Date 11/7/2005 Approved MJO Cells Coloured Blue Cells Coloured Red Project Rigging Summary Specification Drawing Title Is load more than 70%of crane SWL? 1 Nominated competent lift supervisor? (*1 min) Approved Procedure and / or MOC complete? Project Engineer Client Length (m) Drawing No Is there a seabed connection, before, during or after the lift. 2 Nominated competent lift team? (*2 min) Primary Risk Assessment actions Closed Out? Lift Supervisor Vessel / Site Width (m) Rev Is there seabed penetration loading? 3 JHA completed for a personnel transfer? Secondary Lift Plan Safety Masures Considered and Mitigation Actions in Place? Offshore Construction Manager Location Height (m) Lift Planning Summary Drawing Title Is a crane technician required offshore for the Lift? 4 JHA completed for a dangerous goods / chemical lift? Tertiary Suitable weather criteria & window available? Lift Plan Unique No 0 Static weight in air Drawing No What is the lift analysis report no 5 Dedicated certified lift points for lift rigging? Lifting Protocol Agreed Warranty surveyor certificate issued? (as required) Brief Description of Lift Static weight in water Rev Has a trial lift been completed successfully? (Detail results) 6 Lifting accessories and equipment fit for purpose? Personnel and Crane Escape Routes Verified Pre-lift meeting complete with all relevant parties? Date Created Max calculated Dynamic hook load, including rigging (Te) Lifting arrangement description Is pre ballasting of the vessel required? 7 Lifting accessories and equipment certificates checked? Lift Plan complete and signed off? Date of Lift Position of C.O.G Static rigging weight (Te) Is the heeling system required? 8 Has the lift equipment had a pre-use check? Routine/Non Routine Lift Can the load free flood? Certification available & checked Is there topside clearance? 9 Weight verified? Procedure Title Other Relevant Information Is this a spreader bar lift Seafastening disconnected? 10 Normal size & shape / free from sharp edges? Procedure No What is the minimum clearance to the spreader bar Are there any exclusion zones? 11 Is the lift point directly above load? Procedure Rev Can the spreader bar be connected/ disconnected safely Any risk to subsea architecture? 12 Is the load secure of loose objects? Risk Assessment (Onshore) Title Path of load considered? 13 Does crane driver have continuous visibility of lift? RA No Landing of load considered? 14 Lift clear of any plant / equipment / assets / people? RA Rev Disconnection of load considered? 15 Pick up & lay down within operation radius of crane? Job Risk Assessment (Offshore) (As Required) Title Can the Lift Rigging be recovered safely? 16 Assets, deck equipment protected from load? JRA No Any other Lifting Preparations Required? (Specify) 17 Loads clearly visible during night / subsea working? JRA Rev 18 Load landing area clear, deck strong enough and properly prepared? 19 Are tag lines required? 20 Vessel stability - pre ballasting completed? 21 Correct PPE worn? (Banksman clearly identifiable) 22 Sufficient head room / lift height clearance 23 Lifting equipment movement controlled i.e spreader bar 24 Route & laydown area clear 25 Is the lift free from parallel conflicting operations? 26 Is there only one crane in operation, which is not in conflict with other cranes? 27 Does the mode of utilisation permit the full SWL of the crane? 28 Is the Lifting Operation Free of Exclusion Zones or Subsea Architecture? 29 Is hook isolation a non-requirement? 30 Will the lift be continually supervised by the crane driver whilst the load is connected to the crane? 31 Any other concerns? - specify Name 1. Administration 2. Crane /Lifting Appliance Details Crane #2 designation Crane #1 0 0 6. Lifting Preparations Date (any answer NO needs mitigated) (all answers must be YES to proceed Crane #1 designation Overall dimensions Water depth (m) Communications available & checked 7. Safety Measures to be Considered 8. Communications / Lift protocol 9. Final Offshore Check No of Falls Whipline No of Falls Whipline Hydrodynamic loads? Working Wire Length (m) Working Wire Length (m) Potential for Lightening Strike Mobile Crane Use - Outriggers Foundations Satisfactory? Mobile Crane Use - Free from Overhead Services / Traffic? Winch SWL (Te) Is this a winch Crosshaul / Pull-in operation? Crane #2 modes required during lift Winch #1 No of Tuggers Crane tuggers required? Winch Mode Is Crane Protection Required i.e. crane master No of Falls Working Wire Length (m) Please type in your input If you have any comments regarding the use of this spreadsheet, please direct your E-mail queries to liftingoperations@technip.com where they will be addressed Max Design Lift conditions Slack wire possibility? Design load trim? Wind (knots) Drop Down Menu Do not Touch 3. Load Details 4. Lift Rigging Details 5. Lifting Environment Details Type of lift Main Block Significant Wave Height (m) Free Flooding Surface? Seabed Conditions? Crane #1 modes required during lift Crane #2 Main Block Suction Loads? Splash Zone Effect? \\vboxsrv\conversion_tmp\scratch_4\247116635.xls.ms_office Doc No Prepared CDM Rev Checked AST Date Approved MJO 0 0 0 0 0 0 0 0 0 Type of Lift Main Block 0 Crane #1 Modes Required During Lift Crane #2 0 Crane #2 Modes Required During Lift Winch SWL (Te) Crane Tuggers Required 0 Winch #1 0 In Air (Te) 0 In Water (Te) 0 Rev 0 Rev 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15. Pick up & lay down within operation radius of crane? 16. Asset/deck/equipment protected from load? 17. Loads clearly visible during night/subsea working? 28. Is the Lifting Operation free of exclusion zones or subsea architecture? 29. Is hook isolation a non-requirement? 9. Weight verified? 10. Normal size & shape/free from sharp edges? 11. Is the lift point directly above load? 12. Is the load secure of loose objects? 13. Does crane driver have continuous visibility of lift? 14. Lift clear of any plant/equipment/assets/people? 0 0 Any risk to subsea architecture? Are there any exclusion zones? 0 0 0 Path of Load considered? Is pre ballasting of the vessel required? Is the heeling system required? PROJECT LIFTING ANALYSIS REPORT NO (Issued to Ships Services for Approval) 0 0 0 0 5. LIFTING ENVIRONMENT DETAILS Position of COG? Max Calculated Dynamic Hook & Load, inc rigging (Te) 0 0 0 No of Tuggers 0 0 0 0 0 0 0 3. LOAD DETAILS No of Falls 0 Client Vessel/Site Procedure Procedure No Risk Assessment (Onshore) 0 0 0 0 Winch Mode Working Wire Length (m) Is this a Winch Crosshaul / Pull-in Operation? OPSD-CDM-G-006 C 11/7/2005 Help? - liftingoperations@technip.com 1. ADMINISTRATION Project Brief Description of Lift 0 No of Falls 0 0 Is Crane Protection required? i.e. Crane Master 0 Crane Designation #2 Whipline Working Wire Length (m) Design Load Trim? STATIC WEIGHT 0 Length (m) 4. LIFT RIGGING DETAILS RIGGING SUMMARY SPECIFICATION DRAWING Static Rigging Weight (Te) LIFT PLANNING SUMMARY DRAWING Width (m) Other Relevant Information 0 Lifting Arrangement Description Water Depth Certification Available & checked 0 0 Can the spreader bar be connected/disconnected safely? Title 0 Drawing No Lift Plan No Date Created Routine/Non Routine Lift 00/01/1900 0 0
Is there a Seabed Connection Before, During or After the Lift? 2. Nominated competent lift team (x2 min)
COMPLETE MITIGATION ACTIONS IF "NO" ANSWERED
Slack Wire Possibility? 0 0
7. SAFETY MEASURES TO BE CONSIDERED Has a Trial Lift been completed successfully? (Detail Results) IF THE ANSWER TO ANY OF THE ABOVE QUESTIONS IS 'YES' PERMISSION FROM SHIPS SERVICES REQUIRED, REFERENCE FMS-SF-622, Rev 2 Seafastening Disconnected?
0 0 6. LIFTING PREPARATIONS 0 Is the load more than 70% of crane SWL? 0 Potential for Lightening Strike? Landing of Load considered? Disconnection of Load considered? Can the Lift Rigging be recovered safely? 0 0 0 Seabed Conditions? MAX DESIGN LIFT CONDITIONS Wind (knots) Significant Wave Height (m) Hydrodynamic Loads? Free Flooding Surface Splash Zone Effect? 0 0 0 0 0 Mobile Crane Use - Outriggers Foundations Satisfactory? What is the minimum clearance to the spreader bar? Can the Load Free Flood? 0 0 Job Risk Assessment (Offshore) (As required) 0 0 OVERALL DIMENSIONS 0 Height (m) Crane Designation #1 Report No Report No Location 0 0 24. Route & laydown area clear? 18. Load landing area clear, deck strong enough and properly prepared? 19. Tag lines (as required)? 1. Nominated competent lift supervisor (x1 min) 5. Dedicated certified lift points for lift rigging? 0 0 Is there Seabed Penetration loading? 0 27. Does the mode of utilisation permit the full SWL of the crane? 26. Is there only one crane in operation which is not in conflict with other cranes? 20. Vessel stability - pre ballasting completed? 21. Correct PPE worn? (Banksman clearly identifiable) 22. Sufficient head room/lift height clearance? 23. Lifting equipment movement controlled i.e. spreader bar Suction Loads? 0 Is this a spreader bar lift? 0 Rev 0 Rev 0 00/01/1900 Rev Date of Lift 2. CRANE DETAILS / LIFTING APPLIANCE DETAILS Crane #1
0 25. Is the lift free from parallel conflicting operations Is there topside clearance? 31. Any other concerns? (Please specify) 3. JRA completed for a personnel transfer? 4. JRA completed for a dangerous goods/chemical lift? Any other Lifting Preparations required? (specify) 6. Lifting accessories and equipment fit for purpose? 30. Will the lift be continually supervised by the crane driver whilst the load is connected to the crane? Mobile Crane Use - Free from Overhead Services/Traffic? Is a Crane Technician Required Offshore for the Lift? 7. Lifting accessories & equipment certificates checked? 8. Has the lift equipment had a pre-use check? LIFT PLAN 0 0 Title Drawing No 0 0 0 \\vboxsrv\conversion_tmp\scratch_4\247116635.xls.ms_office 0 0 0 0 Lift Supervisor 0 1/0/1900 Approved Procedure and/or MOC completed? Risk Assessment Actions Closed Out? Suitable Weather Criteria and Window Available? 0 Warranty Surveyor Certificate Issued? (As required) Have personnel and crane escape routes been verified? 0 Help? - liftingoperations@technip.com COMPLETE OFFSHORE ONLY 10. SIGNED AND DATED COMPLETE OFFSHORE ONLY 9. FINAL OFFSHORE CHECKS (All answers must be YES to Proceed with Lift) POSITION 0 Tertiary (as required) 0 SIGN DATE Project Engineer 0 1/0/1900 Lift Plan Complete and signed off? 0 1/0/1900 Offshore Construction Manager NAME 0 8. COMMUNICATIONS/LIFT PROTOCOL Primary Lifting Protocol Agreed? Secondary 0 Lift Plan Safety Measures Considered and Mitigation Actions in Place? 0 COMMUNICATIONS AVAILABLE 0 Pre-Lift Meeting Completed with all Relevant Parties \\vboxsrv\conversion_tmp\scratch_4\247116635.xls.ms_office