Sie sind auf Seite 1von 3

DATE:

WELL No.
Time
interval
W/H Pressure (
barg)
05 Min. 31 05 Min. 36.5
10 Min. 31 10 Min. 36.5
15 Min. 31 15 Min. 36.5
20 Min. 31 20 Min. 36.5
25 Min. 31 25 Min. 36.5
30 Min. 31 30 Min. 36.5
Time
interval
W/H Pressure
(barg)
05 Min. 30 05 Min. 52
10 Min. 30 10 Min. 52
15 Min. 30 15 Min. 52
20 Min. 30 20 Min. 52
25 Min. 30 25 Min. 52
30 Min. 30 30 Min. 52
Remarks
No leak on the SCSSV and SSV as bothare holding
Performer Majid
Raju Karnik C.V.Thomas Robert Gomes
Pascal
60
W/H pressure
after
depresuriseing
(barg)
SCSSV LEAK / HOLD TEST
36
60 50
Observations
D120P
Obervations
Obervations
SSV LEAK TEST / HOLD TEST
Up stream Pressure
Well Shut in Pressure
(barg)
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
28/11/2005
RSES
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
Status
Flow line pressure
During test (barg)
Production Supdt.
W/H pressure
after
depresuriseing
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Field Supervisor

DATE:
WELL No.
Time
interval
W/H Pressure
(barg)
115
05 Min. 28 05 Min. 95
10 Min. 28 10 Min. 95
15 Min. 28 15 Min. 95
20 Min. 28 20 Min. 95
25 Min. 28 25 Min. 95
30 Min. 28 30 Min. 95
Time
interval
W/H Pressure
(barg)
05 Min. 28 05 Min. 40
10 Min. 28 10 Min. 40
15 Min. 28 15 Min. 40
20 Min. 28 20 Min. 40
25 Min. 28 25 Min. 40
30 Min. 28 30 Min. 40
Remarks
Performer Majid
Raju Karnik C.V.Thomas Robert Gomes
Pascal
Field Supervisor
No leak on SCSSV and SSV as both are holding
Status
Flow line pressure
During test (barg)
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
28/11/2005
Production Supdt.
W/H pressure
after
depresuriseing
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
RSES
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
95
115 40
Observations
D - 121 P
Obervations
Obervations
SSV LEAK TEST / HOLD TEST
Up stream Pressure
Well Shut in Pressure
(barg)
115
W/H pressure
after
depresuriseing
(barg)
SCSSV LEAK / HOLD TEST

DATE:
WELL No.
Time
interval
W/H Pressure
(barg)
05 Min. 05 Min.
10 Min. 10 Min.
15 Min. 15 Min.
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 20 05 Min. 28
10 Min. 20 10 Min. 28
15 Min. 20 15 Min. 28
20 Min. 20 20 Min. 28
25 Min. 20 25 Min. 28
30 Min. 20 30 Min. 28
Remarks
Performer Majid
Raju Karnik C.V.Thomas Robert Gomes
Pascal
Field Supervisor
SCSSV Leak test cannot be carried out as sleeve is present instead of SCSSV. It was
observed that there is no leak on the SSV as it is Holding
Status
Flow line pressure
During test (barg)
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
28/11/2005
Production Supdt.
W/H pressure
after
depressurising
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
RSES
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
115 25
Observations
D - 122 P
Obervations
Obervations
SSV LEAK TEST / HOLD TEST
Up stream Pressure
Well Shut in Pressure
(barg)
W/H pressure
after
depresuriseing
(barg)
SCSSV LEAK / HOLD TEST ( NO SCSSV ONLY SLEEVE)