Beruflich Dokumente
Kultur Dokumente
JI-163
Doc. No. OIL/SD/07 Rev 0
OIL/SD/07
Shut Down of Oil Production Well
Table of Contents
Action
Page 2 to 2
Pages 3 to 5
Symbols
<>
()
[]
Rev No.
0
Date
May 2004
Safety Action
Verification
Action
Prepared by
R. Gomez
Page 1
Verified by
G. Faber
Approved by
P.L dHaussy
TABLE OF CONTENTS
1
INITIAL STATUS....................................................................................................3
PRELIMINARIES...................................................................................................3
FINAL STATUS......................................................................................................5
Page 2
INITIAL STATUS
-
Oil production is running and operating conditions of all equipment are within the
limit
PRELIMINARIES
< > Ensure all personnel have H2S detectors & Escape masks.
< > Ensure that all F&G systems are in automatic.
< > Inform Dor-2 and Dor-1 about the operation
< > Ensure that radio communication is working between CCR & out side operator/
Dor-1 and Dor-2
< > Ensure that all F&G or process Inhibitions has been entered into the RED
BOOK
< > Ensure Trolley Breathing apparatus is available at cluster side
Page 3
Oil production wells will trip automatically in case of the causes mentioned
below:
ESD-1 by manual push buttons, F&G system or fusible loop which closes:
SCSSVs + ESD-2 + ESD-3 of all wells on the cluster
ESD-3 by flowline PSHH, PSLL or push buttons from each well head control
panel: Only individual well shut down (close SSV)
3.1
[]
Check that proper portable manifolds are available for Cluster depressurization
()
()
()
Ensure the burner is ready at catchments pit & LPG gas is available
()
3.2
Closing of wells
[]
[]
Gradually reduce oil flow from the wells by closing the choke
[]
[]
[]
Page 4
3.3
FINAL STATUS
-
Oil well(s) shut down (SSV, Manual Wing valve and choke closed)
Page 5