PTG-TMY-YAD2-IN-RFQ-018
TOTAL E&P MYANMAR
YADANA SUBSIDENCE PROJECT-EPSC 2
EPCIC FOR BROWNFIELD MODIFICATION (PP, MCP, WP1, WP2)
FEED/BASIC ENGINEERING
WAVE PROTECTION OF ESV/SDV & FO JUNCTION BOX
Contract:
13-Jan-12 TV
Date Description App
TOTAL E&P MYANMAR
YADANA SUBSIDENCE PROJECT-EPSC 2
FEED/BASIC ENGINEERING
REQUISITION
FOR
REVISIONS REVISIONS
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 X
2 X
3 X
4 X
5 X
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
PG REMARKS REMARKS
TOTAL E&P MYANMAR
YADANA SUBSIDENCE PROJECT-EPSC 2
EPCIC FOR BROWNFIELD MODIFICATION (PP, MCP, WP1, WP2)
MATERIAL REQUISITION
TABULATION OF REVISED PAGES
FOR CFT SHEET
FOR PO 2/5
Revision
Date
SHEET
WAVE PROTECTION OF ESV/SDV & FO JUNCTION BOX 3
1.0 SCOPE OF SUPPLY 4
2.0 DEFINITION OF TERMS 5
3.0 GENERAL REQUIREMENTS 5
4.0 SUPPLIER'S RESPONSIBILITIES 5
APPENDICES
1. Supplier's Documents Requirement Schedule (SDRS)
2. Technical Exception Form
3. Spare Part Form
REQUISITION NUMBER :
0
TOTAL E&P MYANMAR
FEED/BASIC ENGINEERING
YADANA SUBSIDENCE PROJECT-EPSC 2
PTG-TMY-YAD2-IN-RFQ-018
TABLE OF CONTENTS
13-Jan-12
FOR CFT SHEET
FOR PO 3/5
Revision
Date
:
The requiremens of this requisition, together with requirement of the documents, code and standards listed below, shall be
complied with:
A. SCOPE OF SUPPLY
1
B. DATA SHEET
1 0
C. COMPANY GENERAL DOCS.
1 03
2 08
E. PROJECT SPECIFICATIONS
1 01
2 00
F. PROJECT DRAWINGS
1
G. CODES AND STANDARDS
H. REQUISITION ATTACHMENTS
1
2 Technical Exception Form
Notes:
1. Applicable codes and standards are specified in the Instrument Data Sheets specifications.
NO. Reference
EQUIPMENT / BULK MATERIAL
0
13-Jan-12
WAVE PROTECTION OF ESV/SDV & FO JUNCTION BOX
Remark Rev.
Attachment-1
Attachment-2
Note-1
Supplier's Documents Requirement Schedule
(SDRS)
TOTAL E&P MYANMAR
FEED/BASIC ENGINEERING
REQUISITION NUMBER : PTG-TMY-YAD2-IN-RFQ-018
YADANA SUBSIDENCE PROJECT-EPSC 2
Description
General Specification for Passive Fire
Protection: Basis Of Design
GS EP SAF 337
MM-YAD-00-DORI-434500
MM-YAD-00-DORI-474018
Refer to Section 1.0 of this requisition.
General Specification for External protection
offshore and coastal structures and equipment
by painting.
GS EP COR 350
Instrument Design and Installation
Specification for ESV/SDV Protection
Enclosures on PP, WP1 & WP2 Platforms
FOR CFT SHEET
FOR PO 4/5
Revision
Date
1.0 SCOPE OF SUPPLY
This supply is composed of two parts:
Part I : Equipment / Bulk Material Supply
Part II : Documents and Drawings Supply
1.1 Part I : Equipment / Bulk Material Supply
The scope of supply for Wave Protection of ESV/SDV & FO Junction Box shall comprise of, but not limited to the following:
NO.
1 8 unit
8 unit
NO.
2 5 unit
5 unit
NO.
3 2 unit
2 unit
4 Set of spare parts for commissioning
5 Set of spare parts for 2 years operations
6 Inspection & Test
7 Surface treatment, painting, and preparation
8 Packing and transportation
REMARK
Refer to the Datasheet:
MM-YAD-00-DORI-434500
Rev.0
DESCRIPTION
Wave Protection of ESV/SDV & FO Junction
Box for PP Platform
REMARK
- ESV-40267
- ESV-40137
- SDV-40266
- ESV-40021
- ESV-40268
- ESV-40157
- Existing 6.6 kV
electrical cable
- OTU for optic fibre
1 Load
1 Load
1 Set
1 Load
TOTAL QUANTITY
SHALL BE SUPPLIED
1 Set
ITEM / TAG QUANTITY DESCRIPTION
TOTAL E&P MYANMAR
FEED/BASIC ENGINEERING
YADANA SUBSIDENCE PROJECT-EPSC 2
PTG-TMY-YAD2-IN-RFQ-018
0
REQUISITION NUMBER :
13-Jan-12
ITEM / TAG QUANTITY
- ESV-20039
- Existing 6.6 kV
electrical cable
Wave Protection of ESV/SDV & FO Junction
Box for WP2 Platform
Refer to the Datasheet:
MM-YAD-00-DORI-434500
Rev.0
TOTAL QUANTITY
SHALL BE SUPPLIED
- ESV-10012
- SDV-10601
- ESV-10951
- SDV-10952A
- SDV-10952B
Wave Protection of ESV/SDV & FO Junction
Box for WP1 Platform
Refer to the Datasheet:
MM-YAD-00-DORI-434500
Rev.0
TOTAL QUANTITY
SHALL BE SUPPLIED
ITEM / TAG QUANTITY DESCRIPTION REMARK
FOR CFT SHEET
FOR PO 4/5
Revision
Date
TOTAL E&P MYANMAR
FEED/BASIC ENGINEERING
YADANA SUBSIDENCE PROJECT-EPSC 2
PTG-TMY-YAD2-IN-RFQ-018
0
REQUISITION NUMBER :
13-Jan-12
1.1 Part II : Documents and Drawings Supply
The detail requirement of documents and drawings supply is mentioned in Supplier's Documents Requirements Schedule
as attached.
FOR CFT SHEET
FOR PO 5/5
Revision
Date
2.0 DEFINITION OF TERMS
SUPPLIER :
Supplier of the Main Equipment, designated by the PURCHASER to provide
the equipment and services in this document and its attachments.
PURCHASER :
The organization that issues the purchase order and specifications to the Vendor.
COMPANY :
TOTAL E&P MYANMAR As the ultimate user and owner or the authorized
representative of Company.
3.0 GENERAL REQUIREMENTS
3.1 General requirements are available in document no. GS-EP-INS-101 "Instrumentation Engineering, Supply and
Construction General Requirements
3.2 All materials and equipment furnished shall be new, sound, and free of defects and shall meet the specified design
and environmental conditions.
4.0 SUPLIER'S RESPONSIBILITIES
4.1 General
4.1.1 SUPPLIER shall assume single point responsibility for all aspects of the work. This shall include co-ordination
of the work, managing sub-SUPPLIERS, liaison with PURCHASER and timely completion.
4.1.2 Components or assemblies obtained by SUPPLIER from sub-SUPPLIER shall be compatible with the complete
equipment package, shall comply with the relevant specifications and shall be considered as an integral part of
SUPPLIER's scope of supply.
4.1.3 SUPPLIER shall provide performance guarantee, quality guarantee and warranty for all items included in
the equipment requisition.
4.1.4 Substitution or changes from the requirements of the purchase requisition must be approved in writing by
PURCHASER.
4.2 Experience Qualification
4.2.1 All equipment and materials offered and supplied shall be reliable and proven in the specified environmental and
process operating conditions.
4.2.2 Equipment and materials shall be manufacturer's standard product properly selected and applied for the specified
conditions.
4.3 Preferred Sub-SUPPLIERS
4.3.1 The PURCHASER list of preferred sub-SUPPLIERS Shall be as per Company's 'Approved Manufacturers List'
unless otherwise approved by PURCHASER.
4.3.2 In general sub-SUPPLIER materials and components shall comply with relevant standards referenced in
the technical requisition or relevant internationally recognized standards. In some cases a standard equipment
package may utilize manufacturer's standard sub-SUPPLIERS so that substitution is impractical. Details of these
items shall be provided as a clarification.
4.3.3 Details of proposed sub-SUPPLIERS and any exceptions or clarifications to Purchaser's preferred sub-SUPPLIERS
list shall be provided. Any changes or new exceptions after placement of a purchase order shall be subject to written
approval by PURCHASER.
13-Jan-12
0
REQUISITION NUMBER : PTG-TMY-YAD2-IN-RFQ-018
TOTAL E&P MYANMAR
FEED/BASIC ENGINEERING
YADANA SUBSIDENCE PROJECT-EPSC 2
FOR CFT SHEET
FOR PO 5/5
Revision
Date 13-Jan-12
0
REQUISITION NUMBER : PTG-TMY-YAD2-IN-RFQ-018
TOTAL E&P MYANMAR
FEED/BASIC ENGINEERING
YADANA SUBSIDENCE PROJECT-EPSC 2
4.4 Exceptions
Exceptions to the specification, datasheets, referred codes and standards and company specification shall be
clearly identified in the attached form "Technical Exceptions" Exceptions to the requisition requirement and
submitted along with the proposal for purchaser's review. In the absence of such a list complete compliance
will be assumed.
4.5 SUPPLIER Weight Control Procedure
4.5.1 SUPPLIER shall be aware of the importance placed by PURCHASER on the provision of accurate weight data,
which is considered critical to the topsides design.
4.5.2 SUPPLIER shall be responsible for the implementation of a weight control procedure that ensures that accurate
weight data for the equipment is provided promptly, in accordance with the requirements of the VDRS, see
Attachment "Vendor's Document Requirement Schedule".
4.5.3 SUPPLIER shall provide Equipment Weight data.
4.5.4 Contingencies will be applied to SUPPLIER's weight data by PURCHASER and should not be included by
SUPPLIER.
4.6 Technical Requiremnets
4.6.1 In the event of any conflict between Data Sheet and other company documents, the Data Sheet will take precedence.
However the vendor shall bring this to the notice of the purchaser.
1. Supplier's Document Requirement Schedule
APPENDICES - 1
Page : 1/2
PROJECT : YADANA SUBSIDENCE PROJECT-EPSC 2 REQUISITION NO.: PTG-TMY-YAD2-IN-RFQ-018
STATUS CODE : A) PRELIMINARY OR FOR INFORMATION
B) FOR APPROVAL 1. 2 weeks after P.O
C) FINAL AND APPROVED DOCUMENT ALL COMPANY'S COMMENTS INCORPORATED 2. 1 month after P.O
D) AS DELIVERED 3. At delivery
At tendering
stage 1 2 3 4 6
1. GENERAL DOCUMENTS
1.1 Planning : Sub-orders, fabrication, delivery, production organization A B
1.2 List of sub-supplier A B
1.3 Quality Assurance Manual A
1.4 Quality Assurance dossier duly stamped by certifying Authority B C
1.5 incorporating manufacturing and inspection documention
2. ENGINERING and INSTALLATION / OPERATING DOCUMENT
2.1 General Arrangement / Dimension Drawing A B C
2.2 Sectional Drawing with Parts Number A B C D
2.3 Data sheet A B C D
2.4 Opearting Manual B C D
2.5 Installation Manual B C D
2.6 Spare Part List - Recommended spare parts for comm. & 2-years operation A B C
Note :
- Any document return to supplier with comments must be reissued for approval in same quantity after revision
SUPPLIER'S DOCUMENTS REQUIREMENT SCHEDULE
ITEM DESIGNATION
Installments
Page : 2/2
PROJECT : YADANA SUBSIDENCE PROJECT-EPSC 2 REQUISITION NO.: PTG-TMY-YAD2-IN-RFQ-018
STATUS CODE : A) PRELIMINARY OR FOR INFORMATION Installements:
B) FOR APPROVAL 1. 2 weeks after P.O
C) FINAL AND APPROVED DOCUMENT ALL COMPANY'S COMMENTS INCORPORATED 2. 1 month after P.O
D) AS DELIVERED 3. At delivery
At tendering
stage 1 2 3 4 6
3. MANUFACTURING AND INSPECTION DOCUMENTS
3.1 Inspection and test plan A B D C
3.2 Material & Equipment Certificate B C
3.3 NDT report
3.4 Fabrication drawing B C
3.5 Dimensional report A B C
3.6 Final weight report A D
3.7 FAT Report B C
4. SHIPMENT
4.1 Packing List B/C D
4.2 Instruction for handling, transportation and storage A B/C D
4.3 Sea fastening and appliance control report (if any) B/C D
4.4 Shipping documentation D
Note :
- Any document return to supplier with comments must be reissued for approval in same quantity after revision
ITEM DESIGNATION
Installments
SUPPLIER'S DOCUMENTS REQUIREMENT SCHEDULE
1. Technical Exception/ Clarification Form
APPENDICES - 2
Document No. : PTG-TMY-YAD2-IN-RFQ-018
Revision : 0
Page : 1 of 1
Note that only exceptions noted by SUPPLIER in this format will be considered by COMPANY and SUPPLIER understands that unless specifically
listed herein, SUPPLIER's proposal is fully compliant with COMPANY Technical Requirements.
YADANA SUBSIDENCE PROJECT-EPSC 2
CLARIFICATION FORM
TECHNICAL EXCEPTION/
Wording of COMPANY's Paragraph
Wording of Supplier's Proposed
Paragraph
Clarification/
Exception No.
COMPANY's
Document Number
Doc.
Rev.
Section or
Reference
COMPANY/ PURCAHSER's
Response
1. Spare Part Form
APPENDICES - 3
SPL-E no: Page:
List total amount :
Remarks: Written by:
Revision no: Date:
Tag no: Revision description:
Supplier or Vendor: Description:
Main Order: Vendor or Supllier: Leading discipline:
Description: Model: MIEC Contractor Approval:
Tag no.: Serial no: Company approval:
I
t
e
m

N
o
.
R
e
v
i
s
e
d
Component
Manufacturer
Name
Manufacturer
Part Number
Vendor Vendor Reference Article Description
Drawing No./
Reference
T
y
p
e

o
f

P
a
r
t
U
n
i
t
Q
u
a
n
t
i
t
y

p
e
r

M
a
t
e
r
i
a
l
N
u
m
b
e
r

o
f

M
a
t
e
r
i
a
l
s
T
o
t
a
l

Q
u
a
n
t
i
t
y
C
o
m
m
.
/

S
t
a
r
t
-
u
p

S
P
.
C
a
p
i
t
a
l
O
p
e
r
a
t
i
n
g

S
P
.
D
e
l
i
v
e
r
y

T
i
m
e

(
W
e
e
k
)
U
n
i
t

P
r
i
c
e

(
C
u
r
r
e
n
c
y
)
C
o
m
p
a
n
y

M
a
t
e
r
i
a
l

M
a
s
t
e
r

C
o
d
e
M
a
n
a
g
e
m
e
n
t

T
y
p
e
Q
u
a
n
t
i
t
y

m
i
n
i

f
o
r

M
M
Q
u
a
n
t
i
t
y

m
a
x
i

f
o
r

M
M
Q
u
a
n
t
i
t
y

f
o
r

S
U

&

S
E
Q
u
a
n
t
i
t
y

t
o

o
r
d
e
r
Installed Proposal MIEC Contractor Recommendation
C
o
m
p
a
n
y

a
p
p
r
o
v
a
l
MAIN EQUIPMENT (main tag) EQUIPMENT or SUB EQUIPMENT

Das könnte Ihnen auch gefallen