Sie sind auf Seite 1von 47

VOCATIONAL TRAINING

On
3000MW THERMAL POWER PLANT
AT

NTPC
LIMITED
RIHAND
SUPER
THERMAL POWER PROJECT,
RIHAND NAGAR SONEBHADRA (U.P.)
SUBMITTED BY:
PRATYUSH MAHATO
OF

PRANVEER SINGH INSTITUTE OF TECHNOLOGY


KANPUR (U.P.)
SESSION 2014-2015
UNDER THE EXPERT GUIDANCE
OF:
Mr. N.K. SINGH, D.G.M. (B.M.D)
Mr. R.P. SINGH, Supdt. (BMD)

ACKNOWLEDGEMENT
With feelings of joy and thanks, I placed in your hand my Project report.
It is my pleasant privileges to thank all those who have help me in
molding and shaping my project. Without their guidance, cooperation
and best wishes it would have been impossible for me to complete my
dissertation report. A big thanks to all those who helped me by sparing
time amidst their busy schedule and for being kind enough to help me
whenever I needed them.
I feel grateful and wish to express my gratitude to MR. NITIN
SRIVASTAVA, HOD of mechanical department of PSIT, Kanpur for
providing me an opportunity to do the project in my field of interest. I
would also like to acknowledge special thanks for his continual support
and for the creation of friendly environment in my work places.
As man is a social animal. He requires the encouragement and
affection of his parents and friends to accomplish his goal and I have
been Lucky to get it and make this project report a success.
Finally, I am thankful to all the respected Executive employees of
N.T.P.C RIHAND, RIHAND NAGAR, for providing me the necessary
information, cooperation in VOCATINAL TRAINING. I thank god
almighty for his abundant blessing because without it this project was
only a dream.
DATE: 8TH JULY 2014
PRATYUSH MAHATO

Roll no: 1116440078


III Year
Mechanical Engg.
PRANVEER SINGH INSTITUTE OF TECHNOLOGY
KANPUR(U.P.)

CERTIFICATE
NATIONAL THERMAL POWER CORPORATION LTD.
(A GOVERNMENT OF INDIA ENTERPRISE)
RIHAND SUPER THERMAL POWER PROJECT
P.O.-Rihand Nagar, Distt. Sonebhadra (U.P.)
DATE- 8/07/2014
This is to certify that this summer training report has been prepared
by MR. PRATYUSH MAHATO S/O SHRI S.C.MAHATO, a student of
B.Tech. (MECH. ENGG) at PSIT, KANPUR in the partial fulfillment of
requirement of vocational training at NTPC Rihand.

The matter was analyzed by candidate under my guidance and this


report embodies the work done by him.

We wish him a bright future.

Approving Authority:

Guide:

Mr. N.K.SINGH

Mr. R.P. SINGH

DGM (BMD)

SUPDT. (BMD)

CONTENTS
ABOUT NTPC
RIHAND SUPER POWER PROJECT INTRODUCTION
1. MODIFIED RANKINE CYCLE
2. MAIN BOILER
3. ARRANGEMENT OF THE MAIN BOILER
4. TECHNICAL DATA
5. BOILER AUXILIARIES
6. SOOT BLOWING SYSTEM
7. TURBINE
8. TURBINE SYSTEM
9. TURBINE AUXILIARIES

ABOUT N.T.P.C.
The NTPC was formed in 1975 to meet the power requirement challenge faced by the
nation during the period. N.T.P.C. (National Thermal Power Corporation) is an Indian
Govt. undertaking. Present installed capacity of NTPC is 41,184 MW (including 5,364
MW through JVs) comprising of 23 NTPC Stations (16 Coal based stations, 7
combined cycle gas/liquid fuel based stations), 7 Joint Venture stations (6 coal based
and one gas based) and 2 renewable energy projects
NTPC ranked 337th in the 2012 Forbes Global 2000 ranking of worlds biggest
company with a current generation capacity of 41,794 MW, NTPC planned to become
128,000 MW company by 2032.

NTPC's core business is engineering, construction and operation of power


generating plants and also providing consultancy to power utilities in India and
abroad. As on date the installed capacity of NTPC is 41,184 MW through its 16

coal based (31,855 MW), 7 gas based (3,965 MW) and 7 Joint Venture Projects
(5,364 MW). The JV company operates the captive power plants of Durgapur
(120 MW), Rourkela (120 MW), Bhilai (574 MW), Ratangiri (1940 MW),
Muzzaffarpur(110 MW), Jhajjar (1500MW) and Vallur (500 MW). NTPC is also
managing Badarpur thermal power station (705 MW) of Government of India.
Recognizing its excellent performance and vast potential, Government of the
India has identified NTPC as one of the jewels of Public Sector Navratnas- a
potential global giant. Inspired by its glorious past and vibrant present, NTPC is
well on its way to realise its vision of being one of the worlds largest and best
power utilities, powering Indias growth.
Rihand Super Thermal Power Project
(6x500 MW)
INTRODUCTION
2.1 SALIENT FEATURE

Location:

Total proposed capacity: 3000 MW, in 3 stages each of 2X500MW

Present capacity:

Bijpur village, Dist. Sonebhadra. (U.P).

3000 MW (Stage 1: 2*500MW)


(Stage 2: 2*500 MW)
(Stage 3: 2*500 MW)

Total land (in acres):

Power Evacuation:

Beneficiary States:

Financing:

Major Resources:

UP
MP
Total
4680
1752
6432
+/-500Kv HVDC Bipolar line to Dadri (Delhi), 400kV
single circuit AC line to Shaktinagar and
Kanpur.
UP, Haryana, Punjab, Rajasthan, Jammu & Kashmir,
Himachal Pradesh, Chandigarh and Delhi.
Export Credit of pound sterling 344million, aid
from Govt. of U.K. pound sterling 177
million. Govt. of India afforded the rest cost
of the project.

COAL- (a) Source - Amlori mines.


(b) Maximum consumption- 43,300MT/Day
for 3000 MW (E-Grade Coal).
(c) Mode of Transportation- MGR Rail
Transportation System.
WATER- (a) Source- Rihand Reservoir.
(b) Maximum Consumption 300 cusecs.
(c)Maximum cooling water requirement1500 cusecs for 1000MW.

Chimney:
Ash disposal:
Commencement of work:
Unit - I

Unit II

224.5m (RCC structure with steel flue).


Ash slurry pumped to Ash dyke.
09/02/1983.
Unit - III

Unit- IV

Unit- V

Unit- VI

Synchronization 31.03.1988 05.07.1989 31.01.2005 31.09.2005 Jan2012 May2012


01.01.1990 01.01.1991 15.08.2005 01.04.2006 April2012 Sept2012
Commercial
Operation

Rihand super thermal power project (RhSTPP) has the current generation capacity of
3000MW. There are six Units where each Unit has the capacity of 500MW. Units 1 & 2
were commissioned in 1989 and Unit 3 & Unit 4 was commissioned recently in August
2005. The power plant has two switchyards of 400KV & 132KV which are
interconnected to each other. These switchyards feed the northern power grid form
where the transmission of power is done. One 400KV bus is used for H.V.D.C.
transmission which delivers power from Rihand to Dadri near Delhi. The thermal
plant intakes water from the near by water reservoir the Govind Vallabh Pant
Reservoir based on Rihand river. The reservoir rests on the dam named Rihand dam,
which also powers the Hydro power station of 250MW. The requirement of coal is
fulfilled from Amlori coal mines which are situated in Madhya Pradesh. The RhSTPP.
powers various States such as Uttar Pradesh, Delhi, Punjab, Himachal Pradesh,
Rajasthan etc.
New technology
Super critical technology at NTPC Sipat project (3X600MW) to increase the
efficiency of the cycle and to decrease the green house gas emission.
Closed cycle seawater cooling at Simhadri project for first time in India.
Introduction of IGCC (Integrated gasified combined cycle) for clean and
efficient utilization of coal.
Environment management
Liquid water treatment plants at Farakka and Kahalgaon.
Ash water recycling system at Kahalgaon and Korba to reduce water
requirement for ash disposal at these station

ABSTRACT
Any thermal power plant is converting the chemical energy of fossil fuel (coal) into electrical
energy. The process involved for this conversion is based upon the Modified Rankine Cycle. The
major components that are used to accomplish the Modified Rankine Cycle are
i) Boiler feed pump,
ii) The steam generator water walls (evaporator),
iii) Steam generator super heaters,
iv) Steam turbine,
v) Reheater,

vi) Condenser,
vii) Regenerative feed heaters etc.

All components of a power generating cycle are vital and critical in operation. In Modified
Rankine Cycle the two most important aspects that are added are reheating & regenerative
heating. By reheating, steam coming from exhaust of the turbines, is used to send back to the
reheater of the boiler so that its enthalpy increases and more work can be done by this steam the
other purpose is to make steam dry so that no harm will be done to the blades of the turbine.
In RHSTPP there are four turbines in Tandem coupling namely one H.P Turbine, one L.P
Turbine & two L.P Turbine coupled with the generator to which is synchronised with the grid to
produce electricity at 50Hz.
In all my modesty, I wish to record here that a sincere attempt has been made for the
presentation of this project report. I also trust that this study will not only prove to be of academic
interest but also will be able to provide an insight into the area of technical management.

MODIFIED RANKINE CYCLE


A thermal power station operates using a closed steam power cycle, which is a
dual (vapour + liquid) phase cycle. In this cycle, the working fluid i.e. water undergoes
various thermodynamic processes and is used repeatedly. Previously, Rankine cycle was
used in most of the thermal power plants. However, in modern power plants the
Rankine cycle is modified to include superheating of steam, regenerative feed water
heating and reheating of steam.
5
4
3
2
T
1

6
S

The modified cycle is represented on T-S diagram. Various processes are:


1-2 Ideal pressure increase at constant entropy in boiler feed pump.
2-3 Heat addition in the boiler at constant pressure.
3-4 Isentropic expansion in HP turbine.
4-5 Reheating at constant pressure.
5-6 Isentropic expansion in IP and LP turbines.
6-1 Extraction of latent heat in condenser.
Factors affecting thermal efficiency of Modified Rankine Cycle are listed as under:
Initial Steam Pressure.
Initial Steam Temperature.
Reheat Pressure and Temperature.
Condenser Pressure.
Regenerative Feed Water Heating.

MAIN BOILER
A. BOILER FUNDAMENTALS:
Principles of combustion:
1. The primary function of oil and coal burning systems in the process of steam
generation is to provide controlled efficient conversion of chemical energy of
fuel into heat energy, which is then transferred to the heat absorbing surfaces
of the steam generator. When combustion is properly completed the exhaust
gases will contain, CO2, water vapour, sulphur dioxide and a large volume of
nitrogen, combining carbon and hydrogen with the oxygen in air brings about
combustion. When carbon burns incompletely it forms carbon monoxide.
2. Composition of air:
a) 79% nitrogen and 21% oxygen by volume.
b) 77% nitrogen and 23% oxygen by weight.
3. Excess air:
In practice the theoretical quantity is not sufficient to ensure complete
combustion and extra air has to be supplied. This excess air is known as excess air.
4. Ignition:
Fuel must be ignited before it can burn. Raising the temperature of the
fuel to its ignition temperature brings about combustion.
5. The following factors in efficient combustion are usually referred
to as The three TS.
A)TIME: It will take a definite time to heat the fuel to its ignition
temperature and having ignited, it will also take time to burn.
B) TEMPERATURE: A fuel will not burn until it has reached its ignition
temperature. Preheating the combustion air increases the speed at which this
temperature will be reached.
C) TURBULENCE: Turbulence is introduced to achieve a rapid relative
motion between the air and the fuel particles. This produces a quick
propagation of the flame and its rapid spread throughout the fuel/air
mixture in the combustion chamber.
6. Combustion efficiency:
Maximum combustion efficiency depends on
a. Design of the boiler
b. Fuel used
c. Skill in obtaining combustion with the minimum amount of excess air.

7. Thermal efficiency of a boiler is measured by the amount of the heat


transferred to the water in the boiler by each Kg of the fuel used.
ARRANGEMENT OF THE MAIN BOILER:
1). Boiler Structural:
The boiler structurals are divided into two parts.
a) Supporting Structures: boiler-supporting structure consists of a
systematic arrangement of columns stiffened with horizontal beams
and vertical diagonal bracings and comprise of low carbon steel
material. The main columns support the main boiler components
viz. drum, economizers air preheaters, burners and galleries at
various levels.
b) Galleries and Stairways: Galleries and stairways around the
combustion and the heat recovery areas are provided for approach
to the boiler.
2) Furnace:
A Boiler furnace is that space under or adjacent to a boiler in which a
fuel is burned and from which the combustion products pass into the
boiler properly. It provides a chamber in which the combustion
reaction can be isolated and confined so that the reaction remains
under controlled force. In addition, it provides a support or enclosure
for the firing equipment. The wall construction of the furnace is watercooled walls i.e. the wall is of tube in which water is flowing
continuously
3) Boiler drum:
The boiler drum forms a part of the circulation system of the
boiler. The drum serves two functions, the first and primary one
being that of separating steam from the mixture of water and
steam discharged into it. Secondary, the drum houses all
equipments used for purification of steam after being separated
from water. The purification equipment is commonly referred
to as the drum internals.
The quantity of water contained in the boiler below the water
level is relatively small compared to the total steam output.
Primarily, the drum size is determined by the space required to
accommodate the steam separating and purifying equipment.
The steam space provided should be sufficient to prevent
priming and foaming.
Material: The boiler drum is made of carbon steel plates. The

materials used should comply with the Indian Boiler Regulations.


Comparing carbon steel and alloy steel as material for drum, the
carbon steel costs less per ton of material but the overall weight
of drum will be higher because that of thickness.
DRUM INTERNALS:
Drum internals are used to separate water from steam and to
direct the flow of water and steam in a manner so as to obtain
the optimum distribution of drum metal temperature in boiler
operation.
The arrangement of drum normally consists of two or more
integrated device, each of which may be quite different in
design and operate on totally different principles. Each stage
must have higher separation efficiency. The greater the number
of stages of separation, the lower the required efficiency of
each stage .Thus, two stages at 99% efficiency, three stages at
90% efficiency and six stages at 70% efficiency will give
similar results.
Water level gauge is mounted on each end of the steam drum. If
water level goes outside of the prescribed operating limit then
the boiler is tripped. Thus, with increase in pressure, the
separation of water from steam by simple devices becomes
more difficult. It becomes necessary to use more efficient
apparatus if primary separation is to be achieved in a confined
area.

4) Economiser:
The purpose of the economizer is to preheat the boiler feed water
before it is introduced into steam drum by recovering heat from the
flue gases leaving the boiler. Entering first, the economizer water is
heated to about 30 to 40 deg C below saturation temperature. From
economiser the water enters the drum and thus joins the circulation
system. Water entering the drum flows down through the downcomer
and entering header at the bottom. It is located in the boiler second
pass below the superheater. The economizer is continuous loop type
and water flows in upward direction and gas in the downward
direction. All tube circuits originate from the inlet header and terminate
at outlet header which is connected with the economizer outlet headers
through three rows of hanger tubes.
5) Downcomers:
Down comers provide a passage for water from the boiler drum to
bottom ring header. From bottom ring header the water goes to water
walls for heat absorption and conversion into steam heating .To

achieve the circulation of water into water wall Boiler circulation


pumps are provided in down comers.

6) Water walls:
Water walls are the necessary elements of the boiler. They serve as the
means of heating and evaporating the feed water supplied to the boiler
from the economizers via boiler drum and down comers.
In large boilers, water walls completely cover the interior surfaces of
the furnace providing practically complete elimination of exposed
refractory surface. They usually consist of vertical tubes membrane
and are connected at the top and at the bottom to headers. These tubes
receive water from the boiler drum by means of down comers
connected between drum and water walls lower header.
Water walls absorb 50 percent of the heat released by the combustion
of fuel in the furnace, which is utilized for evaporation of feed water.
The mixture of water and steam is discharged from the top of the water
walls into the upper wall header and then passes through riser tubes to
the steam drum.
The design and construction of the water walls depends upon the
combustion and steam conditions and the size of the boiler.
Orifices installed in the inlet of each water circuit maintain an
appropriate flow of water through the circuit.

7) Riser tubes:
A riser is a tube through which the mixture of water and steam pass
from an upper water wall header to the steam drum.
8) Super Heater:
There are three stages of super heater; the first stage consists of horizontal
superheater of convection mixed flow type with upper and lower banks
located above economizer assembly in the second pass. The upper bank
terminates into hanger tubes, which are connected into the outlet header of the
first stage super heater. The second stage superheater consists of a pendant
platen, which is a radiant parallel flow type. The third stage superheater
pendant spaced is of convection parallel flow type.
In radiant super heaters, heat is absorbed by the direct radiation from the
furnace and are generally located at the top of the furnace. Since the furnace
temperature, and therefore the amount of available heat from radiation, does
not rise as rapidly as the rate of the steam flow, thus the steam temperature
drops as the steam flow rises.
Convection superheaters absorb mainly by the impingement of flow of hot
gases around the tubes. A purely convection superheater has a rising steam

temperature characteristic i.e. the amount of available heat from convection;


rise as rapidly as the rate of steam flow.

9) Reheater:
The function of the reheater is to reheat the steam coming out from the
high pressure turbine to a temperature of 540C. The reheater is composed of
two sections-one is front pedant section and rear pedant section. The rear
pedant section is located above the furnace arc and the rear water wall and the
front pedant section is located between the rear water hanger tubes and the
superheater platen section.
The cold reheat is the line from turbine to the boiler and is at a lower
than the reheat line from boiler to the turbine called hot reheat steam. Due to
resistance of flow through the reheat section, the hot reheat steam is at a lower
pressure compared to the cold reheat steam.
10) Burners:
There are forty total pulverized coal burners arranged on the corners at a
height of 18 to 25 meters and twelve oil burners provided each in between
corner two pulverized two-fuel burner.
The pulverized coal burners are arranged in such a way that ten mills supply
the coal to burners at 4 corners, of the furnace. All the nozzles of the burners
are interlinked and can be tilted as a single unit from +30 to 30.
The oil burners are fed with the heavy fuel oil till boiler load reaches to about
25%.
11) Desuperheaters:
A. Superheater Desuperheater:
The superheater desuperheater is fitted between stages 4 and 5(on transfer pipe)
to control the superheated steam at the specified terminal temperature of 540 oC.
The maximum design temperature reduction at the superheater desuperheater is
from 446 oC to 388 oC.
The desuperheater comprises a spray nozzle shell and associated spray assembly
projecting into a section of the superheater steam line. This section of the steam
line forms the desuperheater shell. Steam assisted spray nozzle assembly
provides a fine spray of water which at temperate the steam passing through the
desuperheater.
Spray water for desuperheater is taken from the boiler feed water pump
discharge. In addition, spray water regulating stations are provided further
downstream in each line.
B. Reheater Desuperheater:
The reheater desuperheater is only brought into use when the reheater outlet
temperature rises above the normal temperature.

The reheater desuperheater comprises of a spray nozzle shell and associated


spray nozzle assembly projecting into a section of the steam line between the HP
turbine outlet and the reheater inlet headers. This section of the steam line forms
the desuperheater shell. Water is fed into the shell from the discharge side of the
boiler feed pumps via a reheater desuperheater spray water regulating station.
When the reheater desuperheater is called into service water is fed via the water
tube and passes through the spray nozzle thereby forming a spray which
attemprates the steam passing through the desuperheater and thus decreasing the
quantity of water in the boiler drum is relatively small compared to the total
steam output. So, the drum size is determined by the space required to
accommodate the steam separating and purifying equipments.
12) Boiler Water Circulations Pumps:
Each boiler has water circulation pump consists of a single stage centrifugal
pump on a wet stator induction motor mounted with in a common pressure
vessel. The vessel consists of three main parts a pump casing, motor housing
and motor covers. The motor is suspended beneath the pump casing and is filled
with boiler water at full system pressure. No seal exists between the pump and
motor, but a provision is made to thermally isolate the pump from the motor.
13) Igniters:
High Energy Arc type electrical igniters are provided which can directly ignite
the heavy fuel oil. An exciter unit stores up the electrical energy and releases
the energy at a high voltage and short duration. A spark rod tip, which is
designed such a way that converts the electrical energy into an intensive spark.
A pneumatically operated retracts mechanism, which is used to position the
spark rod in the firing position and retract to the non firing position. Each
discrete spark provides a large burst of ignition energy as the current reaches a
peak value of the order of 2000 amps. These sparks are effective in lighting of
a well-atomized oil spray and also capable of blasting off any coke particle or
oil muck on the surface of the spark rod.
B. WATER CIRCULATION SYSTEM:
Water must flow through the heat absorption surface of the boiler in
order that it is evaporated into the steam. In drum type units the water
is circulated from the drum through the generating circuits and back to
the drum where steam is separated and directed to the superheater. The
water leaves the drum through the downcomers at a temperature
slightly below the saturation. The flow through the furnace wall is at
saturation. Heat absorbed is the latent heat of vaporization creating the
mixture of steam and water.
At very a high pressure the density difference between steam and water
becomes progressively less and a point is reached where natural circulation is
too slow. Natural circulation is limited to boiler with drum operating pressure
around 175 kg/cm-2.

To overcome this forced circulation is employed which uses pumps to speed


up the circulation of the water.

TECHNICAL DATA
Main boiler

500MW

Type

Balanced Draft, Dry bottom, Single drum, Radiant Furnace,


Controlled Circulation, Tangentially Fired, Tiltable Nozzle.

Manufacturer

M/S BHEL (CE DESIGN)

Furnace type

Controlled Circulation.

Drum
a. Overall length
b. Designed pressure

c. Designed temperature
Superheater
a.Number of stages

22070 mm
204.9 Ksc.
366 oC.

6 stages

Reheater
a. Number of stages

3 stages

Steam flow at MCR


a. Steam at final superheater outlet
b. Steam at reheater outlet

1725 TPH
1530 TPH

Water flow at MCR


a. Feed water entering economizer

1725TPH

Coal flow at MCR

316.4 TPH

Steam pressure at MCR (ksc)


At final superheater outlet
At reheater outlet
At reheater inlet
From drum
Economizer inlet

178
43.46
45.85
193.5
196.6

BOILER AUXILIARIES
MILLING SYSTEM: COAL BUNKER: These are in-process storage silos used for storing crushed coal coming from the
coal handling plant through conveyor belts.
There are ten coal bunkers supplying coal to each mills and are located at top of the
mills to aid in gravity feeding of the coal. Each bunker can store coal, which can be
used for 12hrs.
COAL FEEDER: The purpose of coal feeder is to transfer coal at a pre- determined
rate, from coalbunker to the mill.
The coal feeder comprises two continuous chains with L sections flight bars
mounted between the chains at every fifth link .The chains runs on sprockets
mounted at each end of the feeder to given an upper strand movement towards the
driven ends and a lower strand movement in the opposite direction. The drive shaft
is supported on two self aligning bearing mounted in the Plummer block on support
out side the feeder casing, shaft sealing is achieved by the lip seals in the sealing
housing and mounted in board of the bearing to abut the feeder casing.
The tail sprocket shaft is mounted in adjustable bearing blocks adjacent to the feeder
casing with positioned which allow the feeder chain to be tensioned.
Both upper and lower strands run over full width carrying plates with the lower
strands located by angle section guides mounted on the feeder wall. The upper and
lower carrying plates and the inside wall are protected from wear by replace by
replaceable stainless steel panels, chains are kept clean by rubber wiper.
Feeder input is achieved by roller chain drive to the conveyor via a fixed speed
electric motor driving a variable speed gear box, torque limiter and fixed out put
gear box The electric motor is flanged mounted to variable speed gear box, coupled
to the fixed output gear box by a flexible coupling and torque limiter.
The principle of operation of coal feeder is that coal flows from the bunker into the
chain feeder via feed hopper and is conveyed to the mill feed inlet chute, when the
feeder is in the operation, the conveyor chain drag a fixed head of coal towards the
driven ends of the feeder. At the end of the carrying plates the coal falls through the
conveyor onto the bottom plate, where it is picked up by the returning flight bars
and dragged back along the feeder to fall into the mill feed chute.

MILL CHUTE: Mill chute trans port coal directly from the coal feeder to its associated mill, in
addition an emergency chute is incorporated to allow coal to be removed from the
coal bunker via coal feeder in the event that outage time is more than one month, or
if there is a danger from fire in the mill chute area, coal feeder, or coal bunker.
Each mill is provided which transport raw coal from the bunker to the inlet of mill
at the desired rate. The rate of feeding is controlled by variable speed gear box .
Here chain type feeder is present in which continuous chain is moving round
sprockets in which a sprocket is driven by a variable speed D.C motor and the other
sprocket is a return .Sprocket on this chain ,at different MS plates are connected
which are called as scrapers .This type chain feeder are called scraper feeder. The
coal from the bunker falls on a platform which is below the scrapper feeder. When
the scraper moves it will scrap the coal and at the end of platform the coal falls into
the pulverizer.
PULVERISER MILL:There are ten mills for every 500 MW unit located adjacent to the furnace at
0 m level. These mills pulverize coal to desired fineness to be fed to the furnace for
combustion.
The main structure of the pulverisering mill is fabricated from mild steel in three
cylindrical sections, the bottom section (the mill housing support )which support
the entire unit and encloses the mill drive gear unit, a center section (the mill
housing)that contains the rotary grinding element and upper section (the classifier
housing )comprising an accommodate the gas loading cylinders of the mill loading
gear .A platform around the upper section provide an access to an inspection door
and to the top of the mill routine maintenance and is served by detachable ladder .
.
PULVERIZERS:
The pulverizser exclusive of its feeder consists essentially of a grinding
chamber with a classifier mounted above it. The pulverization takes place in a
rotating bowl in which centrifugal force is utilized to move the coal, delivery by the
feeder, outwards against the grinding ring (bowl ring). Rolls revolving on journals
that are attached to the mill housing pulverize the coal sufficiently to enable the air
stream through the pulverizer to pick it up. Heavy spring action through the journal
saddles, provide the necessary pressure between the grinding surfaces and the coal.
The rolls do not touch the grinding rings, even when pulverizer is empty. Tramp
iron and other foreign material are discharged through a suitable spout. The air and
coal mixture passes upward the classifier with its deflector blades where the
direction of the flow is changed abruptly, causing the coarse particles to be returned
to the bowl for further grinding. The fine particles, remaining in suspension, leave
the classifier and pass on through the coal piping to the wind box nozzles.
LOW SPEED MILL:
These are commonly known as tube ball mills and operate at approximately 17 to 20
rev/sec. Such slow speed is essential with these types of mills as otherwise the balls
will held along the rotating surface due to centrifugal force and no milling takes
place.

Advantages of low speed mills:


(1) Wearable part which needs replacement between annual overhauls is only the
ball and this can be done when mill is in operation.
(2) No maintenance for long period.
(3) This mill has no reelects and does not give tramp iron problem.
(4) There is reverse of fuel within the mill which makes the mill output more stable.
Disadvantages of low speed mills:
(1) Power consumed per ton of coal pulverized is nearly to that of economic mills.
(2) This mill consumes more power/ton coal ground especially when not loaded
fully as bulk of power is consumed in rotating mass of heavy ball charge.
BALL MILL:
The ball mill is one of the most advanced designs of coal pulverizer. The advantages
of this mill are:
(1) Lower power consumption.
(2) Reliability.
(3) Minimum maintenance.
(4) Wide capacity (1.7 t/hr. to100 t/hr.).
MILL TECHNICAL DATA:Manufacture-----------------------------M/S BHEL
Type of pulverizer
1003x RP
No. of Mill / boiler
10
Base capacity of Mill
68Tonnes/Hr.
Speed of pulverizer
42rpm
Normal capacity with design coal
52.5 T/Hr
FANS
A fan is a device by which the air is made to flow at required velocity and pressure in
a defined path imparting K.E of its impellers to air/flue gases. This pressure boost is
used to create a draught in the air and flue gas system. Fans mainly perform two
functions:
i.
They supply air required for combustion in the furnace with required pressure
& flow.
ii.
They evacuate the product of combustion i.e. flue gases into the atmosphere
via chimney.
P.A Fan:
The primary air fan supplies heated air to the coal mills to give dry and pulverized
coal to the furnace for efficient combustion. The P.A fan also supplies fresh air to
prevent coal mills by overheating.
There are two P.A fans per boiler, each fan having pneumatically operated radial guide
vanes at the fan inlet to control the fan output. The fan impeller is a double inlet,
centrifugal wheel with backward curved plate blades.

Ambient air is drawn into the P.A duct by two 50% duty, motor driven centrifugal
fans. The air from each fan discharges into a hot air crossover duct via a steam air
heater. This duct extends around to each side of the boiler to supply the hot air to mills
duct, both of which are branched to supply hot air to four coal mills.

F.D Fan:
The forced draught fan system is provided to supply air required for pulverized coal
combustion in the furnace, air for fuel oil combustion and over fire air to minimize
NOx production.
The F.D fan system comprises of two single stage axial flow, constant speed, and auto
variable pitch fans per boiler. These fans provide pressurized atmospheric air to the
boiler for combustion.
Ambient air is drawn into the secondary air system by two 50% duty, motor driven,
axial flow forced draught fans with variable pitch control. The air from each fan
discharges into a hot air crossover duct via a main air heater.
This duct extends around to each side of the boiler furnace to form two secondary air
to burner ducts. At the sides of the furnace, each duct split to supply air to two
corners, and then split again to supply air to each of the nineteen burner/air nozzle
elevations in the burner box.
I.D Fan system:
The induced draught system comprises of three centrifugal double inlet fans per
boiler, two operating and one standby. Each fan unit consists of a backward curved
plate bladed impeller, which is driven by an electric motor through a variable speed
hydraulic coupling. The I.D fan serves the purpose of evacuating the products of
combustion or the flue gases in the atmosphere via chimney. The flue gases after
being cleaned in the precipitators is directed towards the atmosphere through the
chimney.
Scanner air fan:
Scanner fans are installed in the boiler for supplying continuously cooling air to the
flame scanner provided for the flame supervision. Normally one fan remains in
service while the other one remains available as standby.
Scanner air fan is centrifugal type. It takes suction from F.D fan outlet and boosts the
pressure further to provide cooling air to the scanners.
Seal air fan:
Seal air fan supplies sealing air, at a pressure higher than that inside the mill, to a
brush sealing around the stem of the coal mill yoke casting to prevent coal dust
escaping to atmosphere. There are eight seal air fans one per mill to provide sealing
air. Each fan is a close coupled, electrically operated, centrifugal fan unit operated as
part of the mill operating sequence, which incorporates an auto-start facility.
Purge or cooling air fan:
The function of the purge/cooling air system is to provide a continuous supply of
clean air to cool all soot blowers in the retracted position, and to purge each

retractable soot blower lance whenever it is in the retracted position. There are two
fans (one operational, and one standby) to provide purging/cooling air to each of the
soot blowers, and also to prevent furnace gas blow-back into the sealing areas. Each
fan comprises a close coupled, electrically driven centrifugal fan unit, which initially,
is manually operated but which contains an automatic standby.

C) Electrostatic precipitators:
The ash content in the Indian coal is of the order of 30% to 40%. When coal is fired
in the boiler, ashes are liberated and about 80% of ash is carried along with the flue
gases. If this ash is allowed to atmosphere, it is hazardous to health. So, it became
necessary to incorporate an electrostatic precipitator in the path of the flue gases
going in the atmosphere. The electrostatic precipitators are preferred to mechanical
precipitators because they are capable of precipitating particles from sub micron to
large sizes of particles. The efficiency of the modern ESPs is of the order of 99.9%.
In NTPC Rihand, the gas cleaning plant consists of two ESPs that operate on the
exhaust gases from each of the 500 MW steam generators.
The electrostatic precipitator consists of a large chamber, which comprises of
parallel rows of sheet type collecting electrodes suspended from the precipitator
casing with wire type discharge electrodes arranged mid-way between them. At the
inlet of the chamber, gas distributor screens for uniform distribution of the gases in
the chamber, are provided.
The collectors are connected to earth at positive polarity while the discharge
electrodes are connected to a high voltage dc supply at negative polarity. When
dust-laden gas flows between the electrodes, the corona discharge causes the dust
particles to become charged, the particles then being attracted towards and,
eventually, deposited on the collector electrodes.
This dust falls as the collecting electrodes are continuously rapped through a
rapping system and is collected into the pyramid type hoppers, located beneath each
collecting electrodes, from where it is removed by the ash handling system
D) Air heaters:
Air heater is a heat transferring device in which air temperature is raised by
transferring heat from flue gases. Air heaters are capable of reclaiming heat from the
flue gases at low temperature levels and thus reducing the amount of heat rejected to
chimney. This results in increasing the boiler efficiency. For every 20 0C drop in flue
gas exit temperature, the boiler efficiency increases by about 1%. In NTPC Rihand,
recuperative type of air heaters is mainly used. In recuperative air heaters, the
heating medium i.e. flue gases flows through a closely packed matrix structure and
then air is passed through the matrix to pickup the heat. There are two recuperative
type of main air heaters for heating up the air from fans, two recuperative type air
heaters for mill air heating.
Steam air heaters
This type of air heaters does not utilize the heat from the boiler flue gases and so
does not affect the boiler efficiency. These are generally used during starting when

the flue gases entering the regular air heater is low and hence further heat extraction
is not possible and low temperature corrosion prevails.
There are two main steam air heaters and two mill air heaters. Steam air a heater
comprises of round tubes carrying steam to be condensed. These heaters are
provided with air extraction system so that air entering with steam will not lock and
prevent the operation of air heater. In addition, the outlet temperature of air can be
controlled easily.

E) Firing system
NTPC Rihand has direct firing system. In this system, a controlled quantity of
crushed coal is fed to each bowl mill (pulverizer) by its respective feeders and
primary air is supplied from the primary air fans which dries the coal as it is being
pulverized and transports the pulverized coal through the coal piping system to the
coal burners. In this system, burners are set at each corners of the furnace and are
directed to strike the outside of an IMAGINARY CIRCLE at the center of the
furnace. Because the streams of fuel strike each other, extremely good mixing is
obtained. Since the body of the flame produced is given a rotary motion, it leads to a
longer flame travel and gases spread out and fill the combustion.
There are ten pulverizers, out of which eight are used and two remains in standby.
The raw coal feeders supply 74 TPH of coal to each mill.
The pulverized coal and air discharged from the coal burners is directed towards the
center of the furnace to form firing circle. There are 32 tilting, tangentially fired coal
burners fitted at the four corners of the boiler at eight elevations.
The secondary air heating system supplies secondary air for combustion in the
furnace around the pulverized coal burners and through auxiliary air compartments
directly adjacent to the coal burner compartments. There are 16 air-atomizing
igniters per boiler, which initially ignite the coal and air mixture.
Above a predictable minimum loading condition, the ignition becomes selfsustaining. Combustion is completed as the gases spiral up in the furnace.
SOOT BLOWING SYSTEM
Introduction
In RhSTPP, soot deposited in various regions of boiler is removed with the help
of soot blowers, which utilize steam as the main working medium. This part is
mainly concerned with the existing soot blowing system and the problems
arising in the system during operation.
The removal of soot is very necessary for the efficient working of the plant. This
is because soot acts as an insulator for the heat transfer taking place between the
flue gases and water/steam inside the tubes. On the other side, it increases the
metal temperature of superheater and reheater tubes located inside the boiler.
This temperature increase may cause damage of the tubes resulting leakages
across the tubes. Which, in turn affect the working of the boiler.

So, regular soot blowing is very necessary in the boiler. Similarly, soot is also
deposited on the air preheater baskets, which causes plugging of the baskets.
Also in case of oil firing during initial light-up unburnt oil may deposit in
baskets. This deposited oil may cause fire hazard in air heater. To avoid these
problems soot blowing is done in air preheater also.

Soot blowing process:


The complete soot blowing process can be divided into following three major
sequential parts:
A. Shut down process- This part of the process step checks the close status of
all the valves.
B. Warm up process- In this step the valves according to the selected blower
group open to provide hot steam to the selected blower group at certain
pressure level.
C. Blowing process- In this sequence actual blowing of steam takes place.
The blower pairs under currently selected group when comes in to
operation carries the steam inside the boiler and continues to blow till it
returns to its park position.
Steam blowing scheme:
When blowers go inside the boiler they carries steam, which is made available to
the blowers through the section valves dedicated for the blower group. These
section valves are all motorized and their positions are sensed by their end limit
switches.
Valves are classified in four categories according to their operational involvement.
They are listed as follows:
a) Main steam supply valves.
b) Steam pressure control valves.
c) Section valves.
d) Drain valves.
The main steam supply for soot blowing is obtained from two alternative sources
each isolated by a separate motorized isolating valve. Only one source can be
selected at a time. Now, this steam supply is distributed to four sections of the
boiler and each section is isolated by a motorized section valve. Down stream of
which a pressure switch monitors the steam pressure.
The air heaters can be cleaned using an auxiliary steam supply. This supply is used
exclusively for the air heater soot blowers when the air heater is required to be
cleaned during start up of the boiler. The auxiliary supply is connected
downstream of the section valve, which remains closed when this source is being
used. The drainage pipe work is isolated by a number of motorized drain valves.

Location of Soot Blowers:


The blowers are divided into groups, numbered from 1 to 9. Group 1 to 4
comprises of wall blowers and group 5 to 9 comprises of long retractable soot
blowers. The soot blowers within each group are listed in pairs, with an odd
numbered soot blower paired with an even numbered soot blower.

Wall Blower:
Presently there are 88 wall blowers, which are numbered from 1 to 88. All wall
blowers are located at four levels, so grouped as group-1, group-2, group-3 &
group-4, of first pass of boiler each having 22 blowers. Group-1 is below furnace
zone and other three are above furnace zone.
Long Retractable Soot Blower:
LRSBs are kept in LHS and RHS of the boiler. Odd numbered LRSBs are kept in
RHS and even numbered LRSBs are kept in LHS. With an exception of group 6,
all soot blowers in a particular group are operated in synchronous pairs in an
automatic sequence i.e. an odd numbered soot blower with an even numbered soot
blower
LRSBs are mainly used to penetrate between the tube banks of the economizer,
superheater etc. It consists of a fabricated box casing, steam lance tube, steam feed
tube, steam isolating valve, traverse and rotary chains, etc.
Whenever the signal to operate the soot blower is given from the control room, an
electric motor drives the traverse reduction gearbox from its parked position, at a
preset distance the steam isolating valve opens to allow steam to flow through the
feed tube and out through the lance tube nozzles. The pattern of the steam jet from
the nozzles is helical with a different pitch on the inward stroke to that on the
outward stroke. At about mid-stroke a feed tube support rises to abut the feed tube
preventing sagging.
Whenever the extent of the stroke has been reached, a reverse limit switch is
actuated causing the main gearbox/lance tube to reverse and return to its parked
position engaging the stop limit ready for the next operation, having re-set the
feed tube support mechanism and isolated the steam isolating valve.
An air scavenge valve is fitted to the steam isolating valve which prevents the
ingress of boiler gases into the valve chest and provides a positive air flow when
the soot blower is in the parked position.
Air is also provided for the wall box to prevent gas leakage from the boiler.

SOOT BLOWER ARRANGEMENT

PP1 PP2 PP3 PP4 PP5 PP6

12

13

14

15

16

28

34

35

36

37

38

39

50

56 57

58

59

60

61

82

83

23

24

25

26

27

45

46

47

49

67

68

48

69 70 71 72
FRONT
WALL
WALL

78 79
REAR

123

WALL DESLAGGER

124

125
126
AIR HEATER BLOWER

80

81

17

LONG RETRACTABLE SOOT BLOWER

STEAM TO MECHANICAL POWER


INTRODUCTION
A thermal power plant is based upon the principle of conversion of heat energy into
mechanical energy. For this conversion of energy a power plant requires a turbo
machine.
A turbo machine is a power producing thermodynamic machine. In order to
function, a turbo machine requires a suitable working fluid, a source of high-grade
energy and a sink for low-grade energy. In a thermal power plant water is used as a
working fluid and it is converted into steam.
A steam turbine is a device that converts heat energy of the steam coming from the
boiler into the mechanical energy of shaft rotation.
NTPC Rihand has four 500 MW units. Each unit has one steam turbine.
For large turbo machines, multicylinder designs are used. The number of cylinder
depends on the terminal conditions of steam and speed of rotation. The turbine with
a number of cylinders on a single shaft is described as a Tandem compound
machine. NTPC Rihand is a fossil-fired power station using a typical turbine of 500
MW output in each unit. Each of the two turbines consists of a single flow HP, a
double flow IP and two double flow LP turbines (cylinders) coupled to the generator
shaft.
Each section of steam turbine consists of a rotor from which project several rows of
closely spaced blades. Between each row of moving blades there is a row of fixed
guide vanes (blades) that projects inward from circumferential housing. The vanes
are carefully shaped to direct the flow of steam against the moving blades at some
angle and at a high velocity that will maximize the energy conversion.
The cross-sectional diameter of a turbine section increases continuously and so the
steam expands. In this process the temperature and pressure of the steam decreases
and volume increases continuously. The LP section has the largest cross-sectional
diameter, whereas the HP has smallest cross-sectional diameter. Separate stop valves
and governing valves are provided to control the steam inlet and outlet from the
turbines.
The main auxiliaries of a steam turbine are the rotor, blades, guide vanes,
casing, bearings and couplings, bolting, steam chests, valves and critical
piping.
INTRODUCTION TO 500 MW POWER PLANT
BOILER:

The boiler is a radiant, controlled circulation drum, dry bottom type unit. The boiler
units are designed for the following terminal conditions (mcr):
Evaporation a)SH outlet : 1,725 t/hr

b)RH outlet: 1,530 t/hr


Working pressure after stop valve:178 kg/cm-2
Steam Temperature at SH outlet :540 deg C
Steam Temperature at RH Inlet :344.1 deg C
Steam Temperature at RH Inlet :45.85 kg/cm-2
Steam Temperature at RH Inlet :43.36 kg/cm-2
Feed Water Temperature at ECO Inlet:256 deg C
Furnace Design Pressure : +/- 660 mm wc(g)
The boilers are of single furnace design, circulating pumps to provide assisted
circulation.
Each Boiler corner is fitted with tilting tangential burner boxes comprising for
high energy ignitors, four light-up heavy oil fired burners and eight pulverized
coal burners. The angle of tilt from the horizontal is about 30 deg to +30 deg.
Feed water to the boiler passes through HP feed heaters into the economizer and
then to the steam drum from where it flows into the suction manifold and
furnace wall circuits via the three boiler circulating pumps, returning to the
steam drum as a water/steam mixture. This mixture is separated into three stages
and first two stages are incorporated into the turbo separators and the final stage
takes place at the top of the drum just before the steam enters the connecting
tubes comprising of first stage superheating.
Within the steam circuit there are a further four stages of superheating, making
five in total.
There are also three stages of reheat.
Superheater temperature control is provided by spray attemperation situated in
the connecting link between the superheater low temperature pendant outlet
header and the superheater division panel inlet headers.
Pulverized coal system
The system for direct firing of pulverized coal utilizes bowl mills to pulverize
the coal and a tilting tangential firing system to admit the pulverized coal
together with the air required for combustion (secondary air) to the furnace.
As crushed coal is fed to each pulveriser by the feeder, primary air supplied
from the primary air fans which dries the coal as it is being pulverized the
transports the pulverized coal through the coal piping system to the coal nozzles
in the wind box assemblies.
The pulverized coal and air discharged from the coal nozzles is directed towards
the center of the furnace to form firing circle.
Primary air system
The primary air draught plant supplies hot air to the coal mills to dry and convey
pulverized coal to the burners.
The P.A system comprises two P.A. fans, two steam coil air preheaters (SCAPH)
and two regenerative air preheaters. Each fans, which is of sufficient rating to
support 60% MCR load, discharges through a SCAPH into a common bus duct
that has four outlets, two directing air into the primary air preheater for heating,
two direct cold air straight to the pulverized mills.

Secondary air system


The secondary air draught plant supplies the balance of air required for
pulverized coal combustion, air for fuel oil combustion, and overfire air to minimize
the production of nitrous oxide(NOX).
The secondary air system,comprises two forced draft (F.D.) fans, two steam coil air
preheaters
(SCAPH) and two regenerative type secondary air preheaters.

Flue gas handing system


The flue gas handling plant draws the hot flue gases from the furnace and
discharges, them to atmosphere through the chimney. During its passage to the
chimney, flue gas is passed through a feed water economizer and four regenerative
air preheaters to improve boiler efficiency and through four electrostatic
precipitators to keep dust emission from chimney within prescribed limits.

Soot blowing system


On load, gas side cleaning of boiler tubes and regenerative air heaters is achieved
using 126 electronically controlled soot blowers which are disposed around the
plant as follows:
88 Furnace wall blowers
: steam
34 Long retractable soot blowers
: steam
4
- Air heater soot blowers primary
and secondary air heaters
: steam

TURBINE
GENERAL DESCRIPTION
The turbine is a reaction, condensing type, tandem compound with throttle
governing and regenerative system of feed water heating. It is coupled to directly to
the generator. The turbine is suitable for sliding pressure operation to avoid
throttling losses at partial loads. The turbine is a single shaft machine with separate
HP, IP and LP turbines. HP turbine is a single flow cylinder where as IP and LP are
double flow cylinders. Steam flow to HP Turbine is controlled by four combined
main stop and control valves by a simple throttle governing system. On the two
exhaust lines of HP turbine, swing check valves are provided which prevent hot
steam from the reheater flowing back into the HP turbine. The hot reheat steam is
admitted to the IP turbine through the four combined stop and control valves. IP

exhaust is connected to the LP turbine by cross over pipes without valve sat
diametrically opposite points.
HP TURBINE
The outer casing of the HP turbine is of the barrel type and has neither axial nor a
radial flange. The guide blade carrier is axially split and kinematically supported.
The space between the outer casing and the inner casing is fed from admission
steam to HP turbine. This steam is drained through HP casing drain during start up
which promotes quicker heating of inner casing which results in lesser problems of
differential expansion. The inner casing is attached in the horizontal and vertical
planes in the barrel casing so that it can freely expand radially in all directions and
axially from a fixed point. The HP turbine is provided with a balance piston in the
admission side to counter act the axial thrust caused by steam forces. HP turbine is
provided with 18 stages of reaction blades.
IP TURBINE
It is of double flow construction and consists of two casings. Both are axially split
and inner casing kinematically supported and carries the guide blades. The inner
casing is attached to the outer casing in such a manner as to be free to expand
axially from a fixed point and radially in all directions. IP turbine is having 14
reaction stages per flow. Extraction steam to high pressure heater no.5 and deaerator
are taken from IP turbine and the IP-exhaust respectively.
LP TURBINE
The casing of the double flow LP cylinder is of three-shell design. The shells are
axially split and of rigid welded construction. The inner shell taking the first rows of
the guide blades is attached kinematically in the middle shell. Independent of the
outer shell, the middle shell, is supported at four points on longitudinal beams. Two
rings carrying the last guide blade rows are also attached to the middle shell. LP
turbine is provided with 6 reaction stages/flow.
TURBINE SYSTEM
HP STEAM SYSTEM
The high pressure and temperature steam is piped from the boiler stop valves to the
steam inlet ends via two steam legs or steam pipes. These two steam pipes are
further branched into four sub-branches. These branches end-up into four inlet
valves of four horizontally arranged steam chests, two on each side of the HP
cylinder.
Each of the steam chest contains a HP emergency stop valve and a HP governing
valve arranged co-axially. The HP stop valve is a crucial valve and is used only
during emergency conditions. Steam leaves the governor valves through branch
pipes to the top and bottom inlet tee pieces on the HP cylinder. The steam chest
assemblies are mounted on the foundations close to the HP cylinder. Each stop and

governor valve is opened by a hydraulic operating gear and closed by two coil
springs.
IP STEAM SYSTEM
The steam expands in the HP turbine and is fed into the reheater section of the
boiler. From reheater section of the boiler the steam is piped into the steam inlet
ends of the intermediate pressure turbine through four inlet pipes.
There exist four steam chests two on each side of the IP cylinder. Each steam chest
contains an IP intercept stop valve and an IP governing valve arranged co-axially.
Steam leaves the governor valves through branch pipes to the top and bottom tee
pieces on the IP cylinder.
The opening and closing mechanism of the valves of the IP turbine is similar to that
of the HP stop valves and governing valves.
LP STEAM SYSTEM
IP steam after expansion is exhausted through four stub pipes, two at each end at the
top half of the IP cylinder, and is ducted to the two LP cylinders by IP/LP crossover
pipes. The volume of steam at the IP outlet is enormous and to handle such an
enormous volume of steam two LP turbines are provided.
The steam from each of the LP turbines after expansion is fed into the condensers
mounted below the LP turbines. In the condensers the steam outlet from the LP
turbines is condensed to give condensate, which further undergoes a cyclic process
to give feed water for the boiler input.
Here, under slung condensers with 800 inclined tubes are used, using a connecting
duct between the turbine outlet flange and condenser inlet flange. As the condenser
tubes are normally much longer than the width of the turbine casing, so this duct is
trapezoidal in shape.
The heat energy carried by the steam is converted into mechanical power, which
results into the shaft rotation. The turbine shaft is coupled with the generator shaft.
This rotary motion of the generator shaft is converted into electrical power by the
generator. The power output from the generator is at low voltage level of 20 kV`.
This low voltage is boosted to high voltage level of 400 kV to reduce the
transmission losses
.
TURBINE AUXILIARIES
Turbine casing
Steam turbine casings are the massive steel casings that encase the internal
stationary and rotating components of the turbine. Turbine casings have two critical
functions:
a) Containing the steam pressure and
b) Maintaining support and alignment of the internal components.
There are generally two casings:
i) Outer casing

The outer casing is divided on the horizontal centerline into top and bottom half
casings. Both the halves are bolted together with bolts and cap nuts at their
horizontal joint flanges.
ii) Inner casing
The inner casing is subjected to the highest temperatures and pressures, is also
divided at the horizontal centerline into top and bottom half casings, which are
bolted together in a similar manner at their horizontal joint flanges.
The inner casing is supported within the outer casing in such a manner as to
maintain proper alignment and allow thermal expansion. Cracking of the casing
can lead to steam leaks and, in extreme situations, to bursting. Cracks in casings
are typically located at the inlets of HP and IP turbine sections, where the local
thermal stresses are higher.

Turbine Blades
Blades are the single most costly parts of the turbine. The function of the turbine
blades is to convert the available heat energy carried by the steam into mechanical
energy. Blades fitted in the stationary part are called guide blades or nozzles and
those fitted in the rotor are called moving blades.
Steam chests and valve
Each of the HP, IP, and LP cylinders of the turbine has four steam chests two on
each side of the turbine. Steam chests are the pressure vessels or steam carrying
spaces, which performs the function of both carrying as well as transferring the
steam at high pressure and high temperature via valves into the turbine cylinders.
These steam chests comprises of a stop valve and a governing valve.
The steam from the superheaters outlets is admitted to the HP steam chests via four
HP steam mains. The steam from the steam chests is admitted to the HP turbine
steam inlet pipe through the emergency stop valves and the associated governing
valves which are housed in steam chests. After expansion in the HP turbine the
steam is fed into the reheater and then to IP steam chests, through HP turbine steam
outlet pipe. The steam from IP steam chests is fed into the IP turbine via IP stop
valve and IP governing valves and then to LP steam chests.
Stop valves
The stop valves are emergency valves placed in the steam chests and are provided in
the main steam line. The purpose of the emergency stop valves is to cut off the
steam supply during periods of shutdown and to provide prompt interruption of
steam flow through the turbine cylinders in an emergency trip.
Normally, these valves are kept open fully but during emergencies these valves are
fully closed (100%). During such conditions, the plant is producing no power
because no input is given to the turbine.
Governing valves
The governing valves are also situated in the steam chests. These are the control
valves i.e. they provide accurate control of the steam flow rate into the turbine, thus
controlling the generator load when the machine is synchronized to the grid.

HP governing valves are the most important valves. They control the amount of
power produced by the plant or unit. For a unit producing 500 MW power, the HP
governing valve opening is kept as 40-45% of the total valve opening.
Turbine Oil System:
OIL SUPPLY SYSTEM
The oil supply system fulfills the following functions:
a) Lubricating and cooling the bearings.
b) Driving the hydraulic turning gear during interruptions to operation, on start
up and shut down [1].
c) Jacking up the shaft at low speeds (turning gear operation, start up and shut
down) [1, 2].
OILSYSTEM
Under normal operating conditions, the main oil pump (1) situated in the bearing
pedestal and coupled directly to the turbine shaft draws oil from the main oil tank (26)
and conveys it to the pressure oil system.
The suction of the main oil pump is aided by two injectors (25). The injectors produce
pressure at the suction connection to the main oil pump sufficient for all types of
operation. This guarantees that the main oil pump takes over the safe supply of oil and
cavitations that could occur due to greater suction heads are avoided. The amount of
oil required for driving is extracted from the pressure oil circuit and adjusted by
means of the throttle (31).
The oil for the turning gear (7) is also extracted from the pressure oil system. Oil is
admitted to the nozzles by opening the shut off valve (33). The pressure oil is cooled
in the oil coolers (19) and reduced to lubricating oil pressure in the throttle (18). The
throttle is adjusted on the initial start-up. The amount of oil required for each bearing
is adjusted on start up by means of the oil throttles (15).
FULL LOAD AUXILIARY OIL PUMPS
During turning gear operation and start up and shut down operation, one of the two
three phase A.C, full load auxiliary oil pumps (22,24) supplies the pressure oil system
and takes over the function of the main oil pump when this is not in operation because
the turbine is running too slowly.
The full load submersible auxiliary oil pumps are situated on the oil tank (26) and
draw in oil directly.
EMERGENCY OIL PUMP
When the main and full load auxiliary oil pumps fail, the EOP supplies oil directly to
the lubricating oil line, by passing the oil cooler and thus preventing damage to the
bearing shells.
OIL RETURN SYSTEM
The lubricating oil from the bearings is returned to the main oil tank via a header.

EXTRACTION OF OIL VAPOUR


The main oil tank is designed to the air tight. The extractors (28) produce a slight
vacuum in the main oil tank and the bearing pedestals to draw off any oil vapour.
FILTERS
Oil for the thrust bearing is passed through the duplex oil filter which can be switched
over and cleaned during operation.
MAIN OIL TANK
The main oil tank contains the oil necessary for the lubricating and cooling of the oil
bearings and for the lifting device. It not only serves as a storage tank but also for
deaerating the oil. The capacity of the tank is such that the full quantity of oil
circulated not more than 8 times per hour. This results in a retention time of approx. 7
to 8 minutes from entry into the tank to suction by pumps. This time allows
sedimentation and detainment of the oil.
Oil returning to the tank from the supply system first flow through a submerged inlet
into riser section where the first stage deaeration takes place as the oil rises to the top
of the oil tank. Oil overflows from the riser section through the oil strainer into the
adjacent section of the tank where it is then drawn off on the opposite side by the
suction pipe of the oil pumps. Main oil tank has the following mountings:
1.
AC auxiliary oil pump
2.
DC emergency oil pump
3.
Shaft lift oil pumps
4.
Oil injector
5.
Oil vapour extractor
6.
Oil level indicator
7.
Sonar level limit switch
The main oil pump is situated in the front bearing pedestal and supplies the entire
turbine with oil that is used for bearing lubrication, cooling the shaft journals and as
primary and test oil. The main oil pump is driven direct from the turbine shaft via the
coupling. These pump also convey oil in the suction branches
MAIN OIL PUMP WITH HYDRAULIC SPEED TRANSMITTER
The main oil pump is situated in the front bearing pedestal and supplies the entire
turbine with oil that is used for bearing lubrication, cooling the shaft journals and as
primary and test oil. The main oil pump is driven direct from the turbine shaft via the
coupling. These pumps also convey oil in the suction branches of the main oil pump
for oil injectors that maintain a steady suction flow to main oil pump.
Hydraulic speed transmitter operates on the same principle as centrifugal pump
impeller. The variation of the pressure in the primary oil circuit due to a speed
variation serves as a control impulse for the hydraulic speed governor. The hydraulic
speed transmitter is supplied with control oil supplied from the control equipment
rack. The suction of the pump is always flooded and hence maintains an uniform
suction pressure.
AUXILIARY OIL PUMP
The auxiliary oil pump is a vertical one stage rotary pump with a radial impeller and
spiral casing. It is fixed to the cover of the oil tank and submerges into the oil with the

pump body. It is driven by an electric motor that is bolted to the cover plate of the
main oil tank. The pump shaft has a sleeve bearing in the pump casing and a grooved
ball bearing in the bearing yoke. The bearings are lubricated from the pressure
chamber of the pump; the sleeve bearing via a bore in the casing; the grooved ball
bearing via lube line.
DC BEARING OIL PUMP
This is a vertical, centrifugal submerged type and serves for lubrication and cooling of
the bearing during emergency conditions when one of the other pumps fails. This is
driven by a D.C. motor.
SHAFT OIL PUMP
The lift oil pump is self-priming screw spindle pump with three spindles and internal
bearings. The pump supplies the oil to lift the turbine rotor at low speeds.
OILVAPOUR EXHAUSTER
The function of oil vapour exhauster is to produce a slight negative pressure in the
main oil tank and in the bearing casing and thus draw off the oil vapour.
OIL COOLER
Function of oil cooler is to cool the lubricating oil supplied to the bearing of the
turbine. Oil cooler consists of the tube nest, the inner, outer shell and water boxes.
The tube nest through which the cooling water flows is surrounded by the oil space
formed by the outer shell. The oil is to be cooled enters the oil cooler and flows to the
inner shell. This shell supports the large baffle plates, which are provided with an
opening in the center. Between every two large plates there is a small intermediate
plate is smaller in diameter than the inner shell and leaves an annular gap. This
arrangement serves to achieve a cross flow pattern forcing the oil flowing to the outlet
branch to flow through the middle of the large plates, while passing round the edge of
the short ones.
TURBINE GLAND SEALING SYSTEM:
HP-Turbine, IP-Turbine and LP-Turbine gland leak off are connected to seal steam
header and vapour exhauster system. Initially gland steam requirement for all the
three cylinders is met by supplying auxiliary steam to the seal steam header and the
header pressure is maintained by the seal steam control valve. When the unit load is
raised above 30 to 35%, HP & IP-glands start supplying gland leak off steam to the
header to the requirement of LP-glands. Beyond 40% load, no auxiliary steam is
required. Once the self sealing steam takes place, then seal steam header pressure is
maintained by opening the leak of steam control valve to the condenser.
Gland steam header is provided with a motor driven drain valve which helps to raise
the gland steam temperature during start up. This drain valves normally remains
open till the gland steam temperature to LP gland increases beyond 150.
CONDENSATE WATER SYSTEM:
The purpose of this system is to store an adequate quantity of DM Water to meet the
makeup requirements for normal cycle fluctuations and for abnormal operating
conditions when supply of DM Water is interrupted.

This system will transfer condensate to and from storage tanks as to satisfy main cycle
requirements. The main cycle flow and thermodynamic requirement is maintained by
transporting the condensate collected in the condenser hotwell through various stages
of feedwater heating and other equipment to the deaerating feedwater heater.
The condensate extraction pumps normally deliver the condensate through the three
low pressure feedwater heaters, the deaerating feedwater heater to the deaerating
storage tank. The low pressure feedwater heaters receive extraction steam as it passes
through feedwater heater. The deaerating further preheats the condensate prior to its
entry into the deaerating storage tank. The deaerating feedwater heater is warmed by
extraction steam during the normal operation and auxiliary steam & cold reheat steam
are utilized as the heat source during start up and shut down condition.
The normal make up to the condenser is supplied from demineralizing plant through
the makeup pumps. Normally, on low level in the condenser hotwell, condensate will
flow from the condensate storage tank to hotwell by static head in the tank and
differential pressure due to the condenser vacuum, however, this flow will be
inadequate, the condensate, transfer will supplement the flow. This makeup is sprayed
into the steam space above the tube bundles.
The condenser hotwell is condensate collection vessel, integral with the condenser
shell, and located in a pit below the ground floor. Condensate collected in the hotwell
is pumped by 3*50 % condensate extraction pumps to the feed storage tank through
feedwater placed in series. Two lines from hotwell, make a common header where
from three lines are connected at the suction of three condensate extraction pumps.
The suction piping to the pumps is vented back to the condenser, to insure that the
non-operating pumps stays completely flooded. These vent lines include manual
valves on the vent for each pump.
A minimum flow (350 T/hr) recirculation line for each pump is provided, returning to
the condenser via a flow control valve and a locked open shut off valve.
The shaft seals of these pumps are the water-injected type fed from a header to
prevent the suction of air, particularly the pump that is not operating while the
condenser is under vacuum.
CONDENSATE EXTRACTION PUMP (CEP):
The function of Condensate extraction pumps is to pump out the condensate to the
deaerator through gland steam cooler, and LP heaters. The steam from the LP
cylinders exhausts into the condenser shells where it is constrained to flow across
the water tubes, through which cooling water is circulated.
The steam condensed on the tubes drain to the bottom of the shell .The condensate
is retained in the condenser shell bottom by means of the condenser level control
valve. The water in a condenser provides a head of water for the condensate
extraction pump to suppress cavitations in its suction impellers.
There are two 100% duty extraction pumps, one remains in duty and one remains
stand by. With all the necessary instruments such as suction and discharge valve
isolating and dump valves to insure efficient operation.
The thrust bearings in the driving motors have temperatures sensor, which can trip
the motors automatically.

The pump discharge the condensate via the gland steam condenser and the
condensate polishing plant to the LP feed heating system.
AIR EXTRACTION PUMP:
The function of the air extraction pump is to raise and maintain the vacuum
conditions in the turbine main condensers, and to remove air and other noncondensable gases vented to the condenser from various parts of the turbine and
feedwater heating system.
GLAND STEAM CONDENSOR
An automatic turbine gland sealing system is used to prevent the escape of steam
into the turbine hall, where it would condense on the walls and the plant.
It also prevents the ingress of air at the rotor ends of all the turbine cylinders. This is
done by using the gland steam condenser.
The function of the gland steam condenser is to maintain a sub-atmospheric
pressure at the outermost leak-off belt of the glands and thereby prevent the leakage
of steam from the glands into the turbine hall. The gland steam condenser condenses
the steam from the steam/ air mixture drawn from the outer pocket of the gland.
This heat given by the steam is absorbed by the feedwater. Condensate formed in
the shell drains to the gland steam condenser drain tank. This is again recirculated
back to the condensers.
DRAIN FLASH CONDENSOR
The drain flash condenser receives heater drip or drain water from LP heaters. When
the drain water enters the flash condenser through the disperses, steam is flashed
off. This steam is drawn into the tube nest where it condenses and cascade to the
bottom of the shell. The resulting drain water is delivered to the main condenser.
The water side of the DFC is of the conventional to pass surface type in which the
feed water flows through the tube and steam passes over them. The vessel comprises
a tube nest, a shell, an inlet and an outlet water box. The water box has a dished end
and incorporates the feed water inlet and outlet connections. A flanged branch on
the water box is fitted with a davit type hinged cover to give access to the tube
bores.
A center plate and an end plate fitted with two stiffeners form a diversion plate,
which separates the incoming, and outgoing flows .The end plate carries a cover,
which is located and bolted between the stiffening ribs.
The DFC is mounted on steel work on four attachment points at the water box
bonded to upper and lower mild steel bearing plates.
BOILER FEED PUMPS (BFP):
Boiler feed pumps are an important part of any boiler operation. They control the
amount of water fed to the boiler and the manner in which it is fed.
Centrifugal - Continuous
Turbine - Intermittent
In order to properly select a boiler feed pump five key points must be considered:

Will the pumps operation be continuous or intermittent?


This is an operational question and is often answered by the type of level control
found on the boiler that the pump will be servicing. As a general rule of thumb,
boilers with a capacity of 10,000 lbs./hr. or less utilize a float type switch that starts
and stops the boiler feed pump to satisfy a predetermined water level within the
boiler. This is a classic intermittent operation.
Boilers with capacities exceeding 10,000 lb./hr. typically employs a modulating feed
water regulator and will continuously feed water to the boiler at various rates
depending upon the water level in the boiler.
By knowing which operation you are to satisfy, you can determine which pump
design is best suited for your application. As a general rule of thumb a turbine pump
is used in an on-off situation and a centrifugal pump is used for continuous
operation. But remember, this is a general rule and is some cases a centrifugal could
be used for an on-off application and a turbine for continuous.
What is the temperature of the water being pumped?
It is also important to know the temperature of water you intend to pump. Most
pumps can usually handle 215F to 230F, other pumps are available that can handle
higher temperatures by using external water-cooling. Keep in mind that a deaerator
pump must be able to handle higher temperatures because they operate at a 5 psi or
227F.
What is the required capacity?
How much water you intend to pump is dependent upon the evaporation rate of the
boiler the pump will service. A safe figure for an on-off application would be 2
times the evaporation rate of the boiler. With a modulating level control, a factor of
1.3 times the evaporation rate plus recirculation is recommended.
What is the desired discharge pressure?
When you pump directly into the boiler you will need to overcome the pressure in
the boiler as well as any piping losses. You can choose the right pump by looking at
the pump curves to determine which will accomplish this task. Should you have a
modulating valve in the discharge line, the minimum you will need to add to the
boiler operating pressure will be 20 to 25 lbs. Make sure that the pump can handle
the pressure along with the flow rate needed. With an on-off level control the pumps
should be designed for the relief valve pressure.
What is the NPSH or net positive suction head required?
This is the last piece of information that you will need. This is the minimum
absolute pressure at the suction nozzle at which the pump can operate. To avoid
pump cavitation, the NPSHA of the system must be greater than the NPSHR of the
pump. In other words, the available NPSH must be higher than the required. We
have always sized our deaerator stands to be two feet higher than the NPSH needed
for the pump selection. Remember, the water level in the storage tank adds to the
safety margin.
TDBFP

Turbine driven BFP uses turbine of 14 stages connected to condenser. Turbine is


coupled with main pump having engage/disengage unit called Power pack unit using
oil pressure. Between turbine and booster pump gear assembly is there.
Various system of TDBFP is discussed below:
1) Lube Oil System
Lube oil system of both TDBFPS are provided with one Main Oil Tank each in
which oil level is separately maintained. It has two AC AOPs, one JOP AC and one
DC AOP connected to tank. Lube oil pressure is maintained at 3.0-kg/sq. cm is called
control oil which is used as governing oil.
Lube oil after passing through coolers is led to various bearing of TDBFP system. DC
AOP discharge oil, which is, used on failure of AC AOPs bypass the coolers. During
barring of TDBFP same lube oil at pr. 4.0-kg/ sq. cm is used as power fluid in barring
gear impellers. In the lube oil system, pressure is changing by the recirculation flow.

2) Seal/ Injection System


Mechanical seals are provided on BP side for which continuous cooling is done by
CEP water. For BFP side constant seal injection pressure around 18-kg/sq. cm is
maintained with the help of control valve. Filters are also provided in this line.
From this line small pipe provides water in the exhaust steam as exhaust load spray.
Seals drain is collected as clean drain into drain tank and dirty drain flows into
common drain header.
3) Steam System
For TDBFP there are three sources for steam namely 1. Auxiliary steam 2. Cold
reheat line 3. IP-LP cross over steam. Extraction steam parameters are maintained
at 4.0 kg/sq cm. & 300 degree centigrade. During cold start when CRH or IP-LP
steam is not available, Aux. Steam is used for rolling of TDBFP for initial boiler
filling. Once steam is insufficient for increasing the speed beyond 3500 rpm, CRH
steam is automatically cut off.
4) Feed Water System
Water from deaerator is taken by suction into booster pump and then fed into BFP
suction. Drains & vents are provided in FW system for initial charging and venting
of BFP during rolling.
5) Gland Sealing of Turbine
Downstream steam from main turbine gland sealing is used for TDBFP sealing.
Before opening of exhaust valve gland sealing should be done as this is line is
connected to condenser.
6) Governing System
For having the required flow through BFP, speed of turbine has to be adjusted and
for what we need perfectly efficient governing system. Governing system is using the
control oil at 9 kg/sq cm. which in turn depending on the position of starting device
and speeder gear will develop secondary oil and auxiliary secondary oil pressure for

operating the 4MCVs and one ACV thereby adjusting the steam flow speed change is
effected. Governing is achieved with the help of two governors namely hydraulic and
Electrohydraulic governors having EHG control and HG follows it up.
BOOSTER PUMP:
Each boiler feed pump is provided with a booster pump in its suction line which is
driven by the main motor of the boiler feed pump. One of the major damages which
may occur to a boiler feed pump is from cavitation or vapour bounding at the pump
suction due to suction failure. Cavitation will occur when the suction pressure at the
pump suction is equal or very near to the vapour pressure of the liquid to be pumped
at a particular feed water temperature. Therefore all the three feed pumps are
provided with a main shaft driven booster suction line for obtaining a definite
positive suction pressure. The boiler feed pump is coupled with its driving motor
through hydraulic coupling. The hydraulic coupling serves the purpose of
controlling the speed of feed pump for maintaining a definite delivery head and
delivered quantity of the feed water as per the requirement of the boiler.
DEARATOR:
Deaerators are used to remove oxygen from boiler feed-water. It performs the
following functions:
It serves as a feedwater heater.
Feedwater is deaerated by the removal of non-condensable gases
present in the feedwater and reduce the oxygen content to a level of
about 0.007 ppm.
It acts as a buffer to the fluctuations of condensate feedwater flow
that occur in service durations.
The tank height provides a hydrostatic head to satisfy the suction
pressure requirements of the boiler feed pumps.
The presence of non-condensable gases in the feedwater causes the waterside
corrosion or thinning of the boiler tube walls and this further leads to the rupture of
walls by the internal fluid pressure.
Here steam injection-type deaerator is used to deaerate the feedwater. Feedwater
from LP heaters is admitted to the deaerator tank and steam is bled from two
sources, one from the HP turbine (which is known as cold reheat steam), and the
other from the IP turbine exhaust. When this steam and feedwater come in direct
contact with incoming water is heated and also gets deaerated.
Steam initially enters the deaerator through a special, stainless steel Jet Spray
atomizing valve. This valve is designed to fully atomize and provide complete
deaeration under all load conditions. This design insures that the purest steam comes
in contact with the purest water. Once this high velocity steam mechanically shakes
out the last traces of non-condensable gases from the water, it flows upward into the
pre-heater area where it meets the incoming make-up water and pumped returns.
This water continuously condenses the steam, which preheats and releases the noncondensable gases into the internal vent condenser where they are metered
harmlessly to the atmosphere. This action causes more steam to be drawn into 6the
system to complete the cycle.
From the bottom of the deaerator, feedwater is piped through three outlet pipes,
each with a strainer, to the three boiler feed pumps and the used up steam is
recirculated back to condenser.

The deaerator is mounted at a high-level with its centerline 34.65 m above the
datum level.

The deaerating heater utilizes steam by spraying the incoming water into an
atmosphere of steam in the preheater section (first stage). It then mixes this water with
fresh incoming steam in the deaerators section (second stage).
In the first stage the water is heated to within 2C of steam saturation temperature and
virtually all of the oxygen and free carbon dioxide are removed. This is accomplished
by spraying the water through self adjusting sprat valves which are designed to
produce a uniform spray film under all conditions of load and consequently a constant
temperature and uniform gas removal is obtained at this point.
From the first stage the preheated water containing minute traces of dissolved gases
flows into the second stage. This section consists of either distributor or a several
assemblies of trays.
Here the water is in intimate contact with an excess of fresh gas/free steam. The steam
passes into this stage and it is mixed with the preheated water. Deaeration is
accomplished at all the rates of flow if conditions are maintained in accordance with
design criteria. Very little steam is condensed here as the incoming water has high
temperature caused by the preheating. The steam then rises to the first stage and
carries small traces of residual gases. In the first stage most of the steam is condensed
and the remaining gases passes to the vent where the non-condensable gases flow to
the atmosphere.

The water, which leaves the second stage, falls to the storage tank where it is stored
for use. At this time the water is completely deaerated and is heated to the saturated
steam temperature corresponding to the pressure within the vessel.
The condensate pressure just before the entry to deaerators shall be 3 psi more than
the deaerator steam pressure.
FEEDWATER HEATERS
A feed water heater is a special form of a shell and tube heat exchanger designed for
the application of recovering the heat from the turbine extraction steam by preheating
the boiler feed water. Its principal parts are a channel and a tube sheet, tubes, and a
shell. The tubes may be either bent tubes or a straight tube. Feed water heaters may be
defined as high-pressure heaters when they are located in the feed water circuit
upstream from the high pressure feed water pump. Low-pressure feed water heaters
are located upstream from the condensate pump, whichs takes its suction from the
condenser hot well. Typically low pressure feed water heaters are designed for feed
water pressures between 27 kg/cm sq. and 57 kg/cm sq., high pressure feed water
heaters range from 112 kg/cm sq. to 335 kg/cm sq. for super critical boilers.
Each feed water heater bundle will contain from one to three separate heat transfer
areas and zones. These are condensing, desuperheating, and sub-cooling zones.
Economics of design will determine what combination of the three is provided in each
heater.
A condensing zone is present in all feed water heaters. Large volumes of steam are
condensed in this zone and most of the heat is transferred here.
The desuperheating zone is a separate heat exchanger contained within the heater
shell. This zones purpose is to remove superheat present in the steam. Because of the
high steam velocities employed, condensation within the desuperheating zone is
undesirable.
The sub-cooling zone is another separate counter heat flow heat exchanger whose
purpose is to sub-cooling incoming drains and steam condensate.
HEATER OPERATION:
Prior to opening the feed water valve, the channel start up vents are to be opened and
remain open until all passages have been purged and feed water begins to discharge.
To remove air from the shell sides of a heater, which does not operate under
vacuum, the shell start up vent valves should be opened prior to the admission of the
steam to the feed water heater. The extraction lines must be free of all the
condensate to prevent the damage to the heater internals by slug flow. When the
drains outlet valve is opened, the shell start up vent valves are to be closed and the
operating air vent valves are to opened. Continuous venting of air and other noncondensable is assured by keeping the shell operating vent valves open.
On initial plant start up of the horizontal feed water heaters, having integral drain
coolers, the liquid level is to be kept just below the high-level alarm point.
On initial plant start-up of horizontal feed water heaters, having integral drain coolers,
the liquid level is to be kept just below the high-level alarm point. This will avoid the
possibility of flashing at the sub-cooler inlet and the possible tube damage that can
result. Approach temperature in excess of 8 degree centigrade indicates the probability
of flashing at the sub-cooler unit.

VENTING
Proper venting is necessary on feedwater heaters. All operating air vent connections
must be piped to permit continuous venting. The venting system in a feedwater heater
is designed to assure that all points where non-condensable gases could collected are
vented. Failure to utilize all of the operating air vents can lead to corrosion damage
and loss of performance due to air blanketing.
Vent lines of heaters operating at a different shell pressure must not be piped to a
common manifold. Failure to run individual vent lines from each heater has resulted
in inadequate or no venting of heater operating at a lower shell side than other heaters,
piped into a common manifold.
FEEDWATER BY-PASSING
A feedwater heater may be severely damaged by erosion and vibration, if it is
operated for any significant period or time with the next lower heaters feedwater flow
by passed. When a heater is by passed, its normal feedwater is passed on to the next
higher heater. This next higher heater will come close to making up the duty of both
the heaters. This single heater will tend to draw a total amount of extraction of steam
approx. equal to the flow of both the heaters.
In case of heaters with desuperheating zones, the increased steam load due to by
passing the previous heater can cause an excessive pressure drop in the
desuperheating zones, which can cause an excessive pressure drop in the
desuperheating zone, which in turn can cause condensation. The condensate flowing
at high velocity can lead to severe tube erosion.
Excessive steam flow to a heater, resulting from by passing the feedwater side of the
previous heater, can result in:
a) Localized high velocity leading to vibration of the tubing.
b) Flows, which cannot be adequately handled by the drain, control valve.
c) Condensation in the desuperheated zone and high velocity impingement.
LP Feed Heating System
The low-pressure (LP) feedwater heating system is provided to improve the thermal
efficiency of the heat cycle by heating condensate from the condenser with lowpressure steam bled from the LP cylinder.
Low-pressure (LP) feedwater heaters are basically simple straightforward tube and
shell heat exchangers, with the condensate passing through the tubes and the bled
steam being admitted to the shell.
There are total three LP heaters used in the feed heating cycle. Since, there is a
significant volume of unused space between the exhaust of a double-flow LP
cylinder and on the top of under slung condenser, this space is utilized by inserting
two LP heaters in a horizontal altitude. This results in the low-pressure drop and
high temperature for the bled steam, which is used for heating the condensate, with
consequential improvement in cycle efficiency. The LP heater No. 3 is located
outside the periphery of the condensers.
The heaters are stacked so that the ultimate LP heater can drain its bled-steam
condensate into the condenser above the working level of condensate in its base.

HP Feed Heating System


The high-pressure (HP) feedwater heating system is provided to improve the
thermal efficiency of the heat cycle by raising the temperature of the feedwater
before it enters the boiler. Like LP heaters HP feedwater heaters are also of
traditional form, but are arranged in a horizontal altitude to ensure free gravity
drainage of their bled-steam lines and heater-to-heater drainage. Bled steam to No. 6
HP heaters is fed from the HP turbine exhaust system and to No. 5 HP heaters from
IP turbine.
The system contains four HP heaters arranged horizontally in pairs with a drain
flash vessel situated above and between each pair. The pairs are identified as bank
A and bank B and each contain a No. 5 HP heater, a No. 6 HP heater and the
associated drain flash vessel. In the HP feed heating system, water is supplied from
the boiler feed pumps via the boiler feed regulating station and is piped through
three ways; one to each bank of heaters and one to the bypass pipe. When this
feedwater is passed through the HP heaters, its temperature is increased.
Each heater bank has its own feedwater inlet and outlet isolating valves, which, with
the bypass pipe and its spring-loaded valve, permits either bank to be taken out of
service for minor maintenance or repairs while plant is on load.
Drains from the HP heaters are taken either to the deaerator or to condenser A,
depending on the levels of water and pressures existing in the heaters, which in turn
depends on the generator load. The drains are controlled by level controllers and at
normal loads pass to the deaerator. At low loads, drains are diverted to the
condenser.
Feed Regulating Station (FRS)
To maintain the rate of feed-water input to the boiler corresponding to the steam
output from the boiler under all conditions of loading, feed regulating station is
used. For this purpose, feed regulating station has four regulating lines out of which
one line remains stand-by. Also to ensure security of steam supply it has been
considered necessary to provide a multiple feed-water regulating valve arrangement
The three-element feed-flow regulating system has been developed to meet the
requirements of the boiler. The essential factors that are mainly considered are the
steam flow from the boiler, the feed water flow to the boiler and the water level in
the boiler drum.
BY- PASS SYSTEM:
The by-pass system performs an important function. It permits the boiler to be
operated independently of the turbine-generator system. The by-pass system
comprises two main unitsHP By-pass system.
LP By-pass system.
HP By-pass system
This system comprises of the operation of bypassing the HP steam without being
passed through the HP turbine. The HP steam is taken from each of the main steam
lines after the HP steam stop valves. The main steam passes into the cold reheat inlet
pipes via four pressure control valves and their associated isolating valves. The valve
include the spray water supply and control equipment .The H.P. valve will operate
automatically to maintain upstream pressure on start .In addition upon rapid load
rejection .These valves will operate to relieve 60% of MCR rated steam flow to the

reheat system .The H>P>relive valve mounted on the main steam pipe work will
operate to relive excess steam to atmosphere
LP By-pass system
The LP by-pass system consists of four lines taken from the four hot reheat pipes
(upstream of the IP turbine control valves). These four lines are then converged into
two. The steams in each line flows through an isolating valve, a pressure control
valve and then into the condenser dump tube, bypassing the IP, LP turbines.
GENERATOR
The two 514 MW turbine-generator sets are set axially in line in the turbine hall.
The generator is a 2-pole, 3-phase, hydrogen and water-cooled machine, driven
from the turbine. The main exciter is solidly coupled to the rear end of the generator
shaft. A brush less main exciter provides the excitation power for the generator. The
output from this exciter is fed to the generator rotor.
The exciter line is directly coupled to the turbine generator shaft and is driven at
generator speed.
Each generator has its own independent stator windings.
Hydrogen is used to cool the generator rotor winding and stator core, the stator
winding is directly water-cooled.
GENERATOR OPERATIONAL LIMITS:
Rated output
Rated output
Nominal stator voltage
Speed
Power factor
Frequency

514 MW
605 MVA
20 kV
3000 r/min
0.85 Lag
50 Hz

MAIN EXCITER SYSTEM


The main exciter system is a six-pole, three-phase, rotating armature generator. The
stator has D.C. Field system and A.C. winding is mounted on the exciter rotor.
The rotating rectifier is mounted on the exciter unit shaft out board of the exciter
armature .The rectifier modules, one +ve and other ve are contained within the +ve
and -ve rectifier hubs shrunk onto the exciter unit shaft.
The main exciter is solidly coupled to the rear end of the generator shaft. Here a
brush less main exciter is used to provide the excitation power for the generator. The
output from this exciter is fed to the generator rotor.
The exciter line is directly coupled to the turbine generator shaft and is driven at
generator speed
The main exciter is supplied with power by a pilot exciter whose output is rectified
and controlled by the excitation control system (ECS). This pilot exciter is located
to the front of the main exciter and is a salient pole, permanent magnet, a.c.
generator of the hetropolar type. The pilot exciter is air-cooled with an open, selfventilated air system.
ELECTRICAL BARING GEAR
The HP, IP and LP rotors must be turned continuously during start-up and shut down
periods. This provides even heating or warm up in the initial start up stage of the
turbine and cooling during a shut down of the turbine.

To perform this operation an automatic engaging and disengaging electrical barring


gear is used. This electrical barring gear rotates the coupled turbine and generator
rotors continuously at approximately 35rev/min.
Electrical barring gear is a motor driven machine i.e. it receives power to operate from
the motor, which is vertically mounted on a support plate outside the pedestal above
the wormshaft. This motor supplies 37 kW power for the barring gear operation. This
power transmission between motor and barring gear takes place through worm and
worm wheel arrangement.
The motor driven electrical barring gear is mounted on a pedestal at the extreme rear
of the generator and exciter and the drive to the turbine generator rotor is transmitted
through a Synchronous Self Shifting (SSS) clutch, which automatically engages to
drive the turbine generator rotor at a constant speed of approximately 35 r/min and
automatically disengages when the rotor speed, under steam, rises above this value.
If the electrical barring gear motor develops a fault or if the complete rotor requires
turning for maintenance checks, it can be turned manually. The individual rotors of
each cylinder can be turned independently.

MAIN, COLD REHEAT AND HOT REHEAT STEAM LINE


MAIN STEAM LINE

MAIN STEAM STOP VALVE

S
U
P
E
R
H
E
A
T
E
R

HIGH PRESSURE
TURBINE

MAIN STEAM LINE

MAIN STEAM STOP VALVE


HP BYPASS SYSTEM

DESUPER HEATER
COLD REHEAT LINE
HOT REHEAT LINE
R
E
H
PRESSURE
E
A
T
I
N

R
E
H
E
A
T

IV

INTERMIDIATE
TURBINE

O
U
T
IV

DESUPER HEATER

TO LOW PRESSURE
TURBINE

BIBLIOGRAPHY
1.

Power plant engineering by P.K. Nag

2.

www.wikipedia.org

3.

Power plant engineering by Black and Veatch

4.

Manuals of NTPC Rihand

Das könnte Ihnen auch gefallen