Sie sind auf Seite 1von 15

HARMONIC ANAYZER

PZ96L-3EH
Measurement of AC signals 50-60Hz
Single-phase network
3-phase balanced network
3-phase unbalanced network, 3 wires
3-phase unbalanced network, 4 wires

Operation Manual
Version: 20090227



Shanghai Ac r el Lt d.
ADD: No.253 Yulv Road, Madong Industrial Park, J iading District, Shanghai, China ZIP: 201801
TEL:0086-21-69158338 FAX: 0086-21-69158303
EMAIL:acrel008@vip.163.com WEB: http://www.acrel.cn



Contents



1. General ..1
2. Characteristics 1
3. Technical features ....1
4. Installing and wiring ....2
4.1 Installing size (mm) ...2
4.2 Installing explanation ....2
4.3 Wiring ....2
4.3.1 Lower connectors ...2
4.3.2 Upper connectors ...3
5. Package ............3
6. Installation attention .....3
6.1 Voltage input ..3
6.2 Current input ..4
6.3 Installation of CT ...4
6.4 Wiring RS485 interface ....4
7. Explanation of manipulation: ..4
7.1 Main menu: ..4
7.2 MEASURE: Electrical parameters ..4
7.3 HARMONIC Harmonic parameters ..5
7.4 QUALITY quality of network .6
7.5 kWh The tariff of watt-hour .....6
7.6 SWITCHING The State of switch ..7
7.7 SOE ...7
7.8 SETTING User Setting ...7
8. RS485 communication ...9
8.1 Generals ....9
8.2 The list of communication address ..9

Acrel Shanghai Acrel Co.,Ltd
1
1. General
PZ96L-3EH is a kind of electrical network analyzer designed by ACREL under the IEC norm, and it has
several international advanced technologies.
It can measure all the electrical data in the three phase network, including measurement of multi-rate
energy and 4-quadrant energies, harmonic and quality of electrical network analysis, 4 Digital inputs, 3 relay
outputs and RS485 or Ethernet. Therefore PZ96L-3EH can be widely used in SCADA and DCS system.
2. Characteristics
1, Measuring accurately the data of three phase network, such as phase voltages, line voltages, current,
active, reactive and apparent power, power factor etc..;
2, 4-quadrant energies, including active capacitive energy, active inductive energy, reactive capacitive
energy and reactive inductive energy; It can also count the energies in 8 zone times by 3 tariffs (the energies in
this month, in last month, in before last month and total energy);
3, Measuring component and THD of the 2~31 ranges harmonic of current and voltage, current K-factor,
voltage crest factor, waveform factor, degree of voltage and current unbalance etc.., and users can analyze the
electrical network quality with these data;
4, It can be equipped 4 Digital inputs, 3 relay outputs, 1 RS485 communication with MODBUS protocol in
order to satisfy the demand of measurement and control in long distance.
3. Technical features
Feature Values
Network Single phase, 3P3L, 3P4L
Frequency 45~65Hz
Normal: AC 100V, 400V
Overloading: 600V(continuous); 1000V / 30s Voltage
Consumption: < 0.2VA
Normal: AC 1A, 5A
Overloading: 6A(continuous); 50A /1s
Input
Current
Consumption: < 0.2VA
Pulse output Mode: Optocoupler pulse output
Communication RS485 (Modbus-RTU) ; Ethernet (ModBus/TCP protocol)
Digital input (DI) 4 drying contact inputs, with +5V power
Digital output (DO) Mode: 4 NO contacts (AC 250V/3A, DC 30V/3A)
Accuracy Frequency 0.01Hz, reactive energy 1 class, others 0.5 class
Display LCD
Power supply AC/DC 85~270V; consumation: 4VA
Isolation
Power / current input / voltage input: AC2kV/1min;
Power / Digital inputs / RS485: AC1.5kV/1min;
Inputs / outputs / housing >5M
Environment
Working T: -10 ~+45 ; Storing T: -20 ~+70
Relative humidity: 5%~95% Non-Condensing; Altitude: 2500m
Acrel Shanghai Acrel Co.,Ltd
2
4. Installing and wiring
4.1 Installing size (mm)


4.2 Installing explanation
PZ96L-3EH is installed by embedded type and fixed by Push-In type:
1. Open an orifice on the switchboard as opening size (8888);
2. Put out our analyzer, and then loosen the fixing bolt (anticlockwise), put down the installing shelf;
3. Insert the analyzer into the orifice and fit on the shelf and fixing bolt (clockwise).
4.3 Wiring
4.3.1 Lower connectors
5, 6, 7, 8, 9, 10 connect current inputs; 1, 2, 3, 4 connect voltage inputs





Acrel Shanghai Acrel Co.,Ltd
3


4.3.2 Upper connectors

Power Impulse 2 DO 4DI RS485 Ethernet
12, 13 connect power supply; 17, 18 connect active energy impulse output; 34, 3536 connect 2 relay
outputs; 24, 25, 26, 27, 28 connect Digital inputs; 21, 22, 23 connect RS485 port, E connect Ethernet port
Attention: COM1, COM2 can not be short-circuit

5. Package
Including analyzer (with connectors), shelves and installation manual.
Before opening the package, please check it carefully. If there is any damage, please contact ACREL or
our dealers in time and keep down the damage package. If it is the responsibility of ACREL or our dealers, we
shall exchange the damage in time.

6. Installation attention
6.1 Voltage input
Voltage input should be less than 120% normal voltage (100V or 400V), otherwise please use PT;
On the voltage input, please use1A fuse.
Wire our analyzer according to the mode of PT wiring, as below:
Mode of wiring Option
2 element 3P3L
3 element 3P4L
Make sure of matching voltage input with current input, and make the same of phase and phase sequence,
(otherwise it appears the error of values or signals).

Acrel Shanghai Acrel Co.,Ltd
4
6.2 Current input
Normal current input 1A and 5A, for more than 5A please use CT;
Make sure of matching current input with voltage input, the same of phase sequence and direction;
If on the circuit of CT there are other meters, please wire them by series.
Before cut off current input, you should cut off the primary circuit of CT or short the secondary circuit of CT
at first.
6.3 Installation of CT
We propose using line bank, and do not connect CT directly in order to simplify mounting and
dismounting.
6.4 Wiring RS485 interface or Ethernet interface
Our analyzer is equipped with asynchronous semiduplex RS485 communication (MODBUS-RTU) or
Ethernet communication (MODBUS-TCP), and all the data can be transmit by it. In theory, we can series 128
devices on a MODBUS circuit, and each meter has its address. We advise using STP (<0.5mm
2
) and we
should wire far away high voltage cable or other intense interferential place.

7. Explanation of manipulation:
7.1 Main menu:
With power you can see phase voltages at first. You can press to enter main menu.
The content of MENU:
1 MEASURE: phase voltage, line voltage, current, P, Q, S, total power, cos;
2 HARMONIC the data of current and voltage harmonic, harmonic bar graph and harmonic wave;
3 QUALITY crest factor, THFF, KF, u, i, voltage peak value, voltage vector, current vector;
4 kWh this month, last month, before last month multi tariff kWh and total kWh;
5 SWITCHING Memory the states of switches of input and output;
6 SOE SOE (1-16 switch);
7 SETTING including setting of system, of communication, of tariff, of alarm, of time and deleting
SOE and clearing counter.
After entry of MEASURE, you can choose the items by pressing upper key or lower key. When the item is
in the white shadow, please press enter key to enter this item.
7.2. MEASURE: Electrical parameters press to change display
Phase voltage U Line voltage V Current I Active power P Reactive power Q
Apparent power S Total power Power factor COS.
Acrel Shanghai Acrel Co.,Ltd
5


7.3, HARMONIC Harmonic parameters
When VALUE, press to enter the harmonic data interface, it
displays 2-7 ranges voltage harmonic, press to display other
ranges current or voltage harmonic data and total harmonic THD, it can
display 31 range maximum.
When WAVEFORM, it displays the phase voltage and current
harmonic waveform of A phase. Press to display B phase voltage
and current harmonic waveform, C phase voltage, current waveform, 3
phase voltage waveform and 3 phase current waveform.
When BAR, it displays the phase voltage and current harmonic bar graphic of A phase. Press to
display B, C phase harmonic bar graphic.
Press to return the previous menu.

% Ua Ub Uc
02 00.00 00.00 00.00
03 00.00 00.00 00.00
04 00.00 00.00 00.00
05 00.00 00.00 00.00
06 00.00 00.00 00.00
07 00.00 00.00 00.00
UA
IA
40
20
40
20
2 10 T
UA
IA
Acrel Shanghai Acrel Co.,Ltd
6
7.4 QUALITY quality of network
CF: (Crest Factor)
Because voltage Harmonics will influence the isolation of circuit, we
have to notice the voltage peak value. The crest factor is the ratio of
maximal of voltage harmonic superimpose and RMS. The ideal CF of sine
wave is 1.414.
THFF: (Telephone Harmonic Form Factor)
The interference of harmonic may cause the noise of communication
system and influence the quality of communication; our ears and the
telephone can not response well to the 50Hz current and voltage but can
response well to about 1KHz current and voltage; In Europe, CCITT
detect the interference of harmonic to telecom with Pn, then figure it with
THFF.
It is 0 when no harmonic.
KF: (Current K Factor)
The current K factor is the number of current harmonic, and it can
help you to choose transformer. K factor and KVA are used together to
change the transformer to deal with the load of the non-line or harmonic.
Current K factor is the value of thermal effect of transformer caused by harmonic. The bigger is K factor,
the higher is the heat caused by harmonic.
UF: (Unbalance factor)
To look at the current and voltage unbalance factor. In the 3 phase distribution, if the current or voltages
RMS arent same or the difference among 3 phase angle is not 120 degree, we call the phase voltages or
current is unbalance. The unbalance voltage or current of 3 phase can be divided positive component,
negative component and zero component..
U PEAK: (The Peak Voltage)
U VECTOR: (The voltage vector)
To look at positive component, negative component and zero component.
I VECTOR: (The current vector)
To look at positive component, negative component and zero component.

7.5, kWh (The tariff of watt-hour)
kWh is to display the multi tariff kWh in this month, then press
to choose displaying the last month, the before last month,
total and 4 quadrant kWh. Note: the kWh is the kWh after CT.

4 quadrant energies:
EPI (Import kWh)
EPE (Export kWh)
EQL (Import kVarh)
EQC (Export kVarh)



Acrel Shanghai Acrel Co.,Ltd
7
This Month Last Month Before Last Month
Total Energy 4 quadrant energies

7.6 SWITCHING (The State of switch)
The state of switching is to indicate the state of Digital input (DI) and Digital output (DO). The Digital input
is powered by +5V, and Digital output is a pair of contacts no powered. When there are switching input or
output, indications will change on from off. (NO-Normal open, NC-Normal close)

7.7 SOE
SOE displays the message of switching input and output. In the right
picture, the first message figures when Oct 22
nd
2007, 12h01m55s1: 55,
the first switching input is closed; the second message figures when Oct
22
nd
2007, 12h00m55s, the first switching input is opened; the third
message figures when Oct 22
nd
2007, 12h35m55s, the first switching
output is closed; press the to look at the other messages, and there
are total 16 messages.

7.8 SETTING (User Setting)
SETTING, it will be the password input at first. Press to move the cursor, and with the right key or left
key to change the number. The default password is 0001. After input, press enter key to enter the interface of
user setting.
PARAMETER: (System setting)
NETWORK (3P4L, 3P3L, 1P1L) ,
U RANGE (380V,100V) ,
I RANGE (5A, 1A) ,
CT RATIO (ratio PT)
Acrel Shanghai Acrel Co.,Ltd
8
PT RATIO (ratio CT)
Press to choose item, press to change value
RS485: (Communication setting)
ADDRESS the communication address (001~247)
BAUD the communication speed (4800bps, 9600bps, 19200bps, and 38400bps).

TARRIF: (The multi tariff energy setting)
Press to change items, and press to change value. Our meter
can be set 8 zones and 3 rates:









TIME: (Time setting)
Press to change items, and press to change value.
SWITCHING: (The setting of switch) (the default is NO)
Press to change items.
For DO1 press to change switch type as level, pulse or alarm. And
press to change the level and pulse width.
For DO2 press to change switch type just as level, pulse. And
press to change the level and pulse width.

ALARM: (Alarm setting) (the default is alarm NC)
The alarm will be active when you choose BELL in DO1 under
switching setting as above.
Press to choose items and press To change value. The
alarm can be set over voltage, under voltage, over current, the
unbalance of current or voltage alarms.
EX: If set the alarm when 100V < U < 264V, current > 5A, the set
values are 264.0, 100.0, 5.000.
NO. TIME Description
1 00: 00 When 00: 00~03: 00 , PEAK
2 03: 00 When 03: 00~06: 00 , PEAK
3 06: 00 When 06: 00~09: 00 , PEAK
4 09: 00 When 09: 00~12: 00 , PEAK
5 12: 00 When 12: 00~15: 00 , PEAK
6 15: 00 When 15: 00~18: 00 , PEAK
7 18: 00 When 18: 00~21: 00 , PEAK
8 21: 00 When 21: 00~00: 00 , PEAK
Acrel Shanghai Acrel Co.,Ltd
9
OTHERS
CLR.E (Delete the energy counter): NO (no delete), YES (delete)
CLR.S (Delete the SOE): NO (no delete), YES (delete)
BACKLINGHT: OFF,
Press to choose items and press to choose value, and press
the confirm it.

Note: when you change the value of certain item, please press , then I can look at YES and NO, press
choose YES to save the change or NO to quit change.

8. RS485 communication
8.1 Generals
PZ96L-3EH communicates with MODBUS-RTU protocol
8.2 The list of communication address
Address Name Type Remark Byte
0 Address of instrument R/W (001---127) 1
1 speed R/W
0--9600bps(default); 1--19200bps;
2--38400bps
1
2 verification mode R/W 0--no(default);1--impair;2--pair 1
3 Wiring mode R/W 0--SP, 1 - 3F3L, 2 - 3F4L 1
4 Voltage range R/W 0--100V, 1--380V 1
5 Current range R/W 0--1A, 1--5A 1
6 Voltage ratio R/W (0001---9999); 1
7 Current ratio R/W (0001---9999); 1
8 Date R/W The date of reading 1
21-23 1 zone 1 R/W 3
24-26 2 zone 2 R/W 3
27-29 3 zone3 R/W 3
30-32 4 zone4 R/W 3
33-35 5 zone5 R/W 3
36-38 6 zone6 R/W 3
39-41 7 zone7 R/W 3
42-44 8 zone8 R/W
8 zones, 3 rates,
each zone is 3 bytes:
1
st
is hour, 2
nd
is minute, 3
rd
is rate;
3 rates are :
1 - Peak, 2 -Flat, 3 -Vale;
3
53 1
st
Digital input RO NO 1, NC 0 1
54 2
nd
Digital input RO NO 1, NC 0 1
55 3
rd
Digital input RO NO 1, NC 0 1
56 4
th
Digital input RO NO 1, NC 0 1
61 1
st
Digital output R/W 1 NO; 0 NC 1
62 2
nd
Digital output R/W 1 NO;0 NC 1
63 3
rd
Digital output R Alarm state: 1 NO; 0 NC
Acrel Shanghai Acrel Co.,Ltd
10
128 Year R/W Time; // BCD format 1
129 Month R/W Time; // BCD format 1
130 Day R/W Time; // BCD format 1
131 Hour R/W Time; // BCD format 1
132 Minute R/W Time; // BCD format 1
133 Second R/W Time; // BCD format 1
143-148 SOE1 R SOESOE; 6
149-154 SOE2 R 6
155-160 SOE3 R 6
161-166 SOE4 R 6
167-172 SOE5 R 6
173-178 SOE6 R 6
179-184 SOE7 R 6
185-190 SOE8 R 6
191-196 SOE9 R 6
197-202 SOE10 R 6
203-208 SOE11 R 6
209-214 SOE12 R 6
215-220 SOE13 R 6
221-226 SOE14 R 6
227-232 SOE15 R 6
233-238 SOE16 R 6
243 phase voltage Uab R after CT or PT 1 decimal 1
244 phase voltage Ubc R After CT or PT 1
245 phase voltage Uca R After CT or PT 1
246 line voltage Uab R After CT or PT 1
247 line voltage Ubc R After CT or PT 1
248 line voltage Uca R After CT or PT 1
249 current Ia R After CT or PT 3 decimals 1
250 current Ib R After CT or PT 1
251 current Ic R After CT or PT 1
252 Frequency F R 2 decimals 1
253-254 A phase active Pa R After CT or PT 2 decimals 2
255-256 B phase active Pb R After CT or PT 2
257-258 C phase active Pc R After CT or PT 2
259-260 Total active P R After CT or PT 2
261-262 A phase reactive Qa R After CT or PT 2 decimals 2
263-264 B phase reactive Qb R After CT or PT 2
265-266 C phase reactive Qc R After CT or PT 2
267-268 Total reactive Q R After CT or PT 2
269-270 A phase apparent Sa R After CT or PT 2 decimals 2
271-272 B phase apparent Sb R After CT or PT 2
273-274 C phase apparent Sc R After CT or PT 2
Acrel Shanghai Acrel Co.,Ltd
11
275-276 Total apparent S R After CT or PT 2
277 A phase power factor R 2 decimals 1
278 B phase power factor R 1
279 C phase power factor R 1
280 Total power factor R 1
281 A phase Crest factor R 3 decimals 1
282 B phase Crest factor R 1
283 C phase Crest factor R 1
284 A Phase THFF R 2 decimals 1
285 B Phase THFF R 1
286 C Phase THFF R 1
287 A current K factor R 2 decimals 1
288 B current K factor R 1
289 C current K factor R 1
290 A phase voltage peak value R Secondary 1 decimal 1
291 B phase voltage peak value R Secondary 1
292 C phase voltage peak value R Secondary 1
293 Positive sequence voltage R 1 decimal 1
294 Negative sequence voltage R 1 decimal 1
295 ZeR sequence voltage R 1 decimal 1
296 Positive sequence current R 3 decimals 1
297 Negative sequence current R 3 decimals 1
298 ZeR sequence current R 3 decimals 1
299 Voltage unbalance factor R 2 decimals 1
300 Current unbalance factor R 2 decimals 1
333-334 Peak kWh (this month) R Secondary 2 decimals 2
335-336 Flat kWh (this month) R Secondary 2 decimals 2
337-338 Vale kWh (this month) R Secondary 2 decimals 2
339-340 Total kWh (this month) R Secondary 2 decimals 2
341-342 Peak kWh (last month) R Secondary 2 decimals 2
343-344 Flat kWh (last month) R Secondary 2 decimals 2
345-346 Vale kWh (last month) R Secondary 2 decimals 2
347-348 Total kWh (last month) R Secondary 2 decimals 2
349-350
Peak kWh (before last
month)
R Secondary 2 decimals 2
351-352
Flat kWh (before last
month)
R Secondary 2 decimals 2
353-354
Vale kWh (before last
month)
R Secondary 2 decimals 2
355-356
Total kWh (before last
month)
R Secondary 2 decimals 2
357-358 Total peak kWh R Secondary 2 decimals 2
359-360 Total flat kWh R Secondary 2 decimals 2
Acrel Shanghai Acrel Co.,Ltd
12
361-362 Total vale kWh R Secondary 2 decimals 2
363-364 Total multi rate kWh R Secondary 2 decimals 2
365-366 EPI (Import kWh) R Secondary 2 decimals 2
367-368 EPE (Export kWh) R Secondary 2 decimals 2
369-370 EQL (Import kVarh) R Secondary 2 decimals 2
371-372 EQC (Export kVarh) R Secondary 2 decimals 2
373-402
A phase voltage 2-31
ranges harmonic
R 2 decimals 30
403-432
B phase voltage 2-31
ranges harmonic
R 2 decimals 30
433-462
C phase voltage 2-31
ranges harmonic
R 2 decimals 30
463-492
A current 2-31 ranges
harmonic
R 2 decimals 30
493-522
B current 2-31 ranges
harmonic
R 2 decimals 30
523-552
C current 2-31 ranges
harmonic
R 2 decimals 30
553 A phase voltage total THD R 2 decimals 1
554 B phase voltage total THD R 2 decimals 1
555 C phase voltage total THD R 2 decimals 1
556 A current total THD R 2 decimals 1
557 B current total THD R 2 decimals 1
558 C current total THD R 2 decimals 1
559-590
A phase voltage sample
points (32 points/wave)
R A phase voltage sample points 32
591-622
B phase voltage sample
points (32 points/wave)
R B phase voltage sample points 32
623-654
C phase voltage sample
points (32 points/wave)
R C phase voltage sample points 32
655-686
A current sample points (32
points/wave)
R A current sample points 32
687-718
B current sample points (32
points/wave)
R B current sample points 32
719-750
C current sample points (32
points/wave)
R C current sample points 32
Note:
1. Read and write: R just read, with 03H order; R/W read and writes, with 10H order, interdict to write
to the non-listed or non-written address.
2. The data is figured by set point, the data is format of percentage.
8.3 Comparison of the communication value and real value (Val_t communication value, Val_s real value)
1, voltage, current, power factor, frequency
Acrel Shanghai Acrel Co.,Ltd
13
These values is red by Modbus-RTU 03 order, each occupy one word. The comparison is as below:
communication value real value Unit
U: Uan, Ubn, Ucn, Uab, Ubc, Uca Val_s (Val_t / 10) PT ratio V
I: IA, IB, IC Val_s (Val_t / 1000) CT ratio A
PF: PFA, PFB, PFC, PFS Val_sVal_t / 1000 None
F: FR Val_sVal_t / 100 Hz
2, P, Q, S and kWh
These values is red by Modbus-RTU 03 order, each occupy one word. The comparison is as below:
Val_s (Val_t / 100) PT ratio CT ratio; and Val_t first word 65536 + second word.
3, Voltage CF, THFF, KF, UF
These values is red by Modbus-RTU 03 order, each occupy one word. The comparison is as below:
communication value real value Unit
Voltage CF Val_sVal_t / 1000 none
THFF Val_sVal_t / 100 none
Current KF Val_sVal_t / 100 none
Voltage peak value Val_sVal_t / 10 V
Positive, negative, zeR voltage Val_sVal_t / 10 V
Positive, negative, zeR current Val_sVal_t / 1000 A
Current & voltage UF Val_s (Val_t / 10) % percentage
4, the data of current and voltage harmonic
These values is red by Modbus-RTU 03 order, each occupy one word. The comparison is as below:: Val_s
(Val_t / 100) %
5 time and date
These values is red by Modbus-RTU 03 order, each occupy one word. The comparison is as below:: with
BCD format

Das könnte Ihnen auch gefallen