1

Table of Contents
Master File Report - By Assembly .....................................................................

Master File Report - By Cost Code ....................................................................

Master File Report .............................................................................................

Take-off Detail Report ........................................................................................

Job Takeoff Report ...........................................................................................

Job Material List ................................................................................................

Job Category Report .........................................................................................

Purchase Order Sequence Report ....................................................................

Sample Purchase Order ....................................................................................

10

Sample Purchase Order.....................................................................................

11

Sample Purchase Order ....................................................................................

12

Customer Proposals ..........................................................................................

13

Customer Proposal - With Detail .......................................................................

14

Square Foot Projection ......................................................................................

15

Conversion Formulas ........................................................................................

16

Price Book .........................................................................................................

17

Profitable Construction
Master File Report
60.30900 to 60.34100

FEB 9,1999
10:08AM

Page

Item/Assm# CostCode Description

Unit

60.30900

04221
03.10910
03.21150
03.30900

48" x 48" x12" Conc Ftg


Exterior Square Footings
#5 Rebar (EA) (20 Len)
2500 PSI Concrete

EA
EA
LF
YD

S
1
Square Footings Rebar
48x48x12 Footings (Each)

60.33000

03100
03.10300
03.30900
03.30990
03.31300
03.31310

3.5" Concrete Slab - 2500PSI


Concrete Labor Slab
2500 PSI Concrete
Fiber Mesh 1.5# Bag
6 Mil Visqeen (20 x 100)
Visqueen Tape

SF
SF
YD
CY
EA
EA

S
None
3 1/2 Slab to Cubic Yards
Fibermesh to 4" Slab
Roll 20 x 100
Visqueen Tape

60.33020

03100
03.10300
03.30910
03.30990
03.31300
03.31310

3.5" Concrete Slab - 3000PSI


Concrete Labor Slab
3000 PSI Concrete
Fiber Mesh 1.5# Bag
6 Mil Visqeen (20 x 100)
Visqueen Tape

SF
SF
YD
CY
EA
EA

S
None
3 1/2 Slab to Cubic Yards
Fibermesh to 4" Slab
Roll 20 x 100
Visqueen Tape

60.33100

03100
03.10500
03.30900
03.30990
03.31300
03.31310

4" Concrete Slab (Mono)


Concrete Labor Monolitic Slab
2500 PSI Concrete
Fiber Mesh 1.5# Bag
6 Mil Visqeen (20 x 100)
Visqueen Tape

SF
SF
YD
CY
EA
EA

S
None
Slab 4inch Conv
Fibermesh to 4" Slab
Roll 20 x 100
Visqueen Tape

60.33120

03100
03.10500
03.30910
03.30990
03.31300
03.31310

4" Monolithic Salb - 3000 PSI


Concrete Labor Monolitic Slab
3000 PSI Concrete
Fiber Mesh 1.5# Bag
6 Mil Visqeen (20 x 100)
Visqueen Tape

SF
SF
YD
CY
EA
EA

S
None
Slab 4inch Conv
Fibermesh to 4" Slab
Roll 20 x 100
Visqueen Tape

04221
03.10100
03.30900
03.31200
03.31600
04.22500
04.25000
04.25300
04.41100
04.41110
03 21150

Stem Wall - 2 Blks/Bars 8x16


Concrete Labor 8x16 Footer
2500 PSI Concrete
2 Rod Chairs(LF) /100
6" Loop Ties /1000
Concrete Masonry Block Labor
8x8x16 Regular Block
8x8x16 Header Block
Type S Mortar (BG=60 Blk/150 B
Sand (9 Bags Mortar = 1 Yd)
#5 R b (EA) (20 L )

LF
LF
YD
LF
EA
EA
EA
EA
BG
YD
LF

S
None
Footing 8x16
Rod Chairs
Loop Ties 1/1000
2 per Foot (Block)
16" Material to LF
16" Material to LF
Type S Mortar 2 Blk/LF
Sand = Two Blk per LF
20 R b 2
f

60.34100

Cat

u Assemblies are a grouping of items with a mathematical relationship to the assembly


take-off value.
v Assemblies will automatically convert each item into its appropriate purchase units.
(i.e. A slab assembly taken off by square foot will convert concrete to yards.)
3

Profitable Construction
Master File by Cost Code

FEB 9,1999
10:29AM
CostCode Description
Item #
Description
02860

Min Units

P.Group

Custom Fence Allowance


Picket Fence Allowance
Fencing Allownace

$$
$$
$$

A
A
A

N
N
N

I
I
I

0
0
0

1.0000
1.0000
1.0000

ALLOW
ALLOW
ALLOW

$$

1.0000

SITEWK

$$
$$
$$
$$
EA
$$
LF
LF
LF
LF
LF
LF
SF
SF
SF
SF
LF
LF
LF
EA
EA
EA
EA
EA
EA
EA
EA
LF
LF
LF
LF
LF
LF

S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
A
M
M
M
M
M
M

N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

0
0
0
0
0
0
0
0
0
0
0
20
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
20
20
20
20
20

1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000

CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
ALLOW
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE
CONCRE

Marine Docks
02.40800

u 03100

Cat Tax Type Waste

Fencing
02.80100
02.80200
02.90000

02910

Unit

Page 1

Marine Dock

Concrete Flatwork
03.10000
03.10010
03.10020
03.10030
03.10040
03.10050
03.10100
03.10110
03.10200
03.10210
03.10220
03.10230
03.10300
03.10320
03.10400
03.10500
03.10600
03.10800
03.10900
03.10910
03.11000
03.11010
03.11020
03.11030
03.11100
03.11130
03.11140
03.21150
03.21160
03.21170
03.21180
03.21190
03.21200

Concrete Labor Bid


Concrete/Masonry Layout to Linte
Concrete Labor & Material Bid
Concrete Labor Special
Concrete Labor Form & Pour Steps
Conc. Flat Work/CMU L & M Bid
Concrete Labor 8x16 Footer
Concrete Labor 12x16 Ftg
Concrete Labor 10x20 Footer
Concrete Labor 10x24 Footer
Concrete Labor 12x30 Footer
Concrete Labor 8x16 Beam
Concrete Labor Slab
Concrete Labor (Drives & Walks)
Concrete Labor Slab w/Mono Foote
Concrete Labor Monolitic Slab
Concrete Labor Bearing Walls
Interior Footers 1 Story
Interior Footers 2 story
Exterior Square Footings
Layout Charges/Corner
Layout Charges
Interior Drops
Shower Drops
Stomp Concrete Allow.
Prestressed Concrete Units Bid
Core Drilling Allowance
#5 Rebar (EA) (20 Len)
#3 Rebar (TN) Grade 60 (20 Len)
#4 Rebar (TN) Grade 60 (20 Len)
#5 Rebar (TN) Grade 60 (20 Len)
#6 Rebar (TN) Grade 60 (20 Len)
#7 Rebar (TN) Grade 60 (40 Len)

u A cost code is used to group items for customer proposals or budget updating in

accounting. Estimating budgets and purchase order detail are a bi-product of the
estimate and can immediately be uploaded to Prosoft Job Cost accounting system and
other windows accounting systems.
4

FEB 9,1999
11:56AM

Page

Profitable Construction
Master File Report u
03.21200 to 03.31100

Item/Assm# CostCode Description

Unit

03.21200

03100
#7 Rebar (TN) Grade 60 (40 Len)
UNASSN Unassigned Vendor

LF
LF

03100
#8 Rebar (TN) Grade 60 (40 Len)
UNASSN Unassigned Vendor

LF
LF

03100
#9 Rebar (TN) Grade 60 (40 Len)
UNASSN Unassigned Vendor

LF
LF

03100
Concrete Retaining Walls - Bid
UNASSN Unassigned Vendor

$$
$$

03100
Concrete Pumping - Slabs
UNASSN Unassigned Vendor w

EA
EA

03100
Concrete Pumping
UNASSN Unassigned Vendor

$$
$$

03100
Concrete Pumping - Beams
UNASSN Unassigned Vendor

$$
$$

03100
Lintel Mud
UNASSN Unassigned Vendor

CY
CY

03100
2500 PSI Concrete
UNASSN Unassigned Vendor

YD
YD

03100
3000 PSI Concrete
UNASSN Unassigned Vendor

YD
YD

03100
3500
UNASSN Unassigned Vendor

YD
YD

03100
4000 PSI Concrete
UNASSN Unassigned Vendor

YD
YD

03100
Add for 3000 PSI
UNASSN Unassigned Vendor

YD
YD

03100
Small Rock Mix add
UNASSN Unassigned Vendor

YD
YD

03100

CY

03.21210

03.21220

03.29000

03.30500

03.30510

03.30512

03.30600

03.30900

03.30910

03.30915

03.30920

03.30960

03.30980

03.30990

Fiber Mesh 1.5# Bag

Cat
420.0000

None

415.0000

None

410.0000

None

1.0000

None

400.0000

None

150.0000

None

150.0000

None

42.0000

None

54.5000

None

58.0000

None

60.0000

None

60.0000

None

4.0000

None

4.0000

None

u The master file data base contains items and assemblies.


v An item is a building resource that is user definable. Examples would be permits,

2 X 4, framing, labor and windows.


w Each item can have multiple vendors attached for quick price comparisons. The system
maintains each vendors unique part number for accurate purchase order generation.
5

FEB 9,1999
12:08PM

Takeoff Description
Assembly Item No. Description
1
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360
60.34360

Status PO # Notes
PO # S Unit

Stem Wall - 4 courses

03.10200
03.21150
03.30900
03.31100
03.31600
03.31620
03.31700
04.25000
04.25300
04.41100
04.41110
04.22500
03.21150
03.30510
03.30910
03.31010
03.11010

Page

Profitable Construction
Job Takeoff Report
Sample Estimating Job

Stem Wall - 4 Blks/2Bars 10


Concrete Labor 10x20 Foote
#5 Rebar (EA) (20 Len)
2500 PSI Concrete
3 Rod Chairs(LF) /100
6" Loop Ties /1000
Cavity Caps
Grade Stakes 16" (100)
8x8x16 Regular Block
8x8x16 Header Block
Type S Mortar (BG=60 Blk/
Sand (9 Bags Mortar = 1 Yd
Concrete Masonry Block La
#5 Rebar (EA) (20 Len)
Concrete Pumping
3000 PSI Concrete
10/50 CORNER #5 Rebar (E
Layout Charges

Takeoff Qty

Purchase Qty

Unit Price

Extension

0.00
342.00
61.50
24.00
2.00
1.00
251.00
4.00
923.00
308.00
21.00
3.00
1,025.00
102.50
1.00
4.00
103.00
1.00

2.5000
5.2500
54.5000
20.0000
7.0000
0.0200
10.5000
0.6500
0.7500
5.5000
18.5000
0.6500
5.2500
150.0000
58.0000
2.5000
175.0000

855.00
322.88
1,308.00
40.00
7.00
5.02
42.00
599.95
231.00
115.50
55.50
666.25
538.13
150.00
232.00
257.50
175.00

2
I
2I
2I
2I
2I
2I
2I
2I
2I
2I
2I
2I
2I
2I
2I
2I
2I
2I

LF
LF
YD
LF
EA
EA
EA
EA
EA
BG
YD
EA
LF
$$
YD
EA
EA

341.50
341.50
51.23
19.76
1.13
0.34
227.67
3.42
768.38
256.13
17.08
2.37
1,024.50
85.38
0.34
2.73
85.38
0.34

5,600.73
2
60.33020
60.33020
60.33020
60.33020
60.33020
60.33020
60.30100
60.30100
60.30100
60.30100
60.30100
60.30100
60.30100
3
60.40300
60.40300
60.40300

Slabs

03.10300
03.30910
03.30990
03.31300
03.31310
03.10100
03.21150
03.30900
03.31200
03.31600
03.31700

I
3.5" Concrete Slab - 3000PS
Concrete Labor Slab
3000 PSI Concrete
Fiber Mesh 1.5# Bag
6 Mil Visqeen (20 x 100)
Visqueen Tape
8" x 16" Concrete Ftg (2) #5
Concrete Labor 8x16 Footer
#5 Rebar (EA) (20 Len)
2500 PSI Concrete
2 Rod Chairs(LF) /100
6" Loop Ties /1000
Grade Stakes 16" (100)

Masonry Walls - 10

03.21150
03.30512

3
I
3I
3I
3I
3I
3I
I
3I
3I
3I
3I
3I
3I

v 3,764.00

SF
YD
CY
EA
EA

3,764.00
40.66
46.47
1.88
3.76
86.34
86.34
8.63
2.84
0.28
0.09
0.86

LF
LF
YD
LF
EA
EA

0.00
3,764.00
49.00
56.00
3.00
5.00
0.00
87.00
11.00
4.00
1.00
1.00
1.00

0.3500
58.0000
5.8575
59.0000
2.3500

1,317.40
2,842.00
328.02
177.00
11.75

1.9500
5.2500
54.5000
17.0000
7.0000
10.5000

169.65
57.75
218.00
17.00
7.00
10.50
5,156.07

10 CMU Wall W/ knock-ou


#5 Rebar (EA) (20 Len)
Concrete Pumping - Beams

I
4 I LF
4 I $$

290.00
14.50
0.29

0.00
17.91
1.00

5.2500
150.0000

u Take-off detail reports provide complete audit of all entries.


v By entering a quantity (3764 SF) on one line, the assembly calculates detail material
items and converts each detail item to the appropriate units (YD, EA, CY).
w Units are completely user definable. In our example $$ are used for bid items.
x The purchase quantity is the result of the take-off quantity adjusted for waste and
then rounded up.
y The status of the item determines whether the items is (I) included used or as an
(A) alternate.
6

94.03
150.00

FEB 12,1999
11:17AM

Page

Takeoff Description
Assembly Item No. Description
16

Slabs

Job Takeoff Report


Sample Estimating Job
Status PO # Notes
PO # S Unit
I

Takeoff Qty Purchase Qty

Unit Price

Extension

60.33020
3.5" Concrete Slab - 3000PS
I
3,764.00
0.00
60.33020 03.10300 Concrete Labor Slab
3 I SF
3,764.00
3,764.00
0.4200
1,580.88
Notes: Each take-off line item can have notes added on the fly while entering take-off quantities. At the users option the notes can
appear on reports and purchase orders.

Additionally standard notes can be created (called specifications) and these notes can be added by simply selecting the specific
"SPEC". Specifications are typically created for each trade, this way each purchase order includes any important notes that
would be appropriate for the trade receiving the purchase order.

60.33020
60.33020
60.33020
60.33020
60.30100
60.30100
60.30100
60.30100
60.30100
60.30100
60.30100

03.30910
03.30990
03.31300
03.31310
03.10100
03.21150
03.30900
03.31200
03.31600
03.31700

3000 PSI Concrete


Fiber Mesh 1.5# Bag
6 Mil Visqeen (20 x 100)
Visqueen Tape
8" x 16" Concrete Ftg (2) #5
Concrete Labor 8x16 Footer
#5 Rebar (EA) (20 Len)
2500 PSI Concrete
2 Rod Chairs(LF) /100
6" Loop Ties /1000
Grade Stakes 16" (100)

3I
3I
3I
3I
I
3I
3I
3I
3I
3I
3I

YD
CY
EA
EA

40.66
46.47
1.88
3.76
86.34
86.34
8.63
2.84
0.28
0.09
0.86

LF
LF
YD
LF
EA
EA

49.00
56.00
3.00
5.00
0.00
87.00
11.00
4.00
1.00
1.00
1.00

61.7700
5.8575
62.8350
2.5028

T
T
T
T

3,026.73
328.02
188.51
12.51

2.1000
5.5913
58.5750
18.1050
7.4550
11.1825

T
T
T
T
T

182.70
61.50
234.30
18.11
7.46
11.18
5,651.90

Adjusted for: Sales Tax, Waste and Vendor Order Req.

Total

5,651.90

Note: Only Takeoffs from "16" to "16" have been printed.

u Large note fields allow for full explanations on take-off and purchase order reports. This
note field also transfers to purchase orders.

FEB 9,1999

Profitable Construction

12:13PM

Job Material Summary


Sample Estimating Job

u
Item #
03

Item Description

Page

Cat

Order Quantity

87.00
342.00

Unit Price

Extension

LF
LF

1.9500
2.5000

169.65
855.00

Unassigned Vendor
Unassigned Vendor

SF
EA
LF

0.3500
175.0000
5.2500

1,317.40
175.00
1,029.00

Unassigned Vendor
Unassigned Vendor
Unassigned Vendor

Unit

Vendor Name

Concrete

03.10100
03.10200

Concrete Labor 8x16 Footer


Concrete Labor 10x20 Footer

S
S

03.10300
03.11010
03.21150

Concrete Labor Slab


Layout Charges
#5 Rebar (EA) (20 Len)

S
S
M

3,764.00
1.00
196.00

03.30510
03.30512

Concrete Pumping
Concrete Pumping - Beams

M
M

1.00
1.00

$$
$$

150.0000
150.0000

150.00
150.00

Unassigned Vendor
Unassigned Vendor

03.30900
03.30910
03.30990

2500 PSI Concrete


3000 PSI Concrete
Fiber Mesh 1.5# Bag

M
M
M

28.00
58.00
56.00

YD
YD
CY

54.5000
58.0000
5.5000

1,526.00
3,364.00
308.00

Unassigned Vendor
Unassigned Vendor
Unassigned Vendor

03.31010
03.31100

10/50 CORNER #5 Rebar (EA)


3 Rod Chairs(LF) /100

M
M

103.00
2.00

EA
LF

2.5000
20.0000

257.50
40.00

Unassigned Vendor
Unassigned Vendor

03.31200
03.31300
03.31310

2 Rod Chairs(LF) /100


6 Mil Visqeen (20 x 100)
Visqueen Tape

M
M
M

1.00
3.00
5.00

LF
EA
EA

17.0000
59.0000
2.3500

17.00
177.00
11.75

Unassigned Vendor
Unassigned Vendor
Unassigned Vendor

03.31500
03.31600

8" Anchor Bolts


6" Loop Ties /1000

M
M

17.00
2.00

LF
EA

0.2800
7.0000

4.76
14.00

Unassigned Vendor
Unassigned Vendor

03.31620
03.31700
03.72040

Cavity Caps
Grade Stakes 16" (100)
Conc. Cols 10" 1/2" 10 Installe

M
M
M

251.00
5.00
2.00

EA
EA
EA

0.0200
10.5000
185.0000

5.02
52.50
370.00

Unassigned Vendor
Unassigned Vendor
Unassigned Vendor

03.72050

Conc. Cols 10" Full 10 Installe

6.00

EA

210.0000

1,260.00

Unassigned Vendor

04

Masonry

04.22500
04.22600

Concrete Masonry Block Labor


Concrete Masonry Blk Labor 10 W

S
S

1,025.00
3,263.00

EA
EA

0.6500
0.9000

666.25
2,936.70

Unassigned Vendor
Unassigned Vendor

04.22640
04.25000
04.25200

Block Masonry Labor-U Lintel Pou


8x8x16 Regular Block
8x8x8 Halves Block

S
M
M

30.00
4,577.00
119.00

LF
EA
EA

1.2500
0.6500
0.6000

37.50
2,975.05
71.40

Unassigned Vendor
Unassigned Vendor
Unassigned Vendor

04.25300
04.25500

8x8x16 Header Block


8x8x16 Knock out Block

M
M

308.00
218.00

EA
EA

0.7500
0.7500

231.00
163.50

Unassigned Vendor
Unassigned Vendor

04.25510
04.26200
04.26500

Lintel Felt
174 Prestress Lintel
140" Lintel

M
M
M

3.00
3.00
1.00

EA
EA
EA

3.0500
109.0000
51.0000

9.15
327.00
51.00

Unassigned Vendor
Unassigned Vendor
Unassigned Vendor

04.26600
04.27200

134" Lintel
94" Lintel

M
M

1.00
1.00

EA
EA

47.0000
31.0000

47.00
31.00

Unassigned Vendor
Unassigned Vendor

04.27300
04.27400
04.27800

84" Lintel
76" Lintel
510" Lintel

M
M
M

2.00
5.00
2.00

EA
EA
EA

27.2500
23.0000
17.6000

54.50
115.00
35.20

Unassigned Vendor
Unassigned Vendor
Unassigned Vendor

04.28000
04.30200

46" Lintel
37" Window Sill

M
M

1.00
1.00

EA
EA

13.8500
8.9500

13.85
8.95

Unassigned Vendor
Unassigned Vendor

04.30300
04.30400
04.34000

53" Window Sill


74" Window Sill
2/8 2" Recessed Dr Hdr

M
M
M

1.00
5.00
2.00

EA
EA
EA

12.4500
17.4500
13.5000

12.45
87.25
27.00

Unassigned Vendor
Unassigned Vendor
Unassigned Vendor

04.41100

Type S Mortar (BG=60 Blk/150 Bri

87.00

BG

5.5000

478.50

Unassigned Vendor

u The item number structure is definable, however the included database is structured
following industry standards (CSI numbering system).
v Categories are used to define the item type (material, labor, etc.).
w Order quantity is adjusted to vendor order minimums.
x Shows the current vendor of choice for the job. Switching vendors is accomplished
with ease.
8

FEB 9,1999
12:24PM

Page 1
Job Category Report
Sample Estimating Job

Category Description
A
L
M
O
S

Allowances
Labor
Material u
Overhead
Sub-Contract

Cost

Category Markup

Extension

1,700.00
0.00
26,211.90
33,656.18
108,095.53

0.00
0.00
0.00
0.00
0.00

1,700.00
0.00
26,211.90
33,656.18
108,095.53

169,663.61

0.00

169,663.61

Overhead Markup
Profit Markup
Adjusted for: Sales Tax, Category Markup, Waste and Vendor Order Req.

FEB 9,1999
12:29PM

0.00
20,359.63
190,023.24

Page 1
PO Sequence Report

PO Pack No
0
1
2
3
4
5
6
7
8
9
10

Description
Undefined
Site Preperation (1)
Foundation (2)
Slab
Masonry Walls
Framing (5)
Trades - rough
Drywall
Trim/Wall Ceramic/Cabinets
Trades - Finals
Finish

u Category reports are available with or without markup.


v Purchase order packages serve multiple functions within the EST system. Material

takeoffs are done in different logical groupings than actual materials are ordered.
With the addition of purchase order sequence you tell estimating how to order material.
Additionally the interface between estimating and account uses these purchase order
packages.

FEB 12,1999
Date:
PO Pack:
3

Vendor: CONCLA

Purchase Order

Ship To:

Concrete Labor Sub


123 Main Street
Dallas, TX 92349

Sample Estimating Job


Job Address
Job City, ST ZIP

Phone/Fax: /
Contact:
John Concrete
Part Number
03.10100
03.10300

Unit Price

Extension

Concrete Labor 8x16 Footer


87.00 LF
2.1000
Concrete Labor Slab
3,764.00 SF
0.4200
Each take-off line item can have notes added on the fly while entering take-off
quantities. At the users option the notes can appear on reports and purchase orders.

182.70
1,580.88

Description

v
w

Quantity

Unit

Additionally standard notes can be created (called specifications) and these notes can be
added by simply selecting the specific "SPEC". Specifications are typically created for
each trade, this way each purchase order includes any important notes that would be
appropriate for the trade receiving the purchase order.

Total

1,763.58

Job Notes

This area is reserved for General Job Notes, which you wish to appear on all of the purchase orders. The notes are added at the job
header level and a user has the option to print purchase orders with or without General Job Notes.

u A purchase order will automatically adjust to the # of pages needed based on the

amount of purchase order detail and purchase order notes.


v Purchase order detail (vendor, price, line items, notes) can be easily changed prior to
printing purchase orders from job cost accounting.
w Purchase order line item notes and general job notes that were added at the estimating
level can be included on purchase orders.
10

FEB 12,1999
Date:
PO Pack:
2

Vendor: CONCMA

Ship To:

Concrete Material Supplier


4567 N.W. 110 Ave
Dallas, TX 33456

Sample Estimating Job


Job Address
Job City, ST ZIP

Purchase Order

Phone/Fax: /
Contact:
John Concrete
Part Number

Description

03.21150
03.30900
03.30910
03.31600
03.31700

#5 Rebar (EA) (20 Len)


2500 PSI Concrete
3000 PSI Concrete
6" Loop Ties /1000
Grade Stakes 16" (100)

Quantity
164.00
24.00
4.00
1.00
4.00

Unit
LF
YD
YD
EA
EA

Unit Price
5.2500
55.0000
58.0000
7.0000
10.5000

Extension
*
*
*
*
*

SubTotal
* Tax
Total

861.00
1,320.00
232.00
7.00
42.00
2,462.00

160.03
2,622.03

Job Notes

This area is reserved for General Job Notes, which you wish to appear on all of the purchase orders. The notes are added at the job
header level and a user has the option to print purchase orders with or without General Job Notes.

u Taxable line items are marked with an asterisk. A single purchase order can contain
taxed and non-taxed items.
v Purchase orders and reports calculate tax based on the job location.
11

FEB 12,1999
Date:
PO Pack:
3

Vendor: CONCMA

Ship To:

Concrete Material Supplier


4567 N.W. 110 Ave
Dallas, TX 33456

Sample Estimating Job


Job Address
Job City, ST ZIP

Purchase Order

Phone/Fax: /
Contact:
John Concrete
Part Number

Description

03.21150
03.30900
03.30910
03.30990
03.31200
03.31300
03.31310
03.31600
03.31700

#5 Rebar (EA) (20 Len)


2500 PSI Concrete
3000 PSI Concrete
Fiber Mesh 1.5# Bag
2 Rod Chairs(LF) /100
6 Mil Visqeen (20 x 100)
Visqueen Tape
6" Loop Ties /1000
Grade Stakes 16" (100)

Quantity
11.00
4.00
49.00
56.00
1.00
3.00
5.00
1.00
1.00

Unit
LF
YD
YD
CY
LF
EA
EA
EA
EA

Unit Price
5.2500
55.0000
58.0000
5.5000
17.0000
59.0000
2.3500
7.0000
10.5000
SubTotal
* Tax
Total

Extension
*
*
*
*
*
*
*
*
*

57.75
220.00
2,842.00
308.00
17.00
177.00
11.75
7.00
10.50
3,651.00
237.32
3,888.32

Job Notes

This area is reserved for General Job Notes, which you wish to appear on all of the purchase orders. The notes are added at the job
header level and a user has the option to print purchase orders with or without General Job Notes.

u Scheduled delivery of material is handeled easily by grouping material take-offs by specific

purchase order packs.

12

FEB 9,1999
12:34PM

Page: 1

Proposal For:
Sample Estimating Job

Cost Code Description

Total Amount

00015
00020
00710
00720
00730
00850
01050
01710
02010
02115
02250
02610
02800
03100
03480
04220
04221
06100
06110
06190
06200
06210
06410
07210
07310
07700

Lot
Realty Commissions
Permits & Fees
Builders Risk
Utilities/Dumpster
Plans & Specs
Field Engineering
House Cleanup/Labor
Compaction Testing
Lot Grading/Fill
Termite Control
Driveway
Landscaping
Concrete Flatwork
Special Concrete
Masonry Block
Masonry Foundation
Frame Carpentry
Rough Lumber
Roof Trusses
Finish Carpentry
Millwork
Cabinet Work
Insulation
Roofing
Alum. Soffit
i
d

16400
16510

Electric Contract
Electric Fixtures

3,784.00
v 17,000.00
7,167.95
1,675.00
1,350.00
2,129.18
815.00
2,622.20
250.00
3,283.00
1,023.90
4,500.00
5,000.00
4,676.17
1,630.00
7,469.56
6,080.63
7,569.64
6,488.46
7,162.13
2,831.20
3,234.86
5,300.00
1,300.00
11,000.00
2,405.13

5,625.00
500.00

Sub Total
Profit
Overhead
Total

169,663.61
20,359.63
0.00
$190,023.24

u Customer proposals are organized by cost code so comparison between


customer proposals and job costing are easily audited.
v The amount can either be the actual cost or include markup.
w Profit and overhead is available at the bottom if desired.
13

FEB 9,1999
12:54PM

Page: 3

Proposal For:
Sample Estimating Job

Cost Code Description


Item #
Description
03100

Quantity

Unit Price

Extension

3,764.00
49.00
56.00
3.00
5.00

0.3500
58.0000
5.8575
59.0000
2.3500

1,317.40
2,842.00
328.02
177.00
11.75

Concrete Flatwork
03.10300
03.30910
03.30990
03.31300
03.31310

Concrete Labor Slab (Stem Wall)


3000 PSI Concrete
Fiber Mesh 1.5# Bag
6 Mil Visqeen (20 x 100)
Visqueen Tape

u
03480

4,676.17

Special Concrete
03.72040
03.72050

Conc. Cols 10" 1/2" 10 Installe


Conc. Cols 10" Full 10 Installe

2.00
6.00

185.0000
210.0000

370.00
1,260.00
1,630.00

04220

Masonry Block
03.21150
03.21150
03.21150
03.21150
03.21150
03.21150
03.21150
03.21150
03.21150
03.21150
03.30512
03.30910
03.30910
03.30910
03.30910
03.30910
03.30910
03.30910
03.30910
03.30910
03.30910
03.31500
03.31500
03.31500
04.22600
04.22640

#5 Rebar (EA) (20 Len)


#5 Rebar (EA) (20 Len)
#5 Rebar (EA) (20 Len)
#5 Rebar (EA) (20 Len)
#5 Rebar (EA) (20 Len)
#5 Rebar (EA) (20 Len)
#5 Rebar (EA) (20 Len)
#5 Rebar (EA) (20 Len)
#5 Rebar (EA) (20 Len)
#5 Rebar (EA) (20 Len)
Concrete Pumping - Beams
3000 PSI Concrete
3000 PSI Concrete
3000 PSI Concrete
3000 PSI Concrete
3000 PSI Concrete
3000 PSI Concrete
3000 PSI Concrete
3000 PSI Concrete
3000 PSI Concrete
3000 PSI Concrete
8" Anchor Bolts
8" Anchor Bolts
8" Anchor Bolts
Concrete Masonry Blk Labor 10 W
Block Masonry Labor-U Lintel Pou

17.91
0.62
1.24
0.00
0.00
0.00
1.24
0.00
0.00
-0.01
1.00
4.45
0.12
0.24
0.00
0.00
0.00
0.18
0.00
0.00
0.01
7.29
9.71
0.00
3,263.00
10.00

u Detail customer proposals support the summary report.


v Relates to the material item with the job.
w Price includes all taxes and markups (optional).
14

5.2500
5.2500
5.2500
5.2500
5.2500
5.2500
5.2500
5.2500
5.2500
5.2500
150.0000
58.0000
58.0000
58.0000
58.0000
58.0000
58.0000
58.0000
58.0000
58.0000
58.0000
0.2800
0.2800
0.2800
0.9000
1.2500

94.03
3.26
6.51
0.00
0.00
0.00
6.51
0.00
0.00
-0.05
150.00
258.10
6.96
13.92
0.00
0.00
0.00
10.44
0.00
0.00
0.58
2.04
2.72
0.00
2,936.70
12.50

FEB 9,1999
1:14PM

Page 1
Square Foot Projection Report
Sample Estimating Job

u
Product
Group Description

Cost

ALLOW Allowances
CABNT Kitchen & Bath Cabinets
CARPEN Carpentry
CONCRE Redimix Concrete Materials
DOORS Product Group DOORS
ELECTR Electrial
EQUIP Product Group EQUIP
FINISH Product Group FINISH
GARAGEGarage Doors
GENREQ General Requirements
INTDRS Interior Doors
LUMFIN Finish Lumber
LUMRGHRough Lumber
MASON Masonry Materials
MECHANHVAC Mech
MECPLB Mechanical - Plumbing
SITEWK Site Prep
SPCL
Product Group SPCL
STUCCO Stucco
THERM Thermal Protection
TRUSS Roof & Floor Trusses
WINDOWWindows

Job Square Foot:


Existing SF Cost:
Proposed SF Cost:

Category
Markup Existing Cost

3,500
48.48
46.00

v
Proposed Cost

Difference

18,200.00
5,300.00
10,066.20
11,273.62
585.75
5,625.00
0.00
13,722.50
1,143.00
36,543.33
1,573.64
955.24
8,103.47
8,582.74
4,832.00
5,775.00
4,556.90
1,632.35
6,100.00
14,130.74
7,162.13
3,800.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

18,200.00
5,300.00
10,066.20
11,273.62
585.75
5,625.00
0.00
13,722.50
1,143.00
36,543.33
1,573.64
955.24
8,103.47
8,582.74
4,832.00
5,775.00
4,556.90
1,632.35
6,100.00
14,130.74
7,162.13
3,800.00

17,268.98
5,028.88
9,551.26
10,696.92
555.79
5,337.25
0.00
13,020.52
1,084.53
34,673.95
1,493.14
906.37
7,688.94
8,143.69
4,584.82
5,479.58
4,323.79
1,548.85
5,787.95
13,407.88
6,795.75
3,605.61

931.02
271.12
514.94
576.70
29.96
287.75
0.00
701.98
58.47
1,869.38
80.50
48.87
414.53
439.05
247.18
295.42
233.11
83.50
312.05
722.86
366.38
194.39

169,663.61

0.00

169,663.61

160,984.45

8,679.16

Adjusted for: Sales Tax, Category Markup, Waste and Vendor Order Req.

u Product Group is used to quickly review vendors. In the price change mode,

product group allows for quick selection of a new vendor.


v Proposed Cost is based on the user entering a new cost per square foot and then
the software pricing by trade / product group.

15

FEB 9,1999
1:17PM

uTo

From
LF
MO
PR
RL
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SQ
SY
YD

YD
MO
PR
RL
$$
$$
BG
CY
CY
CY
CY
CY
CY
CY
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
MO
SF
YD
YD
YD
YD
SQ
SY
YD

Page 4
Conversion Formulas
Default
No
Yes
Yes
Yes
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
No
No
No
No
Yes
Yes
Yes

Formula

Description

.00138*2
1
1
1
1/50
1
1/150*7 v
.04815
.0963
.1284
.1605
.18
.24
.012346
1/32*1.302
1/32*1.357
1/32*1.413
1/32*1.031
1/32*1.054
1/32*1.083
1/32*1.118
1/32*1.158
1/32*1.202
1/32*1.25
7
1
1
1/16
.0005
.001111
1/32
(8*12)/144*.8
.001
1
1
.010802
(1/150*7)/9
1/80
.015432
1
1
1

Sand = Two Blk per LF


None
None
Default Conversion "RL" to "RL
Constuction Glue to SF
None
Brick Mortar to SF
2 Course Fill w/ compaction w
3 Course Fill w/ Compaction
4 Course Fill w/ Compaction
5 Course Fill w/ Compaction
6 Course Fill w/ Compaction
7 Course Fill w/ Compaction
Fibermesh to 4" Slab
10/12 Roof Pitch to Plywd
11/12 Roof Pitch to Plywd
12/12 Roof Pitch to Plywd
3/12 Roof Pitch to Plywd
4/12 Roof Pitch to Plywd
5/12 Roof Pitch to Plywd
6/12 Roof Pitch to Plywd
7/12 Roof Pitch to Plywd
8/12 Roof Pitch to Plywd
9/12 Roof Pitch to Plywd
Bricks /SF
Insurance Multiplier
One
Plyclips
Roll 20 x 100
Roll 6 x 150
Sheets (4x8) to SF
Sheets 8" x 12" to SF w/ lap
Visqueen Tape
None
None
3 1/2 Slab to Cubic Yards
Brick Sand to SF
Slab 4inch Conv
Slab 5inch Conv.
None
Default Conversion "SY" to "SY
None

u Formulas From / To allow for conversion from unlike units.


v Uses standard algebraic expressions or factors.
w Description provides the user with a quick way to identify the function of the formula.
16

FEB 9,1999
1:32PM

Page

Vendor Pricebook

Vendor ID/Name: UNASSN Unassigned Vendor

Updated

Vendor Part No

Description

Unit

7/16/95
7/04/95
7/04/95
7/16/95
7/16/95
7/16/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/16/95
7/16/95
7/04/95
7/16/95
7/16/95
7/04/95
7/04/95
7/04/95
7/16/95
7/04/95
7/16/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95
7/04/95

02.95000
02.95100
02.95200
02.95300
02.95400
02.97000
02.97100
03.10000
03.10010
03.10020
03.10030
03.10040
03.10050
03.10100
03.10110
03.10200
03.10210
03.10220
03.10230
03.10300
03.10320
03.10400
03.10500
03.10600
03.10800
03.10900
03.10910
03.11000
03.11010
03.11020
03.11030
03.11040
03.11050
03.11060
03.11070
03.11080
03.11090
03.11100
03.11110
03.11120
03.11130
03.11140
03.21150
03.21160
03.21170
03.21180
03.21190
03.21200

Landscaping Allowance
Landscaping Bid
Landscaping/Sprinkler Al
Land./Sod/Irr. Allowance
Landscaping & Sod Allow.
Sprinkler System Allow.
Sprinkler System Bid
Concrete Labor Bid
Concrete/Masonry Layout to Linte
Concrete Labor & Material Bid
Concrete Labor Special
Concrete Labor Form & Pour Steps
Conc. Flat Work/CMU L & M Bid
Concrete Labor 8x16 Footer
Concrete Labor 12x16 Ftg
Concrete Labor 10x20 Footer
Concrete Labor 10x24 Footer
Concrete Labor 12x30 Footer
Concrete Labor 8x16 Beam
Concrete Labor Slab (Stem Wall)
Concrete Labor (Drives & Walks)
Concrete Labor Slab w/Mono Foote
Concrete Labor Monolitic Slab
Concrete Labor Bearing Walls
Interior Footers 1 Story
Interior Footers 2 story
Exterior Square Footings
Layout Charges/Corner
Layout Charges
Interior Drops
Shower Drops
Masonry Mailbox Allowance
Driveway Allowance
Asphalt Driveway (6" Base 2" Top
Driveway Labor Allowance
Driveway Allowance SF
Exterior Concrete SF
Stomp Concrete Allow.
Driveway Pattern @ $1.50
Concrete Patterning Allowance
Prestressed Concrete Units Bid
Core Drilling Allowance
#5 Rebar (EA) (20 Len)
#3 Rebar (TN) Grade 60 (20 Len)
#4 Rebar (TN) Grade 60 (20 Len)
#5 Rebar (TN) Grade 60 (20 Len)
#6 Rebar (TN) Grade 60 (20 Len)
#7 Rebar (TN) Grade 60 (40 Len)

$$
$$
$$
$$
$$
$$
$$
$$
$$
$$
$$
EA
$$
LF
LF
LF
LF
LF
LF
SF
SF
SF
SF
LF
LF
LF
EA
EA
EA
EA
EA
EA
EA
SF
$$
SF
SF
EA
SF
SF
EA
EA
LF
LF
LF
LF
LF
LF

Unit Cost
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
100.0000
1.0000
1.9500
2.5000
2.5000
2.6000
4.0000
15.5000
0.3500
0.4500
0.8500
0.7500
1.0000
1.0000
1.2500
35.0000
10.0000
175.0000
175.0000
50.0000
1.0000
1.0000
1.2000
1.0000
1.7500
1.7500
3.1500
1.5000
1.0000
1.0000
1.0000
5.2500
451.0000
444.0000
431.0000
426.0000
420.0000

u Shows the last time the specific line item was changed.