Rev: 05
SITE ID:
SITE NAME:
Tower Height :
Date of visit/s
Contractor:
Task Description
Accepted
Major -to be
cleared within 48
hours
Minor - to be cleared
within 7 days
Not applicable
Comments
Major
Minor
N/A
Comments
Ok
1-1
1-2
q
q
q
q
q
q
q
q
1-3
Tower Design is according to Korek Specs, (wind speed 160 Km/Hr, FPA 16m2 (GF)/5m2 (RT): Tower Code is
1-4
The drainage pipes for the tower foundation is working properly and comply with site level.
1-5
The tower and site foundation backfilling is done properly.(no sign of settlement)
1-6
1-7
1-8
1-9
No sign of welding but for special cases , Q&A team must approve first
1-10
1-11
All structures are painted to Korek specifications (galvanizing value with paint........................)
1-12
1-13
Supplying Tower Poles / Antenna mount according to Korek Specifications ( Antenna pole No. 3 ; MW pole No. 1
1-14
Climbing ladder & Cable run for feeders installation have upright construction & Without twisting or deflection
1-15
1-16
1-17
The feeders cable tray stands bolted on a concrete platforms should be casted on site.
1-18
All connection have been checked including double bolts, screws,. Using flat & spring washers
1-19
1-20
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
1-21
New tower navigation light installed and in operation according to Korek specification Switch, box control is connected to the sensor
Signature:
/
Signature:
Signature:
/20
SITE NAME:
SITE ID:
1 of 17
Ok
Major
Minor
N/A
2-1
2-2
Shelter foundation is leveled and dimensions as per confirmed with deployment team (Dim. L: 25 ;W: 25 ;H27
2-3
2-4
Master Keys for Site Access, Shelter, Generators, Fuel Tank and Equipment are labeled and submitted to O&M (minimum 3 copies)
2-5
2-6
Shed & its foundation are installed as per specs for OD Pad
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
2-7
Shelter is sealed and weather proof and silicon must be used to seal any clearance between shelter panel
2-8
2-9
2-10
Door blocking system (open min 120) & hydraulic arm door allowing to open the door leaf min 120
q
q
q
q
q
q
q
q
q
q
q
q
2-11
2-12
2-13
2-14
2-15
2-16
single A/C insures the cooling for the shelter and equipment
2-17
2-18
Air-conditioning cooling-fluid pipes are correctly installed and protected against weather and damage
2-19
Air-conditioning condenser units outside are properly installed on mounting frames with vibration rubbers
2-20
2-21
2-22
2-23
2-24
2-25
All the interior & exterior lights should be installed inside brackets .
2-26
Emergency light is installed correctly and is working on batteries minimum for 3 Hrs.
2-27
Fire Extinguisher is full, free standing or hanging on the wall by the door and expiry date....................
2-28
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
2-29
2-30
Roxtec for (Feeder,MW ,Power Cable, Air Conditions & Earth Cable) installed properly
2-31
2-32
q
q
q
q
q
q
q
q
q
q
q
q
) & Brand (
konka
+samsung
q
q
q
q
Ok
Major
Minor
N/A
3-1
3-2
3-3
3-4
Barbed wire sed on the fence top for protection as per specs.
3-5
Site flooring works is done properly (leveled and well compacted also gravel to be used for GF & RT sites )
3-6
contractor will be responsible to repair the damages take place during construction life cycle
3-7
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
) ; H(
) ; W(
) , ( If required )
Comments
Comments
Signature:
/
Signature:
Signature:
/20
SITE NAME:
SITE ID:
2 of 17
GROUNDING
Ok
Major
Minor
N/A
4-1
4-2
4-3
4-4
EGB to the site grounding ring using 70mmconductor ( External Bus bar Dim. L:
4-5
Copper strip inside shelter installed and grounded with dim. 30*3mm .
4-6
IGB connection to the EGB by using 70mm ground cable (Internal Bus bar Dim. L:
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
4-7
;W:
;W:
;Thick.:
;Thick.:
4-8
4-9
Both genets & Fuel tank are properly grounded with 50 mm ground cable
4-10
q
q
q
q
q
q
q
q
q
q
q
q
4-11
4-12
Grounding is not established from one piece of equipment to another (daisy chain is not permitted)
4-13
4-14
4-15
Separate Lightening cable used must be 70mm and metallic clamps for mounting on tower
4-16
4-17
GF tower must have 4 ground manholes each leg have its own grounding system
4-18
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
Grounding test result is < 5 Ohms and certified test report is available
q
q
q
q
q
q
q
q
AC POWER
Ok
Major
Minor
N/A
5-1
5-2
5-3
5-4
Cable Trays installation must be done properly and no sharp edge must be found also no trip hazard is permitted .
5-5
5-6
5-7
Wiring inside MDB is correct installed and labeled according to design layout
5-8
All wires have been terminated properly with no loose wire termination.
5-9
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
5-10
5-11
5-12
Site Electrical Drawings and Grounding Drawings must be available at site and in the 'As build drawings'
5-13
5-14
The commercial power cable installed inside a GI or PVC duct and connected to the MTS properly.
5-15
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
Signature:
Signature:
Signature:
/20
SITE NAME:
Comments
Comments
SITE ID:
3 of 17
Ok
Major
Minor
N/A
6-1
6-2
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
6-4
External ______ liters fuel tank is properly installed, rust free and grounded
6-5
Are the genset exhausts directed away from shelter, walls and other site components.
6-6
Are the genset and fuel tank located in a way that allow proper access for maintenance.
q
q
q
q
q
q
6-7
6-8
ATS panel is functioning properly, with no alarm conditions , type of installation ( indoor , outdoor )
6-9
6-10
Fueling pipe are sealed & installed inside galvanized cable tray
q
q
q
q
q
q
q
q
q
q
q
q
6-11
Fuel pipe and power cable trays to be grounded between each other and also to be connected to main bus bar
6-12
6-13
q
q
q
q
q
q
q
q
q
6-3
2 generators are installed on site and locked for limited access ( Gen. capacity & brand )
q
q
q
DC Power
Ok
Major
Minor
N/A
7-1
7-2
7-3
7-4
7-5
7-6
7-7
7-8
Battery Racks properly fixed, connected to the rectifier and properly labeled
7-9
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
Signature:
Signature:
Signature:
/20
SITE NAME:
Comments
Comments
SITE ID:
4 of 17
ALARM DESCRIPTION.
Ok
Major
Minor
Minor
8-1
8-2
8-3
8-4
8-5
GENERATOR 1 FAILURE
8-6
GENERATOR 2 FAILURE
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
8-7
8-8
8-9
AC MAINS FAILURE
8-10
q
q
q
q
q
q
q
q
q
q
q
q
8-11
Rectifier minor
8-12
Rectifier major
8-13
8-14
8-15
8-16
8-17
8-18
8-19
8-20
External alarms test via LCT(local craft terminal/note book) at site or by NMS
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
Signature:
/
Comments
/20
SITE NAME:
Signature:
5 of 17
(Antennas -feeders)
Task Description
1
1-1
1-2
1-3
Antennas have correct tilts according to the design, tilting kits installed
1-4
Feeder cables are grounded to a bus bar at the antenna end, on the mid of the tower.
1-5
Earth kits properly connected to the feeder and isolated by water proof
1-6
1-7
1-8
1-9
1-10
1-11
1-12
External cable tray is rust free, correctly supported and has no sharp edges
Task Description
RBS/BTS
2-1
2-2
2-3
2-4
2-5
2-6
2-7
2-8
Feeder cable loss maximum VSWR in antenna feeders is less than 1.32
2-9
All BBS PSU's/PUC, Fans, & cards installed and functional as per site configuration
2-10
2-11
2-12
2-13
2-14
2-15
The bus bar inside shelter should be connected to outdoor bus bar by one earth cable
COMMENTS
OK
COMMENTS
Signature:
/
OK
/20
SITE NAME:
SITE ID:
Signature:
6 of 17
Serial Number:---------------
RBS(DRU) to IJ
F to JO
OJ to Ant
N/A
N/A
N/A
RBS(DRU) to IJ
F to OJ
OJ to Ant
BTS/RBS(DRU)to IJ
F to JO
OJ to Ant
BTS/RBS(DRU)to IJ
F to OJ
OJ to Ant
BTS/RBS(DRU) to IJ
F to JO
OJ to Ant
BTS/RBS(DRU) to IJ
F to OJ
OJ to Ant
Feeder Label
Feeder Length
Total Feeder Attenuation
Total Feeder Delay
Cell A(Feeder RX)
Feeder Label
Feeder Length
Total Feeder Attenuation
Total Feeder Delay
1.2 Cell B(Feeder TX,RX)
Feeder Label
Feeder Length
Total Feeder Attenuation
Total Feeder Delay
Cell B(Feeder RX)
Feeder Label
Feeder Length
Total Feeder Attenuation
Total Feeder Delay
1.3 Cell C(Feeder TX,RX)
Feeder Label
Feeder Length
Total Feeder Attenuation
Total Feeder Delay
Cell C(Feeder RX)
Feeder Label
Feeder Length
Total Feeder Attenuation
Total Feeder Delay
2- VSWR Test
Cell A
Cell B
Feeder Label(TX,RX)
Feeder Label(RX)
Feeder Label(TX,RX)
Feeder Label(RX)
Signature:
/
/20
SITE NAME:
SITE ID:
Signature:
7 of 17
A.
MW CHECKING
Azimuth arms are fixed and tighten with the correct and proper way.
Grounding cables of aligned element are correctly connected to the Bus bars.
All IF connectors and IF grounding are isolated accordingly to the MW standards with tape and weather proof.
All IF cables are installed properly, clamps installed for each (1.0 M)
B.
GSM CHECKING
there is a labeling in the jumpers that are connected to the three sectors
there is a fixing to the isolation of the feeder joins with the jumpers and connectors water proofing and grounding.
Major
Service
Major
Service
Signature:
Signature:
/
/20
Site Name
Site Code
Signature:
8 of 17
This site is :
SULR
Sulaymanya
EMEK
Rejected
Dept. Representatives
Name
CW
Dana Fakhradin
\2011
POWER
Kawa Latif
\2011
BSS
Azad Ali
\2011
TR
Ari Muhamed
\2011
RF
Omed Omer
\2011
Taha Sdiq
\2011
Warzer Muhamed
\2011
Sarmad Ramzi
\2011
Hazem Tantawy
\2011
Signature
Signature
Date
1
1-1
1-2
1-3
1-4
1-5
1-6
1-7
1-8
1-9
1-10
1-11
1-12
1-13
1-14
1-15
1-16
1-17
1-18
1-19
1-20
1-21
Task Description
TOWER & POLES (CIVIL , INSTALLATION WORKS)
Tower foundation completed as per specs.
Tower height is according to design.
Tower Design is according to Korek Specs, (wind speed 160 Km/Hr,
FPA 16m2 (GF)/5m2 (RT): Tower Code is
The drainage pipes for the tower foundation is working properly and
comply
withand
sitesite
level.
The tower
foundation backfilling is done properly.(no sign of
settlement)
Foundation Anchor Bolts are fitted correctly and within tolerance
Tower installation have upright construction. Without twisting or
deflection
All bolts are tightened and within tolerance.
No sign of welding but for special cases , Q&A team must approve first
Galvanizing of tower (w/o paint)as per specs (85 microns)
Accepted
Major -to be
cleared within 48
hours
Minor - to be cleared
within 7 days
Ok
Major
Minor
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
/20
q
q
q
q
q
q
q
q
q
q
q
SITE NAME:
q
q
q
q
q
q
q
q
q
q
q
Issue: 0003
Rev: 05
Date of Rev: 12/05/2011
Approved by: Muhammad Asim
Not applicable
Comments
N/A
Comments
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
q
SITE ID: