SPECIFICATION FOR

M.S. E.R.W.PIPES

HINDUSTHAN PETROLEUM CORPORATION LTD.


8, SHOORJI VALLABHDAS MARG
POST BOX NO- 155, MUMBAI-400 001
TECHNICAL SPECIFICATIONS
---------------------------------------------------SPECIFICATION FOR MS ERW PIPES FOR FIRE WATER LINES
SCOPE: Supply of MS ERW black line pipes of various sizes conforming to following
specification/details.
Item

Mild steel Pipes - ERW

Code

IS 1239(Part 1):2004

Dimensional standard :

IS 1239(Part 1):2004

Length of each pipe

Single random length of 4-7 M

Ends

Bevelled with end protection caps

Marking

As per clause 17 of IS 1239

DIMENSIONAL DETAILS:
Nominal size
( NB In mm )

Thickness

Grade

150 mm

5.40 mm

Heavy

100 mm

5.40 mm

Heavy

80 mm

4.80 mm

Heavy

THIRD PARTY INSPECTION:


Third party inspection is mandatory and shall be arranged by the supplier at their own cost.
Pipes shall be inspected by one of the following agencies only:
1. Lloyds

2. DNV

3.

EIL

4.

ICS

5.

BV

6.

SGS

HINDUSTHAN PETROLEUM CORPORATION LTD.


8, SHOORJI VALLABHDAS MARG
POST BOX NO- 155, MUMBAI-400 001
TECHNICAL SPECIFICATIONS
---------------------------------------------------SPECIFICATION FOR MS ERW PIPES FOR FIRE WATER LINES
SCOPE: Supply of MS ERW line pipes of various sizes conforming to following
specification/details.
Item

Mild steel Pipes - ERW

Code

IS 3589: 2001

Dimensional standard :

IS 3589: 2001

Length of each pipe

Single random length of 4-7 M

Ends

Bevelled with end protection caps

Marking

As per clause 18 of IS 3589

DIMENSIONAL DETAILS:
Outside Dia
( In mm )
323.9 mm

Thickness

Grade

7.10 mm

Fe 410

273 mm

6.30 mm

Fe 410

219.1 mm

6.30 mm

Fe 410

THIRD PARTY INSPECTION:


Third party inspection is mandatory and shall be arranged by the supplier at their own cost.
Pipes shall be inspected by one of the following agencies only:
1. Lloyds

2. DNV

3.

EIL

4.

ICS

5.

BV

6.

SGS

SCOPE OF INSPECTION FOR MS ERW PIPES:


Inspection shall be done strictly in accordance with the relevant IS Code.
1. CHEMICAL REQUIREMENT :
(i) Laddle Analysis
(ii) Product Analysis
The supplier shall conduct the above tests in an approved Chemical Laboratory, and shall get
the test results endorsed on the respective test reports by the third party inspection agency.
The third party inspection agency shall ensure correlation between the manufacturer's
report of heat analysis with the material and the finished pipes.
2. VISUAL INSPECTION
3. PHYSICAL TESTS:
(i) Tensile Tests
(ii) Flattening Test
(iii) Hydrostatic Test
NOTE: Hydrostatic test and visual inspection shall be done for 100 % quantity of the pipes.
All remaining Physical Tests, mentioned above, shall be done with samples drawn as per
clause 16 of IS 1239. Lot sizes for Chemical analyses shall be as specified in relevant IS
codes. All pipes shall be stamped/marked by the 3rd party inspection agency. All test reports
in original shall be submitted to HPCL despatch location and no pipe shall be despatched
without obtaining clearance from third party inspection agency.
.
4. ALTERNATIVELY , in case the pipes are procured from manufacturer Having ISO 9001
certification and that all the above test specified above are certified by them and correlation
with the certificates can be carried out at site the third party Inspection can be waived at the
discretion of Engineer in Charge.