The New Technologies Demonstrator Programme is a scheme part of Defra's Waste
Implementation Programme, New Technologies Workstream, to demonstrate advanced
waste processing technologies in ngland! " pot of #$%million was allocated to fund &%
demonstrator pro'ects with the pro'ect (eing headed () Dave *rooks at Defra! The
scheme is not on schedule for the am(itious targets that were initiall) set out () Defra,
however + pro'ects out of the initial &% are now pro'ected to (e operational () "pril ,%%+,
over , )ears (ehind schedule!
Contents
-hide.
& The scheme
, /ontrovers)
$ The pro'ects
o $!& 0perational
o $!, /ontracts signed
1 2ee also
3 4eferences
[edit] The scheme
The scheme initiall) was allocated #$, million, of which #, million was to help fund
research and development into waste technolog)!
-&.
The scheme for the distri(ution of the
main #$% million pot commenced in ,%%1 and was originall) split into two rounds:
-,.
405ND &: 3 demonstrator pro'ects in operation () $&!&,!%3
405ND ,: 3 demonstrator pro'ects in operation () $&!&,!%6
There pro'ect had a huge response for the first round, with 7& pre89ualification
9uestionnaire su(missions (eing filed from interested parties!
-citation needed.
The 9ualit) of
some of the initial (ids were criticised () :artin *rockelhurst, ;ead of Waste 2trateg), at
the nvironment "genc) who remarked some of the applications were poor and came
from a <)oung industr)<!
-$.
[edit] Controversy
There have (een concerns that the pro'ect is taking too long and some participants
threatened to walk out!
-1.
0n the &&
th
"pril ,%%6, Defra declared that its initial timescales
were am(itious and pro'ects were not on target!
-3.
0f the &% original pro'ects planned a
total of + have now (een signed and includes gasification, in8vessel composting,
anaero(ic digestion and mechanical heat treatment! =rom the original target dates for
operational demonstrator plants outlined in the initial assessment criteria onl) , pro'ects
are now operational >true as of ,7!&&!%6?!
-6.
0n the ,1 Novem(er ,%%6, Dave *rooks
announced that the new target for all plants (eing operational is "pril ,%%+!
[edit] The proects
[edit] !perational
&! @reenfinch anaero(ic digesters, Audlow, 2hropshire
,! *ioganiB in8vessel composting plant, Aeominster
[edit] Contracts signed
&! "D"2Cnvar in8vessel composing plant, 2t Ives, /am(ridgeshire
,! Dorwaste gasification plant, 2eamer /arr, 2car(orough
$! Premier Waste aero(ic digestion plant, Durham
1! Novera gasification plant, Dagenham
3! nergos gasification plant, Isle of Wight
6! /ompact Power gasification plant, "vonmouth
7! =airport ngineering, mechanical heat treatment, :erse)side