSkilled-No.: This is a mandatory field. The user has to enter the no. of
Semi-Skilled labour estimated for the work.
Labour-UnSkilled-Cost: This is a mandatory field. The user has to enter the estimated
cost for the Unskilled labour.
Labour-Total-No.: This is auto-calculated field summing the values entered in the field
of Skilled No. + Semiskilled No. + Unskilled No. The user need not to enter the value.
Material: This is a mandatory field. The user has to enter the estimated cost for the
Material to be used for the work.
Contingency: This is a mandatory field. The user has to enter the estimated cost for
the Contingency (Administrative Expenses) for the work.
Note: The above fields should not be left blank. If the data is not available for any field,
the user should enter 0.
After entering the Technical-Sanction-Details, the user should update the record by
clicking the ‘Update’ button.
After updating the Technical-Sanction-Details only , the user should enter the details of
material required. If the data is not available, the user may click the button ‘Click for
More works to Edit’ to return to the main screen of the work-details.
Name of the Material: The user can select the material required for the works. If the
material is not displayed in the combo box, the user can add the material by clicking
‘Add New’ link.
Quantity: It’s a mandatory field. The user should enter the quantity of the material
selected.
Price: It’s a mandatory field. The user should enter the unit-price of the material
selected.
After entering the details, the user should click the button ‘Click for More works to Edit’
to return the main screen of the work-details.
The user can continue to edit more works by entering the details as explained above.
Generate Notesheet
After editing the sanction details, the user can generate Notesheet by selecting a
Technical Sanction No.
After clicking the ‘Generate Notesheet’ option the user may edit the technical sanction
date but it should be strictly later or same as the proposal-date of all the works with the
selected technical sanction no.
This option facilitates the user to view and print the notesheet already generated.
This module is for financial sanction of the works. When a user click on this
option then the following screen will appear
The user can select any one from the following options which displayed in the drop down
box:
4) Sanction/Comment Works
5) Generate Notesheet
6) View Notesheet
Sanction/Comment Works
This option facilitates the District Programme Co-ordinator to give Financial Sanction
clearance or Comment (without approving) the work which is technically sanctioned.
On selection of the option ‘Sanction/Comment Works’ the following screen will appear.
Corresponding to the District selected in the login screen, it will display the Blocks of the
selected District in which the works are financially sanctioned by DPC. After selection of
the Block, a list of technical sanction no.(s) will be displayed and the DPC has to choose
technical sanction no. On selection of technical sanction no., a list of works with the
selected technical sanction no. will be displayed. For Financial Sanction/Comment, DPC
has to follow the following procedure :
The user should enter the Financial-Sanction-date, which should be strictly later than or
same as the technical sanction-date.
To sanction a work, the user has to click the link ‘Sanction’ displayed in the right side of
the work-code.. On clicking this link, the following screen will appear:
Field Description
Labour Component: This is a mandatory field. The user should enter the total Labour
component cost (Rs. In Lakhs).
Material Component: This is a mandatory field. The user should enter the material
component cost (Rs. in Lakhs).
Total Amount: This is a mandatory field. It is the sum of Labour component and
material component.
To comment on a work, the user has to click the link ‘Comment’ displayed in the left side
of the work-code.. On clicking this link, the following screen will appear:
Field Description
Enter COMMENT for NOT Sanctioning: Its mandatory field. In this field user can
enter the comment (reason) for not sanctioning the work.
When user clicks the ‘submit’ button then the selected work will not be financially
sanctioned.
Generate Notesheet
After entering the sanction details, the user should generate the Notesheet by entering a
Financial Sanction No. which should be unique to Block.
After clicking the ‘Generate Notesheet’ option, the following screen will be displayed
Field Description
Block: It’s a mandatory field. The user should select the Block for which the Financial
Sanction No. has to be entered.
Financial Sanction No.: It’s a mandatory field. It should be unique to Block. So that
the Financial sanction no. is not same for the works in a Block. If the No. already
exists, an error message will be displayed, ‘The Financial Sanction No.’ already exists.
The user can use the ‘Back’ link to enter the correct information.
User Manual of NREGA Page 159 of 205
NIC-DRD User Manual Page 160 of 170
This option facilitates the user to view and print the notesheet already generated.
Block: It’s a mandatory field. The user should select the Block for which the notesheet
for Financial Sanction has be to be viewed/printed.
Financial Sanction No.: It’s a mandatory field. The user should select the Financial
sanction no. for which the notesheet has be to be viewed/printed. On selection of a
Financial sanction no., the following screen will be displayed
This option facilitates the user to edit the financial sanction details entered for the
work(s).
On clicking the option, the following screen will be displayed :
Corresponding to the District selected in the login screen, the combo box will display the
Blocks of the selected District in which the works have been financially sanctioned by
DPC. After selection of the Block, a list of financial sanction no.(s) will be displayed and
the user has to choose the financial sanction no. to edit details. On selection of
financial sanction no., the list of works with selected financial sanction-no. will be
displayed.
The user can edit the Financial-Sanction-date but it should be strictly later or same as
the technical-sanction-date of works with the selected financial sanction no.
The user can edit the financial sanction details by clicking the ‘Edit’ link displayed in the
right side of the work-code.
Field Description
Labour Component: This is a mandatory field. The user should enter the total Labour
component cost (Rs. In Lakhs).
The user should click the ‘Update’ button to save the changes made, if any.
If the user wants to edit more works then he should click on “Click Here for more
Works to EDIT” button.
Generate Notesheet
After editing the sanction details, the user can generate the Notesheet by selecting a
Technical Sanction No.
This option facilitates the user to view and print the notesheet already generated.
Fund transfer from DPC module is used to transfer funds to PO, gram Panchayats and
other implementing agencies. In the case of Executing agencies, funds can be
transferred to executing agencies of gram Panchayat, Panchayat samiti and Zilla
Panchayat. In the case of gram Panchayat, first of all, block has to be selected. Before
this, funds should be available with the DPC. After receiving funds, funds should be
shown in the available funds field. At a time, Funds can be transferred to one or more
GP’s (PO or Executing agencies).But for this, Funds to be transferred field value should
be equal to the sum of funds sought by all GP’s or executing agencies
Field Description
Amount Demanded: This field is used for Amount demanded by the GP’s (PO or
Executing agencies). It is not a mandatory field.
Amount Cut: This field is used for reduction in Amount sought by GP/PO/implementing
Agency by the DPC. It is not a mandatory field.
Cheque/DD/TT Amt.: The amount which is given to the GP’s (PO or executing
agencies) is given here. The funds should be numeric and in Lakhs. It is a mandatory
field.
Cheque/DD/TT No.: The cheque/dd/tt No. of funds which is given to the GP’s (PO or
executing agencies) is given here. The number should be alphanumeric It is a
mandatory field.
Cheque/DD/TT Date.: The cheque/dd/tt date of funds which is given to the GP’s (PO
or executing agencies) is given here. It must be in DD/MM/YYYY format. It is a
mandatory field.
Reason of Cut: This field is used for reason of Amount reduction by the DPC which is
demanded by the GP’s (PO or Executing agencies). It is not a mandatory field.
Error Messages
On the click of this link, the “ Login Screen” will be displayed which is as below
Select state and district as shown in the above screen. You will get the following screen..
In above screen user have to enter username and password. After selecting username and
password select the financial year for which entry to be done. After clicking the GO button.
You will get the following screen.
This report will show the works that are pending for the technical section, it shows
the work name proposal no and date along with Panchayat.
The format of the report is:-
This report will show the works that are pending for the financial section, it shows
the work name, technical sanction No date, amount, proposal no and date along
with Panchayat. It also show the expenditure.
The format of report is:-
select
State : District : Financial Year:
This report shows the location where the account is closed; user can see the report
in different levels. The format of report is:-
select
State : District : Financial Year:
State: District:
Name of No. of Families No. of Photos
S.No.
Block Registered Uploaded
1
This report shows the complaint registered and the action taken on that complaint. The
format of report is:-
State: District :
Job Job Date of
Descriction of Complaint Action Action Taken Date
S.No Date Card_no / Card_no / final
complaint against whom taken (DD/MM/YYYY)
Citizen Citizen disposal
7. STATES
On the clicking of State tab and after selecting the State this “Main Screen” will be
displayed which is as below where the login is there: -
Third Section
In Middle Section There is NREGA statistics and MPR summery as well as more information
about NREGA.
In the third section which is for log in. Here Users have to enter the username, password
and select the financial year for which he/she wants to logging. There is GO button for
entering into data entry and reports of the states section.
After clicking GO button if password is correct the main screen of the Data Entry at the
State level will be displayed as shown below.
If password is wrong then a message will be displayed regarding password is wrong.
Click the link and move to password screen again and retry the password.
In the State page You can see At the center Bellow the NREGA bulletin There are MPR
state level reports You can directly access the reports by clicking on the link:-
Here you can also see the Link Namely Knowledge Network which is for brief knowledge
Of NREGA its status and many more.
Below that link you can see the Status of master data where you can check status of
master data of villages and Panchayats block wise, and another link “missing Panchayats
and villages is for checking status of your whole master data.
After the following “Data Entry and Report” screen will be displayed: -
Funds Module is used to transfer funds to the DPC. The Screen is as shown below:-
Field Description:
Sanction order no: This field is used for entering the sanction order no.
Sanction order date: This field is used for entering the sanction order date, by default
this field will take the current date user can change the date.
Districts: Here in this field user has to select the district for fund transfer.
Amount Sanctioned: This field is used for entering sanctioned Amount by the state.
This field is in lakhs.
Amount Demanded: This field is used for Amount demanded by the DPC. It is not a
mandatory field.
Amount Cut: This field is used for Amount reduction by the State. It is not a
mandatory field.
Reason of Cut: This field is used for reason for Amount reduction by the State. It is
not a mandatory field.
Error Messages:
This link is used for entering the employment generated in that state. Here financial year
is automatically selected i.e. current financial year, and user has to select the month for
which he/she want to enter the employment status.
Here all the districts of that state are displaying, user has to enter the data in the
columns as respected rows of the districts. At bottom of the page there is a save button.
By clicking save button user can insert data and it will display the inserted data.
Errors: - Errors may occur in entering the data when user enters the space or
characters in the numeric field. It will display the error massage.
If all the numeric fields are 0 then it will not insert the data.
This link is used for entering the monthly financial progress report in that state. Here
financial year is automatically selected i.e. current financial year, and user has to select
the month for which he/she want to enter the financial data. User has to enter the data
of financial statistical of the district i.e. opening balance, release from center and state,
release during current year and cumulative expenditure.
Here all the districts of that state are displaying with the latest filled data, user has to
enter the data in the columns as respected rows of the districts. At bottom of the page
there is a save button. By clicking save button user can insert data and it will display the
inserted data.
Errors: - Errors may occur in entering the data when user enters the space or
characters in the numeric field. It will display the error massage.
If entire numeric fields are 0 then it will not insert the data.
This link is used for entering the physical monthly progress report in that state. Here
financial year is automatically selected i.e. current financial year, and user has to select
the district name and month for which he/she want to enter the physical data.
Here all the districts of that state are displaying, user has to enter the data in the
columns as respected rows of the districts. At bottom of the page there is a save button.
By clicking save button user can insert data and it will display the inserted data. User
has to enter the units and expenditure of complete works and ongoing works.
Errors: - Errors may occur in entering the data when user enters the space or
characters in the numeric field. It will display the error massage.
If all the numeric fields are 0 then it will not insert the data.
This link is used for entering the monthly progress report in that state. Here financial
year is automatically selected i.e. current financial year.
Here all the sates are displaying with the latest filled data, user has to enter the data in
the columns as respected rows of the state. At bottom of the page there is a save
button. By clicking save button user can insert data and it will display the inserted data.
Errors: - Errors may occur in entering the data when user enters the space or
characters in the numeric field except state fund notified field can take the character
value. It will display the error massage.
If all the numeric fields are 0 then it will not insert the data.
This link is used for entering the No. of account opened in bank and post office in that
state. Here financial year is automatically selected i.e. current financial year, and user
has to select the month for which he/she want to enter the data. Here user has to enter
the details of the bank post office account, How many persons has the account in bank
or post offices and details of the account individual or joint.
Errors: - Errors may occur in entering the data when user enters the space or
characters in the numeric field. It will display the error massage.
If all the numeric fields are 0 then it will not insert the data.
7.1.3.6 Transparency:
This link is used for entering the transparency details in the state. Here financial year is
automatically selected i.e. current financial year, and user has to select the month for
which he/she want to enter the data.
All the districts of that state are displaying here, user has to enter the data in the
columns as respected rows of the district. BY clicking save button user can insert data
and it will display the inserted data.
Errors: - Errors may occur in entering the data when user enters the space or
characters in the numeric field. it will display the error massage.
If all the numeric fields are 0 then it will not insert the data.
This link is used for entering the Personnel details of capacity Building in the state. Here
financial year is automatically selected i.e. current financial year, and user has to select
the month for which he/she want to enter the data.
All the districts of that state are displaying here, user has to enter the targeted No. of
persons to be appointed and No. of persons have been appointed in the columns at
Gram Panchayat Level, Block Level, District Level in the respected rows of the districts.
By clicking save button user can insert data and it will display the inserted data.
Errors: - Errors may occur in entering the data when user enters the space or
characters in the numeric field. It will display the error massage.
If all the numeric fields are 0 then it will not insert the data.
This link is used for entering the Training details of capacity Building in the state. Here
financial year is automatically selected i.e. current financial year, and user has to select
the month for which he/she want to enter the data.
Errors: - Errors may occur in entering the data when user enters the space or
characters in the numeric field. It will display the error massage i.e. only number is
allowed.
If all the numeric fields are 0 then it will not insert the data.
This link is used for entering the Labour Budget details in the state. Here financial year
is automatically selected i.e. current financial year, and user has to select the month for
which he/she want to enter the data. Here user can enter the projected data that has to
achieve in next financial year. He /she can enter the projected demand of employment
in next financial year, in second column user can enter the persondays generated next
year and in last column the projected expenditure.
All the districts of that state are displaying here, user has to enter the data in the
columns as respected rows of the districts. By clicking save button user can insert data
and it will display the inserted data.
Errors: - Errors may occur in entering the data when user enters the space or
characters in the numeric field. It will display the error massage.
If all the numeric fields are 0 then it will not insert the data.
This report basically for data sent and uploads status of the state and districts at block
level. This report will help the users to find their data status, which are entering data
offline. User can see the remarks field which will help the user to find that their data is
uploaded on server or not, If there is some uncertain data remarks field will show the
error message. This report shown as below:-
This section contains state level reports which will help the user to monitor their status.
Formats of the Reports are as below:-
State :
Employment Generated in Lakhs Persondays During The financial Year 2008-2009
3 4 5 6 7
1 2 8 9 10
a b c d a b c d e
Cumulative Cumulative
Cumulative No. of No. of HH No. of HH No. of HH Cumulative
Cumulative Persondays No. of HH No. of HH
HH issued demanded provided working under No. of
generate (in Lakhs)(Tillcompleted which are
jobcards (Till the employment employment NREGA during Disabled
S.No District reporting month) the reporting month) 100 days beneficiary
(Till the (Till the the reporting beneficiary
(Till the of land
reporting reporting month individuals
SC ST Others Total SC ST Others Total Women reporting reform/IAY
month) month)
month
1
2
Water Provision of
Renovation of
Rural Flood Control Conservation Drought Micro Irregation Land Any Other Activity
Traditional Total
Connectivity and Protection and Water Proofing Irrigation facility to Land Devalopment Approved by MRD
Water Bodies
Districts Hervesting development
No.s No.s No.s No.s No.s No.s No.s No.s No.s No.s
Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure
Comp. Ongoing Comp. Ongoing Comp. Ongoing Comp. Ongoing Comp. Ongoing Comp. Ongoing Comp. Ongoing Comp. Ongoing Comp. Ongoing Comp. Ongoing
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
This report shows the financial Status during the year. It shows the fund released from
center and state and expenditure on skilled worker and on unskilled worker etc. reports
shown below: ---
State :ASSAM
Employment Generated in Lakhs Persondays During The Financial Year 2008-2009
1 1 2 3 54 6
7 8 9
a b c d No. of a b c d e
Cumulative Cumulative HH
Cumulative No. of No. of HH No. of HH working Cumulative
Cumulative Persondays
HH issued jobcards demanded provided under No. of HH No. of HH
Data From generate (in Lakhs)(Till the No. of
DISTRICTS (Till the reporting employment employment NREGA completed which are
MPR/MIS reporting month) Disabled
month) (Till the (Till the during 100 days beneficiary
beneficiary
reporting reporting the (Till the of land
individuals
SC ST Others Total month) month) reporting SC ST Others Total Women reporting reform/IAY
month month
Phase I
MPR
MIS
Difference(MPR-
MIS)
This report will show the comparison of work status between the actual figures and the
software showing figures. This report shows as follows:-
State : ASSAM
Works/Activity
No.s No.s No.s No.s No.s No.s No.s No.s No.s No.s
Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure
Phase I
MPR
MIS
(MPR-
MIS)
This report will show the comparison of financial status between the actual figures and the
software showing figures. This report shows as follows:-
2008-2009
FINANCIAL Year
State: ASSAM Amounts in Lakhs
Release of last year
Release during
but received during Cumulative Expenditure
Current Year
Data Actual the current year
from O.B. as On
Misc Total
Districts MPR on 1st semi-
Receipt Availability On
and April of skilled On
MIS the year Centre State Total Centre State Total Unskilled
and Material
Contingency Total
Wage
skilled
wage
Phase I
State : ASSAM
No. of Employment Employment No. of No. of
Job Employment Provided On
Registered demanded offered filled Families Draw
District Card going
House House House House Muster Completed Graphs
Persons Issued Persons Persons Persons Persondays Roll works
Hold Hold Hold Hold 100 days
Phase I
This report shows the status of work. Status of work means ongoing, on shelf, completed
and suspended. The report shows the status of the work with category wise. Work
Categories are of 9 types. We have shown here only four categories, all other categories
are same as these
State:-
NO. OF WORKS
Water Conservation And Renovation of Traditional
District Flood Control Rural Connectivity
Water Herversting Water Bodies
S.No Name Work Work Work Work Pro.
In- Pro. In- Pro. In- Pro. In-
comp. in comp. in comp. in comp. in Wor
prog. Work prog. Work prog. Work prog.
shelf shelf shelf shelf k
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
STATE
NO. OF WORKS
Water Renovation
District Irrigation Tota
Flood Rural Conservation of Drought Irrigation Land Other
Name Facilities To l
Control Connectivity And Water Traditional Proofing Canals development works
Water SC/ST/IAY/LR
Harvesting
Bodies
Phase I
Phase I
1
Renovation
District Water
of Irrigation Total
Name Conservation Rural Drought Irrigation Land Flood
Traditional Facilities To Others
And Water Connectivity Proofing Canals development Control
Water SC/ST/IAY/LR
Herversting
Bodies
This report shows the execution level at GP,BP and ZP. The report is as follows:-
Work Execution Level Analysis For The Financial Year 2008-2009 As on 4-11-
2008
State:
GP BP ZP Total
Districts Draw Graph
Gram Panchayat Other Imp. Agency Block Panchayat Other Imp. Agency Zilla Panchayat Other Imp. Agency GP Other
This report shows the ratio of the expenditure on Labour and material in different level GP,
BP and ZP. The report is as shown below:-
Rs. in Lakhs
State:
GP BP ZP Total
Districts Component Component Component Component
Labour Material Labour Material Labour Material Labour Material Total
State:RAJASTHAN
Districts Available Fund(in Lakh)
Phase I
Rs In Lakhs
State:
This report shows the Total availability of the fund, cumulative expenditure, employment
provided and the works at that district.
The report shows as follows.
Fin Year
Outlays & Outcomes during Financial Year
State: (Rs. In Lakhs)
Cumulative Expenditure Employment Provided Works
Cost Per Avg. no of Avg.
Total On
Districts On Adm. House In- Personday Labours Persondays
Availability Unskilled Total Persons Persondays completed
Material Exp Hold progress in Rs. Per Work Per Work
Wage
7.2.7 Alerts
The reports are as shown below:-
State:
UnEmployment Allowance Due Unemployment Allowance Paid
District
No. of Days No. of Days Amount
State:
State:
District Name No. of MustRoll Amount in Rs.
DISTRICT NAME
S.No. Blocks Panchayat Village Reg No Head of Household No. of Days
1
The formats of availability of NREGA data on NREGA soft reports are as shown below:-
On clicking on Bank/Post office tab, login screen for Data-Entry option will be displayed
as follows:
Through this option a user can credit the wage in favor of applicants of the previously filled
muster roll. For that, first check A/c Credit check box and enter the date of A/C credited
against the applicant for A/C has to be credited.
Payment by Bank
Bank Name Gramin Bank Branch Name AMARPUR Branch Code 77890
Date From :
Muster Roll No. : 12724 10/07/2008 Date To : 14/07/2008
Work Name :
Formation of Sanction No. :
Work Code :
road from Biswa NoF263NREGA0809/04 Sanction
3002002025/RC/80681
Barma Rubber Date : 26/06/2008
Bagan to
Travel A/c
Wage Total
Total Amount and Credited? Date A/c
S.No Name/RegNo Caste Village Per Cash A/C No.
Attendance Due living Credited
Day payment
exp.
BISHYA
BHAHADUR Atham
1 MALSOM ST Bhyaga 3 85 255 0 255 0002457056737
TR-02-002-02 Para
ABAB CHARAN
Atham
MALSOM
2 ST Bhyaga 3 85 255 0 255 0002457056789
TR-02-002-02 Para
9. MoRD
This link is fro MoRD officials, senior officers in MoRD On the click of this link its “Main
Screen” will be displayed which is as below: -
Through this link Administrator can access Checklist, enter Data and Generate Reports.
There are two sections in this page
9.1 Data entry
9.2 Generate Report
When user clicks on the data entry option the following screen will displays.
User has to enter the user name and the password for the MoRD login. If either of the
username and the password is wrong then it will show the error massage. When User
enters the proceed button then following page is displayed:-
The user is prompted to select State, Financial Year, District and Booking Head. Then
user enters Sanction Order No., Sanction Order Date, Amount Sanction, Amount
Demanded, Amount Cut and Reason of Cut.
Click On Submit.
State: Rs in Lakhs
Fund Transfered Sanction Order Sanction Order Sanction Order
S.No
To .No Amount Date
Works/Activities
Rural Connectivity Flood Control and Water Conservation Drought Proofing Micro Irrigation Provision of Renovation of Land Development Any Other activity
Protection and Water Works Irrigation facility to Traditional Water Approved by MRD
{ Rural Harvesting { Afforestation and Land Owned by bodies { Plantation , Land
Connectivity , etc { Drainage in wager tree plantation , { Minor Irrigation leveling , Others { Any Other
to be indicated logged areas , { Digging of new Others , etc to be canals , Others , { Scheduled caste { Desilting of , etc to be indicated activity Approved
separately } Construction & tanks/Ponds , indicated separately etc to be indicated and scheduled tanks/ponds , separately } by MRD , etc to
repair of percolation tanks , } separately } tribes , Desilting of old be indicated
embankment , Small Check Dams Beneficiaries of canals , Desilting separately }
5tate Others , etc to be , Others , etc to land reform , of traditional open
indicated separately be indicated Beneficiaries of well , Others , etc
} separately } Indra Awas Yojana to be indicated
, Others , etc to separately }
be indicated
separately }
Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.
(Km.) (Km.) (cu.mt) (hect.) (Km.) (hect.) (cu.mt) (hect.) (cu.mt/ hect./ Km.)
Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure Expenditure
Completed Ongoing Completed Ongoing Completed Ongoing Completed Ongoing Completed Ongoing Completed Ongoing Completed Ongoing Completed Ongoing Completed Ongoing
NO. of
Amount of No. of Post
Amount of
Bankwages Office
Wages Total Accounts
Account
Disbursed Account
disbursed Total Amount
Opened
through Opened
S.No. State through post Disbursed(Rs.in
bank
office lakhs)
Accounts
Individual Joint Individual Joint Accounts(Rs. Individual Joint Total
(Rs. in
in lakhs)
Lakhs
Vigilance &
Gram
PRI Monitoring
Panchayat Block Level District Level
Functionaries Committee
Level
Members
S.No. State
Coordinator for
Works Manager IT Manager &
Gram Rozgar Engineers/Technical Programme Computer Accounts Training
Social Audit and
Accountant & Technical Computer
Sahayak Assistants Officer Assistant Manager Coordinator
Grievance Nos. To Nos. To
Assistants Assistant Nos. Nos.
Redressal be be
Trained Trained
Nos. To Nos. To Nos. To Nos. To Nos. To Nos. To Nos. To Nos. To Nos. To Trained Trained
Nos. Nos. Nos. To be Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.
be be be be be be be be be
Trained Trained Trained Trained Trained Trained Trained Trained Trained Trained Trained
Trained Trained Trained Trained Trained Trained Trained Trained Trained
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Works/Activities
Water Conservation Renovation of Provision of Micro Irrigation Drought Proofing Flood Control and
and Water Traditional Water Irrigation facility to Works Protection
Harvesting bodies Land Owned by { Afforestation and
{ Minor Irrigation { Drainage in
tree plantation }
{ Digging of new { Desilting of { Scheduled caste canals } wager logged
States tanks/Ponds,Check tanks/ponds,Desilting and scheduled areas,Construction Total
Dams } of old tribes,Beneficiaries & repair of
canals,Desilting of of land embankment }
traditional open well reform,Beneficiaries
} of Indra Awas
Yojana }
Completed Ongoing Completed Ongoing Completed Ongoing Completed Ongoing Completed Ongoing Completed Ongoing Completed Ongoing Total
PHASE
I
PHASE
II
PHASE
III
TOTAL
9.2.13Archive Report
Amounts in Lakhs
Actual Release during Cumulative Expenditure
O.B. Current Year
as on Total On semi-
On
S.No. State 1st Availability Unskilled skilled and On
Contigency Total
April Centre State Total (Col.3+6) skilled Material
Wage (8+9+10+11) (Percent)
of the wage
year (Percent) (Percent) (Percent)
1 2 3 4 5 6 7 8 9 10 11 12
Works/Activities
S.No States Rural Water Conservation and Water Drought Flood Control and Land Any other activity
Connectivity Harvesting Proofing Protection Development Approved by MRD Total
Nos % Nos % Nos % Nos % Nos % Nos %
10. ADMINISTRATOR
The administrator page is same as citizen page. But the only difference is that by
logging in from administrator page the administrator enter into all the tabs like
Panchayats tab, Implementing Agency tab, District Block Administrator tab and States
tab without logging in through these tabs and can view all reports from all of these tabs.
But the administrator can not make the data entry from this login.