GTAconsultants

.~,.:"~:-:,

/
:

"

:/

)
,J
.

./.r

...-:.

.:~/I

R...1 pa;"

~~)
~-

-4.,

~_~
.,

~~~~~rJ
...

~[t;)~

~~m~~
Scientology Australia

Client //

Church of

Office //

NSW

Reference //

14S 1526000

Date

//

07/10/14

126 Greville Street, Chatswood

Proposed Church of Scientology


Traffic Impact Assessment
07/10/14

Issue: A

Client: Church of Scientology Australia


Reference: 14S 1526000
GTA Consultants Office: NSW

Quality Record
Issue

Date

Description

Prepared By

7/10/14

Final

Oasika Faiz

@GTA Consultonts (GTA Consultonts (NSW)Pty LId) 2014


The informotion contoined in this document is confidential and
intended solely for the

use

of the client for the purpose for which it has

Checked

By

Approved By

Michael Lee

Jason Rudd

Signed

J ?-.-A-i
-

oee I

..

been prepared and

no

representation is made

being made to any third party. Use


whole

or

in

constitutes

or

or is to be

implied as
copying of this document in

part without the written permission of GTA Consultants


an

infringement of copyright. The intellectual property

contained in this document remains the property of GTA Consultants.

GTAconsultants
MElflOURNE

(kJ;tIitr
009001

SYDNEY. BRISBANE. CANBERRA

ADELAIDE. GOLD COAST.TOWNSVILLE

www.gta.com.au

Table of Contents
1.

Introduction

2.

Existing Conditions

2.1

Site

2.2

Previous Site Uses

2.3

Road Network

2.4

Public Transport

2.5

Pedestrian and

2.6

Existing Traffic Volumes

3.

4.

5.

6.

7.

Description

Cycle Infrastructure

3
4

Proposed Church of Scientology Facility

3.1

Overview of

3.2

Proposed Bus Facility

Proposed Development

Travel Behaviour

4.1

Visitation Accumulation

4.2

Travel Modes

11

4.3

Traffic Generation

12

Traffic Assessment

13

5.1

Traffic Generation

13

5.2

Intersection Performance

13

5.3

Residential Street Environmental

14

Capacity

Parking Requirements

15

6.1

Parking

15

6.2

Parking Layout and

Assessment

16

Access

Conclusion

17

Appendices
A:

Proposed Bus Facility Layout Plan

B:

Architectural Car Park Layout Plans

Figures
Figure

2.1:

Subject Site and

Figure

2.2:

Cycle Network

Existing Peak

Figure 2.3:

Its Environs

Hour Counts

1451526000 II 07/10/14

Traffic Impact Assessment II Issue: A


126 Greville Street. Chatswood, Proposed Church of

Scientology

0Ge
GTAconsultants

Figure 3.1:

Proposed Bus Drop Off / Pick Up Facility

Figure

4.1:

Visitation Accumulation

10

Figure

4.2:

Staff Travel Modes

12

Figure 4.3:

1 6 May

Parishioners Travel Modes

Figure

4.4:

Staff Travel Modes

Figure

4.5:

Parishioners Travel Modes

12

1 6 May

12

18 May
-

12

18 May

Tables
Table 2.1:

Peak Hour Midblock Traffic Flows

Table 4.1:

Visitation Accumulation

Friday 16 May 2014

Table 4.2:

Visitation Accumulation

Sunday 18 May 2014

Table 4.3:

Travel Modes

Table 4.4:

Travel Modes

Table 5.1:

Fullers Road-Greville Street Analysis Results

10

Friday 16 May 2014

11

Sunday 18 May 2014

11
14

14S1526000 II 07/10/14

Traffic Impact Assessment II Issue: A


126 Greville Street. Chatswood, Proposed Church of

Scientology

0Ge
GTAconsultants

Introduction

This report has been

prepared by GTA Consultants for the Church of Scientology Australia (the

Church) to present the findings of a traffic and parking


at 126 Greville Street and 23

This report has been


Council
The

assessment of

proposed development

25 Millwood Avenue, Chatswood.

prepared to accompany

development application to Willoughby City

(Council).

development application seeks approval for the adaptive

place
The

of

worship

and ecclesiastical

management

findings of the traffic and parking

assessment

re-use

for the Church of

are

set out

as

Chapter 2 describes the existing conditions of the subject site

Chapter 3 provides

Chapter 4 presents the results from


behaviour of staff and

overview of the
a

existing site into a

Scientology

in Australia.

follows:

an

of the

proposed development

questionnaire survey examining the travel

parishioners at two existing facilities operated by the Church

Chapter 5 assesses the traffic impacts relating to the proposed development

Chapter 6 reviews the parking requirement for the proposed development, and

Chapter 7 presents the conclusion of the traffic assessment.

14S1526000 ((07(10/14

Traffic Impact Assessment ((Issue:A


126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

2.

Existing

2.1

Site

Conditions

Description

The site of the

proposed Church is located at 126 Greville Street and 23

Chatswood and is situated within the

25 Millwood Avenue,

Willoughby Local Government Area.

Properties surrounding the site predominantly include residential

uses

to the south and east. and

bush land to the north and west.


The location of the

subject site and its surrounding environs

are

shown in

Figure

2.1.

(Reproduced with permission from Sydwoy Publishing Pty LId)

Previous Site Uses

2.2

The site at 126 Greville Street was


and

previously occupied by the National Acoustic Laboratory (NAL)

number of related tenancies including medical research. The NAL is the research division

of Australian

Hearing which is a Statutory Authority under the Commonwealth Department of

Human Services.
At its

peak the

NAL

employed

have relocated its research


the site is

470 researches/staff

operations

to the

on

the Greville Street site. However, NAL

Macquarie University Campus in North Ryde and

currently unoccupied.

It is noted that the site was

accommodate
As

some

part of the

some

NAL

accommodate

recently rezoned for low density residential

60 residential

This

zoning would

dwellings.

facility, the site includes an existing multi-deck

some

uses.

136 vehicles. There

are

six additional

car

parking

park with the capacity to

spaces located

adjacent to

14S1526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

the main entry in the forecourt. Vehicle

access

to the

existing

on

site

car

park is provided via

Greville Street with internal road connections.


The

development site also includes two existing residential dwellings fronting Millwood

Both these

properties

have

on

site

property driveways at Millwood

2.3

car

parking

(garages)which

are

serviced

Avenue.

individual

by

Avenue.

Road Network

Fullers Road and Millwood Avenue


Fullers Road and Millwood Avenue

site, Millwood Avenue is aligned in

are
a

classified

as

State Roads

(Route A38).

north-west to south-east direction. It is

In the

vicinity of the

configured

as a

two-

way road with one traffic lane in each direction.

Fullers Road is

aligned

in

Kerbside

an

four lane

configured road that allows access to the site via Greville Street and is

east-west direction to the east of the Greville Street intersection.

parking is prohibited

on

Fullers Road and Millwood Avenue.

Greville Street
Greville Street is
residential

local residential street that

properties fronting onto it.

provides site

access

to the

subject site plus other

It connects to Fullers Road, which becomes Millwood

Avenue to the west of Greville Street. In the

vicinity of the site, Greville Street is aligned in

south direction. A combination of restricted and unrestricted kerbside

parking

is

permitted

northon

Greville Street.
North of Millwood Road/Fullers Road, Greville Street has
7 metres. With car
a

parking permitted

on

sealed road width of

approximately

both sides of the street. the available road width

permits

single travel along Greville Street.

The Millwood Road-Fullers Road-Greville Street intersection is controlled with traffic

Public Transport

2.4
The

signals.

subject site is located approximately 1.8km

within

west of Chatswood Station. Bus

walking distances to the subject site along Millwood

stops are located

Avenue and Fullers Road. These bus

stops service the following bus routes:


o

Sydney Buses 545

Sydney Buses 256

Buses 550

Sydney

These bus stops


12 services
most

provide

Chatswood West to Chatswood


Chatswood to Parramatta.
11 services

during the morning peak period (from 7:00am

during the afternoon peak period (from 4:00pm

to

9:00am) and

to 6:00pm) with route 545

being the

frequent.

Pedestrian and Cycle Infrastructure

2.5

The site contains some


site

Chatswood to Parramatta

on

provisions for walking with public footpaths available in the vicinity of the

Millwood Avenue and Greville Street.

Along Greville Street a footpath is available

on

the eastern side of the Greville Street.

1451526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

126 Greville Street, Chatswood, Proposed Church of ScientOlogy

0Ge
GTAconsultants

The site is well situated for cycling with

path

in the

vicinity

an

on-road

cycle path

on

Fullers Road and

of the Greville Street and Fullers Road intersection.

Figure

short off road

2.2 illustrates the

cycle network around the subject site.


Figure
~lIlIL

2.2:

:.:.~=a____.
~

,/

>))))))))))))))))))))).

It)

Charswaad

I,SiWOiJD
"-FCLUB
o.na
q

Existing Traffic

2.6

Intersection

turning

Greville Street
were

movement counts

were

conducted at the Fullers Road intersection with

Thursday 22 May and Saturday 24 May 2014. On Thursday, the survey periods

between 7:00am and 1 0:00am, and between

survey

The

on

Volumes

period

was

between 11 :OOam and 1

4:00pm and 1 0:00pm. On Saturday, the

:OOpm.

peak hour flows from each of the survey periods

are

presented in Figure 2.3.

14S1526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

Figure

2.3:

Existing

Peak Hour Counts

-.0

Q)

(.I ~....

.....

~~~

V)

~-

~-co

Q)

-~-

-.0-0

C") (.I

~
(9

f~ ~

[7] (8)5 -:::


[1004] (875) 1130
[7] (10)6 ~

.
.
.

Fullers Road

~ 10(10)[14)

1065

(1209) [1078]

~ 13(17)[17]

~t ~
~~li)
~-(f)
-0

::9..::0
U)~:::::
co

10(10)[10]

Weekday

AM

(Weekday PM) [Saturday] Peak

In addition, 7-day automatic tube counts

also conducted at the


o

Greville Street

Fullers Road

Millwood Avenue

The summary results

(midblock traffic flows), from 20 to 26 May 2014, were

following locations:

near

just

Hour Traffic Flows

the

driveway to the subject site

east of Greville Street


near

are

No. 25.

presented in Table 2.1.

14S1526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

Peak Hour Midblock Traffic Flows

Table 2.1:

Locations

NB/EB

SB/WB

Weekday Morning Peak (8:00am-9:00am)

17

24

42

Peak

21

22

44

2-Way

Greville Street
-

Weekday Evening

Weekday Late Evening Peak (9:00pm-10:00pm)

(5:00pm-6:00pm)

Saturday Peak (11 :00am-12:00pm)

11

45

60

105

Fullers Road
-

Weekday Morning Peak (7:00am-8:00am)

1,285

1,157

2,442

Weekday Evening Peak (4:00pm-5:00pm)

999

1,390

2,389

Weekday Late Evening Peak (9:00pm-10:00pm)


Saturday Peak (11 :00am-12:00pm)

322

584

906

1,185

1,145

2,330

Millwood Avenue
-

Weekday Morning Peak (7:00am-8:00am)

1005

1,035

2,040

Weekday Evening Peak (4:00pm-5:00pm)

1,131

822

1,953

503

294

797

901

945

1,846

Weekday

Late

Evening

Peak

(9:00pm-10:00pm)

Saturday Peak (11 :00am-12:00pm)

From the above traffic data, Fullers Road carries the most traffic in the
It has a

peak hour two-way flow of some 2,400 vph. Millwood

flows at 2,000 vph and Greville Street has the least traffic at
occurs on

Avenue has

slightly lower traffic

approximately]00 vph (which only

Saturday).

In addition, the traffic surveys indicate that the traffic flows

late

vicinity of the subject site.

on

these roads

evening peak period (9:00pm-]0:00pm) were approximately

during the weekday

40 per cent of the

weekday

peak hour traffic flows on Fullers Road and Millwood Avenue, and 25 per cent of the weekday
peak hour traffic flows on Greville Street.

14S1526000 ((07(10/14

Troffic Impact Assessment ((Issue:A

126 Greville Street, Chotswood, Proposed Church of Scientology

0Ge
GTAconsultants

Church of Scientology

3.

Proposed

3.1

Overview of Proposed Development

The current ecclesiastical


Asian Pacific
210 staff

region

residing

on

Facility

management offices for the Church of Scientology in Australia and the

are

located in

the

premises. Some 90 of those staff members currently work at the Dundas

Dorahy Street, Dundas. The Dundas site has approximately

site, with the remainder working at the current theological college Church facility at Greek Street,
Glebe. In addition to staff, some 100 parishioners attend the Churchs Greek Street facility.
The Church is

seeking

to relocate their administration offices to

would also accommodate


that the

new

facility would accommodate

reside at the Dundas facility) and


accommodate future

some

new

The

proposal involves the adaptive

re-use

parking

structure to accommodate the

parking

spaces within the

The current
new

dwelling

facility. The

up to 290 administration staff

170 parishioners. The

facility is proposed to be located

proposed that the

a new

new

facility

It is

proposed

(whowill continue to

facility is proposed to

car

new

on

the

of the

subject site of 126 Greville Street, Chatswood.

existing building

on

the site and

existing

The

proposed facility.
existing configuration
park would largely be retained in its current form.

facility will operate

seven

of

car

car

days a week from 8:30am to 9:30pm.

at No. 25 Millwood Avenue is intended to be demolished to make way for a

pedestrian entrance linking the site to a proposed bus stop facility

discussion

new

replace its existing Glebe facility.

anticipated growth of the Church.

The

It is

to

theology college

below). The dwelling

at No. 23 would be retained and used

on

Millwood Avenue

as a

(see

caretakers

residence.
At

present, No. 25 Millwood

exit

driveways

Avenue is accessed via

off Millwood Avenue. This

a one

way access with

separate entry and

arrangement would be retained to

provide

access

for

No. 23. The entry driveway would utilise the existing driveway for No. 25 Millwood Avenue and the
proposed exit driveway would be relocated to accommodate the new bus drop-off facility. The

driveways will be configured to permit left-in and left-out traffic movements from and to Millwood
Avenue.

3.2

Proposed

The Church

owns

Bus

Facility

and operates

number of standard size

(12.5m long) buses with typical seating

capacity of some 40 passengers.


The Church proposes to utilise these buses to transport its staff to and from the site from the
Churchs

provided accommodation at the Dundas site. Staff would be dropped off and picked

up at the

proposed bus drop off facility

As the Church owns and

on

Millwood Avenue

operates the buses, it is able to control the arrival of the buses to ensure

that the buses would not create any unnecessary

adjacent Millwood
than

throughout the day.

congestion issues within the bus facility and the

Avenue. As such, the Church will manage the arrival of the buses such that

bus would be

site at any

given time.

not

more

The

proposed bus facility would accommodate two bus bays. The bus bays would be staggered

one

on

from each other off Millwood Avenue to enable

proposed

bus

drop

off facility is shown in

Figure

independent operation of public buses. The

3.1.

14S1526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

Figure

3.1:

Bus

Proposed

.~

..t&

~,.~
~"c
.A~
il ~-

".

~.

...

S;;
.

0\..

"(~
;~

)I~I..

!A<J
.r~ifa<

"

j~1 ~,

SJ..~,,-.

~/J
.,

.!!r

,.
fJ:~
I.,

.
""

~.

:,.

Jl ~...

;.---

-.....

--

--

;:- -. -

_;:;;0-.,.)

-.I.
-

.:

r-

---nJ

-;

.,"."...-,.............

~:::: ~.. "l1)KL>*!l:."

~__

J..
~.

t.~l

.....,.

~,

1lt:r~

h..

proposed bus drop off/pick up facility has been designed to accommodate two buses within

the bus stop zone. One space would accommodate

development) to be used

private bus (relating to the proposed

staff. The second space would accommodate the relocated

by

public bus stop which is currently located outside No. 19 Millwood


The

"CI

~(Ln

VIr"..,

~
l//j-td.. lAl...; "f"

",""

-.:;;-

_.

-_..-

.--:::=-

___

--.~~--=-.

"

,....

..

r:t~~

L~"~~~."J ~

..

The

_.__

-:Ce r

-~

---;---------~

..,

/,.
/

.,

".

t,f.......(~.
........~

-"

~"

"

."

:~/. /.:~:/

1"
"

....

"

,-

).

/""
.,

~olf.QS.

1i

1
~..

....,

~R~S{O

!II

...~,

..

.l;.... j;

J1fM

.~:.
I

"

"., ~

..I

;-.....9,

____~~~:~c:C:S~~L~~O!)~~_t.~...

~r.__
::r:,_J:,
;,

.~",

.1.:f \J".I1
/.;

J:,

j,
~
#

"....~

.,

------------}-J-__._.__~"i:

---

_--

~~utt!I)~lron:.

.,f.t

.
.

,",r-

......

11;. r ~~_:.)3 -; .1
~

a:~."
.IJ!~~-J..,..I.

..

".

~1~mI......,nll[...

J<-..,j,\~~._,
;..~.

"~.-

",it

..

...

Drop Off / Pick Up Facility


~~arm

Avenue.

proposed bus facility would allow the public bus stop to be used independent of the private

bus stop while the private bus stop would rely on the public bus stop being kept clear. That is, the
operation of the public buses would not be impeded by private buses.
The

proposed bus facility and

access

driveways for No. 23 are contained in Appendix

Roads and Maritime Services

(RMS)and Sydney Transit Authority (STA)were consulted

to the

area

held

proposed bus drop off

on

Appendix

bus

including the proposed

was

proposed bus

access

confirming their support for the proposed

arrangement for No. 23.

requested for swept path analysis to be conducted to demonstrate that a 14.5m bus

19m bus could

bus fleet the

safely enter and exit the private bus bay facility and the proposed public

largest

In this

bus is

regard, it is noted that the Church advised that within their existing
12.5m

long bus.

In addition, the Church is not

intending to acquire

longer than 12.5m.

Swept path diagrams showing


bus

in relation

meeting

Avenue.

bay respectively.

buses

off Millwood Avenue. The

A includes written advice from RMS and STA

bus facility
RMS has

access

18 September 2014. Both RMS and STA have indicated support for the

facility off Millwood

and

with direct

19m bus

bays are presented in Appendix

respective buses

are

able to

as

A The

well

as a

12.5m bus

accessing the private and public

swept path diagrams demonstrate that the

safely enter and exit the bus bays.

Finally, it is noted that the existing Greville Street and other surrounding local residential roads
relatively

and do not

accommodate

vehicles. It is

easily
proposed
large
proposed development would not utilise Greville Street or surrounding

residential streets

part of their approach

as

or

are

that buses

associated with the

narrow

departure routes to and from the site. Church bus

routes would be confined to the main roads around the site, namely Millwood Avenue, Fullers

Road, Pacific Highway and Mowbray Road.

1451526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

126 Greville Street. Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

4.

Travel Behaviour

Questionnaire surveys were conducted at the Churchs Dundas and Glebe facilities to ascertain
current staff and
two separate

parishioners travel behaviour. The questionnaire surveys were conducted

days

Friday 16 May 2014 and Sunday 18 May 2014. The results

are

on

presented

below.

4.1
The

Visitation Accumulation
questionnaire

surveys recorded the time of arrivals for each staff and group of

and also asked them their intended time of

staff/parishioners

on

the site at any

given time

Table 4.1 and Table 4.2. The results


Table 4.1:

Visitation Accumulation

are

also

Friday

to be determined. The results

presented graphically in Figure

Staff

are

tabulated in

4.1.

16 May 2014

Arrival

Hour

Commencing

parishioners
leaving the facilities. This allows the accumulation of

Accumulation

Departure

Parishioners

Staff

Parishioners

Staff

Parishioners

7:00

8:00

35

38

10

9:00

180

35

217

45

10:00

218

50

11:00

219

52

12:00

219

56

13:00

219

60

14:00

220

66

15:00

220

71

16:00

220

69

17:00

219

64

18:00

13

217

56

19:00

217

49

20:00

16

215

34

21:00

29

208

22:00

208

23:00

1451526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

Table 4.2:

Visitation Accumulation Sunday 18 May 2014


Arrival

Hour

Commencing

Accumulation

Departure

Staff

Parishioners

Staff

Parishioners

Staff

Parishioners

7:00

8:00

10

13

9:00

189

35

202

38

10:00

15

202

53

11:00

203

58

12:00

22

205

73

13:00

10

206

81

14:00

207

87

15:00

207

82

16:00

206

75

17:00

207

76

18:00

25

202

52

19:00

201

45

20:00

197

38

21:00

21

197

20

22:00

197

19

23:00

Figure

4.1:

Visitation Accumulation

___Staff

Friday

16 May

-Parishioners

Friday

16

Staff

May

-Sunday

18 May

__Parishioners

Sunday

18 May

250

200

=?o

10:00

11:00

+-

+-

..

-+-

....-....

.-

.......

"
o

150

:>

E
:>
o
o

..:
"
o

100

~
:;:

50

o
7:00

8:00

9:00

12:00

13:00

14:00

15:00

Time of

At any

16:00

17:00

18:00

19:00

20:00

21:00

given time, the maximum accumulation of staff and parishioners would be

and 87 parishioners. These

occur

from 9:00am to

22:00

23:00

Day

some

220 staff

9:00pm.

1451526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

10

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

4.2

Travel Modes

The

questionnaire surveys also asked the respondents their method of travel (i.e. travel modes) to

the facilities. The results


in

graphically
Table 4.3:

Figure

Travel Modes

tabled in Table 4.3 and Table 4.4. The results

Figure

Friday

Modes
site

are

also

presented

4.5.

16 May 2014

Dundas Site

Travel

Live

are

4.2 to

Glebe Site

Staff

Parners

Total

Staff

Parners

Combined
Total

Staff

Parners

Total

83

83

83

83

Car Driver

23

29

23

29

Car Pass

Dropped Off

Taxi

on

Motorcycle

Train

Bus

98

10

108

98

10

108

Cycle

Walk

47

54

47

54

Total

83

83

121

84

205

204

84

288

Parners denotes parishioners

Table 4.4:

Travel Modes

Sunday 18 May 2014

Dundas Site

Travel
Modes

Glebe Site

Combined

Staff

Parners

Total

Staff

Parners

Total

Staff

Parners

Total

86

86

86

86

Car Driver

31

35

31

35

Car Pass

Live

on

site

Dropped Off

Taxi

Motorcycle

Train

Bus

111

118

111

118

Cycle

Walk

44

48

44

48

Total

86

86

120

96

216

206

96

302

Parners denotes parishioners

14S1526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

11

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

Figure

4.2:

Staff Travel Modes

16 May

Figure

4.3:

Parishioners Travel Modes

16 May

walk, 3%

CuPas.s,l%

Ta)( ,2%

Car PaS5, 4%

Figure

4.4:

Staff Travel Modes

18 May

Figure

4.5:

Parishioners Travel Modes

18 May

Walk,2%

Train,1%

From the

questionnaire

private bus.

4.3

surveys, the vast

In relation to the

majority of staff either live on the site or travelled by


parishioners, they travel to the site either by private car or walk.

Traffic Generation

From the above, the combined facilities

and

are

expected to generate

76 vpd

weekend

some

52 vehicles per

day

This equates to

weekday
day.
approximately
during
during the busiest hour (which is the weekday morning peak hour from 9:00am to

(vpd)during
20 vph

some

10:00am). The weekday and weekend late evening periods (9:00pm-10:00pm) would generate
similar traffic flows at
The traffic

approximately 18 vph.

generation is largely related

to the

parishioners.

1451526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

12

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

5.

Traffic Assessment

5.1

Traffic Generation

As indicated in

Chapter 3, the Churchs facilities at Dundas and Glebe will be relocated to the

Greville Street, Chatswood site. The combined church facilities

expected to generate

are

approximately 20 vph during the busiest hour and the weekday and weekend late evening
periods (9:00pm-10:00pm) would generate similar traffic flows at approximately 18 vph.
In addition, the

proposed facility would also accommodate additional staff (increasing from

approximately from 210 staff to 290 staff) and parishioners (from 100 parishioners to 170

parishioners). Given that staff would be transported to/from the site using buses, it is not
expected that the increase in staff numbers would result in additional traffic. At any rate, an
additional 10 vph has been included in the
In relation to the

expected increase in the number of parishioners, this represents an increase of

approximately 240 per cent (based on


visitation survey
the

expected

analysis.

during

traffic

maximum accumulation of 71

typical weekday

generation

see

due to the

parishioners from the

discussion in Section 4.1 and Table

parishioners

would also increase

4.1). Therefore,

proportionally.

Therefore, the revised peak hour traffic generation would be approximately 50 vph during the

weekday morning peak hour and 42 vph during the weekday and weekend late evening
periods.
In addition, there would be

some

lObus movements per

day.

Therefore, the total expected traffic generation would be approximately 70 vph during the
busiest

peak period.

A traffic count from December 2006 estimated that under its

potential
at its full

to

170 vph

the

previous

use, the

site had the

(should the site continue to operate

peak periods
during
generate
capacity of 470 staff). The surveyed traffic generation flows of the site with 280 staff
some

(being the staff number at the time of the traffic survey) still exceeded the expected
development traffic of 70vph for the subject proposed development.
Separately, the proposed development would generate slightly
approval for the site

(i.e. 60 residential

dwellings

which is

traffic than the current

more

expected

to

generate

some

51

vph).

However, the difference (being 19 vph) is not expected to create any material difference.

5.2

Intersection Performance

An intersection

capacity analysis of the Greville Road intersection

was

conducted

using the

computer analysis program SIDRA. The analysis was conducted for the above three peak

periods. The analysis was conducted for existing traffic conditions as well
conditions based

on

the

as

future traffic

expected traffic generation from the proposed development as

discussed above.
It is noted that RMS

uses

determine how efficient

level of service
an

(LoS)as an intersection performance

intersection is

operating under a given

conditions. The level of service ranges from LoS A


LoS F

long

term desirable

measure

to

prevailing traffic

indicating good intersection performance

indicating the intersection is operating unsatisfactorily and

LoS D is the

set of

will

to

require intersection upgrade.

performance level.

1451526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

13

126 Greville Street, Chatswood, Proposed Church of ScientOlogy

0Ge
GTAconsultants

The results

are

presented in Table 5.1.

Fullers Road-Greville Street Analysis Results

Table 5.1:

Weekday Morning

Weekday Evening

Ave.

Vehicle

LoS

Delay

The
with

Peak

Ave.

Ave.

Vehicle

Saturday

LoS

Delay

Vehicle

LoS

Delay

Existing Condition

Future Condition

11

analysis indicates that the Fullers Road-Greville Street intersection is operating satisfactorily

good level of service under existing traffic conditions.

With the additional traffic

arising from the proposed development on the subject site, the

intersection would continue to operate


would remain the

5.3

same as

existing traffic conditions.

Residential Street Environmental

RMS traffic

generation guidelines recommend

maximum of 300 vph) as


Residential streets
street

that under

satisfactorily in the future. The future level of service

an

peak hour volume of 200 vph (with a

capacity goal for local residential streets.

excess

of these limits would result in loss of local

amenity and safety.

The current maximum

peak hour traffic volume for Greville Street is

peak hour flow occurs during


generate

some

are

associated with

105 vph

(this maximum

during the busiest period along Greville Street. These

parishioners arriving and departing the on-site

parking facility via the Greville Street driveway.


Greville Street would be in the order of
The future Greville Street

some

Saturday peak period). The proposed development is expected

50 car movements per hour

vehicle movements

street

desirable

environmental street

having peak hour volumes in

Capacity

As such, the future

car

peak hour traffic volume

on

approximately 155 vph.

peak hour volumes would not exceed RMS suggested environmental

capacity for local residential street.

As such, Greville Street in the future with the

development would not create any adverse

impacts to residential street

amenity

and

proposed
safety.

14S1526000 ((07(10/14

Troffic Impact Assessment ((Issue:A

14

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

6.

Parking Requirements

6.1

Parking

Assessment

Willoughby City Council stipulates various parking provision


The

parking

rates most relevant to the

rates for a number of different

proposed development are

as

uses.

follows:

proposed headquarters:

office/business

one

space per 60m2

proposed church/theology college:

educational establishments

students

+ one

one

space per two staff

public hall/place of assembly/place of public worship

+ one

space per 10 tertiary

space per 10 seats, or

1 space per 10m2 of area if

no

one

space per 10 seats

(or

permanent seating is provided) + one space per 2

employees.
The

proposed ecclesiastical management facility would have

proposed theology college/church

would have

some

5,200m2 of floor area. The

to accommodate 170 parishioners

capacity

(equating to a seating capacity of 170 seats).


The

parking requirements for an educational establishment (excluding provision for tertiary

students
for a

as the proposed development does not include tertiary students) is very similar to those
public hall/place of assembly/place of public worship i.e. one space per 10 seats + one

space per two staff.


In addition, it is assumed that staff from the

from the staff

in the ecclesiastical management facility as such additional parking for


proposed church/theology college would not be required.

working

staff due to the

On this basis, the


o
o

proposed church/theology college would be drawn

proposed development would require the following parking provisions:

proposed ecclesiastical management facility (5,200m2) 87 parking spaces


-

proposed church/theology college

The DCP

(170 seat

capacity)

17

parking

spaces.

required parking is therefore 104 parking spaces.

Notwithstanding the above, it is noted that the Church


their staff. All staff

day.

working

As such, on-site

the site would be

on

parking would

not be

proposes to

transported by

provide transportation for

bus to and from the site each

required for staff with the exception of some

executive staff say 10 spaces. Therefore, the revised DCP

required parking would be 27 parking

spaces.
In addition, the

approximately

questionnaire surveys conducted at the two existing facilities indicate

32 per cent of

drove to the Glebe

parishioners relating to the proposed church/theology college

facility. Therefore, required parking for proposed church/theology college of

1 70 parishioners would be 54 spaces.

Based

on

empirical requirements, the combined parking requirements would therefore be

64 parking spaces
As indicated

(including allowance for some 10 parking

previously, the existing

reconfigurations.

This results in

car

parking

total of 138 car

spaces for executive

some

staff).

structure would be retained with minimal

parking

spaces.

14S1526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

15

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

As such, the available car

accommodate the

6.2

parking

likely parking

Parking Layout and

The

including the
The

existing

structure

access

can more

than

adequately

Access

proposed development involves the refurbishment of the existing

eastern end of the site. It is

proposed

to retain the

general

car

layout of the

park located at the

existing

car

park

from Greville Street.

proposed parking provision includes the following:

134 marked

Six

four accessible

spaces within the

demand of the Church.

car

parking

spaces

motorcycle spaces, and

layout of the

car

parking

spaces at the entrance of the

park is provided in Appendix

B of this

building.

report.

1451526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

16

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

Conclusion

7.
Based

on

the

analysis and discussions presented within this report, the following conclusions are

made:
The

proposed development is expected to generate

some

70 vph

during the busiest

peak period.
ii

Intersection

analysis confirms that the Greville Street intersection with Fullers Road

accommodate the

continue to operate with


iii

can

expected development traffic. The intersection is expected to

good level of service.

Greville Street environmental road

capacity would also be acceptable.

It is not

expected that the proposed development would result in any adverse effects to the
residential street
iv

The

The

amenity and safety.

a parking demand of 64 spaces.


proposed supply of 138 car parking spaces (including four accessible parking

proposed development generates

spaces) would be satisfactory.


vi

In addition, six

vii

The

existing

the

proposed development.

viii

motorcycle spaces are also proposed.

car

parking layout and

access

arrangements will be generally retained for

RMS and STA have indicated support for the


relocation of the

proposed bus facility (including the

existing STA bus stop outside

No.

19) and the proposed vehicle

access

to No. 23 Millwood Avenue.

Overall, it is concluded that the traffic and parking aspects of the proposed development would
be

satisfactory.

1451526000 ((07(10/14

Traffic Impact Assessment ((Issue:A

17

126 Greville Street, Chatswood, Proposed Church of Scientology

0Ge
GTAconsultants

Appendix

"C

11
><

Proposed

Bus

Facility Layout

Plan

14S1526000 II 07/10/14

Traffic Impact Assessment II Issue: A


126 Greville Street, Chatswood, Proposed Church of

Scientology

0Ge
GTAconsultants

~;";~ ~~i;.r, t..

{-

~j ~
~;, ""

..,:l-.",f ."~.,~
.~r"iI.~~_iH~.
~/~p.J.~:OO..~.
.

"I
..

1-::

"."0""

....

~.

...

"," k
"

....,.

:.., :d;~ :.1:",-""


~~~j,~ \~,~~

~,
.....". (

;t

~!
..

,~"

.......

If

J!

4:::;;

,,;;""r,.;
,..Ii

j.~-

~~~I;

,.

"-"."1~

-~,

l.r:""..
"..
,~f."

;"

"

"

.~

I.,

i"

,.;

.l.
n

~J!

,_

;""J;~_,
1

~/

~Ii Ji?
."~~ .""...

~
--

----

-- - - -

..\\0

-...-

.:.--

-- -

~L.--:"-?0S}.

~~~~~~~;
r.":~

-~L.; ;\;)

&:.
-

:..

- -

.tl~

..

i.
,

Ir
.

\
l..

,,~.,:-_--

,.

"

~:!" j.#.~1
~,...

"

,..I..

Jtj)

___:},"W.

..;.~

~INDICATIVE
~\
...i

0>

,_

r1!
w"

-""11-

,-~

~.,.~
.1.

,I

Ii

.
.,." ~

\c.

1.
i

,.

.,~.

~,

"
~

~~.~J~

17,2mm
.

:<-

lI!

_~"

~ -==,.:~~~

...

"-1.

1,-

~;

-,

",

_,_

".=:t-

~i

J7{l-~ ..~

~~~~
I

I"

_
_
_

_..._
.

-~.--:-~.-

-.:;,.

~-

"

,...
.

;:r~j;]1~.,.,-

.t,
~
I

J~_. :.j

~
.

--I~~~

..~

;I~

1.

,,-.

=--

...-:-

r..-~--=-~

AVENUE

~\r~;~~7.J ~1

PROPOSED DRIVEWAY

125m

)".1

~.---_:
.

I,

..
,,! j
~

~;~(~f~~~, ,~."l ;~~

--

,~i

I)

.....fiyC~.

~
I

\;f

,..~

It -

"-

,,,1\

"

ITI

i,l

Ifr ~~"

~.",;. 14 \

,L,"""-

~.~
..I.

-.

~.."

,~V

~OI

."
.,."

....

."I~..:..:..c

~-

,~

,,"

.,

,"II".",..
.

"

,\,

"I

.,L

,I.

~ .",~

.JI

~"

~:J-.

t;";....".,

Il:~j

"

_1

II

."

.~j~ // III.

..

\.1..f

),""-::

",.

1Ij
,Yl,

...,J~~Jt)~I~~ ~-

~.

I)

r"

."

,,?~..

""\iJ:i.,

."

~.

"

.~.

.,.

XIS~PJl. W.

-:

l. . .

AREA

J
t

\,

<",

t~

,; .~

,-t

~
;
.r

",.1

PROPOSED HAiws1lN

I~

~::.

r.

I~j

,-

,-

~ :...

~f

,y :,:1"",

"

fi,

,,r

f~

---;...;i"

--

.,

~:

1;

;.t";..i-

,"

--

1,

\"<.I,IW,..

~.~, J5..~

-:

~..~I" J:t;:,\,-.

"....,.,

(.....

,~"

"

I,

~}i--AI~

,..

-~.

it

._!?i~O-=~,~,

.\l

.~.;
.

/Ii

{~ ,~/\

:0

f?

-?..~ ;;.\

~I"
"t
{1,,;.J: \\", ,.1--4,

._

,,,

-l

""I!.....

,"

"i~~

,--

EXISTING DRIVEWAY

~.J..

I.

~.

....

,,-I

~. l>,~."G.1

.~_....; .II~i.-~"l .~,r


i- ": 1". ~.
.

,.,

".
-.,

~t

~,L~{j~~~
-

"-.

,./"

l(tto

....

..

:J
.&J

,r,~._~~

.."

--

i"J~)
"-::t~~1!
~ ~:\ I iJ \~~

~~

-Iot...~

I,

Y.

.~~rr~~ :~~

IC~t:U =~~\~A..9~~.~\liTi:i
f
,~~-. 7
,J,,- ,~t~
fY4tJi l~
"(~:"J.
,

~~~

,~

X.,k.-rj
~
..\ 1,

,~>.lCJ"-

I ~;~

*~
:...,

~? .-:":
1i..

-,==

?~,

r.

~
~..J !
/
\.~.-~.," ~H":~
,-~
t~ ..!-~-- --;-(

RiMriVED

-~. j.{~.:~<.~ . ~: ~. ,:~~...~..~l"~, :~. .f"-~


~

~.

!,.

~#"".

-",
.

.; -~

ER

~~

1o.",

l"

,I

,/,

T~,,>~"

./
-

.,~."~..POLE.

~.
_

...~

>,

"~J

"r,

!.(~..." ,J~J.,Q

.F.

~
,,-:,:

J~"

_~

",

fJ"

-..,

;~~ ~~,t..

J.

"i",

....1\\.

".

..,.,

11,

(j.....~.,.,1,;:-"

~~

,J~ .\~ ,~~~ w:.)o~~.~i;t

,I,

.,4;.

d,.

~J"

, ,.!J,~
-

PROPOSED SHARED BUS DRAW-IN AREA

,.YF

-,~., .I~..-;l.

"

~ll.>~! ~~=, ".ij

""

BE

I~"

....1~kt.

f" Uir-t.

1"~:

\/t:J.~:. ~.

,~(.~.~
IC,

~Y;~;

~,

:.

~.""fi

~l"

-t;~;jTi",

TR~~.a

~EXISPING

t{~~.

"\...

~..

"

or;

.....:0=

~.

"..

"

~,iI

,"

.,

~.n:",,~~:A

4<1

tJ""
~Y"""Ii\l:"1""
~"I~!- ""~~
.~?~{f~~~~~f,~
1\

,~
!"

>

...

,.

,I

~.

"(

".

,1;

","!

\
,

.\

"-(.
~,

..r

, "

I!"J~

d.,il/""

_~"",,.

jJ

-d

l_1. cJ
k#f:i,
1."-.. ....~
., 14
-.~
11-

fl

"

:1! f\,,;r\~
,

);~1l

,,...l~.
";.

,"

."

,..I"
;
."",

~~:F,::~ ~~,>

..:.

il~~ \\.., ~"",";r:


l
~ \:.. ~?"
,:.
/_
t"
,.
rll :~. 41.
fJ:
,:J"~.,~
"1\
"j f ,.~(.. ,,.. ",

...

...

"

"i

*"

.i-"

J~g;:I.~" ~~

"

t-~
..~

"

,{,

lIP

tr"

~"

"

-"1..,i=-~;r,;.t t~::r~

(J::.)

~~".

."

--;-

",.

~f

"

.......

\L

;;:~

-,

"fl-

~", .;":

.~~

f.

,~.

"

r,~

J:

11.(
li
/
V"
J~C r"
,.

.....- ~
.f,f, ~
J

..

,",

"
"

~.j:

,.

,.,.

,~~

,i,
...-="
--=-

.="J

~
-~~

"
"

~--~

DATE:

Melbourne

039851 9600

Sydney 028448 1800


Brisbane

0731135000

Canberra

0262639400

Adelaide

08 8334 3600

oeo
GTAconsullanls
www.gta.com.au

126 GREVILLE ST, CHATSWOOD WEST

02.10.2014

SCALE:

1 :250@A3

PRELIMINARY PLAN
APPROVED:

BUS BAY CONFIGURATION SKETCH PLAN

ML

2.5

7.5

DRAWING NO,

14S 1526000.03-01-P3

SHEET:

01 OF 07

J,o.i=-...:r:?!;r,;1

l.1, J t
k."f:i,
-d_1. .-., ....~ ~.

t~::r~

f~g;:I_~ ~ ~~

\\..,~~"",";
~?
f,

12,50

....:

~," 1 J;

,-

fI

!"
.

,~(.~.~
SWEPT PATH KEY

J.

~l.l,.~! ~~=. ""Jj

1C,

....,

...

Il

~~I~

.*}}
If:

.rt.

,r=.-"YLI!

Ct

VEHICLE BODY PATH

300mm CLEARANCE
FROM VEHICLE BODY

250

:>0-....1

Truck

250

6.0

1,

Steering Angle

36,6

"

_~...0~\
~i~~!
,

~!,

"

,"

~~

..

,4.., ,.-,

t,

;-~

~";

:ll",l.,~_r.
[

I,

~-

".
,"

~"

$~

:...~
..

,.

,l~-"
,/"k,~~

,\~

,. \ 1:.

-1IIJI!;i
,~~

.,.
\

r,....
.

~T-"!

::::::::::::=-~

,.
_

,~.\.

::
"

..,.

,.,,~

~.$

11

~~

"II

,.",, ,/ ,;.
1\\,

" ~ ,~"

.?

~~

~I,);...

li/

1.4:

CI""~

.~~;

~ ....

~"",~.~jy\,\\

~""fA-

A....

,....

~:. ~. .c.r. "k-"

11.

l....o!J

-:-",

..

4~J,

~~

.,..:;...=

"
.;:.,

r"; ,..--

..

~.

~,.,

--

""71"in:.,

I.

"~i- /
+~... .~Il[j
I

<J

.,..,.

A.,.

.....~

,Jf~ 1..<,,,,<,,-

~jj.~.
~, "f
:11-~
,~"".
io.~lCb~1

",

~~~"

I.
I,::

____

)I..

,,

...

=;;~

1...1,,.......(.,.,,
,,".... ""~

.
--.

..
.

"..._.

.
.
.

=.

1.

-;t,

~~

.J

..,

]---_It.__"..~.:.li/
~,..

--<_

.~--

":,I#r:.

-.

-~

"11

..I
J

\:"

..~ T

.".1

~.,;r
~
~fJ q .
I~~ : C ~:

1~

,.

.1.._.,.".],",.",

-r.rfi. ;;;=
;Tf

l-~

,.

">,}.

It

.,e:;;
L
~..~

,-.

/:,
~
-# .;

~.

~t;_):;

~""\.\~ ~!-~--=;=;-~
~

<.,

t
.-~

~J~"~.,

...-

".

]" ".

00

C-::I~j
~Ir.)..

<~.

~7{
:....~i.},f~
".....

.,..

~~l.

-j.,

"

c,....,

"

~=

."

,~

-,

tI............-.i
~...."..

~~~-;._1
~

,
\,)

"

~-

.~~

,~

..

!ut
",

,,

: l

..

f.~,~(

1
"

*,
-

II

~I.,

-,.

;;

5f

"".

.,~
""".

.
.)":.1-.

:J

iN

"-1"",:-

I~~

. . ~J

,,~.

~
==~_~ll";\tw)

,/.

r.J.\C;~T""
.

~*~- 6;/
I?~~:T!.

-,

,.~It)_-,-

I.

/~;~~"JI/
",~Z" -:m
/."

--

(,

~
"

I,

/).:...

.II)

"~4t\:,

:/..

","
"lI

/.,

r.

."

,":"

11<.

~.

.11~

~...~
,~~- !(,.~.~:I.~~~
;/,J~,,";.!y/.;;,
(~}~Jt.
__,-:
}ifJl-:.Lir"- \

I\l~/f

,\ ~

~~

.";,

-"

~\
~-

J~.
~
"

It.,.
-Jr"l ."..-.1:" ,,-~
~
~.

"

<. :-

../

~(,,;..~"4ff "jH,I,<~/.

:!J!lPI"

!!!f1i",

,~

~:,

~~"
II

,.
~,:.,........~~..~

Iii
,

1:.~/,,~;"~~i~

"

lI6,~i~ -~JJ"
:P..J~ !j/

l.

,.."..

,.1

... f.
,# ,"", .

"

).,...,

--"

,,.1.
I~..

"I!..

.L~,
.~,

t..o.","

J~~~~,\
...:.
.

~~
.......".c.1 "..

~~.-~

,1l Ii".

.,Y. ~...

~,9,..,.,ir~

".1."

_",\ y;)::"-:r~,

~/-1

~~~ "0J~~, ff~"~J~/:~ ~!St.T~.:-;.~<~r~~,----~-.7~~<:--;:.~~-..~~r";i.-

,~k

~,~

...,

i.

1)

......

..

.;.-tt -~

..~I~,t.
.~:J
~-

~~.._

_~

.._

~~J

".

"

~~7:~.J~ ~~~1( 4"


t" 1
L

Ii

~
f:

~.

:,:.

.~I~-.,.,. ,J...::.

,.

~ ~,.j" ~,;
~1

,..-.

"
,

1,

:)".J

17 L
".
...~ .:l"

i:?

~.

_______________.f__t_~~:.."..1

......

o;,;,~..I.~~ l~I~.,..,.
.rl":~~~~.
~..[~

"

f".

"

__",:11 ~~; J;,;;/;

,,;

_.

l~
,.;~~,
F~lt""~i!
11

--:

1~ll_

,-

ifi

Ii.

," I

.
1

fY4

ASSUMED SPEED 10km/h

!e
...",

~~?
.~

1"

~,.~:, .,. ,.)....

fi

Lock to Lock Time

,)Ji7,.

l...;

I"

111-4,

,::.

I~/

YcJP1\,"
,~!~

~.

,"

,~"

--i

/"

I~

" .r,.

.,

~-;.J:

i,~o-=~-v-*"H

it\.-\~,

f?,;,;.

-\k"~II wi

,,

~,~~.;lfl~.~~

~l

"~J"l,

--

r.1:t:!,,\,r~~}i.
~~+I,IW4I,j,I~
~{

.,.,
.

:~l
]..,..~I~\ I~ ~Il
I..
~~,Jtij

metres

Width

......

,\",

~.
-

I..

"1-1

,./

~.i~.~~~
~,

__-ia~_~W-"~~.f

I~,.Iil

"}f. \\

~.~

"~J~..

~\JJ,"!~:
f.,7:~.~~~~~w:.~~~;:~~y.
"

__a.,.~;.AJ;,.

11,

VEHICLE CENTRE LINE

(j

:4

J~J.t:J~.

It

-.

..; .~

~~~~:>J.C()N- E~~~
-",
~~

,, -,

"7~=,~"~":I~,~~:~
:J~h~
":I..\~1
JIIY"

6.85

BUS

>

r/~,

~~,I(~

i;1,.{!-~,t.

,\. S

VEHICLE TYRE PATH


2,20

~,

1(",

"<"

11_

.1

..

fJ ~

rtj

."

.,.j

~,:

--=

-.

~~, r>l!:c":
.

d~
.

=
,,

:"

1) rjl
"

).
.--:
~

.~f
,l
.

..

v~.--~

,WI",
~

,.-;

-=:;....-

..

J--

:::.--:

:.

,"

",.

r?a~
..-

(~

;::::;~

.="J

~.-Il,~~"";~
"7

1 I",
"t b

,
-

--

--=-

---W;,="""",

~~>-

. ~?

"

")..

If.-~
.

;!>-. ~. . " A..~r.(::J1,~~~I"


-

-..

(s
I

...

.,t

".

j.,

,"

.~"

~~ i

.~~

IIIY:

~"~)*i"":

,,-.

,_,!

.,,;,-:

c"-;\J ~~~~ ~
.

~~t

"

.,.

VII,,:_,

~t::

,-::.,

-:.

~,.

/:;,3--F

Melbourne

Sydney 028448 1800


Brisbane

0731135000

Canberra

0262639400

Adelaide

08 8334 3600

.;:J.,.

,f

~!t"
F~~"

1)\"

."l~~
~

."

;~ ~L,.:
JI

126 GREVILLE ST, CHATSWOOD WEST

039851 9600

I_

:-....~~~~
DATE:

,,~~d-\f.

,~,
....
,_~ _,

..

~\1

,_

~-~ ~)........~7
l~

t;

f."

-..II

l;

.
,

"

of)

~.

,,"~

~I

jjb.

I.

....

..

.,.
";",~.,"1 -.,~

?~rj~l
{~:/
.

),

.1

~.l,
-.
.~-~
~-

,-4.

02.10.2014

SCALE:

1 :250@A3

PRELIMINARY PLAN

2,5

7,5

12.5m BUS SWEPT PATH ASSESSMENT


APPROVED:

CHURCH BUS ACCESSING BUS STOP

ML

DRAWING NO,

14S 1526000-03-02-P3

SHEET:

02 OF 07

12.50

,~(.~,~

SWEPT PATH KEY

~l.l,.~! ~~=.

1C,

..J\

VEHICLE CENTRE LINE

,"

.~

VEHICLE TYRE PATH

6B5

220

VEHICLE BODY PATH

BUS

metres

Width

2.50

Truck

2.50

Lock to Lock Time

6.0

Steering Angle

36.6

~!.~."
..

1,

".

~.!J~

"~l;."

.1:.

".~

~,

t,":;-.1~" J~1"
,1 .fJ-.: .~:J

:.~t-

,,
L

",,, I~
I~.

j., -:",. ~, .;~,

,~

~~.;

";

",,:.

~I
:ti
I
.~

1>\

.,
.

,i~
~."

"

.......

I."

<

.0

.~;

..

~J,
0rjl
....

:"

.~.~
~.J,.,

1\~

i
.

~~ -:Ii

r1r.

.,.
......J"
..

fl

....

-...:},v,j:

..", I
.

j.~.

,J]"

", .",

r._~_!:..-----:;:"-.7~:-::--;; _--___~_!;"
,,,,..
~,
to"(
a..T...-.:..*,~. L,
~
//iI.,.,A. L~
~"\
J"I ~-:~?

II

#.""

"

.-

~. ~

"r

/I"~
...--".,,~

lofJ

,,;Jj,~~,./.fJ"#~ ~.1r?/
\~

1-

t.. T;"~r 1""

l,--~"~"i~
//""j.: ~t";..::---_.--~.

"

~-

".

"

_.,

I:-

,~""

~"

..

I~

1":)~f!!I!

==

f!1"-

....

--

lr.J!~

1~

\."

I,

""\\

,T

_".
-"1,;-.....::;-;-,
,"
~

>;rae

""

==-_.n \fM

..

:-

----

.. .,

......""
~

,j"
...

00

w
-

--

--

--

--

-:-

..-

-"~

.::..

~<;

,~v

-~3,f--

ltSb

\!.

1.

.",-.

_:::::::;-:

.~

~~
c

"

1CJ

",

,.;

._-::;:::.:~

"J-:.

~.

,e

,~~

,i,

(~
~

~
-

.-r::
"~~

.="J

"

~.-Il,~~-=;~
"7

,[
-.

"

")..

;!>

--

----

>

.-".,.

!I-d::;

.,t

j.,

"

-,

(s ,......
-

~~~.l;l .\.r~-~
". [("~J.~
,

~~" ~.

.....
-"

~~ i

.~~
~"~)*i"":

"lIlY:

,,-.

._,!

.,,;,-:

;\J

~I., r."~t ?~r.~. l ." .


"".-"r.~" ~."

~".""

r
,I

.
.

,,".

~t::

.,.

.~~I

~-~

1:0

~.

~"~,">."1ff"
l~JV

,:J

.j;~,..
"!t:..
}~ ~~ _~I....:J>"f,
,jIl

t.

,;

-~l.,,;:,

.?.

Illf.;" .=
:-....~~~~

Sydney 028448 1800


Brisbane

0731135000

Canberra

0262639400

Adelaide

08 8334 3600

DATE:

.8

126 GREVILLE ST, CHATSWOOD WEST

039851 9600

1)\"

,.

Melbourne

._

.~.
.\.,

..

,f

\1

..

\,

~~.
....
,_-=
_,

"

of)

"=,

.,iJ~F

.~

&

",,~

..11

l;
"

"

...,~

I.

,~. {~:/
.

.1.......

jjb

.,.

"....

";. ,",
;! 1

i~

;,

.-4

.MS.!

~~

.
.

-------

tI..............,

....

7~.

("

.,l

.L.>!"~

_.

I?"
.

.:i~I~!
~::t~.-:~....~?I(
.
~~j
_~
I~.f~\

.,

.,

Jjj(Jf ,~v<..,.,~

,!!~:,""-":"!~,-

--

_/

(
/.

-:

,
.

"

I~ I"\l.~ If

)--C.k-\
I

_"J>

....,,~~.~,II.,~I.

~.

1-

1~\tI

,"

~~";74,in:
.,.
", t
Jr"l;"

1
I

.\.

~{,: ...~ ~ 1r/1":

^"~
=

/Ii",~

"

.
.

44..

;~"

I"~~

"

JI/I iJ",
; . . "J;.

;t#~.."~I.
,!.~;.:::,.

df.

..

e.

(,,;......~.,

....,.~

,.

~-~-;t:~"
~~.

ll"

:......,~

.1Jlii

..

!1ft

,-~

,--:

II

"

.,

I!!

1l;;,-.
.~"
IP.:

;;
.",.

"\

-B
}~
\l.,~- \
.i.!a"
.;/ ""~.~~"~
! ~
.1.,,~l4~_~~~ >:,~!~,-

11/~~/",

?1l~t. l..~11

\""" ~-r~I~~~jy\,\\

...

"-".-1~ V l(tt. f.~~!i)


"4rt:-f,,~.
\
...J-- -7.
)
~~I
-.t-\I..
I,~. .1,,-
,.~
lIj,
I

";

c.

~~~I

.1( _<0_

",

.~.J

#fI~
J

,/~

-..,-

"il?

~:):,~;"~ ~ :t. :I:.Ii>I",l

r,;

!,."", -"

,.1"

J"

.!.

t:"i-"~\

..~<<

"
.

",~

II

._

--

II
,.
1\~
~,:.,r".~~"~
,~.~ :~/~

~"f

::

"

~-

,\";.

~~.~~

".

,~,~

J~~~~"~

"

>

.....

"

~:, ~

...1\

~k

If~:tt -~

-1

,"_

~"

.~

_---

~"""-.>1
.. "..L.

~,1,l".

~./,

tl!:

~,

""~J

I~

"

~.

~Y; ~

,.~"

.
,

".

~
-;;.,:

,4;-:;.
"

,1,

>_II-C "r"
~.
, ~ ~ ..
I"~":""
:-

"

17

-~
,4,

ASSUMED SPEED 10km/h

"

:?

300mm CLEARANCE
FROM VEHICLE BODY

02.10.2014

SCALE:

1 :250@A3

PRELIMINARY PLAN

2.5

7.5

12.5m BUS SWEPT PATH ASSESSMENT


APPROVED:

CHURCH BUS LEAVING BUS STOP

ML

DRAWING NO.

14S 1526000.03.03.P3

SHEET:

03 OF 07

J..,i=-~;r,;jt

l_1. J t
k."r:i,
-d_1. .-., ....~ ~.

t~..-:J~-

f~g;:I_~ ~ ~~
12.50

f,

\\..,~~""";
~?

....:

jl

11_

~."

,-

...

J;

>

1(-,

,~(.~,~
SWEPT PATH KEY

1C,

~ll,.~! ~~=.
..J\

VEHICLE CENTRE LINE


VEHICLE TYRE PATH

2.20

6.85
VEHICLE BODY PATH

BUS

metres

Width

2.50

Truck

2.50

Lock to Lock Time

6.0

Steering Angle

36.6

300mm CLEARANCE
FROM VEHICLE BODY
ASSUMED SPEED 10km/h
-:

.---?a
;::::;~

~~~ k

,=;

~i--

-~

_~

..

(~

~T

i~
~.-Il,~~"";~
7

1
L

"

")..

,
-

---

--=-

I"

--W;,="""",

~~>-

. ~?

If--~
.

;!>-,. ~. . . A..~r_(::J1_~~~I"
-

",t

(s ,....,
I

...

-"

~~ i

j.,

,"

.~~

IIIY:

~"~)*i"":

,,-.

._,!

0,\;,-:

..

;\J ~~~~ ~

~~t

"
.

VII,,:_,

~t::

,-::.,

.."

-:.

~,.

/:;,3--F

Melbourne

Sydney 028448 1800


Brisbane

0731135000

Canberra

0262639400

Adelaide

08 8334 3600

,,~~d-\-f"
v

I_

,,~..
....
,_-=
_,

,f

~!t"
F~~"

.;:Jf

1)\"

..l~~
~

..

;~ ~1.,,.:
JI

126 GREVILLE ST, CHATSWOOD WEST

039851 9600

:-....~~~~
DATE:

\,
~

,_

...

\1

f."

~_.,.,.d- ~.)........~7
l~

t;

l~

"

of)

-..II

l;

.
,

",,~

I.

~I

if.>.

"

....

.,.
";",-;I .,"1 -.,~

?~rj~l
{~:/
.

),

,I

~..l,
-.
.~-~
~-

e;,

,-4.

02.10.2014

SCALE:

1 :250@A3

PRELIMINARY PLAN

2,5

7,5

12.5m BUS SWEPT PATH ASSESSMENT


APPROVED:

STA BUS ACCESSING BUS STOP

ML

DRAWiNG NO,

14S 1526000-03-04-P3

SHEET:

04 OF 07

~J:::.;;:~7 :~..~~-~~6:.f .~~

12.50

~;.

,I

~~,~..
1,.< 1...~;.

SWEPT PATH KEY


VEHICLE CENTRE LINE

,~v

L-.

300mm CLEARANCE
FROM VEHICLE BODY

250

Truck

250

6.0

Steering Angle

36,6

"if

.::

,e

.!

J~

1,

:.J!.

"....)..I~~

~,

_,:.1

1;;~,~

"
~"",Y# 4

"~

.-4.

t,.1;-.-ff

>,

J"~.

-~---

/~. I. ".t. . .- ~.~


_ .~ ,.~ ~""t;
"1-.
~,.
.!

(-:..

";~

,;-

,.c,.

"~.
-

.J

! ~
;"e

.~;
,,

.~.~

^"~
..,

...

""t

">>

tift

~~,.~,:~:. ~. .c~. k,
~

"!

fl-"-

.....

;I-

~c

"

,-~

;~.

,~-

1.

I,

~~-4tij

Jf.. }i

-;;

l#L

,,

<

~~.c~,oli

JI!<"Z;:)/,\

,.~t;r;-,.-~.-

rt."

-:

~q.~,~

.,

~<;

~
_

.~I\~~~~~.L
~~~~_,

-.

,;,.

.
-

:;1"

f:

~...

..J
-;

/: _--:-:--~~------.-

-=

..-

:;,r.-;,j
~![:O
c--,

~-_.:~~~-~__,00

~~J

::.I"

-:5"o~:.1"

J.

..

,.....

"

",l~ ~

.flt

;~t;.);

,-"

~.

~.
~~
:r~t.. -~

fJ

~.

":

~,,----=;=;-

~-

" J

":~~J~f,

-.

-,

,........"7{. .-~

,
"
~..,,-~

~.

!i~1

1-

..-;;

"
-

I~~

_._jF
.

#"

or....""

;~,.I
~.-.
fi~~rtl
Jr.

___

-..

...

~~

...1"

"Ii

~~

-,

1.

;...........-,

~..~

:. T

.,.\

JI..

l.i[~

"""

~
#.1

.....

-~fl

--

".

"l

-"1.;......"(-;,>;,
:3C:;

.,.........".

""\\",

~"",j-",. --~ ..~.

I.:..
)

Jr" "Ii-

,.

"-

,~~,,~

r::"!~._~
!r
( ~j~p! ,:1
.;,

..,.~~

~,
-~

Il;,~j

"

r._1

If

,.

"l

,t;tl:o

)
""-::"

1.,~

"

,]

",?~..

\.1#

F!r~

").41, :

L,

"

~"

..

,
.

~
\

:/

..T/

}-t>.~ .,.
.

..

."

~.

1,

<"

r.

.."

I,.(~} ~

~\
-

I..

~~:"

."!\

.~)~, .,

111.;

If_Ji)

I~.,.-

,-

J,

~:""

)
UJF_

~.~~"

,./

!e
""

J::;{"

:~

,-~\,~#

~~

----~~....
-

4.

.,."

"

-,:-
,fi

t
".

-Ii.

,-

"!I

~.

1~.~1r ~~.-.

. . ~.~. .

.-..-.

.i"a-!!--.

~~

~:.;:~--~....~

1,

Iii!. "& ~

"

".,\

_,

_-~
:..

~_

~i"I

-~/""
;!
r-

--

~.~--I ~

,..~<<
~

~~

......

~",

;. ,.\

.....,

~~~

___~

_
-.

-~--er;i

~,:"," --& ~

,~ I,

\~ \ ,L

,-~

~~,

!~~~-

-------------

1,

..

~.,,,

~..t:.

~~l-:14wr..
.....i

:;:--7 ~ :-,.:..::--

---

L.~
-..
~,...t~-!

/#

J f~

~,.....,!
<"J
)J.-

..

.,.

-:~.

,-;"i
",

"

~,[

.~

.;/ ;~-~~Jd_!J.

~;~
",." /

~I

tf

"

J~ t~t...

-7"}i""II"

41

,I.

,I
1

~~

~~..,...--~

~~~,

fi,

I.

\"",,"\,,~,"

::..

.)-,

iiiI-o=:~_~
,~

11"lI-4.

,Ii
(.
,~.....

-~

::F

"

,~"

11

~~+I,IW,
~,

~/

"j

~
\ ~,

~<
~-.....

...J

:,-~

\i-J;\\!,.

If ,jf...,...

~\

>

~ _!:-

~.....

"/(

I~

~I\,,~

,.

JIjY"
~

"

..;;,: ~l

r.

~
,

).

1\

"J-,.

,,

._-

=~~\~A~" fc_

J;.
"". ~

III

1t..7

/ :

/...-

,,~;(.

1M

.,"

r~~f",\ /~

"..~~ IT.
~t:~
,...,j,#~I"

"

,;

/Ii.,
"r1r.

,...>>

:-..: /-4

i,:

".

-.;

c J~; F""

>.,j

-:1

~-""" i

r.

--;

-~~.c~b~r~:~
....

5~--.---,,~r---:~
.(~~--_

.:.---

-\!.

.: /T_...,":C"

.=:==

_........:

~~ J

---

-.

,N"_~~

......~..

.-

,,,,-.

"""---""""=

,-~

--

.
-

"

1CJ

....."

~JI
0rjl
....

:"

~.

~." .~~!I .~(i :.":;,;

,.,.

....

_-

;.,;......
.,iI~-

...-.

"_

".,4

,. J"~/
Of,!"

,~,1,

,\

II

...

:!J!lPI"

.~.
.!.~;~::"

:J.,l~.."ttA
,~.,

"~.
.

.~~
~

... f.
"-

~~"

-,;-

.,,,

-.

.~

")r

--I..~~"",

11

_--::
,~,~_-,.

\.-~....~.,"~rt::..::",~/.
/,/..rl,~~T;-":..~~.,
...",.
"r
.
*" /. ~/.
r" _,

-"",

.~,

i/14

...

~..J

.
-

;tf;

",

..

;
~

~,l;~i..
-~f.,

1~

.1:t..-

,lI6,~ ..,J

~~

"--<t

~",.,cr

l"

,I

L"

I~..

.!,.

,~.~

~..II

~,f!!
-

,.1"

"

~,";"-""~

,p";1.

~~~_..
f

ifj

\-JjJ;.-r"
.

<Ii.: ,

,~.J..

;"~;~.,~~\.....~~I!l,~

~.t:

-~c.

_,

":1.."1\

~"""-..1

,J~~ ,,,I~r,;\~" ~,1..f.,~."~~}" If/\~"


/\~
~L~~~.:,~I~..

-~

(j
:;--~I fi~1. .r.:"
l:t,

,~: ::.

....1\-

f" lll

-:

~.,

~"

~I
~,~:F."-,.
~...

...."

"

~...:...

,,/

_"

,~...

.II-C _,"

~"
It

,.1

...

;;-,:

::-.

~,

.-;

~...

i>

:?

~!,-.

t\.l~~_

"

...,

,I,

I,

_JlJ
j3~ ~:f,[f; ":~~l.-\

.~\

-==J~~~I;
c.--\
{l:Ji"-:

<
P
.
-,.;t1;.;~:-i".l
.:~?
t.,~":~" ~rJ
J~"~
,~~"11,);~._---------------f.--t-~-~--"1

ASSUMED SPEED 10km/h

f;

I)<~~-::-=-L)J

,.

~lt~;1:t:!"

T#J"7~~_ =~\.A~!. ,,~J;t?:~"

r;7"

;n"~~~~

-~
~-~ ........

~/>.lCJ

.r
~
7~"~ .,~,,~
~ .I~ ~~-~(f~.~~r 7ii~

,-"-~-,,.#,*,~~~
l

VEHICLE BODY PATH

Lock to Lock Time

~~. ~=.

J.r.
"!l./1

.....

,~

"rJ
,

;1_,<:<:,

metres
:

1C,

"~=

6B5

Width

~~:l~

VEHICLE TYRE PATH

BUS

,...:.(

I\,>,

.\~

-~~i

_,

f.

.,

"!

\I
<i!:,

II!!I

,r

"

(.

l-tJr ~ ~I~ ~

:(1

>

~., 14,

:,_

:.I. 4: .
.t\. fJ:

~
220

,, r

1).

.<~~~~~~i(t r!

"
.

-;

___-::;::;:~

OJ--

~.

~.;L.
;~,..."..,...-~

----=:

,"

(~

~
-

.="J

"

~.-Il,~~"";~
"1

,
~

---

--=-

1
~~~l ,\A-~
".~
f,l:I>~
!,~::::::JC1. 3.,.1
-.\
_c.
......,

").

~~" ~!.
~.
-

(S
I

-_

-..

;;:.

.
H"

"

...

,....:~

,iT

.s.~"

r-

"~ !

,.

,
rl"

".1/. .f"
","1..
~.l,
.

-" ~

,~,

0,\;,-:
1,

?~rJ.~4f
~~...~.,

j
.: !. ~~i,. ,."
r

)*i"

,--4

;.

.,~

,-

~: ."~
-

-:-1"

~-

,,

-..I.

~-~ ~"r--..,">."?f.{

--

~."..~/ ~

<

.~~I

c.

"

,~"

" <If

:0

\1

:...~
,,"
f

--..:J>"

t-

Sydney 028448 1800


Brisbane

0731135000

Canberra

0262639400

Adelaide

08 8334 3600

.....

\,
I

-r-

",

-~l.,,;:,

"

_
-

:-....~~~~
~

126 GREVILLE ST, CHATSWOOD WEST

039851 9600

.~,

17If-;

DATE:
Melbourne

r)f
.

,,

.?

f
\

..

\
~

~~!..

,j;~,."!t"
"}~ ,~

-\1.,11
z

l~J~

I.

I....

-!J-

-.JI

l;,,,,.~.\.

it

.,

y:;;

~J"

02.10.2014

SCALE:

1 :250@A3

PRELIMINARY PLAN

2.5

7.5

12.5m BUS SWEPT PATH ASSESSMENT


APPROVED:

STA BUS LEAVING BUS STOP

ML

DRAWING NO,

14S 1526000-03-05-P3

SHEET:

05 OF 07

l
_#: c,J
It. w.,#f:
,,:,.
1lI..1. ...tI~.,.
....:~J

:-:.r~ -.
~

1100

0.50

~I~I It]

4
-...1 .

SWEPT PATH KEY

270

VEHICLE BODY PATH

ARTICULATED

BUS 19M

,~

Width

2,50

Lock

Track

2.50

Steering Angle
Articulo ting Angle

Lock

Time

6.0

26.5

l!

,,

!~

\"..,,~

~~

-:

-~
:?

",

.....

~4::;J~

..\\0

f> 1 I
~

~.,j.

: ~-

[",

~---

f.

,.)1

>,

"~J

"

J~~

...._..-r"
-~
.

",

".:

,. ....

~.,~.

t:";"~~\

.;a.",

,,-t

\~t

--

.:!J!lPI"

111,

..
~,

;~""

II
./

. 1.
44.~
,,,~ ~,,;..

~~ ~
!

J"I

-.~

~.....:.10.

",.""./

-.,

.~":l,~...

,_

,I

~?:,

~"~.-~"

l..."

~:(;~

~"j

~.,

./."
,,

,i

"

.\

iiii :
~

"

Jt.

;...........-,

".~~j

1..."

~
ri

.~

""=tt-------I-

:
=---

r,

__

-~-

/:;;>:~e-= --=-m-;-.,

J
,"

C;:~.

<L

~,
~

,....

::.I.,....

"Ii

.1

II

,"

. J~:~1

o.

.,

,....

1Ii

::

_.:::

;"

~.:..~i.},f,
"r.~

:l~

,~I

~~

f~,
t

~,
"

~
_~J.
~!

J"

,,"

~1..,

Irtf,

--\
~

-----=;=o

-,l"; "f

It

,~"..

-."",=.

..;,,1

", \~

\;;:~

~~

",~,,;,<,j

,LI~

~,lrJ"
"1..JIJ.~~f
i. "".

I,~

"
"

/:,
\.
~,;:;;"
#

.4J""r"""""I-;.!,
-,.
l.

.J::,~j

Ir.~

~"

"1

,f

.....

JI"

,~

"

ow.

,J,

.~>S..yj

..

J1--:-It.~.:.. ~,,~..J

l~.;;,-_"-J!- ~I
=22,
~"!lyr;i~,filil_
-------.-

.~

_..,
,~~
II
,;

~,

..

\~,t.

"?

-,

"

-,

;r
~~

-1

.~~
r....

,.

,I.I,-"
..~II.)I....;:,-,.,..,-.-~~,.,
~

,,(

,"

...

.r ~..(., >;,

"""""I""

"l

\1

II
,

{,/

..

".

..

,./,
I

."."

"-r-:..,--

f.

"~4t\:,

II

,to

~.~~,

."
"~...
",

/(,

,"

~.

I.

J
t

././".r"~;:::="i.:"

I
."

,..) ."1. ~
,

I:.., \""
"f
L.;

..~,

~} ~
,lot

:1

<~,,~,I1I:t~-"~
&~~\

j
_.:...

",

r.

.,

- ."

..

Y"

:,;J"

_~\,~~

iI>

~ q.,

-,~,,---~~~,

~V;"~
;/f~~
~I
:-#~~];"./

Jt..}iJ.7.~.;f#!::"

~~

~~~

,I

I,

,.

-.

J.
J~.

"~,

-.

"j.

),...,

"

,-

-:

~ .~ I,
iJ-1,"

~;

~,

".~

/.
/f

A~

to

-~....-=..,~.
~/;~A,l,,~ ~~8..

. .-1\ If. .-Ji)


"11

r4.fi

~..-

....,
I..

tf

-~r:

,~1~,Ir.., "~.." .. .
~~
~
1!).~~.. .

~~.

,?

.,~

~,

\11.

I.

...t:;.-= -:-(.
I.
,-

)~ i"-k-\;I-

~~-!i)~-~~~

,..--

~
~ ....

,~

L~J.J.

~tl

."........;.
---~,~..
.~..
~""
fl.(

---i"-----:;:..--7~i,-:--;;;

....

&:.

~~{~.~~-~ ~~-~"
./-//t~;..~~;.L.~~-~

141\\,

ll"" ~

t;:.,

\."

~\

"

~~ ~7t~.
It.,.
J["l;..i

..

,~/,
).

r."

"~r-

"I

.~..1l/

.... ir~, 11.. ~ilrU\\

.""

11~;i
.~~,.,
..,....~

JJ.

(,

(,,;..~ ~,~ jH." <.;J-,~/

~I

df.

1!~":_,~,..f1;"
.~"".\

Y
l(tt.

".

,..

I!!

\,
).,.

.~,

,.r

.-.~ V

j,

IF

r"

,~

,. \~,

..

~~ ~:):,~,;, ~ ~ ~. >

,/ ....":;

...,

"",

J.,:

_:
-.....

",.,

"

/~I,

~~

".

Jd,..

--

,;

u"l..;;I,~

-~:

~L.--:-2..0S},

.~,

..

11.
,~..\,

!!\~~~~~,;,
r.":~

"ie

1;

,)rl

7J
._

4.

,;;J~~~,

,,

"....,

--

-------:;-----------..I----~-~~--_r;i

.~

.,...~~,~l~~

I~:

....,.

<1."kt

!!J; ,c
~ ,r"
, ,:~ Ii~~J "Io.~,.,~. ~~

~f: .,7....

~.

~Y;I~,~,.,

~,

,,;""r,.;
.:.

..

~~I

.,

~I~:-_, " ,J..

,.

".

"~C

...
.

.:t

,.

~;-",t/\

" ,0
.,

"

"

(~, :t~~

"

..;tJ;~"F.l".f.::J.
I~
G~, ",1

70.0

AI

.
,

,I;

fl;

~j

~~-~~,

;;.\__

?..~

r"fi\l~

fY4

ASSUMED SPEED 10km/h

,~!

,~t~

,\ ,~,~

..

-\:k.-rJ

li\

,"

~.~~;J~l~~

"",..,.

-.."

.;= ,~

r.1:t:";f;.J:\~.~.,4iI~}i

\,

"~!"J

,-,

300mm CLEARANCE
FROM VEHICLE BODY

metres
to

...A

I,.

~.~

.....f~..

5.00

-,==
--

~~:llg

6.20

""
;J

:J

.Jl

VEHICLE TYRE PATH


2.60

~~"".

....

VEHICLE CENTRE LINE

f.

Il
h ~~

1~1tIil4J-"7~:J~-:" ~":I~-,~~:~
,.fr ....~: 1<}t~~.1\
JliP~
]~
I
"..~ ......ot.~~...!P...~I\
1;/
:-~I\"---.~!,
.~... I~
~",-:!liOW
"I.
5
",".r
4
,V,

~.~~!

oc,

...

(j

tJ"<.~i;117:~~~\~.~w:.~~~;:.~~Y. Y

I~
!"
r

.....~~
~
"""
.~>J.CJ- ~:S1-:~

,J~J"Q

.~.n:,t~
~~t~ ;4 ~. 1F.p\~

>

,~r.~,~

~,

~,

r/
,~...

"ad!"

..r

..

"~rc

7,00

...

_.

;
_

~E,

!I)
~
f"Y

~f\{~y"~"~.S-.)1

~-----:~V ~;ti)S=

:..

,"

,~~

,i,
~

~~~~...~~;;.,

,="J

-;.-Il..::.~~,
7

...-::;

--=-

").

:;:::s

"
"

~--~

DATE:

Melbourne

Sydney 028448 1800


Brisbane

0731135000

Canberra

0262639400

Adelaide

08 8334 3600

,.

126 GREVILLE ST. CHATSWOOD WEST

039851 9600

02,10,2014

SCALE:

1 :250@A3

PRELIMINARY PLAN

2.5

7.5

19m ARTICULATED BUS SWEPT PATH ASSESSMENT


APPROVED:

STA BUS ACCESSING BUS STOP

ML

DRAWING NO,

14S 1526000-03-06-P3

SHEET:

06 OF 07

I. ...

Ill..

1100

0.50

~I ~I It]
6.20

270

~.

4
-,.1 .

>

,~r.~.~

SWEPT PATH KEY

~ I",

l,l,>~

1C,

-z

~~::::;.

VEHICLE CENTRE LINE

,,

,~

VEHICLE TYRE PATH

2.60

..r

..

"~-,c

7.00

:~~, l _I. c.J


,:...
1t- klf:
1.1.
tI~.,.
......\f:j

5.00

VEHICLE BODY PATH

BUS 19M

ARTICULATED

300mm CLEARANCE
FROM VEHICLE BODY

metres

Width

2.50

Lock

Trock

2.50

Steering Angle
Articulo ting Angle

~t .;

~!
,

",.,1
:?
...... ,...

ASSUMED SPEED 10km/h

26.5

70.0
-:

1,

,.

l~j":I,;. ~ r!,

Io.~.;,

ltl~,~./: .,

~1.

~~

...
~

r
_

~7:~..J

~.,~~~~~I.l,~
~

;.~.

f" ,:,,,,
1

,:.

~.~

....

.,

t,-:;-.1~" J~1.
!t .,r". ~ ~__
-..,

<I!

~I

~-l.;"

/~I.

"~..I!..

",,,,

,~

,;

l(tt

t..

_~

~~ ~

,".

...

~~R ~~.

flttt..

,.

~"
..

.~

.......

"."
.

,.,
,,

J
.

<

.0

.~;

~J,
0rjl
....

:""

.~.~
~.J,."

r1r"

/Ii",~

.."
.....J"
..

,-I ,:
~~,j.#.~1
I

,.

,-,~
~~ -:Ii
~.".

..

....

."

l>\

.,

j~

".

IP.:

-\

....
:;l..l~.."ttA
,~.,
:ti
l ."il\~

JII!IiJ...".
; . . " , . <J;.

..

.!.~;~."~"

~.

"1-

fl

...

,J]""

", .",J

.-

IT/J"
.

,~

iPk-~
.

~V/ \.~

ttJ-:..rl,__.:;I-"~.i~.

It

.:ii.I~!
~:-<~.--~..".~
.
.~I?:, ,~""~"
~~j.",. ._~
I~f~\

I~

)11

..

."

_.---------:_

-"~

..~.

...,-

;)o~~~
-..

.....""

.,

"

IF_Jr
iri1~~

=:.._______~_=

-~.:--:-

c--

--.7"

--

---

c2::J

~.

"\!.
,~v ~

.--=:-

I,

tl1\-

x;
==

,,,,-.

;;/

-===y-

~-~

~~

~~

"-

1CJ

".-

,;

__.-::;:::/~

-":..

~.

,"

,~~

,i,

(~
~
1

...-="
-

----=:
-~~

I,

.~
_

,T

........

Jt.

loc\,,

~_.

-,.

-~

-,--"",,\1
l

..

~~~! -"~f".:(~;:~

II

I~

,:~~t)-~:"-----~-71---:~------~--~---

I)

~Z

1:"

..

I."

.,

,~~,~::~:o~
;~;.-.~:.."Pl:(
rt.;
,:1"
-:

11

~_~

~~...

_--,.

.::..

..

~~

1.~1~-rr.-

/ofJ
~,"-1"""-:--

."r

~...--

:~!j ./

/,

I~L

"

.i. ! ~ \l.~: "f


1;;;?1=~~_;~~~~, ~~~:
_

;/,J""

/_

~.<:

.;/ ;.~~.~?~

J~~ /f

~~..

-:14WI
-

..

.1-- .,,~

","

/".../: -"J,

j~

~.

t;

......,

-...:},v,j:

..", I
.

.:_~~I\,~~\ ,t/~

.*

"

~~

1~\tI"

...

-~t _)--iil:

~~-~.-~
"~.-~!
-4:r,.".:~,
,._:~.;
_.j t-:".= ;,~ .<~
-:~"_\".;

l~ ~~,

_---------...:.-.:...--~
-J"

/h ".4. ~J

i.. /.\.

~~~I

t..-~--~.,"~rt:<::.~./.
!II!... :;...- -:-(

~o

..

~1...Jll~~~~:--,J.I~~
-:--6"!

~I

-.,

~~

1:
.~

J"

.iL

\. (,

,/~

~r-

1.

",!. J!""l ;..


//~

:::=:::::::=-~

"11

..

..

~/"

~~.~~

",

J...:

.:
--.....

;;

"1 ";ff ~

~~

,I ~

~.,. -.-

"
"

.~/~

r~~:t..:
J~~k ,".I~r,; ~ ~~~(~~.
rti,~
.!(_ro-,?1l~t.. l..~11

"

...

...

r"L/~:"
.""l
;;~/.;~.

~~.

~,~ ~~Lf~..;l~~
,. \ Y:.

y.

-1;
~ ~~
j

:-tJ

~"..

C"-!

--==

6.0

,"

Time

Lock

.I~,

1",1

J!

to

"

.="J

..

~.-Il,~~"";~
"1

"),.

,
--

---

~~~.l; ,\.r~-~
", [("~J.~
-, ,

~ -" ~.

>

.-

.-".,.

!,-:::::::J:J

(s
I

-..

;!>
"

.....

j.,

-"

~~ i

.~~
~"~)*i"":

IIIY:

..

",
t

,,-.

,_,!

.,,;,-:

;\J

.--l

l,

~I., r."~t ?~r,~,.l . .


AtS

-t#.-"r.~- ~_.
K
.

~".""

r
.

.1

;,

,.

,,"_,

jjb

.,.

~t::

-.~
.~

I.

.,.

....

-;. ,-,
";! "1

",,~

"

of)

..

,_

i~

,~. {~:/
,

~.

-..II

l;,,,,,~,\.
--

.~~I

-i}~F

1:0

\1

~~.
....
,_-=
_,
.

,f

",

t.

,;

.?"

.8

Melbourne

1"lIf.;" ..=
:-....~~~~

Sydney 028448 1800


Brisbane

0731135000

Canberra

0262639400

Adelaide

08 8334 3600

126 GREVILLE ST, CHATSWOOD WEST

039851 9600

-~"L,;:,

DATE:

1)\"

..

,:J

-j;~,.,
"!t:..
"}~ ~~ .~I....:J>""I

\,.J
~

"=,

~".~,">.",1ff"
l~JV
.

&

"

.1...,...,

~-~

02.10.2014

SCALE:

1 :250@A3

PRELIMINARY PLAN

2.5

7,5

19m ARTICULATED BUS SWEPT PATH ASSESSMENT


APPROVED:

STA BUS LEAVING BUS STOP

ML

DRAWING NO,

14S 1526000-03-07-P3

SHEET:

07 OF 07

.r.~.

Transport

~D

Roads & Maritime


Services

NSW
GOVE_ENT

22 September 2014

Our Reference: SYD14/00565/02 (A7580450)


Michael Lee
Associate

Traffic and

Transport

GTA Consultants
Level 6, 15 Help Street

Chatswood NSW 2067


Dear Michael,
PROPOSED CHURCH ORGANISATION AND EDUCATIONAL FACILITY AT 126 GREVILLE
STREET AND 23

25 MILLWOOD AVENUE, CHATSWOOD

Reference is made to your email dated 12 September 2014 and meeting dated 18 September 2014,
regarding the abovementioned proposal which was referred to Roads and Maritime Services (Roads
and

Maritime) for advice prior to lodging

formal application with

Willoughby Council.

Roads and Maritime has reviewed the concept plan for bus access from Millwood Avenue and would
support the private bus bay facility together with the relocation of the public bus stop.
Roads and Maritime

requires the following

comments to be addressed in the formal

application

to

Council:
1.

private buses must be staggered to avoid queuing of the private buses


queuing behind public bus services. It is understood the applicant is able
set bus arrival and departure times to ensure buses will not queue out onto

The arrival times of the


on

Millwood Avenue

to restrict and

or

Millwood Avenue.
No vehicular

3.

Vehicle

4.

Turn

paths are to be submitted showing that a


proposed private bus bay facility.

14.5 metre bus

5.

Turn

paths are to be submitted showing that a


proposed public bus bay facility

19 metre bus

6.

Any proposed landscaping shall

access

access

is

to 126 Greville Street from Millwood Avenue.

2.

permitted

to 23 Millwood Avenue shall be restricted to residents

not restrict

can

can

only.

safely enter and

safely

sight lines to vehicles

or

exit the

enter and exit the

pedestrians.

emphasised that the comments provided above are informal and of a Pre-DA nature. They are not
to be interpreted as binding upon Roads and Maritime and may change following formal assessment
of a submitted development application from the appropriate consent authority.
It is

Any inquiries in relation to this development application


2041 or Angela.Malloch@rms.nsw.gov.au
Yours

can

be directed to Angela Malloch

sincerely

(9,~
Owen

Hodgson
Manager land Use
Network and Safety

Roads and Maritime Services


27-31

Argyle Street, Parramatta

NSW 2150

I PO Box 973 Parramatta

NSW 2150 I www.rms.nsw.gov.au

131 782

on

8849

Appendix

Architectural Cor Pork Layout Plans

)>
1J

11
><
gel

14S1526000 II 07/10/14

Traffic Impact Assessment II Issue: A


126 Greville Street, Chatswood, Proposed Church of

Scientology

0Ge
GTAconsultants

Size
A

Drawing A1 DrilwnBy TO
2014

SEPT

DA205.dwg

Number

No.

Drawing DA205 Scale 1:250 Project 1405

1405

dimonsirmedilt y

LldCl

all

Architec

verify
to

the

iISCQ(ltensrma;hcopygfWMKAuPv PROSED

Cotrco repo<ted

to

RE-USE

scairog.

in(:)tlSec.sOb proOlC

over

ADPTIVE PLANS
CARP K

All

tako
to

DrawmcgonsstruliQ

Oimonsrlcd

I r"Wj

belore drawing

site

on

Tl is

2067

SYDNEY
ST

SITE

REFUBISHMNT

WEST,

BProject UILDNG GREVILE CHATSWOD


&

126

PLAN

PARK FLO R
1

CAR LEVEL

SCIENTOLGY

2\

OF

CHURCH AUSTRLIA
02.10 4
\

\
\

Descripton

IS UE
DA

Descripton

\0<

:<.\0

"-<0

( 0C\

<,-S

OC-<,
<-,~

(0-,.;<"

<-0,

O{;;

PLAN

PARK FLO R
CAR

GROUND

0401 0402
9299 9299
2
0
0
Kent 02 02
NSW

Stre t

WMKA"ec346-348 Telphone Facsmle. wmkarchlteu,o


Sydney

929
956
082
25

ABN

WM

Melbourne

Brisbane

Adelaide

A Level 25. 55 Collins Street

A Level 4. 283 Elizabeth Street

A Suite 4. Levell

PO Box 24055
MELBOURNE

BRISBANE
VIC

3000

OLD

melbourneo

+61731135000
brisbane

4001

+61883343600

+61747222765

Help Street

CHATSWOOD

NSW

2067

adelaide 0 gta.com.au

townsville

Unit 4. Levell

Sparta Building,

55 Woolley Street

PO Box 5254
WESTCHATSWOOD

1515

SA

5067

TOWNSVILLE

OLD

4810

gta.com.au

DICKSON

Gold Coast

Perth

A Level 9, Corporate Centre 2

A Level 27 44 SI

Box 37

PO Box 62
NSW

PO Box 1064

gta.com.au

Canberra

Sydney
A Level 6 15

OLD

25 Sturt Street

PO Box 3421
NORWOOD

BRISBANE

A Level I

4000

GPO Box 115

+61398519600

gta.com.au

Townsville
136 The Parade

1
ACT

2602

PERTH

Corporate Court

BUNDALL

OLD

+61284481800

+612 6243 4826

+61755104800

sydney Q gta.com.au

canberra

gta.com.au

61 7 5510 4814

www.gta.com.au

4217

WA

Georges Terrace

6000

+6186361 4634

perth

gta.com.au