QUALITY CONTROL INSPECTOR

PROJECT SPECIFIC RESPONSIBILITIES:

Inspect all welding on above ground piping for conformance to codes and client
requirements.

Inspect all welds against the detailed Spool Sheets for conformance to general
arrangement, material grade, and dimensional conformance.

Inspect, record, and mark all received pressure parts and bolt-up materials.

Review MTRs for specification conformance and maintain files with regard to project
specific and surplus materials.

Monitor storage and use of materials for designated applications on a per project basis.

Maintain surveillance of welding and fitting practices for conformance to WPS, Code,
and client specific requirements (i.e. preheat, tacking, electrode storage, weld
parameters).

Receive and review all NDT reports for completeness and accuracy of code and client
required information and correct identification of welds per location and line #.

Provide field surveillance of subcontractor activities such as NDE, boring, spray


insulation, Hydro-torque, etc.

Supervise / participate in the production of weld maps and the mark-up of as built
drawings with welder, NDE, and MTR information.

Assist in the production of hydro test packages, torque joint packages, and final redline
drawings for permanent record and client turnover.

Provide inspection of assemblies prior to hydro testing to ensure all MTRs, NDE, and
visual inspections are complete and issue punch list / test clearance forms prior to hydro.

Witness hydro tests to ensure all required test and calibration documentation are available
and relevant and that the test procedures conform to Park L, code and client requirements.

Receive, review and file / submit all field reports related to civil and earthworks (ie
ditching, backfill, crossing reports, etc.)

Build a photo record of the project as laid out by project management personnel.

Perform final acceptance inspections of pipelines and facilities for conformance to


P&IDs, piping isometric drawings, and client specs. Record results on inspection
checklists or other designated reporting formats.

NON-PROJECT RESPONSIBILITIES

Maintenance of testing equipment calibration records (ie pressure testing, torque testing,
electrical parameter testing).

Continuing education with regard to code revisions and client specifications.

Achieving additional certifications and code endorsements as required by new processes


and business applications.

Development of training aids and instructional manuals for trades activities.