SR. NO. DESCRIPTION OF MATERIALS UNIT QTY. AS PER ACTUAL RT/ AMOUNT Rs.
CONTRACT MATERIALS UNIT(RS)
INSTALLED
GRAND TOTAL : (1) + (2) + (3) + (4) = 1142193 + 257371 + 11455 + 6958.86 =
= #REF!
( In words Rs. Fourteen Lakh Seventeen Thousand Nine Hundred Seventy Eight only )
numbering of
nut
Sr.No Name of group Village
bolts,washers,jump
Barbed Wire
Danger Boards
poles
supports
RSJ Pole 9 Rmt
mm
Earthing Set
painting &
ering etc.
11 kv Disc Insulator
M.S.Angle 50x 50x 6
sundries such as
1 Bangurge Addl Tirth 0 10.5 3 3 1 8 0 4 6 1 0.5 0 1
0 10.5 3 1 8 0 0.5 0 1
Proprietor
T.S.E.No.
DPDC/ ND/103/05-06.
trical Enterprises
ROHAN ELECTRICAL ENTERPRISES
SHOP NO G-13, ARJUN TOWER,
VIJAPUR ROAD SOLPAUR-413004.
3rd R.A.Bill
( In words Rs. Twenty Four Thousand nine Hundred Forty Seven only )
0
0
M.S.Flat 50x 10 mm
2
3
3 11 KV V cross arm with
clamps
3
0
0
0
0
M.S.channel 75x40x6 mm
20.8
20.8
5
11 KV Guarding Channel
6
1
1
Disc Insulator
7
3
3
Pin Insulator
8
1
1
AAAC 34 mm /ACSR
Conducror(Weasel)
9
0.21
0.21
2100
Strain hardware
10
3
3
0
0
1
1
8
8
Earthing Set
14
0
0
Barbed wire
15
2
2
Danger boards
16
0
0
2nd R.A.Bill
0
0
0
0
Aluminium paint
19
0
0
G.I.Wire 8SWG
20
0
0
0.5
0.5
0.07
0.07
Wedge connectors
23
T.S.E.No.
0 DPDC/
ROHAN ELECTRICAL ENTERPRISES
SHOP NO G-13, ARJUN TOWER,
VIJAPUR ROAD SOLPAUR-413004.
2nd R.A.Bill
SR. NO. DESCRIPTION OF MATERIALS UNIT QTY.FOR 1 ACTUAL RT/ AMOUNT Rs.
KM AS PER MATERIALS UNIT(RS)
CONTRACT INSTALLED
( In Words Rs.Two Lakh Fifty Seven Thousand Three Hundred Seventy One only )
1 Bangurge Addl
Name of group
Tirth
Village
SHOP NO G-13, ARJUN TOWER,
Dist.T/F 63 KVA
1
1
1
100x116 H beam 9 M
2
M.S.channel 100x50x6 mm
2 101.2
2 101.2
3
M.S.channel 75x40x6 mm
4
ROHAN ELECTRICAL ENTERPRISES
M.S.Angle 50x50x6 mm
5
Pin Insulator
0
0
7
Strain Set
3
3
8
Distribution Box
1
1
9
Lightening Arrestor
1
1
10
Stay set
2
2
11
Earthing Set
5
5
13
Danger boards
2
2
16
2nd R.A.Bill
G.I.Wire 8SWG
26
26
17
Barbed wire
15
15
18
painting of hardware&supports
1
1
22
T.S.E.No.
1 DPDC/
ROHAN ELECTRICAL ENTERPRISES
SHOP NO G-13, ARJUN TOWER,
VIJAPUR ROAD SOLPAUR-413004.
2nd R.A.Bill
No.
L.T.Earthing Set
Stay wire7/10, Kg
G.I.Wire 8 SWG.Kg
Poles. No.
No.
P.G.Clamps. No.
poles &
T.S.E.No.
Kms
Jointing Sleeves
L.T.Stay Set
Concreting of
Binding tape.Kg
AAC ANT Cond.
M.S.Clamps Pair.
L.T.Shackel Insul.
L.T.Shackel
Hardware No.
stays.CMT.
L.T.Spacers.No.
No.
Sr.No Name Village
Kms
Jointing Sleeves
L.T.Earthing Set
L.T.Stay Set
Concreting of
poles &
T.S.E.No.
Stay wire7/10, Kg
Binding tape.Kg
G.I.Wire 8 SWG.Kg
Poles. No.
M.S.Clamps Pair.
L.T.Shackel Insul.
L.T.Shackel
Hardware No.
No.
P.G.Clamps. No.
stays.CMT.
L.T.Spacers.No.
165
81 16.02 12.54 244 522 756 0 0 82 162 1134 162 13.65 0 129 2 0 14.64
84 16020 12540
Proprietor
To, ROHAN ELECTRICAL ENTERPRISES
The Superintending Engineer(SURC) SOLAPUR
M.S.E.D.C.L, Circle Office, Bill No:- 32/ 09/ 09-10. dt 25/09/2009
Solpaur SUB;- Ist RA Bill for HT/LT line work on Turnkey basis for DPDC Scheme
Ref:- 1)SE/SURC/Ag Turnkey/ 7326 dt 26/08/2009
L.T. LINE 3 ph 4 W.
With ANT for phase & GNAT for neutral
( In Words Rs Twelve Lakhs Sixty One thousand Seven Hundered Seven only)
L.T. LINE 3 ph 4 W.
With ANT for phase & GNAT for neutral
( In Words Rs Twelve Lakhs Sixty One thousand Seven Hundered Seven only)
TOTAL QTY:- 0 0
Wt per item 6.1 7.5
Total Wt in Kg 0 0 0
L.T Line Fabrication Details Mohol S/Division
TOTAL QTY:- 0 1
Wt per item 6.1 7.5
Total Wt in Kg 0 7.5 7.5
7.5
Location List of Work Done: Mohol S/Division
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Sr.No Name Village
Poles. No.
M.S.Clamps Pair.
No.
P.G.Clamps. No.
Stay wire7/10, Kg
Binding tape.Kg
G.I.Wire 8 SWG.Kg
L.T.Spacers.No.
L.T.Stay Set
Concreting of
Kms
Jointing Sleeves
AAC ANT Cond.
L.T.Shackel Insul.
No.
L.T.Shackel
Hardware No.
stays.CMT.
poles &
Kms
1 Khatake A.N Shingoli 2+1 0 0.36 4 9 16 0 0 1 4 28 4 0.225 0 0.9 0 0 0.18
2 Kore S.B S' Wirwade 2 0 0.24 2 6 16 0 0 1 2 14 2 0.15 0 0.6 0 0 0.12
3 Thorat C.S Dewadi 5 0 0.6 11 15 16 0 0 1 2 14 2 0.375 0 1.5 0 0 0.3
4 Patil C.D kurul 0 0.36 0.36 3 0 16 0 0 1 3 21 3 0 0 0 0 0 0
5 Kamble A.N N.Pimpari 3 0 0.36 2 9 16 0 0 1 2 14 2 0.225 0 0.9 0 0 0.18
6 Kapse T.S S.Babulgaon 2 0 0.24 2 6 16 0 0 1 2 14 2 0.15 0 0.6 0 0 0.12
7 Bhosale R.K Kamati 6 0 0.72 3 18 16 0 0 1 3 21 3 0.45 0 1.8 0 0 0.36
8 Pawar A.G Ankoli 4 0 0.48 5 12 16 0 0 1 3 21 3 0.3 0 1.2 0 0 0.24
9 Doke S.H Ankoli 2 0 0.24 3 6 16 0 0 1 3 21 3 0.15 0 0.6 0 0 0.12
10 Varade D.B Inchgaon 2 0.12 0.12 2 6 16 0 0 1 2 14 2 0.15 0 0.6 0 0 0.12
11 Waghchavare T.N Bhambewadi 2 0.12 0.12 3 6 16 0 0 1 2 14 2 0.15 0 0.6 0 0 0.12
12 Street Light Begampur 5 0.24 0.12 0 15 16 0 0 1 2 14 2 0.375 0 1.5 0 0 0.3
13 Shaikh J.A Mohol 1 0 0.12 3 3 16 0 0 1 2 14 2 0.075 0 0.3 0 0 0.06
14 Fartade V.N S.Babulgaon 1 0.06 0.06 3 3 16 0 0 1 2 14 2 0.075 0 0.3 0 0 0.06
15 Bhosale S.S S.Wirvade 4 0 0.48 3 12 16 0 0 1 3 21 3 0.3 0 1.2 0 0 0.24
16 Doke B.D Ankoli 2 0 0.24 2 6 16 0 0 1 2 14 2 0.15 0 0.6 0 0 0.12
17 Bachute P.B Varkute 2 0 0.24 2 6 16 0 0 1 2 14 2 0.15 0 0.6 0 0 0.12
18 Shinde S.N Varkute 2 0 0.24 2 6 16 0 0 1 2 14 2 0.15 0 0.6 0 0 0.12
19 Chavan D.L Ankoli 1 0 0.12 2 3 16 0 0 1 2 14 2 0.075 0 0.3 0 0 0.06
20 Farate Aundhi 2 0 0.24 2 6 16 0 0 1 2 14 2 0.15 0 0.6 0 0 0.12
21 Solankar M.K Aundhi 2 0 0.24 2 6 16 0 0 1 2 14 2 0.15 0 0.6 0 0 0.12
22 Bachute R.S. Aundhi 1 0 0.12 2 3 16 0 0 1 1 7 1 0.075 0 0.3 0 0 0.06
Concreting
Set
Cond. Kms
Cond. Kms
Sleeves
L.T.Stay
G.I.Wire 8
Sr.No Name Village
Poles. No.
AAC ANT
AAC GNAT
M.S.Clamp
s Pair.
No.
Jointing
No.
s. No.
L.T.Earthin
No.
Wire. Kg.
Binding
tape.Kg
SWG.Kg
Bolts.etc.
g Set
insulator
of poles &
Nut
L.T.Shacke
L.T.Shacke
l Hardware
Stay
Stay
l Insul. No.
P.G.Clamp
wire7/10,
Kg
Binding
stays.CMT.
s.No.
L.S.
L.T.Spacer
1 Lonari A.N. Yelegaon 2 0 0.24 2 6 16 0 0 1 2 14 2 0.15 0 0.6 0 0 0.12
2 President Ramlingeshwar Samajseva Mandal Tirth 10 0 1.2 7 30 16 0 0 1 4 28 4 0.75 0 3 0 0 0.6
3 Waghmare V.B Malkawtha 1 0.06 0.06 5 3 16 0 0 1 2 14 2 0.075 0 0.3 0 0 0.06
4 Koli Wasti L & F Connections Malkawtha 14 0.84 0.84 8 42 16 0 0 1 6 42 6 1.05 0 4.2 0 0 0.84
0 0 0 0 0 0 0
27 0.9 2.34 22 81 64 0 0 4 14 98 14 2.025 0 8.1 0 0 1.62
81
16 1.8 8.4 85 243 416 0 0 26 64 448 64 6.075 0 24.3 0 0 4.86
65 1800 8400 127.5
Location List of Work Done: Mohol S/Division (Raut)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Concreting of
Sr.No Name Village
Poles. No.
M.S.Clamps Pair.
Hardware No.
No.
P.G.Clamps. No.
Stay wire7/10, Kg
Binding tape.Kg
G.I.Wire 8 SWG.Kg
L.T.Spacers.No.
L.T.Stay Set
Kms
Jointing Sleeves
AAC ANT Cond.
L.T.Shackel Insul.
No.
L.T.Shackel
stays.CMT.
poles &
Kms
1 Kaka V Waghmode Yawalee 3 0.54 0.18 5 12 16 0 0 1 2 14 2 0.1 0 3 0 0 0.18
2 B.S. Waghmare Wafale 1 0.18 0.06 5 6 16 0 0 1 2 14 2 0.1 0 3 0 0 0.06
3 A.G.Londhe Papari 1 0.18 0.06 5 6 16 0 0 1 2 14 2 0.1 0 3 0 0 0.06
4 A.B.Gavali Mohol 1 0.18 0.06 5 6 16 0 0 1 2 14 2 0.1 0 4 0 0 0.06
5 St. Light Shirapur 3 0 1.08 11 25 64 0 0 4 8 56 8 0.5 0 5 0 0 0.18
6 A.A.Patil Shirapur 1 0 0.12 5 2 8 0 0 1 2 14 2 0.1 0 2 0 0 0.06
7 Bal Vikas School Shirapur 5 0 0.6 4 6 8 0 0 1 2 14 2 0.1 0 3 0 0 0.3
8 Syesh Havale Arjunsond 2 0 0.24 4 3 8 0 0 1 2 14 2 0.1 0 3 0 0 0.12
9 Shrikant Havale Arjunsond 1 0 0.12 4 2 8 0 0 1 1 7 1 0.1 0 3 0 0 0.06
10 14 nos L & F Conne Anagar 28, 7 2.1 2.1 27 52 88 0 0 10 24 168 24 1.5 0 10 0 0 2.1
11 Govardhan R Kasabe Shirapur 2 0.36 0.12 5 9 16 0 0 1 2 14 2 0.1 0 3 0 0 0.12
12 N.S.Mali Anagar 3 0 0.36 3 5 12 0 0 1 3 21 3 0.1 0 10 0 0 0.18
58 3.54 5.1 83 134 276 0 0 24 52 364 52 3 0 52 0 0 3.48
1.5
Agency poles utilised 45 124.5
Company poles utilised 13
T.S.E.No.
DPDC/ND/61/09-10
DPDC/ND/208/09-10
DPDC/ND/204/09-10
DPDC/ND/157/09-10
DPDC/ND/247/09-10
DPDC/ND/248/09-10
DPDC/ND/216/09-10
DPDC/ND/245/09-10
DPDC/ND/241/09-10
DPDC/ND/230/09-10
DPDC/ND/72/09-10
DPDC/ND/
DPDC/ND/314/09-10
DPDC/ND/237/09-10
DPDC/ND/146/09-10
DPDC/ND/243/09-10
T.S.E.No.
DPDC/ND/225/09-10
DPDC/ND/251/09-10
DPDC/ND/270/09-10
DPDC/ND/261/09-10
T.S.E.No.
DPDC/ND/41/08-09
DPDC/
DPDC/
EE/R/SUR/T/SE.CS/1720
/5-3-08
DPDC/
DPDC/ND/32/08-09
DPDC/ND/33/09-10
DPDC/
DPDC/ND/48/08-09
DPDC/ND/29/08-09
DPDC/ND/31/08-09
DPDC/ND/26/08-09
Location List of Work Done: Mohol S/Dn ( RAUT)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Concreting of
AAC ANT Cond.
L.T.Shackel
Hardware No.
Sr.No Name Village
Kms
Jointing Sleeves
L.T.Earthing Set
L.T.Stay Set
poles &
T.S.E.No.
Stay wire7/10, Kg
Binding tape.Kg
G.I.Wire 8 SWG.Kg
Poles. No.
M.S.Clamps Pair.
L.T.Shackel Insul.
No.
No.
P.G.Clamps. No.
stays.CMT.
L.T.Spacers.No.