Resumen
Abstract
The purpose of the present study was performed to
demonstrate the benefits which can be obtained by
implementing the high voltage Control Center into
the laboratory at "Universidad Politcnica
Salesiana". It was based on the different possibilities
of monitoring the physical and electrical signals
which were produced during each test using the
SCADA system, because it will work as a link
between the operator and the electrical process.
Besides that, the basic factor control center
established harmony to some kinds of control,
industrial communications, types of structures and
conditions within a high voltage laboratory; through
this a better control and electrical process monitoring
can be obtained which are produced within the
laboratory. Established an alternative to optimize,
time, resources and knowledge with a technical and
economical analyses.
ndice de Trminos
Keywords
Centro de control, DAQ, Factibilidad, SCADA, Control Center, DAQ, Factibility, SCADA, PLC,
PLC, Pruebas de laboratorio.
Laboratory Tests.
Estudiante Egresado de la Carrera de Ingeniera Elctrica de la Universidad Politcnica Salesiana. Autor para correspondencia :Luigi_f1258@hotmail.com
Ingeniero Elctrico, Estudiante del programa de posgrado en Energas Renovables en la Escuela Politcnica del Ejrcito, Jefe del rea de profesionalizacin de
la Carrera de Ingeniera Elctrica UPS sede Quito.
1. Introduccin
2.2 Comunicaciones
En los centros de control las comunicaciones
toman un papel importante, ya que se basan en los
sistemas de arquitectura de procesamiento de datos
estructurados y dependientes de modelos de
sistemas de control distributivo, todas estas tiene
que tener estructuras dependientes de sistemas de
comunicaciones para cada uno de esto funcione de
manera ordenada. Para dichos intercambios de
comunicacin se necesita de elementos fsicos
capaces de trasportar la informacin de las seales
del proceso, para ello se usan medios pticos,
medios almbricos y medios inalmbricos
[1][3][4][4][6]
3.1.
Jaula de faraday
3.2.
3.4.
3.3.
Siendo:
4. Datos a monitorear
Los datos a monitorear sern los de voltaje, se
tiene como base el estndar americano con la norma
ANSI C84.1 "Electric Power Systems and
Equipment-Voltage Ratings (60 Hz)". En el que se
especifica los niveles ptimos de tensin para los
sistemas de potencia desde los 100 V hasta los 230
kV a 60 Hz.
(2)
Siendo:
5. Especificaciones de un centro de
control
Con los principios de seguridad, control y
monitoreo del laboratorio actual; se requerir de los
diferentes elementos electrnicos para asegurar un
nivel de seguridad y fiabilidad en la adquisicin de
datos y control. En este sistema se deber contener
los distintos tipos de visualizacin inteligente y
notificaciones del caso para tener una confiabilidad.
Los puntos a tomar en cuenta en el diseo
debern ser[20]:
Sistema de visualizacin.
Sistema de procesamiento de seal.
Espacio fsico.
Muebles tcnicos tipo raks para equipos de
control y medida.
Sistema de cableado.
Protocolos de comunicaciones.
4.4
Seales complementarias
(3)
Siendo:
Vin (t) es la seal resultante (Seal de
impulso).
Vo es el voltaje pico de la seal.
es el valor de tiempo de frente de la seal
de impulso (1,2 us 30%).
Gas
(pd)min Vbmin volts
Aire
0,55
352
Nitrgeno
0,65
240
Hidrgeno 1,05
230
SF6
0,26
507
CO2
0,57
420
O2
0,7
450
Nen
4
245
Helio
4
155
Valor de cresta 3%
Duracin del frente 30%
Duracin del Cola 20%
de
la
rigidez
Donde
p es la presin en atmosferas.
d es la separacin o distancia en centmetros.
6.4 Pruebas
de
transformador
aislamientos
de
un
(4)
Siendo:
(5)
6.6 Determinacin de
dielctricas del aire.
(6)
Siendo:
caractersticas
las
Siendo:
Densidad relativa
Factor de Correccin
del aire
0,7
0,72
0,75
0,77
0,8
0,82
0,85
0,86
0,9
0,91
0,95
0,95
1
1
1,05
1,05
1,1
1,09
1,15
1,13
(9)
10
Analgico
9.3 Software
El software que se utilizara dentro de un centro
de control de control debe estar en funcin de los
equipos a implementar, ya que este necesitara de la
comunicacin directa sobre los actuadores y
sensores para su control y medida, adems se debe
de contar con las herramientas bsicas de Microsoft
Office o algn editor de texto, el cual nos permitir
el abrir los archivos generados dentro del sistema de
monitoreo y Microsoft SQL Server Management
Studio o algn motor de base de datos para la
apertura de las bases de datos, ya que con esto se
podr manejar y administrar las bases de datos, si en
cierto caso se requiere crear nuevos parmetros para
el almacenamiento.
9.1 Personal
Para esto se requerir de una ejecucin del tipo
tcnica realizada por un Ingeniero o un Estudiante
que realice tesis de grado de la carrera de Ingeniera
Elctrica, ya que debe tener conocimientos bsicos
de electrnica de potencia y de la Alta Tensin,
puesto que dentro de este laboratorio se cuenta con
las conexiones elctricas desde los equipos de Alta
Tensin hasta el equipo de control y monitoreo, se
debe tener conocimiento sobre adaptabilidad de
equipos de cierto nivel de tensin con otros y el
aislar correctamente los cables para no tener
inconvenientes.
10.
Conclusiones.
9.2 Hardware
Se debe contar con tarjetas de divisores de
tensin para reducir el voltaje para que las seales
puedan ser utilizadas por las tarjetas de adquisicin,
ya que cada una de estas se encuentra sujeta a los
niveles de tensin de cada fabricante. Para el
procesamiento de datos, la Universidad debe de
contar con computadoras de ltima generacin para
este tipo de laboratorio, por lo que estas deben
11.
Referencias.
14