Beruflich Dokumente
Kultur Dokumente
DOCUMENT NO.
PROJECT NAME
SITE LOCATION
GS E&C JOB NO.
CLIENT NAME
CONTRACTOR NAME
VENDOR NAME
P.O. NO. (GS)
DESCRIPTION
STEEL STRUCTURES
PROJ:
1 APPROVED
4 NOT APPROVED.
APPROVAL
CUSTOMER:
MR
N:
PO
N:
ITEM:
U.O.:
VR Doc. CODE:
BY:
REV.
DATE
DESCRIPTION
RE-SUBMIT
FOR
DATE: XX/XX/XXXX
PREPD
CHKD
APPD
Doc No.
Job No.
Rev. No.
Page
2 of 8
TABLE OF CONTENTS
1.0
Scope
2.0
References
3.0
4.0
5.0
Material Identification
6.0
Fit-up Inspection
7.0
Welding Inspection
8.0
Nondestructive Examination
9.0
Doc No.
Job No.
Rev. No.
Page
3 of 8
Scope
This procedure establishes the instructions for preparation and control of Inspection and Test
Plan (ITP) which identifies the main activities (inspection, test) to be performed during
fabrication.
2.0
References
All of work shall be carried out according to this procedure and following references.
AISC : American Institute of steel construction
ASTM : American Society for Testing and material
AWS: American Welding Society
SSPC: Steel Structure Painting Council
JIS: Japanese Industrial Standards
3.0
The ITP (Inspection and Test Plan) shall be used for inspection and test during the
fabrication of structural steel.
3.2
3.2.2
3.2.3
3.2.4
3.2.5
4.0
All materials used in the manufacture of structural steel should be covered by mill
certificates showing chemical analysis, mechanical test required by the applicable
specification. All the materials shall be bought from the Approved vendors and from
the listed countries.
4.3
Doc No.
Job No.
Rev. No.
Page
4 of 8
4.4
5.0
Dimension check.
Material Identification
Material shall be identified as defined in the applicable industry specifications, such as
applicable manufacturing specification number (e.g., ASTM, JIS specification and grade)
and/or heat numbers, heat codes, or unique identifiers. Bolting is identified as per the
markings provided in the bolt manufacturing standards (AISI, JIS). Instrument bulks are
identified by manufacturer's markings. Material identification will be applied by the
manufacturer directly to the item, using low stress stamps or paint stencils. All of work shall
be carried out according to this procedure and following references.
6.0
Fit-up Inspection
6.1
6.2
7.0
Doc No.
Job No.
Rev. No.
Page
5 of 8
Material Identification
7.1
Welding shall be carried out only in accordance with approved WPS as per AWS
D.1.1 section 3.
7.2
Welding Procedure Specification shall be qualified for the production welding position
as per AWS D1.1 as per AWS D.1.1 section 3 and 4 and 7T04-CS-00-TS-009 section
2.4.
7.3
Welders and welding operators' performance shall be verified properly as per AWS
D1.1 section 4.
7.4
Welded products shall be visually checked for such features as dimensional accuracy
of the weldment and presence of surface porosity, slag inclusion, cracks, craters,
undercut, overlap and etc. as per AWS D1.1 5.24 of Table 6.1 and 7T04-CS-00-TS009 section 1.3.2.
7.5
Welders should have valid I.D cards and their certificates with QC file.
The welding consumables are approved ones and are in good storage
conditions.
Approved welding procedures are followed and if not inform the scale.
Welder# shall be hard stamped at 100mm from weld centerline for scale.
8.0
9.0
Doc No.
Job No.
Rev. No.
Page
6 of 8
Inspection to be done
-
Refer all requirements to the latest edition of AWS D1.1 or other codes and
standards specified by Customer.
Use proper inspection tools e.g., welding gage, inspection mirror, torch light
etc.
Check for proper fillet weld sizes, joint preparation and appearance.
8.2
All structural members shall be subject to 100% visual & dimensional inspection.
9.2
Dimensions & Visual Inspection shall be checked in accordance with the shop detail
drawing, specification requirement and drawings.
9.3
9.4
10.1 For paint coatings, surface preparation shall be inspected to ensure the requirements
of section 4, 7T04-PR-00-TS-001 is complied with and the result recorded.
10.2 For galvanized coatings, testing and inspection shall be conducted in accordance with
7T04-PR-00-TS-001 section 8. The test and inspection report shall be reviewed, and
the results shall be verified as complying with the requirement.
11.0 Final Inspection
Doc No.
Job No.
Rev. No.
Page
7 of 8
The checks to be made at the Final Inspection shall include, but are not limited to the
following :
-
Actual measurement shall be marked against the Approved DWG is attached to the
Dimension Report - Signed by VENDOR QC & CONTRACTOR RI.
CHECK Color coding as per the project requirement /as per approved drawing.
All the completed structure and parts shall be checked against packing list to ensure the
conformance of the package number, quantity and identification markings as per
specification requirement. Bolt & Nut shall be done box packing with proper rust prevention
treatment.
13.0 Documentation
Mill Certificates (Shapes , Plate, Grating, Bolt & Nuts with Washer, Weld-rod)
NDE Report for the nominated point with NDE control sheet.
Dimension inspection report should be done 100% using drawing to show the