Basics of SAP-PLM
Bala PP QM 280 posts since Nov 17, 2011
Basics of SAP-PLM Aug 6, 2012 7:41 AM
Sir,


What is the difference between CC01 and CC31? What is the difference between
ECN,ECR,ECO ?Can any one send me the step by step procedure for learning ECM and Revision level and
also the important study topics in SAP-PLM? kindly suggest for any study materials for SAP-PLM?

J.Balakrishnan
Rupesh Brahmankar
Re: Basics of SAP-PLM Aug 6, 2012 7:57 AM
Dear,

Please use the search option in this forum you will get lot of stuff in this forum.
http://scn.sap.com/thread/790970

Regards,
R.Brahmankar
Bala PP QM 280 posts since Nov 17, 2011
Re: Basics of SAP-PLM Aug 6, 2012 8:05 AM
Sir,

Thanks for your immediate reply and useful thread

J.Balakrishnan
Swetha A 615 posts since Jun 7, 2011
Re: Basics of SAP-PLM Aug 6, 2012 8:07 AM
Hello,

Difference between CC01 and CC31- refer the thread below:
http://scn.sap.com/thread/790970
Basics of SAP-PLM
Generated by Jive on 2014-10-04+02:00
2
Setting for revision level and ECm:
http://help.sap.com/saphelp_470/helpdata/en/d8/73200e4b7511d1894b0000e8323c4f/content.htm
http://help.sap.com/saphelp_media464/helpdata/en/d4/09c0cfa3a811d189be0000e829fbbd/content.htm

Course material PLM150 deals with Engineering change management
PLM100 for basics.

Please look for SDN threads before reporting as it leads to duplicates.

regards
Bala PP QM 280 posts since Nov 17, 2011
Re: Basics of SAP-PLM Aug 6, 2012 8:11 AM
Thank you swetha,

Before posting in SCN, i have searced for threads related to ECM, it eas not giving
enough clarity so only i posted a thread. thanks for your reply

J.Balakrishnan
Sharat Sugur 1,302 posts since Sep 13, 2010
Re: Basics of SAP-PLM Aug 6, 2012 4:30 PM
Dear Balakrishnan,

Let me share some points on your queries
What is the difference between CC01 and CC31?

CC01 - Is master used to create change number which is called as Engineering Change Number.
CC31 - Is ECR which is Engineering change request


What is the difference between ECN,ECR,ECO ?

ECN - Engineering change number is actually used as tracking for the action for mplementing engineering
change

ECR - Engineering change request which is a request put forth by the engineering team and can be discussed
in cross functional teams in organization to accept or reject based on the impacts

Basics of SAP-PLM
Generated by Jive on 2014-10-04+02:00
3
ECO - Engineer change to order - this carries the changes made in design and creating order with respect to
this order and proving out.


Can any one send me the step by step procedure for learning ECM and Revision level and
also the important study topics in SAP-PLM? kindly suggest for any study materials for
SAP-PLM

You can use CC01 transaction to create ECN number and use it to do master data changes like BOM, Material
master, routing etc. This change number will be associated with the master data and you can find the report of
the same in CC07.
Suggest you to go through the link provided Mr. Rupesh which is http://scn.sap.com/thread/790970.

Any specific questions, please ask for clarity.
Best regards,
Sharat
Bala PP QM 280 posts since Nov 17, 2011
Re: Basics of SAP-PLM Aug 6, 2012 8:30 PM
Sir,


Thanks for your Much useful reply, what is the T code for Engineering change order

J.Balakrishnan
Sharat Sugur 1,302 posts since Sep 13, 2010
Re: Basics of SAP-PLM Aug 7, 2012 7:06 AM
Hi
There is no separate transaction code for ECO, you have to use general production order concept only to do
this. You can use different order type if you track it separately. This is the concept in ECN and not the process
in SAP. Concept used in some business processes, may not be in all.

Hi Balakrishnan, request you to refer the details on link http://scn.sap.com/docs/DOC-19331. Good to say
thanks by awarding points.

regards,
Sharat