tellabs-8605
equipment guide
Installation Stepby-Step
last modified on 12 September 2010
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
no tags
Power up the
8605
Connect Laptop...
Connect laptop to the Console Port on the 8605 and
open a compatible communications package (CWAC
or HyperTerminal)
Power on breakers
Observe the 8605, does the unit power up?
Check all power LEDs on the front panel are lit
http://tellabs-8605.tiddlyspace.com/
1/20
10/6/2014
Connection
Sequence
Safety
2/20
10/6/2014
Crimping
Pre-Crimped
Tellabs Power
Lead
last modified on 17 August 2010
http://tellabs-8605.tiddlyspace.com/
3/20
10/6/2014
tags: crimping
Incorrectly
Crimped
tags: crimping
Example of a
Crimp
http://tellabs-8605.tiddlyspace.com/
4/20
10/6/2014
1.
2.
3.
4.
5.
6.
7.
8.
9.
tags: crimping
Crimping Pins to
Bare Ended Wire
last modified on 16 August 2010
http://tellabs-8605.tiddlyspace.com/
5/20
10/6/2014
Completed Crimp
last modified on 16 August 2010
http://tellabs-8605.tiddlyspace.com/
6/20
10/6/2014
Maintaining
Polarity
Connecting the
Tellabs 8605 to
the Customer
Supply
last modified on 17 August 2010
Objectives
Pre Req's and Ref Docs
Cable Colour Code
Power Demarcation and Supply Problems
Test for Voltage and Polarity
tags: installation guide
DC Power
http://tellabs-8605.tiddlyspace.com/
7/20
10/6/2014
Objectives
DC Power Supply
Training and
Reference
Materials
last modified on 17 August 2010
DC Power Cable
Colour Code
last modified on 17 August 2010
8/20
10/6/2014
Grey = Negative
Failure to maintain the correct polarity will have
serious implications on the installat
tags: dc power
Power
Demarcation and
Supply Problems
last modified on 17 August 2010
Remember:
It is the customers responsibility to provide power
as part of making the site Ready For Install (RFI)
It is not Openreachs responsibility to correct any
problems with the power supply
This course does not provide the Openreach
engineer with full DC Power installation training
If the sites power supply has not been provided
correctly, the job should be sent back as Site not
RFI using the standard Openreach process.
tags: dc power
DC Supply
Testing
9/20
10/6/2014
10/20
10/6/2014
plastic washers
Install the BNC Balun adaptors and the required
number of E1 cables from 8605 PDH ports to the
Balun Panel.
tags: installation guide
Earth Bonding
and Grounding
last modified on 17 August 2010
tagging:
Earth Bonding
Earth Grounding
Telecoms Earth Label
tags: installation guide
Earth Bonding
last modified on 17 August 2010
http://tellabs-8605.tiddlyspace.com/
11/20
10/6/2014
tags: earthing
Earth Grounding
last modified on 17 August 2010
Example of the
grounding sticker
View Step-by-step Guide
tags: earthing
Telecoms Earth
Label
last modified on 17 August 2010
http://tellabs-8605.tiddlyspace.com/
12/20
10/6/2014
tags: earthing
Sample Rack
Layout
1U 4x2 NTE
ADVA EAD
3 1U Ventilation Gap
2
1U Tellabs 8605
1U Balun Panel
Pre-Installation
Checks
http://tellabs-8605.tiddlyspace.com/
13/20
10/6/2014
A telecommunications
earth is fitted to the
last modified
on 17 August 2010
enclosure
There is adequate rack space for the EAD, 8605
and Balun patch panel/tray as specified in the job
pack
Space for the provision of the required 1U airflow
gaps for the 8605
8605 power cables installed with female Molex
connections to the customers 48v supply.
Anti-static precautions must be observed throughout.
tags: installation guide
Types of
Installations
Example of a
MEAS
Installation
http://tellabs-8605.tiddlyspace.com/
14/20
10/6/2014
Rack Type
Installation
http://tellabs-8605.tiddlyspace.com/
15/20
10/6/2014
Vodafone
Cabinet
Installation
http://tellabs-8605.tiddlyspace.com/
16/20
10/6/2014
Wall Type
Installation
http://tellabs-8605.tiddlyspace.com/
17/20
10/6/2014
Tools and
Testers Required
last modified on 17 August 2010
Equipment
Delivery
http://tellabs-8605.tiddlyspace.com/
18/20
10/6/2014
Checklist
Equipment and
Connectivity
last modified on 17 August 2010