This document provides the results of an enclosure integrity test for a room containing Example Building 1 in Exampletown, WA. The test was conducted on March 31, 2002 using FM200 (HFC227ea) as the fire suppression agent. The total room leakage was measured to be 0.2676 m^2, above the maximum allowed leakage of 0.1338 m^2 to ensure a minimum 10 minute retention time. As a result, the enclosure FAILED the retention time acceptance test, as the agent-air interface was calculated to descend below the minimum protected height in only 0.2 minutes.
This document provides the results of an enclosure integrity test for a room containing Example Building 1 in Exampletown, WA. The test was conducted on March 31, 2002 using FM200 (HFC227ea) as the fire suppression agent. The total room leakage was measured to be 0.2676 m^2, above the maximum allowed leakage of 0.1338 m^2 to ensure a minimum 10 minute retention time. As a result, the enclosure FAILED the retention time acceptance test, as the agent-air interface was calculated to descend below the minimum protected height in only 0.2 minutes.
This document provides the results of an enclosure integrity test for a room containing Example Building 1 in Exampletown, WA. The test was conducted on March 31, 2002 using FM200 (HFC227ea) as the fire suppression agent. The total room leakage was measured to be 0.2676 m^2, above the maximum allowed leakage of 0.1338 m^2 to ensure a minimum 10 minute retention time. As a result, the enclosure FAILED the retention time acceptance test, as the agent-air interface was calculated to descend below the minimum protected height in only 0.2 minutes.
CleanAgent 2001 retention time prediction program revision 2.5.4. Complies with NFPA 2001 Appendix C, year 2000 edition. By Retrotec, Inc, 2200 Queen Street, Bellingham, WA USA 98229 360-738-9835 www.retrotec.com Software Licensed to: CRF Tech Engineering Solutions air leaks in agent leaks out Building, Location Example Building 1, Exampletown, WA, USA Company, Contact General Electric, John Client Dude Room name Change range experiment Test number 1 Calibration Certificate # 2 Certificate created 2002/02/03 Test date/time 2002/03/31 00:00 Net Protected Volume, V 15 m^3 Tester Sample Tech Maximum Protected Height, HO 3.66 m. Certified to Level: 4 - ISO multi-point & vent test Minimum Protected Height, H 3.00 m. Signature ....................................................... Static during retention, PSH 0.0 Pa Elevation above sea level 229 m. Operating temperature 21 C Correction method NFPA 2001 (2000) Formula A-3-5.3.3 C Initial concentration, 7.26% Correction factor 0.97 Mixing during retention No Agent FM200 (HFC227ea) Agent quantity 1 m^3 Total room leakage, ELA 0.2676 m^2 Minimum concentration, CF 7.26% Lower Leakage, BCLA 0.1338 m^2 Minimum retention time 10.0 minutes Below ceiling leakage defaulting to worst case -- 50% of total leakage. This enclosure was tested in compliance with NFPA 2001 and 12A. Assuming no continual mixing during the retention period, enclosure leakage could allow sufficient agent to be lost to cause an air/agent interface to descend from a Maximum Protected Height of 3.66 m. to the Minimum Protected Height specified of 3.00 m. The retention time would then be 0.2 minutes which is less than the minimum retention time of 10 minutes. The enclosure therefore FAILS this acceptance procedure. Notes here are a bunch of notes here are a bunch of notes here are a bunch of notes here are a bunch of notes here are a bunch of notes here are a bunch of notes here are a bunch of notes here Witnesses DOOR FAN TEST -- Total Room Leakage Data CleanAgent 2001 retention time prediction program revision 2.5.4. Complies with NFPA 2001 Appendix C, year 2000 edition. By Retrotec, Inc, 2200 Queen Street, Bellingham, WA USA 98229 360-738-9835 www.retrotec.com Software Licensed to: CRF Tech Engineering Solutions air leaks in agent leaks out Building, Location Example Building 1, Exampletown, WA, USA Company, Contact General Electric, John Client Dude Room name Change range experiment Test number 1 Calibration Certificate # 2 Certificate created 2002/02/03 Total Room Leakage Operator In the room Smoke doesn't move Temperature during test (C) Static pressure 0 Pa 21 inside 21 outside Depressurization Range for room pressures: -15.8 to -18.8 Blower range Room pressure -10* Auto corrected RP -9.5 Range 9 Flow Pressure 100 Auto corrected FP 102.6 Corrected flow (m^3/sec.) -0.6610 * Room pressure is too low. Retention time may be 9% shorter than predicted. Pressurization Range for room pressures: 15.8 to 18.8 Blower range Room pressure 11* Auto corrected RP 10.5 Range 9 Flow Pressure 123 Auto corrected FP 126.8 Corrected flow (m^3/sec.) 0.7030 * Room pressure is too low. Retention time may be 7% shorter than predicted. F 0.50 10.0 ELA m^2 0.2679 Standard Error NA NA Correlation NA NA Intercept k1 0.2090 0.2120 0.2105 Slope n 0.5000 0.5000 0.5000 FA 0.50 @Pa 9.5 10.5 10.0 ELA m^2 0.2657 0.2694 0.2676 Depressurization Pressurization Average Lower Leakage Below ceiling leakage of 0.1338 m^2 @ 10.0 Pa is the worst case assumption of 50% Technician: Sample Tech Certified to Level: 4 - ISO multi-point & vent test Yes Level 1 - Fire enclosure design basics for improving agent retention and passive protection Yes Level 2 - adds single door fan operation and NFPA clean agent retention time calculations Yes Level 3 - adds double door fan operation for Lower Leak measurement Yes Level 4 - adds multi-point ISO door fan operation and discharge pressure relief vent Printed on: 2014/01/11 19:41 Page 2 Printed on: 2014/01/11 19:41 Page 3 DOOR FAN TEST -- Graph CleanAgent 2001 retention time prediction program revision 2.5.4. Complies with NFPA 2001 Appendix C, year 2000 edition. By Retrotec, Inc, 2200 Queen Street, Bellingham, WA USA 98229 360-738-9835 www.retrotec.com Software Licensed to: CRF Tech Engineering Solutions air leaks in agent leaks out Building, Location Example Building 1, Exampletown, WA, USA Company, Contact General Electric, John Client Dude Room name Change range experiment Test number 1 Calibration Certificate # 2 Certificate created 2002/02/03 One Year Calibration Certificate Certificate # 2 System Model # Retrotec - 970hp System Owned By Demo Certificate Console # 145898 For CA2001 ver 2.0 license # 125-555 Equipment Calibrated by Colin Genge Good for one year date: 2002/02/03 expires: 2003/02/03 This certificate complies with calibration requirements of NFPA 2001 Appendix C, year 2000 edition and ISO 14520. Completed by Retrotec Inc, 2200 Queen Street, Bellingham, WA, USA 98226-4766 Analog 60 This gauge used for Room Pressure serial # 93333 to correct mult by & add gauge CR MRC error Pa 0.00 - 10.50 0.95 0.00 8.0 7.6 8.0 -0.4 10.50 - 14.75 0.98 -0.25 12.0 11.5 12.0 -0.5 14.75 - 17.50 1.04 -1.14 15.0 14.4 15.0 -0.6 17.50 - 26.00 0.94 0.53 20.0 19.4 20.0 -0.6 26.00 - 36.50 0.95 0.24 31.0 29.8 30.0 -0.2 36.50 - 51.00 1.03 -2.76 41.5 40.2 40.0 0.2 51.00 - 999.00 1.00 -1.00 55.5 54.5 55.0 -0.5 Analog 250 This gauge used for Flow Pressure, Blower #1 serial # 93334 to correct mult by & add gauge CR MRC error Pa 0.00 - 31.00 0.97 0.00 25.0 24.2 25.0 -0.8 31.00 - 40.50 1.05 -2.63 35.0 34.2 35.0 -0.8 40.50 - 60.00 1.03 -1.54 49.0 48.7 50.0 -1.3 60.00 - 88.00 1.07 -4.29 73.5 74.5 75.0 -0.5 88.00 - 126.00 1.05 -2.63 96.0 98.4 100.0 -1.6 126.00 - 174.00 1.04 -1.25 145.0 149.8 150.0 -0.2 174.00 - 999.00 1.00 6.00 194.0 200.0 200.0 0.0 Analog 250 This gauge used for Flow Pressure, Blower #2 serial # 93335 to correct mult by & add gauge CR MRC error Pa 0.00 - 31.00 0.97 0.00 25.0 24.2 25.0 -0.8 31.00 - 40.50 1.05 -2.63 35.0 34.2 35.0 -0.8 40.50 - 60.00 1.03 -1.54 49.0 48.7 50.0 -1.3 60.00 - 88.00 1.07 -4.29 73.5 74.5 75.0 -0.5 88.00 - 126.00 1.05 -2.63 96.0 98.4 100.0 -1.6 126.00 - 174.00 1.04 -1.25 145.0 149.8 150.0 -0.2 174.00 - 999.00 1.00 6.00 194.0 200.0 200.0 0.0 Five Year Calibration Certificate Certificate # 2 System Model # Retrotec - 970hp System Owned By Demo Certificate Console # 145898 For CA2001 ver 2.0 license # 125-555 Equipment Calibrated by Colin Genge Good for five years date: 2002/02/03 expires: 2007/02/03 This certificate complies with calibration requirements of NFPA 2001 Appendix C, year 2000 edition and ISO 14520. Completed by Retrotec Inc, 2200 Queen Street, Bellingham, WA, USA 98226-4766 CR is the Corrected Room pressure. CR = "gauge" reading X "mult by" factor + "& add" factor. CF is the Corrected Flow pressure derived the same way. The corrected readings are compared to the TRUE reading from our Master Reference Calibration (MRC) gauge and the resulting error shown in Pascals. Maximum allowable error is +/- 1 Pa from 0 to 50 Pa and +/- 5 Pa over 50 Pa. Five Year Calibration Certificate Certificate # 2 System Model # Retrotec - 970hp System Owned By Demo Certificate Console # 145898 For CA2001 ver 2.0 license # 125-555 Equipment Calibrated by Colin Genge Good for five years date: 2002/02/03 expires: 2007/02/03 This certificate complies with calibration requirements of NFPA 2001 Appendix C, year 2000 edition and ISO 14520. Completed by Retrotec Inc, 2200 Queen Street, Bellingham, WA, USA 98226-4766 CALIBRATION EQUATIONS WITH CALCULATION EXAMPLES: blower #1 serial # >> 93335 blower #2 serial # >> 93336 blower range N K K1 K2 K3 K4 MF CR FF cfm m 3 / sec #1 18F 0.4690 311.5000 0.000 1.000 0.000 1.027 10.0 21.5 75 2,423 1.1437 #1 18R 0.4800 366.8000 0.000 1.000 0.000 0.793 10.0 21.3 88.6 2,503 1.1813 #1 9 0.4920 144.5000 0.000 1.000 0.000 0.993 10.0 17.6 78.5 1,228 0.5794 #1 5 0.4510 97.4100 0.000 1.000 0.000 0.997 10.0 19.3 69.6 658 0.3106 #1 3 0.4700 51.4800 0.000 1.000 0.000 1.055 10.0 13.2 74.5 412 0.1944 #1 1.4 0.4670 30.4200 0.000 1.000 0.000 1.026 10.0 11.4 75 234 0.1106 #1 1.3 0.4420 27.7100 0.000 1.000 0.000 1.179 10.0 24.1 74.5 220 0.1036 #1 1.2 0.4830 17.2600 0.000 1.000 0.000 1.169 10.0 15.5 23.2 92 0.0435 #1 1.1 0.4740 12.7100 0.000 1.000 0.000 1.111 10.0 34.7 81.4 114 0.0536 #1 0.1 0.5100 5.7700 0.000 1.000 0.000 1.049 10.0 20.3 64.8 51 0.0240 #2 18F 0.4690 311.5000 0.000 1.000 0.000 1.095 10.0 23.1 72.9 2,550 1.2033 #2 18R 0.4800 366.8000 0.000 1.000 0.000 0.793 10.0 23.1 88.9 2,507 1.1832 This calibration certificate compares the calibration holes in the Retrotec test chamber with the tested blower's measurement of those holes. The left hand column shows the area of holes open in the Retrotec flow chamber. To the right is the comparable Retrotec Door Fan result using the above referenced CA2001 software license. Maximum allowable error is +/- 5%. BLOWER TEST RESULTS: error Holes open in flow chamber cm 2 blower range cm 2 % cm 2 3,148 1 18F 3,135 -0.4 -13 3,148 1 18R 3,254 3.3 106 1,834 1 9 1,755 -4.3 -79 925 1 5 899 -2.8 -26 678 1 3 680 0.3 2 419 1 1.4 417 -0.6 -2 274 1 1.3 268 -2.1 -6 143 1 1.2 141 -1.8 -2 115 1 1.1 115 0.6 0 67 1 0.1 68 1.0 1 3,152 2 18F 3,183 1.0 31 3,152 2 18R 3,129 -0.7 -23 This calibration includes both gauge and blower error combined. CR and CF come from the One Year Certificate. For Flow Towards the operator, CF must be reduced by CR before calculating flow to yield FF, the symbol for the Final Flow pressure. For Flow Away from the operator CF=FF. FF must be >=MF and (CR * K2) otherwise flow pressure is too low for accurate results Flow in cfm = (FF-CR*K1)^N*(K+K3*FF)*K4 For m 3 /sec, divide by 2118.882. Five Year Calibration Certificate Certificate # 2 System Model # Retrotec - 970hp System Owned By Demo Certificate Console # 145898 For CA2001 ver 2.0 license # 125-555 Equipment Calibrated by Colin Genge Good for five years date: 2002/02/03 expires: 2007/02/03 This certificate complies with calibration requirements of NFPA 2001 Appendix C, year 2000 edition and ISO 14520. Completed by Retrotec Inc, 2200 Queen Street, Bellingham, WA, USA 98226-4766 Technician: Sample Tech Certified to Level: 4 - ISO multi-point & vent test Yes Level 1 - Fire enclosure design basics for improving agent retention and passive protection Yes Level 2 - adds single door fan operation and NFPA clean agent retention time calculations Yes Level 3 - adds double door fan operation for Lower Leak measurement Yes Level 4 - adds multi-point ISO door fan operation and discharge pressure relief vent