The verification Matrix is a tool available to support eFDVS. It allows the system through Component DVP details, as well as the former APQP elements, to be managed in one Excel file for each New-tooled End-item. The list below denotes what must be done in the VM, and what may be done as an alternative subject to the usage policy of your organization.
The verification Matrix is a tool available to support eFDVS. It allows the system through Component DVP details, as well as the former APQP elements, to be managed in one Excel file for each New-tooled End-item. The list below denotes what must be done in the VM, and what may be done as an alternative subject to the usage policy of your organization.
The verification Matrix is a tool available to support eFDVS. It allows the system through Component DVP details, as well as the former APQP elements, to be managed in one Excel file for each New-tooled End-item. The list below denotes what must be done in the VM, and what may be done as an alternative subject to the usage policy of your organization.
The Verification Matrix is a tool available to support eFDVS that allows the system through component DVP details, as well as the former APQP elements (now referred to as the Supplier APQP/PPAP Readiness Assessment), to be managed in one Excel file for each New-tooled End-item. The list below denotes what must be done in the VM, and what may be done as an alternative subject to the usage policy of your organization.
The prime alternative subject to region/cluster/program policy: Component DVP details (e.g. schedule dates) in VM
This Method/Tool applies to the following GPDS Deliverable(s):
Deliverable # Deliverable Name VG-T-88-D5 Under Body V0 Verification Matrices (VM's) for New-tooled End-items VG-T-72-D5 Under Body V1 Verification Matrices (VM's) for New-tooled End-items VG-T-56-D5 Under Body V2 Verification Matrices (VM's) for New-tooled End-items VG-T-80-D5 Upper Body V0 Verification Matrices (VM's) for New-tooled End-items VG-T-24-D5 Upper Body V1 Verification Matrices (VM's) for New-tooled End-items VG-T-04-D5 Upper Body V2 Verification Matrices (VM's) for New-tooled End-items
B. An Overview of the VM worksheet structure and the contents of each sheet
The VM is an Excel file that will normally consist of three tabs. Tab 1 is the eFDVS DVP downloaded. This download can be one-time, with all future maintenance in Excel, or it can be downloaded regularly when required if DVP details are maintained in eFDVS. Tab 2 is the DVP for any supplier testing not maintained in eFDVS. Note that Tabs 1 and 2 can be combined if desired the concept is that by keeping them separate the supplier can provide updates as required for their DVP that can be conveniently pasted into the VM. Tab 3 is the Supplier APQP/PPAP Readiness Assessment (formerly APQP), which is always maintained in the VM.
For now, well concentrate in explaining how to create, utilize and maintain Tab 3 Supplier APQP/PPAP Readiness Assessment.
C. Guidelines for Supplier APQP/PPAP Readiness Assessment
1. Purpose:
The Supplier Manufacturing APQP/PPAP Readiness Section of the Verification Matrix (VM) is a structured method for assessing completeness of the customer requirements. The Supplier APQP/PPAP Readiness Assessment is also used to facilitate communication between all persons and activities involved in a program and ensure that all required steps are completed on time, with a high quality-of-event in support of the GPDS Supplier Engagement Process.
The Supplier APQP/PPAP Readiness Assessment (Schedule A) is the tool by which external suppliers perform Advanced Product and Quality Planning. Implementation of the GPDS Supplier Engagement Process and the use of the Supplier APQP/PPAP Readiness Assessment will prepare external suppliers for the Production Part Approval Process (PPAP) submission.
3. Checklist Structure:
The checklist is comprised of There are 3 sections within the Assessment: Header Section Element Status Section Summary Section
Header Section The header section of the Assessment has selection boxes that indicate the Milestone being reported (Fig.3, Call Out (1)), Priority/Non-Priority (Fig.3, Call Out (2)), GPDS Vehicle Partition (Powertrain, Under Body and Upper Body Fig.3, Call Out (3) and Vehicle PMT (Fig. 3, Call Out (4)). These selection boxes are important because they are required for management reports, and they will display the proper rows to reflect differences in UP and UN timing, for example.
Before starting a new assessment, confirm that the fields (Current Milestone, Priority Site and Vehicle Partition) are correctly selected to ensure timing and reporting accuracy on the Summary Section. A question mark character ? will show up in the Current and/or Future Deliverable Status IF an assessment is missing in any of the deliverable rating boxes.
Figure 3 Header Section of Supplier APQP/PPAP Readiness Assessment
The header also contains information about the supplier, the part (Fig.4, Call Out (1)), Ford and Supplier Contact Information (Fig.4, Call Out (2)) and Program Timing, including Material Required Date (MRD)/ In Plant Date (Fig.4, Call Out (3)).
Figure 4 Header Section of Supplier APQP/PPAP Readiness Assessment
The header should be completed at the beginning of the program, and will only be updated as team members or program timing/required dates change.
Element Status Section The actual status of each of the 31 APQP/PPAP elements is recorded in this section. The Element Status section has the following hierarchy:
Figure 5 Assessment Section of Supplier APQP/PPAP Readiness Assessment
The Element Status Section is divided into 31 parts representing the combined 31 elements (fig.5, Call Out (1)) of the standard APQP and PPAP processes. Within each of the 31 APQP/PPAP elements are deliverables (Fig. 5, Call Out (2)). There is at least one deliverable for each APQP/PPAP element, and the status of these deliverables drives the rating (Red/Yellow/Green/Complete/N/A) status for each element. Deliverables are intended to reflect, where possible, quantifiable evidence of element success or completion. For example, deliverables will reflect key in-process metrics like Cpk or OEE.
Supporting each of the deliverables are sets of expectations (Fig. 5, Call Out (3)). Expectations are guidelines used to assist team members in the successful completion of the elements, and where applicable, help rate the completion of the related deliverables
31 APQP/PPAP Elements 48 Deliverables (Minimum 1 per element) 217 Expectations (1) SUPPLIER INFORMATION (2) FORD AND SUPPLIER CONTACT INFORMATION (3) PROGRAM TIMING (1) ELEMENT (2) DELIVERABLES (3) EXPECTATIONS GPDS Supplier APQP/PPAP Readiness Assessment Author: KATIA BURLINGAME - burlin1 Initial Release Date: 09/25/2007 Version: 1.0 Page 5 of 9
CONFIDENTIAL
While expectations will be rated Red/Yellow/Green/Complete, they will not drive the element rating only deliverables will drive element ratings. The ratings for expectations are intended only for internal use and communication. Expectations should be thought of as Quality of Event criteria and will be directly aligned with the APQP/PPAP work instructions. The expectation section can be expected to be updated and added to over time to reflect systemic lessons learned.
Summary Section This part of the Assessment is intended to summarize the element status for the entire document. Currently, there are 5 parts to the summary:
Figure 6 Summary Section
CURRENT Milestone Deliverable Status
The spreadsheet provides a summary report of the deliverables that are required to be complete up until the milestone being reported. A Chart (fig. 7, Call Out (1)) graphically represents the number of Red, Complete, Not Submitted and Not Applicable Deliverables.
Figure 7 Current Milestone Deliverable Status
The spreadsheet displays the rating in a numeric fraction format (Fig. 7, Call Outs (3,4)) where the denominator is the cumulative number of all deliverables required to be complete up until the milestone being reported.
For example, at FDJ (fig.7, Call Out (2)), only 19 deliverables are required to be complete. If 3 out of the 19 deliverables are not complete, the spreadsheet will use3 as the numerator for the Red deliverables and 19 for the denominator. The rating will be displayed as R - 3/19 (meaning 3 out of the 19 required deliverables are Red) Fig. 7, Call Out (3)). The Complete rating will be the remaining, displayed in the chart as C 14/19 (meaning 14 out of the 19 required deliverables are Complete). Note that in this example, 1 deliverable was not submitted and 1 was considered not applicable. Only Red,Complete, Not Applicable Status ratings are allowed for the REQUIRED deliverables
A status is considered Not Submitted (?) Fig. 7, Call Out (4) - when a deliverable cell is left in blank (no status). CURRENT MILESTONE DELIVERABLE STATUS FORECAST MILESTONE DELIVERABLE STATUS PPAP ELEMENT DATES AND BUILD SUPPORT PLANS SUPPLIER VISITS RATING CRITERIA AND ASSESSMENT DEFINITION (1) CHART (5) ACTION PLAN (3) RED (4) NOT SUBMITTED (2) REPORTED MILESTONE GPDS Supplier APQP/PPAP Readiness Assessment Author: KATIA BURLINGAME - burlin1 Initial Release Date: 09/25/2007 Version: 1.0 Page 6 of 9
CONFIDENTIAL
There is also an interesting feature provided in the assessment. Once Red and Not submitted fractions are displayed, the user can also double-click on the cells (AB314 for Red and AB318 for Not Submitted) to find out the Excel cell location of the items that have considered in the score.
Fig. 8 Special Feature to locate Red and Not submitted status
The last portion of the Current Milestone Status Box is the An Action Plan Summary box (Fig.7, Call Out (5)) containing 8 key parameters (Sourcing, Design, Tooling, Process, DV/PV Testing, Capacity, Logistics and Others) related to any given Red status. The text entered in the Action Plan Summary box must be succinct and objective since it populates the Supplier Scorecard Report.
FORECAST Milestone Deliverable Status
The External APQP/PPAP Readiness Assessment also provides a second chart containing an outlook of all the remaining deliverables that are not yet required to be complete. This will provide a future outlook for the part(s) and allowing the teams to forecast issues, leverage workload and perform planning activities.
The ratings follow a similar principle in the Current Milestone, except that Yellow and Green ratings are allowed. For example, at <FDJ>, there are 19 deliverables required to be complete (refer to current milestone deliverable status). Since the total program deliverables are 48 (fixed), the remaining deliverables (29) are considered to be the deliverables for forecast. These deliverables are the difference between the number of total deliverables (48) and the number of deliverables that are due (in this example 18). They can be rated Green, Yellow, Red and Complete with ratings also represented as a fraction. In the given example the results are: a) One deliverable due at <LR> was assessed and based on current assumptions and/or data is found to be Red b) No deliverables are completed at this time c) Nineteen deliverables are yellow d) One deliverables is not applicable e) Two deliverables have status missing (cells were left blank and a question mark appears in the pie chart) f) Remaining deliverables are on track (green)
Based on the above scenario, the ratings in the Forecast Chart will be displayed as: C - 0/29, Not submitted- 2/29, N/A - 1/29, G 6/29, Y 19/29, R -1/29, assuming the remaining balance is on track (Green).
The PPAP Element Dates (fig. 9, Call Out (1)) information is a summary of the promised and actual PPAP dates in the Element Status automatically populated from the Planned and Actual Completion Date columns. The Build Support Plan (fig.9, Call Out (2)) information will be rolled up as part of the SUPPLIER SCORECARD.
Fig. 9 PPAP Element Dates and Build Support Plan.
The Supplier Visits box (Fig.9, Call Out (3)) information is required for Priority Suppliers only (it appears only when the "Priority" supplier boxed is selected in the header). The team will manually track planned and actual visit dates along with the teams attendance for each visit. The visit completion information is rolled up on the ELEMENT SUMMARY REPORT.
Rating Criteria and Assessment Definition
Against the program milestones, Deliverables and Expectations will show two color schemes: Light Grey With No Box Forecast Period (activity is not expected in this time period, but the supplier must enter a rating to show whether or not they forecast risk to the deliverable completion in the future. Dark Grey With Black Box Deliverable/Expectation Start & End Points (activity is expected to begin and end between these milestones.
Prior to the required deliverable/expectation completion timing, deliverables/expectations can be rated Red, Yellow, Green, or Complete. At the he required deliverable/expectation completion timing, deliverables/expectations must be rated Complete or Red. A deliverable must be tracked until it is complete. After the required deliverable/completion timing, a deliverable must continue to be rated Red until it is Complete. Once Complete, it is no longer required to be rated at subsequent milestones.
(1) PPAP Element Dates (3) Supplier Visits (2) Build Support Plan Dark Grey with Black Box Light Grey with no Box GPDS Supplier APQP/PPAP Readiness Assessment Author: KATIA BURLINGAME - burlin1 Initial Release Date: 09/25/2007 Version: 1.0 Page 8 of 9
CONFIDENTIAL
D. How to start 1. Open the file 2. Find the "Security Warning" window (as in below):
3. Select "Enable Macros"
4. If the Security window is not present, the Macros have probably been blocked on your computer Schedule A will not run without these macros. You can test this scenario by looking into the drop down list and if a list of milestones (Fig. 10) is not present, then the macros are not running. Please contact your IT department to allow macros.
For Microsoft Excel 2007: 1. When you open Schedule A for the first time, you will see a "Security Warning" showing right below the ribbon bar
2. Select on the "Options" button
3. The "Microsoft Office Security Options" window will open, from here select "Trust all documents from this publisher" and then click on the "OK" button.
4. The macros in this document will now be enabled. Any time you open this document in the future, the macros will automatically be enabled.