Sie sind auf Seite 1von 40

ro[ecLs updaLe

lor Ward 8
Monday, CcLober 6, 2014
1
6:30 p.m. Ca|| to Crder and We|come - Don Ldwards, Iac|||tator
6:3S p.m. Cpen|ng kemarks - Mauhew 8rown, D|rector
6:40 p.m. Lng|neer|ng kemarks - Muhammed kha||d, Inter|m Ch|ef Lng|neer
6:4S p.m. Adm|n|stranve kemarks - Don Ldwards

6: S0 p.m. Group 1:
ro[ect Deve|opment rocess Cverv|ew
Anacosna Streetcar Lxtens|on LA
DC Streetcar
1ramc L|ght Synchron|zanon

7:00 p.m. Group 2:
11th Street 8r|dge
South Cap|to| Street Corr|dor
South Cap|to| Street 1ra||
7:4S p.m. uesnons and Comments
8:2S p.m. Next Steps
8:30 p.m. Ad[ourn



7:2S p.m. Group 3:
St. L||zabeths Campus Infrastructure
Cxon kun 1ra||
Southern Avenue

7:3S p.m. Group 4:
Asset Management
Low Impact Deve|opment
Urban Iorestry
Street L|ght Upgrades
Agenda
ro[ecLs updaLe
lor Ward 8
Croup 1
1ransportanon ro[ect Deve|opment rocess
|ann|ng
Nanona| Lnv|ronmenta| o||cy Act
(NLA)
I|na| Des|gn
k|ght-of-Way
Construcnon
NLA rocess|ng Cpnons
(C|asses of Acnon)
NO
Proposed Action
Coordination and
Analysis
Significant Impact ?
Listed
Categorical
Exclusion (CE)
Public Comment
Public Hearing
Documented
Categorical
Exclusion (CE)
Environmental
Assessment
(EA)
Significant
impact
Notice of Intent & Scoping
Process
Draft Environmental Impact
Statement (EIS)
Record of Decision (ROD)
Final Environmental Impact
Statement (EIS)
Agency Action Agency Action
Finding of No
Significant Impact (FONSI)
Agency Action
Coordination and
analysis as needed
No significant
impacts
Unknown
YES
Document
appropriately
Class of Acuon for nLA
CaLegorlcal Lxcluslon (CL)
LnvlronmenLal AssessmenL (LA)
LnvlronmenLal lmpacL SLaLemenL (LlS)
rogrammauc AgreemenLs
CaLegorlcal Lxcluslon
PlsLorlc reservauon
D|str|ct Department of
1ransportanon (DDC1) rocess
uenlng Lhe roblem
ueveloplng Soluuons for Lhe roblem
Analyzlng Lhe lmpacLs
Avoldlng/Mlnlmlzlng/Mlugaung lmpacLs
Maklng lnformed ueclslons
Cood uocumenLauon (uaLa, uaLa, uaLa!)
Why Do We Do NLA?
!"#$ &'()" *+,-$-(. /&0-.12
Goa|s:
1o exLend Lhe currenL Anacosua lnlual
Llne SegmenL from Lhe 1emporary
MalnLenance and Cperauons laclllLy Lo
Lhe Anacosua MeLro SLauon and 8us
1ranslL CenLer
ApproxlmaLely 1 mlle ln lengLh
rlmarlly on SouLh CaplLol SLreeL and
llrLh SLerllng Ave from Anacosua meLro
sLauon Lo souLh of llrLh SLerllng/SouLh
CaplLol SLreeL lnLersecuon
lncludes roadway reconsLrucuon,
SLreeLcar Lracks and faclllLy
Status
ConsLrucuon underway
Anacosna In|na| L|ne Segment &
Metro Connecnon
8
Goa|s:
Cpumlze 203 Lramc slgnals Lo.
8educe Lramc congesuon/vehlcular emlsslons
lmprove bus runnlng umes
Cpumlze pedesLrlan crosslng umes
Status:
CompleLed Aprll 2014 - 8esulLs show beneL of $77 for every dollar spenL
vehlcles
! 13 neLwork-wlde Lravel ume savlngs over all peaks
! 34 reducuon ln delays aL Lramc slgnals
! 23 reducuon ln sLops aL Lramc slgnals
1ranslL Cperauons
! ercenLage of laLe buses reduced from 17 Lo 10
! Cn-ume arrlvals lmproved from 74 Lo 78
! lncrease ln 'ahead-of-schedule' arrlvals
edesLrlans
! edesLrlan clearances meeL Manual on unlform 1ramc ConLrol uevlce S1us
Network-w|de 1ramc L|ght Synchron|zanon
Wards 6, 7, and 8
ro[ecLs updaLe
lor Ward 8
Croup 2
Goa|s:
lmprove moblllLy by provldlng separaLe
freeway and local Lramc connecuons Lo
boLh dlrecuons 293, Lhe SL/SW lreeway
and local sLreeLs
rovlde a shared use paLh for pedesLrlans
and blcycllsLs
8eplace Lhe exlsung funcuonally declenL
and sLrucLurally obsoleLe brldges
rovlde an addluonal alLernaLe evacuauon
rouLe from our nauon's CaplLal
lnclude new Lrall connecuons, lmproved
dralnage and oLher envlronmenLal
lnvesLmenLs
Status:
hase ll (ro[ecL Compleuon) ls on-golng,
scheduled for compleuon ln mld-2013
11
th
Street 8r|dges
kep|acement ro[ect
Schedu|e:

Cpened D3, D4 kamps from 11
th

Street to I-69S
August 2014
Southeast 8|vd to 8arney C|rc|e Ianuary 201S
hase II Comp|enon Summer 201S
Goa|s:
8eplace lrederlck uouglass Memorlal 8rldge
1ransform Lhe corrldor lnLo a grand urban
boulevard
lncrease safeLy and communlLy accesslblllLy
lmprove mulu-modal LransporLauon opuons
SupporL economlc developmenL
Status:
rocuremenL sLage for hase 1 consLrucuon
South Cap|to| Street
Corr|dor ro[ect
Schedu|e:

Nonfy Short-L|sted Contactor 1eams Ianuary 31, 2014
Issue kequest for roposa|s W|nter 2014
kece|ve 1echn|ca| roposa|s Spr|ng 201S
Se|ect Des|gn-8u||d 1eam Ia|| 201S
Issue Nonce to roceed Ia|| 201S
I|na| Comp|enon Lnd of 2019
Goa|s:
lmprove blcycle/pedesLrlan access along Lhe
SouLh CaplLol SLreeL/Cverlook Avenue corrldor
lncrease mulu-modal connecuvlLy for local
nelghborhoods, mlllLary bases and recreauonal
desunauons beLween uC vlllage and oplar olnL
rovlde a llnk souLh from Lhe ulsLrlcL's Anacosua
8lverwalk 1rall Lo Maryland's Cxon 8un 1rall and
Woodrow Wllson 8rldge connecuon wlLh vlrglnla
South Cap|to| Street 1ra||

Status:
Conunulng prellmlnary/concepLual
deslgn



ro[ecLs updaLe
lor Ward 8
Croup 3
Goa|s:
upgrade urban roadway and uullLy lnfrasLrucLure
(ueslgn-8ulld dellvery)
ConnecL LasL Campus Lo ad[acenL nelghborhoods
rovlde mulu-modal LransporLauon opuons LhaL
lnclude LranslL, blcycles, and pedesLrlans
Mlnlmum 33 Cerued 8uslness LnLerprlse (C8L)
paruclpauon goal
Status:
rellmlnary ueslgn and LnvlronmenLal
AssessmenL compleLed.
ueslgn-8ulld rocuremenL ln rogress
St. L||zabeths Last Campus
Stage 1-Infrastructure & Un||ty Improvements
1arget Schedu|e:

Issued kequest for roposa|s August 2014
Des|gn 8u||d roposa| Due Cctober 2014
Se|ecnon of Des|gn 8u||d Contractor December, 2014
Contractor Award 1
st
uarter 201S
I|na| Des|gn of Infrastructure 3
rd
uarter 201S
Construcnon 8eg|ns 4
th
uarter 201S
St. L||zabeths Last Campus
Stage 1-Infrastructure & Un||ty Improvements
17
Goa|s:
lmprove access wlLhln Cxon ark
Pelp non-moLorlzed neLwork connecuons Lo
surroundlng desunauons
8ehablllLaLe and consLrucL new Lralls
rovlde Llghung for funcuonal lllumlnauon and
securlLy of Lhe Lrall
lmprove waLer quallLy & reduce sLormwaLer runo
Status:
rellmlnary ueslgn compleLed !uly 2014
llnal ueslgn ln rogress
Schedu|e:

ro[ect M||estones Date]1|me of ear
re||m|nary Des|gn Comp|eted Iu|y 2014
I|na| Des|gn Started August 2014
I|na| Des|gn Comp|enon August 201S
Annc|pated Construcnon 2016-2017
Cxon kun 1ra|| kehab|||tanon
Cxon kun 1ra|| kehab|||tanon
hase I ro[ect L|m|t:
SouLhern Avenue SL, beLween 8arnaby
8oad & SouLh CaplLol SLreeL
Goa|s:
lmprove vehlcular and pedesLrlan safeLy
Comply wlLh Amerlcans wlLh ulsablllues AcL
(AuA) requlremenLs
lmprove Lramc operauon
8eplace brldge over Wlnkle uoodle 8ranch/
lmprove geomeLry
upgrade SLreeL Llghung for funcuonal
lllumlnauon & enhanced securlLy along Lhe
corrldor
lmprove 8arnaby 8un Channel
Status:
LnvlronmenLal and rellmlnary ueslgn

Southern Avenue and 8r|dge
Cver W|nk|e Dood|e 8ranch
Schedu|e:
Conceptua| Des|gn Comp|eted Ia|| 2013
re||m|nary Des|gn Start Spr|ng 2014
I|na| Des|gn Start 3
rd
uarter, 201S
Construcnon 4
th
uarter, 2016
Southern Avenue and 8r|dge
Cver W|nk|e Dood|e 8ranch
Southern Avenue and 8r|dge
Cver W|nk|e Dood|e 8ranch
SafeLy and CeomeLrlc lmprovemenLs of l-293
(uC 293) - l? 2013
8ehablllLauon of Anacosua lreeway (l-293)
8rldges over nlcholson SL. SL - l? 2013
8ehablllLauon of Anacosua lreeway (l-293)
8rldges over SouLh CaplLol SL. SL - l? 2013
ennsylvanla Ave.-MlnnesoLa Ave. SL
lnLersecuon lmprovemenL - l?2013
Cther Upcom|ng ro[ects
ro[ecLs updaLe
lor Ward 8
Croup 4
I-14 Ward 8 Work Comp|eted:
8oadway avlng
! More Lhan 4.3 Lane Mlles aved
Alley 8epalr
! 3744 1sL SLreeL SL
! 2333 14
Lh
L SL
! 3026 8ennlng 8oad nL
Sldewalk 8epalr
! Morrls 8oad SL (lrom WesL SLreeL
SL Lo ML vlew SLreeL SL)
I-1S Ward 8 Work |anned:
8oadway avlng
! 3 mlles
Alley 8epalr
! More Lhan 0.3 mlles
Sldewalk 8epalr
! 2.3 mlles


Asset Management ro[ects
koadways, A||eys and S|dewa|ks
Goa|s:
8educe sLormwaLer runo lnLo Anacosua and
oLomac 8lvers from Lhe publlc rlghL-of-way
uslng Low lmpacL uevelopmenL (Llu) as parL of
uuC1 clLy-wlde lnluauve
lnsLall bloreLenuon (planLed areas) behlnd
curbs ad[acenL Lo sLreeL and ln curb bumpouLs
Lo capLure runo from sLreeL
lnsLall permeable pavlng Lo prevenL runo
Status:
llnal deslgn compleLe for Lrle SLreeL
Cxon 8un ln prellmlnary deslgn
Start Lr|e Street SL (Ward 8)
Construcnon
Spr|ng 201S
Cxon kun Green Streets (Ward 8)
Construcnon
201S
Cxon kun S|tes
Lr|e Street SL
Low Impact Deve|opment
ketroht ro[ects
Schedu|e:
Goa|s:
SupporL and enhance sLorm waLer capLure
raLes from Lhe ulsLrlcLs sLreeLs as mandaLed
by LA ln Lhe MS 4 permlL
1ree 8oxes shall be malnLalned by Lhe
abumng owner as per Lhe uCM8 24
SLreeL 1rees are malnLalned by Lhe ulA lSA
cerued arborlsL and servlces should be
requesL Lhrough Lhe Mayor Call CenLer aL
311
Landscape/green spaces enhance Lhe
nelghborhood and provlde Lramc calmlng
Status:
Cngolng and seasonally based
Landscaped Med|ans]Green
Spaces]1ree Serv|ces Ward 8ased
Schedu|e:

1rash Week|y except w|nter months
Weed|ng Month|y from Apr|| to Cctober
Mu|ch|ng As needed
run|ng As needed
|annng As needed
Goa|s:
SupporL and enhance communlLy llvablllLy
Sausfy federally-mandaLed sLormwaLer
managemenL consenL decree (MS4 ermlL)
uellver envlronmenLal servlces
! Cleaner alr - Cleaner waLer
1o calm Lramc
1o beauufy nelghborhoods!
Status:
1hls fall and sprlng ulA wlll lnsLall over 730 Lrees ln
ward 8
uuC1's planung season wlll sLarL ln CcLober and
wlll conunue Lhrough Aprll
1he llnk Lo all our planung slLes can be found on
Lhe uuC1 web slLe under - urban foresLry - uuC1
1ree Servlces Schedule - rsL map ln Lhe mlddle of
Lhe screen.
Web SlLe ls hup://ddoL.dc.gov/node/300202
Ward 8 1ree |annng
Goa|s:
upgrade exlsung sLreeLllghL sysLem
beLween Marun LuLher klng, !r. Avenue
Lo 10Lh lace
rovlde beuer unlformlLy of llghL
meeung englneerlng sLandards
(enhances safeLy)
lnsLall more emclenL LLu xLures
(reduces power cosL)

Status:
ConsLrucuon compleLe AugusL 2014
SLreeLllghL procedures
Street||ght Upgrade
A|abama Avenue, SL
Schedu|e:

Comp|ete Des|gn Iebruary 2014
Construcnon Start Iune 2014
Construcnon Lnd August 2014
Street||ght Genera| Update
Ward 8
number of llghLs converLed Lo new LLus (Lo daLe): 333 llghLs
S1kLL1LIGn1 MAIN1LNANCL
LIIICILNC IN 1nL LAS1 6 LAkS
LAk 2009 2010 2011 2012 2013 2014
(01]01
-09]30)
nuM8L8 Cl
MAln1LnAnCL
CALLS

3069 2969 3036 2192 2481 1701
6:30 p.m. Ca|| to Crder and We|come - Don Ldwards, Iac|||tator
6:3S p.m. Cpen|ng kemarks - Mauhew 8rown, D|rector
6:40 p.m. Lng|neer|ng kemarks - Muhammed kha||d, Inter|m Ch|ef Lng|neer
6:4S p.m. Adm|n|stranve kemarks - Don Ldwards

6: S0 p.m. Group 1:
ro[ect Deve|opment rocess Cverv|ew
Anacosna Streetcar Lxtens|on LA
DC Streetcar
1ramc L|ght Synchron|zanon

7:00 p.m. Group 2:
11th Street 8r|dge
South Cap|to| Street Corr|dor
South Cap|to| Street 1ra||
7:4S p.m. uesnons and Comments
8:2S p.m. Next Steps
8:30 p.m. Ad[ourn



7:2S p.m. Group 3:
St. L||zabeths Campus Infrastructure
Cxon kun 1ra||
Southern Avenue

7:3S p.m. Group 4:
Asset Management
Low Impact Deve|opment
Urban Iorestry
Street L|ght Upgrades
Agenda
1hank you!
Cuesuons and CommenLs?
8ack-up Slldes
Goa|s:
LxLenslon of Anacosua lnlual Llne and parL
of Lhe 22-mlle rlorlLy SLreeLcar SysLem
Status:
referred alLernauve selecLed (CSx 8allroad
8lghL-of-Way) and recommended Lo Lhe
lederal 1ranslL Agency (l1A)
LnvlronmenLal AssessmenL (LA) and oLher
documenLs submlued Lo l1A for revlew and
approval ln !uly 2014
Next Steps:
1he nauonal LnvlronmenLal ollcy AcL
(nLA) process concludes when l1A concurs
wlLh Lhe preferred alLernauve and lssues a
llndlng of no SlgnlcanL lmpacL (lCnSl)


ub||c kev|ew of LA March-Apr||
2014
Se|ected referred
A|ternanve
Apr||-May
2014
I|na| Lnv|ronmenta|
kev|ew by I1A & InWA
Cngo|ng
CSk ka||road k|ght-of-Way: ConcepLual renderlng of
preferred alLernauve as recommended Lo l1A

Schedu|e:
Anacosna Streetcar Lxtens|on
Lnv|ronmenta| Assessment
Network-w|de 1ramc L|ght Synchron|zanon
In Wards 6, 7, and 8
Network-w|de 1ramc L|ght Synchron|zanon
In Wards 6, 7, and 8
37
11th Street 8r|dge ark Des|gn Compennon
CMA + CLIN
38
11th Street 8r|dge ark Des|gn Compennon
8a|mor| Assoc|ates]Cooper, kobertson & artners
39
11th Street 8r|dge ark Des|gn Compennon
Stoss Landscape Urban|sm]nwe|er + oon Arch|tecture
40
11th Street 8r|dge ark Des|gn Compennon
Wa||ace koberts & 1odd] NLk1 Arch|tects

Das könnte Ihnen auch gefallen