EXECUTIVE PROFILE

I am an Electrical Engineer with more than twenty-nine (29) years work experience with several
reputable EPC, Consultancy, and Oil & Gas Companies or Operators.

My major part of my career has been built on solid participation, quality-oriented output and timely
delivery of different phases of both brownfield and greenfield projects from Project Definition, Basic
Engineering, FEED/Conceptualization, and down to Detail Engineering, Construction Field Support,
FAT/SAT, Commissioning/Start-up. I also have several years experience in LNG Operations and
Maintenance.

The following roles have defined my job function at various times in my career:-

Discipline Lead Electrical Team Leader Design Engineer Field Engineer Start-up Engineer
Senior Maintenance Engineer Project Engineer Electrical Specialist Instrument Engineer
Proposals Engineer Electrical Inspector

I am highly computer literate, with a thorough understanding and ability to use various software
platforms including AutoCAD, Smartplant, ETAP and CYME.



PROFESSIONAL EXPERIENCE


PROJECT ENGINEER ELECTRICAL Apr 2012 to present
Brunel International SEA Pte Ltd
Republic of Singapore

Evonik Methionine SEA Pte Ltd is expanding its Methionine business by building the fifth methionine
plant (Me5 Project) in Jurong Island, Singapore to serve the Asia Pacific market. Methionine is a key
raw material for producing high quality animal feeds.

Responsibilities included:

Act as Electrical focal point for Evoniks Me5 Infrastructure Area
Attending project meetings
Preparing of purchase orders
Reviewing of detail engineering documents such as detail specifications and detail design
drawings
Carrying out of Factory Acceptance Tests (FAT)
Maintaining the interfaces related to the discipline of electrical engineering
Documentation
Reviewing of field engineering documents such as construction drawings

Resume of Peter Nodado Mejorada, Page 2 of 8
Supervision of the EPCM contractor (JACOBS Singapore)
Carrying out of Site Acceptance Tests (SAT)
Maintaining the interfaces related to the discipline of electrical engineering
Organizing of third party inspections
Field commissioning support (supervision)
Supporting the project HSE goals through feedback, participation and further training

Specific accomplishments to date

Prepared training slides of the plant electrical power system for technicians.
Witnessed high voltage tests on the all 66 and 10kV equipment.
On-site training on operation and maintenance of Siemens 66kV 8DN8 and 10kV 8DB10, GIS
switchgear.
Preparation of SIMOCODE parameters for commissioning of Siemens intelligent motor control
units.
Factory acceptance test (FAT) for two (2) 10kV, 3MVA, fully enclosed, diesel emergency
generator sets.
Compilation of motor nameplate database for use of plant engineering staff.
Provided technical input e.g. system SLDs and schematics to commissioning team for all
electrical subsystems in the Infrastructure (Utilities) area.
Feasibility study and subsequent evaluation of cathodic protection schemes for natural gas
pipelines from local utilities company.
FAT for typical motor control (DOL and Soft Starter) schematics with the project DCS vendor.


ELECTRICAL SPECIALIST Dec 2009 to March 2012
Malaysia LNG (MLNG) Sdn Bhd
Bintulu, Sarawak, Malaysia

Employed to support MLNGs objective to achieve Superior Performing Asset status in the
PETRONAS group of companies by delivering projects aimed to increase production and
operating reliability.
Reports to the Engineering Senior Manager (ESM) of the Project Development Department
(PDD) on all technical issues for electrical discipline.
Took charge and single point responsibility to deliver fit-for-purpose electrical design on all
projects and plant change activities assigned by ESM.
Maintained technical integrity and quality of all project deliverables as per department
procedures.
Managed interfaces with other project stakeholders who includes Planning, Construction and
Supply Chain Managements.
Actively supported Health, Safety, Environment and Quality objectives of the Company.
Acted as a technical advisor and resource to junior engineers and designers.

MLNG Dua Debottlenecking Project
New electrical facilities included two (2) new gas turbine generators, one (1) diesel standby
genset, new HV feeders, HV and LV motors.
Provided technical assistance to the Electrical Construction and Commissioning team.



Resume of Peter Nodado Mejorada, Page 3 of 8
MLNG MARLIN Project
New 132kV/11kV substation to power very large motor drives (7MW, 19MW, and 47 MW) for
mini-LNG plant that uses boil gas from six (6) LNG tanks.
Involved with Detailed Feasibility Studies and FEED stage of the project, reviewing and vetting
deliverables from two (2) competing consultants.

MLNG New Boiler Project and Existing Boilers Rejuvenation
New electrical facilities to support the project included a new HV/LV substation.
Reviewed electrical deliverables for front end engineering gates 2 and 3 as per PETRONAS
project management procedure.
Participated in Project Risk Assessment and Constructability Review workshops.
Boilers rejuvenation requires detailed engineering activities for additional LV feeders.

MLNG Tiga ROSE Project
ROSE is code name for the project which aims to rectify instabilities in the operation of the acid
gas removal units (AGRU) in Trains 7 and 8.
New electrical facilities include HV motors, LV motor fin fan coolers and small LV loads.
Acted as PDD technical focal point between EPCC contractor thru MLNG project team and MLNG
asset holders.
Reviewed deliverables during the detailed design phase.


LEAD ELECTRICAL ENGINEER July 2008 to Nov 2009
Perunding Ranhill Worley Sdn Bhd
Miri, Sarawak, Malaysia

Engaged to lead a team of electrical engineers supporting Sarawak Shell Berhad's (SSB) Technical
Integrity Restoration Project on all its onshore and offshore assets.
Reported to the Design Engineering manager of the MESC Integrity Restoration (IR) project on all
technical issues relating to the Electrical IR Theme.
Provided technical guidance and direction to subordinate senior engineers.
Functioned as Technical focal point between SSB (client) and PRW Electrical team.
Managed interfaces with other Engineering disciplines, Procurement and Construction teams as
the disciplines interim project engineer.
Actively participated in preparation of documents for the Value Assurance Review (VAR) process.
Maintained technical integrity and quality of all project deliverables.
Review and analyse Corrective Action Worksheets (CAWs) raised by SSB with the intention of
determining possible solutions to eliminate or mitigate the reported deficiencies of the assigned
Electrical theme topic.
Discussed proposal/s with SSB Technical Authorities and obtain consensus on the best way
forward.
Raise CTR for allocation of resources to execute the agreed solution.
Prepare the Project Execution Plan.
Manage and monitor the progress of the deliverables produced by the Electrical team.
Ensure that the teams who will undertake the works are competent electrical personnel.
Liaised with the SSB, PRW and other third parties in all technical matters that affect the work.




Resume of Peter Nodado Mejorada, Page 4 of 8
SENIOR ELECTRICAL ENGINEER Aug 2004 to June 2008
TECHNIP Abu Dhabi
Abu Dhabi, United Arab Emirates

RASGAS Onshore Expansion Project, Phase 2, LNG trains 6 & 7
Ras Laffan Industrial City, Qatar
Provided technical assistance to the Electrical Construction and Commissioning team.
Resolved technical queries raised by subcontractors.
Prepared field design change (FDC) packages as required by site conditions which ensured
compliance with the clients requirements.
Liaised with client PMT for matters that required coordination and approval of site activities.

Qatar Gas II Development Project Offshore Facilities EPC
Ras Laffan Industrial City, Qatar
Prepared running test procedures for all major electrical equipment on three (3) new wellhead
platforms WH4, WH5 and WH6. These facilities will supply new feed gas for Qatar Gas LNG trains
3 and 4.
Provided electrical discipline input for the preparation of each wellhead platform operating
manual.

Dolphin Energy Taweelah Gas Receiving Facility
Abu Dhabi, UAE
Tasked as a Startup Engineer to provide start-up assistance to the facility as part of the Clients
integrated team.
Supervised vendor activities for site acceptance test for gas-engine generator and fuel gas
heater.
Managed the completion of electrical punch lists in ICAPS.
Attended to technical queries from operations and provided appropriate solutions when
required.

TOTAL France D12 Project Normandy Refinery FEED
Lyon, France
Provided engineering augment support to the Electrical and Instrument Department of Technip
France, Lyon office on deputisation from Technip Abu Dhabi.

Engineering Services for Base Camp of Rasgas III
Ras Laffan Industrial City, Qatar
Provided engineering support and solutions to various site issues for the Technip Chiyoda Joint
Venture construction team.

ADGAS Proposal for EPC Package 1 Das Island Facilities
GASCO Proposal for EPC Package 3 Habshan Facilities / Onshore Pipeline / Export Pipeline
Abu Dhabi, UAE
Prepared requisitions for inquiry, manhour estimate for detailed engineering and design phase,
technical write-ups, review and endorsement of FEED package, subcontract scope of works,
technical evaluation of vendor offers and managed a team of designers for preparation of bill of
quantities.



Resume of Peter Nodado Mejorada, Page 5 of 8
ADCO North East Bab EPC Project
Abu Dhabi, UAE
Updated, re-wrote and finalised operating manuals for Al Dhabiya and Rumaitah electrical
power and distribution systems.

GASCO New Common Standby Flare Stack at Habshan FEED
Abu Dhabi, UAE
Prepared specifications and datasheets for electrical items.
Produced single line drawing for additional scope, loadlist for new motors and other flare
equipment, cable schedule and routing, MTO and electrical design basis.
Provided input to project definition report.
Updated document registry and weekly reports.

ADMA OPCO Zakum West CSP Booster Pump Modifications Detailed Engineering
Abu Dhabi, UAE
Prepared specifications for cables, bulk materials, switchboard modification and electrical
installation for the new, bigger booster pumps.
Performed cable sizing calculation and relay coordination and relay setting study.
Supervised designer for the preparation of drawings and other deliverables.
Provided electrical input to construction scope of work.

PEDCO Salman Offshore Facilities Detailed Engineering
Salman Island, Iran
Prepared and updated equipment specifications.
Performed technical evaluation on electrical packages.
Carried out vendor documentation review.
Updated required deliverables based on final vendor data and client comments.


SENIOR ELECTRICAL ENGINEER (PROPOSALS) June 2003 to July 2004
TECHNIP Geoproduction
Kuala Lumpur, Malaysia
As part of the electrical department's proposal team, reviewed and studied tender documents in
order to determine the required project deliverables and resources.
Prepared Bill of Quantities for Construction scope.
Prepared electrical scope of work input for EPC tender.
Prepared cost estimates based on previous projects and updated quotations from vendors.

Co-generation Plant Project Proposal Petronas Penapisan Melaka Sdn Bhd
Malacca, Malaysia
Project involves the installation of a co-generation plant inside the existing refinery.
This new plant consists of five 20MW turbine-driven generators, four of which is gas fuelled and
one is steam driven.
Other works include a new substation housing 33kV and 6kV switchgear will be installed, to lay
new 33kV cables, new transformers (generator and substation units) and modifications to be
implemented at existing 33kV boards at other substations.



Resume of Peter Nodado Mejorada, Page 6 of 8
Ethane Buffer Storage Tank Project Proposal Petronas Sdn Bhd
Kuantan, Malaysia
Project concerns the installation of a new portable 11kV substation, impressed current CP
system, power distribution to new motor loads, lighting and small power.

Otway Gas Plant Project Proposal/Mini-FEED Woodside Australia
Victoria, Australia
Reviewed and studied tender documents in order to determine the required project deliverables
and resources.
Performed electrical power system studies (load flow, short-circuit and large motor starting
analysis) using ETAP.
Prepared Bill of Quantities for Construction scope.
Prepare cost estimates based on previous projects and updated quotations from vendors.

Maharaja Lela Compression Platform FEED TOTAL FINA ELF Brunei
Kuala Belait, Brunei
Performed power system studies (load flow, short-circuit and large motor starting analysis) using
ETAP.
Prepared electrical scope of work input for EPC tender.

East China Sea Development Project FEED Endorsement CNOOC/SHELL/UNOCAL Joint Venture
Shanghai, China
Developed new load list based on reduced electrical load arising from minimum facilities
philosophy.
Prepared new electrical equipment layout.
Performed electrical equipment sizing calculations.
Prepared cost estimates for the electrical scope.
Raised report for power requirements at the CEP facility based on the new minimum facilities
and additional facilities installed at CEP.


SENIOR ELECTRICAL ENGINEER Sept 2001 to May 2003
TECHNIP Abu Dhabi
Abu Dhabi, United Arab Emirates

Soroosh/Nowrooz Integrated Development EPC National Iranian Oil Company
Soroosh/Nowrooz offshore fields, Iran
Performed detailed engineering on main power distribution and other electrical systems,
equipment and cable layouts, load lists, cable schedules and other deliverables as required.
Handled requisitions for cables, racks, electrical bulk materials, heat tracing, lighting fixtures,
interposing relay panel, navaids system and other electrical construction materials.
Carried out technical evaluation on vendor proposals.
Reviewed and approved vendor documentation.
Raised and updated job specifications as needed.
Updated weekly and monthly progress reports.
Coordinated interface issues with other disciplines.
Directed and supervised a team of electrical designers.



Resume of Peter Nodado Mejorada, Page 7 of 8
Additional LPG Tanks FEED Qatar Petroleum
Mesaieed, Qatar
Carried out relay coordination and relay setting study using CYME.
Prepared specifications for electric heaters.
Reviewed comments from client on other electrical equipment specifications and updated the
relevant deliverables accordingly.


ELECTRICAL PROJECT ENGINEER Aug 1999 to Aug 2001
Malaysia Liquefied Natural Gas Sdn Bhd
Bintulu, Malaysia
Provided the required technical support on various Company projects and related activities.
Supported preparation of electrical scope for tender to external parties.
Raise minor contracts for maintenance.
Supervised and monitored contractor activities, reviewed and approved project document
deliverables.
Undertook FAT related activities on major electrical items and equipment as per project
requirements.
Major projects involved:-
LNG Trains 7 and 8 Expansion (MLNG Tiga Project)
LNG Trains 1, 2 and 3 Rejuvenation Project
New Control Building Project
Re-Instrumentation Upgrade Project


ELECTRICAL TEAM LEAD July 1998 to July 1999
Stork Engineers and Contractors BV
Damascus, Syria
In charge of electrical discipline works for Al Furat Petroleum Company under the Damascus Design
Office contract involving mainly brownfield works of the clients onshore oil and gas installations in
Deir Ezzor.


ELECTRICAL TEAM LEAD Dec 1996 to June 1998
Protek Engineers Sdn Bhd
Miri, Malaysia
In charge of electrical discipline works for Sarawak Shell Berhad under the Miri Design Office
contract involving mainly brownfield works of the clients oil and gas installations both onshore and
offshore.


SENIOR MAINTENANCE ENGINEER Dec 1993 to Nov 1996
Malaysia Liquefied Natural Gas Sdn Bhd
Bintulu, Malaysia
In charge of all preventive and breakdown maintenance activities that ensured reliability of
electrical plant equipment in the Utilities Area such as HP and LP steam turbine generators, dual
fuel turbine generators, main transformers, seawater intake MV motors, MV and LV substations,
impressed CP system, UPS, emergency diesel gensets, overhead electric cranes among others.

Resume of Peter Nodado Mejorada, Page 8 of 8
Duties and responsibilities included :-
toolbox talks
long term and short term or turnaround maintenance contracts
electrical studies
reports and recommendations
spare part rationalisation
and 24/7 on call service duty
weekly testing and paralleling of emergency genset
MV and LV switching


DISCIPLINE LEAD May 1991 to Nov 1993
Kvaerner Minconsult Sdn Bhd
Miri, Malaysia
In charge of electrical discipline works for Sarawak Shell Berhad under the Miri Design Office
contract involving new and modification works of the clients oil and gas installations both onshore
and offshore.


ELECTRICAL/INSTRUMENT ENGINEER Nov 1989 to April 1991
Philippines National Oil Company
Makati, Philippines
Provided engineering support to all three (3) geothermal energy power installations and projects in
the Philippines including routine site visits, inspections and short term field assignments.


ELECTRICAL ENGINEER Sept 1984 to Oct 1989
Atlantic, Gulf and Pacifica Company Manila Inc.
Makati, Philippines
Carried out electrical construction activities in the companys fabrication yard in the province of
Batangas.
Performed material take-offs and costing of electrical items for oil and gas projects.
Participated in the task force for a main frame computer based cost estimating system.


EDUCATION

Bachelor of Science in Electrical Engineering (1984)
University of the Philippines Diliman Campus
Quezon City, Philippines


PROFESSIONAL AFFILIATIONS

Member PRC Board of Electrical Engineering Philippines
License No. 14602

Member PRC Board of Electronics and Communications Engineering Philippines
License No. 2125

Das könnte Ihnen auch gefallen