Beruflich Dokumente
Kultur Dokumente
For
SONTHALIA RICE MILL
S-3/36,37 SEC-A, ZONE-B
MANCHESWAR INDUSTRIAL ESTATE
BHUBANESHWAR-10
AUDITED BY
V S RAI ASSOCIATES
ENERGY MANAGEMENT CONSULTANTS
TIRUPATI APARTMENT, FLAT-1D
BD-205/206, KAMALPARK
KOLKATA-700101
V S RAI ASSOCIATES-ENERGY MANAGEMENT
CONSULTANTS
Page | 2
CONTENTS
SECTIONS
DESCRIPTION
PAGE NO.
Summary of Findings
1.0
2.0
3.0
4.0
8
10
5.0
6.0
11
12
Annexure I-II
Page | 3
SUMARY OF FINDINGS
Ref no.
Action Suggested
1.0
2.0
3.0
4.0
5.0
6.0
Recurring
Budgetary
Saving/year
Investment
Rs.
Rs.
Details are specifically illustrated
Page
No
167000
52500
60200
nil
10
Total
11
12
Page | 4
Page | 5
Connected HP
22.5
172.5
222+27
Connected-KW
16.785
128.68
165.612+20
116.5+20
86.909+15
40
30
30
47
22
35
697.50 HP
519.986 KW
Remarks
i.Total actual running load with
two lines ( parboiling
Operation) was found to the
order of 300KW with running
Power demand of 320KVA
ii Powqer factor was observed
to the order of 0.94-0.96
Running loadKW
90
135
Running LoadKVA
96
143.9
Remarks
i.Total actual running load with
two lines ( parboiling
Page | 6
dryers
iii.Colour sorting m/c
with Compressor
iv Boiler section
v. Other misc load
Total load
Proposed load with
Arua section& ketel
Total Plant running
load
30
33
10
35
300 KW
110
10.70
37
320.06 KVA
120
410 KW
Page | 7
CONSULTANTS
Page | 8
Main
I/C
panel
line.-2
0.0.490.60
Polishing
Motor-1
30HP
Polishing
Motor-2
30HP
Polishing
Motor-3
30HP
Polishing
Motor-4
30HP
Silky
50HP
Dryers.
No.1
0.74
0.46
0.35
0.63
0.82
0.65
Equipments Dryers
No2
Air
Blowers
Power
factor
0.0.600.75
0.700.77
Air
Boiler
Comp.
panel
18.5 Kw
0.55-0.87 063-.071
LT Trs
O/G
Remarks
0.90-.94
Page | 9
Details of capacitor, SFU & HRC fuses are out lined below which are to be connected on
secondary side of transformer preferably across LT out going ACB. These capacitors should
remain in circuit even on off or holidays or on part load.
a. Capacitor for 500KVA Trs = 25 KVAR
b. Rating of SFU
=63 Amp.
c. HRC fuse rating
= 63 amp.
Total investment for item no a, b & c would be around Rs.12500
3.2.2 ADDITIONAL CAPACITOR ACROSS KEY LOAD CENTRE
In view of low power factor across key load centers it is strongly felt to install additional
capacitors to improve PF up to 95% and above. Details are summarized below:
Particular Line-1
PDB
Capacitor 20
-Kvar
Line-2
PDB
20
Line-3
PDB
20
Dryer
PDB-1
7.5
Dryer
PDB-2
7.5
Boiler
PDB
5
Sortex
PDB
10
Other
PDB
10
Total
100
Kvar
P a g e | 10
Reccurring
saving/year
Rs 36000
Phasr-II
7.2 kg/cm
5 kg/cm
Rs 61250
5.5kg/cm
4.5 kg/cm
P a g e | 11
The likely power cost saving with the reduce air pressure generation would be Rs 60,200/annum
without any investment. However it is suggested that initially the present air pressure generation
should be reduce to 6 kg/cm and later on the air pressure setting should be restricted to 5 kg/cm
only.
4.3 RECOMMENDATION
It is strongly recommended to reduce the operating pressure of sorting air compressor from 7
kg /cm to5 Kg/ cm in two phases to optimize power consumption without any investment.
P a g e | 12
carried out once in 3 years.The organization may approach some local agency to carry out above
said inspection & measurement.
6.0 GENERAL MAINTENACE & PREVENTION OF BREAK-DOWNS
6.1 STATUS REVIEW
The organization is equipped with number of electrical mototors, Distribution Board/panels *&
motor starters. To cater the power requirement of entire mill.Presently as and when equipment
fails, electrician is called for the necessary repair and maintenance. This is a time consuming and
SAS type maintenance repair arrangement and call for review.
It has been observed during audit period that most of the distribution boards/panels are filled
with fine dirt & dust particles which seeped through joints and gaskets of panel board, switches
and starters. The said dirt and dust deposits are injurious to the health of the electrical system and
accelerate faults. Further electric motors are muscles of production & are taken them granted
because they usually perform so well. But when a motor fails, entire machine and some time
system goes down. Break downs are quite frequent & causes significant production loss.
6.2 ACTION SUGGESTED
In view of above, a strong possibility was exlored to initiate a preventive care for electrical
equipment to enhance the reliability and minimize the outage of plant machinery.
a.It is our considered suggestion that management should initiate preventive care (maintenance)
with help of a semi skilled workers which would be supplied with air blower, pliers and a set of
spanner to clean all the distribution panel, motor starter and electric motors with following
regular frequency :
Normal season
Peak season
B .Electric motors fitted with grease nipple must be lubricated with grease gun at least once in
six months.
c. Gear Box/Radicon Gear box: The lubricant of Gear box must be topped to maintain minimum
level on regular basis.
c. Cleaning o f suction air filters of Air compressor must be done at -least once in a month
to main good performance.
Place: Kolkata
Date: 26.07.2012
For V SRAI ASSOCIATES-ENERGY MANEGEMENT CONSULTANTS
V S RAI ASSOCIATES-ENERGY MANAGEMENT
CONSULTANTS
P a g e | 13
V . S. RAI