Sie sind auf Seite 1von 3

DATE:

WELL No.
Time
interval
W/H Pressure (
barg)
05 Min. 26 05 Min. 45
10 Min. 26 10 Min. 45
15 Min. 26 15 Min. 45
20 Min. 26 20 Min. 45
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 26 05 Min. 55
10 Min. 26 10 Min. 55
15 Min. 26 15 Min. 55
20 Min. 26 20 Min. 55
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
No leak on the SCSSV and SSV as bothare holding
Rashid S.A J Louis
Vincent
SCSSV LEAK / HOLD TEST
Up stream Pressure
Well Shut in Pressure
(barg)
79
W/H pressure
after
depresuriseing
(barg)
RSES
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
45
78.5 55
Observations
During test (barg)
Field Supervisor
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
03/02/2006
D120P
Obervations
Obervations
SSV LEAK TEST / HOLD TEST
Performer
Majid/Karnik
Status
Flow line pressure
During test (barg)
Production Supdt.
W/H pressure
after
depresuriseing
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)

DATE:
WELL No.
Time
interval
W/H Pressure
(barg)
05 Min. 24.5 05 Min. 50
10 Min. 24.5 10 Min. 50
15 Min. 24.5 15 Min. 50
20 Min. 24.5 20 Min. 50
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 24.5 05 Min. 52
10 Min. 24.5 10 Min. 52
15 Min. 24.5 15 Min. 52
20 Min. 24.5 20 Min. 52
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
Rashid S.A J.Louis
Vincent
Production Supdt.
W/H pressure
after
depresuriseing
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Field Supervisor
52
Performer
Obervations
W/H pressure
after
depresuriseing
(barg)
Up stream Pressure
Status
Flow line pressure
During test (barg)
Well Shut in Pressure
(barg)
79
Majid/Karnik
Observations
No leak on SCSSV and SSV as both are holding
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
2/3/2006
D - 121 P
Obervations
79
SSV LEAK TEST / HOLD TEST
SCSSV LEAK / HOLD TEST
RSES
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
50

DATE:
WELL No.
Time
interval
W/H Pressure
(barg)
05 Min. 24 05 Min. 60
10 Min. 24 10 Min. 60
15 Min. 24 15 Min. 60
20 Min. 24 20 Min. 60
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 24 05 Min. 62
10 Min. 24 10 Min. 62
15 Min. 24 15 Min. 62
62 24 20 Min. 62
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
Rashid S.A J. Louis
Vincent
Production Supdt.
W/H pressure
after
depressurising
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Field Supervisor
62
Performer
Obervations
W/H pressure
after
depresuriseing
(barg)
Up stream Pressure
Status
Flow line pressure
During test (barg)
Well Shut in Pressure
(barg)
101
Majid/Karnik
Observations
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
2/3/2006
D - 122P
Obervations
101
SSV LEAK TEST / HOLD TEST
SCSSV LEAK / HOLD TEST ( NO SCSSV ONLY SLEEVE)
RSES
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
60

Das könnte Ihnen auch gefallen