Working since last 9 years in cement sector as mechanical engineer at various positions.
self confidence, decisive,
achieved assigned tasks well in manner, getting confidence of others and give confidence to team members, fully supportive. Major tasks achieved in my supervision are 1. Complete erection and commissioning of 04 Ball Mills (110t/h) and Packing Plants Areas at Lucky Cement Limited. 2. Replacement of new loose type design of supporting blocks (Kiln Shell) Askari cement Limited, Wah. 3. Rollers adjustment for correction of kiln horizontal and vertical axis. 4. Machining of Tyres, Supporting Rollers, and Hydraulic Thrust device. 5. Kiln comprehensive inspection carried out along with F.L.Smidth Experts. 6. Ball Mill slide shoe bearings replacement carried out under my supervision with in 8 working days at maple leaf cement factory Limited. 4. Replacement of New improvest diaphragm of Estanda carried out under my supervision. Specialties Leadership, Goals & Target settings, Fully Motivated towards profession,
Responsible for performance processes, assessments, audits and metrics of the Cargill Reliability Excellence Improvement effort. Member of Corporate Reliability Excellence Governance team that is responsible of execution and deployment of the Cargill Reliability Excellence model and processes. RE Governance team liaison to Corporate MRO procurement efforts and corporate capital deployment processes. Responsible for external reliability and maintenance benchmarking and industry liaison efforts for Cargill plant operations. Worldwide Reliability & Maintenance Manager
Responsible for maintenance & reliability of Cargill's global operations, consisting of15 operating groups (1200+ facilities). Chairman of Cargills Global Maintenance & Reliability Steering Committee. Activities include maintenance and reliability best practice identification, gap analysis work, and strategic planning of improvement opportunities. Lead Cargill's M&R Center of Excellence (COE) internal reliability training courses and curriculum. Highly involved in talent management & recruiting effort for Cargill Maintenance and Reliability career path. Lead improvement in our core predictive technologies, preventative maintenance systems, work management systems, precision practices and root cause failure analysis processes. Detailed training in vibration analysis, oil analysis, infrared thermography, ultrasonics, motor circuit testing and other NDT predictive technologies. Experienced in use of five CMMS/EAP systems (Maximo, SAP, Marcam, MP2, and internally built system).
Responsible for the facility 24/7 maintenance & capital construction effort. Supervised 3 maintenance supervisors, 1 construction manager, 35 internal maintenance personnel, and 75 mechanical contractors. Developed short & long range plans to improve mechanical reliability, performance and cost control. Directed our preventative and predictive maintenance program using our CMMS. Dealt with employee motivation & performance issues in a union environment. Additionally in 1992- 93, was involved as a business representative to set design requirements, debug the software, and implement a computerized business system to manage the Corn Milling Division NA plant expense. In 1994, I was selected as a team member of the Cargill's team that evaluated Cargill's current maintenance, purchasing, and inventory control practices worldwide. The team's product was the development of a Cargill Corporation's "Best Practices Document for Maintenance, Purchasing and Inventory Control".