Beruflich Dokumente
Kultur Dokumente
Design Span:
Overall culvert length:
H soil:
H surch:
H wind:
P impact:
70.00
140.00
60.00
1111.11
8.75 ft
18.25 ft
Arm from CL top slab
ft lbs/ft
1.063 ft
ft lbs/ft
1.396 ft
ft lbs/ft
3.896 ft
ft lbs/ft
5.396 ft
9 ft
247 ft lbs/ft
Load Combination 3:
Earth + Surcharge + Impact + 30% of Wind at 125%
H3 =
1071 plf
M3 =
5068 ft lbs/ft
H design:
1321 plf
M design:
d wall =
7.625 inches
Try #6@12: As =
0.44
k=
0.254
j=
fv =
14 psi
fc=
927 psi
fs=
24483 psi
6265 ft lbs/ft
b =
in**2/ft
D =
0.915
OK
OK
OK
12 inches
0.004809
n =
Check Minimum Reinforcing
1.2 Mcr =
8.22 ft kips
NMn =
14.24 ft kips
USE
OK
19 inches
7.19 kips
1.71 ft
4.94 kips
39.18 ft kip
At=1 leg=
0.2 in**s
* spacing
0.051646 * spacing
7.75 inches
Say =
6 inches
At design OK
Use
6 inches
0.18 in**2
0.23 in**2
D req'd =
Atotal =
2.17 in**2
Use 8 #6s:
0.000579 D min =
0.00220256
3.52 in**2
b=
0.00030805
9 inches