Ref: WR/EPC/RRVPNL/11-12/142

Date: 04.10.2011
Commercial Deviations
Volume / Clause

Ref / Page No.

As specified in the
specification

Vol I - Schedule B1

Page No. 1 to 32

Plant and equipment


(including mandatory spare
parts) to be supplied,
including type test charges
for tests to be conducted

Vol I - Annexure A

Cl. 2.0 Part - B Subclause l

Vol I - Annexure A

Cl. 2.0 Part - B Subclause m

Information regarding
bidder's anticipated
ownership change
.and
aceptance by owner
Proposal of manufacturing
methods

.and the completion


schedule

Ref: WR/EPC/RRVPNL/11-12/142
Date: 04.10.2011

s
Commercial deviation and
variation to the
specification
We have not considered type
test charges for equipments,
as equipments offered by us
are already type tested for
similar rating of equipments.

We confirm that there is no


change of ownership
anticipated within two years
from bid submission date.
All the materials are bought
out items which will be
manufactured at
manufacturer's workplace.
We are enclosing the duly
filled in technical particulars
as per the format vide
Schedule D. The project
completion schedule is
enclosed in Attachement 8
(Schedule A)

Ref:WR/EPC/RRVPNL/11-12/0143
Date: 20.12.2011
ANNEXURE to Schedule K
Technical Comments
Sl No.
1

4
5

Volume / Clause

Ref / Page No.

Part -10 (Section- I) Sub clause 4.2)


Technical Specf. For Frequency Planning
PLCC System

As specified in the
specification
Successful
bidder.Frequency Plan

Sub clause 9.2)


Power Line carrier
terminal

PLCC terminal shall use


..unless
otherwise specified

Sub clause 9.9)


Power Line carrier
terminal

The PLCC set shall be


designed..
Indian Standards

Technical deviation and variation to the specification


Our present offer is based on the frequency mentioned in clause no
4.1. In case of any change,we will propose frequencies based on the
availability of latest grid map of the local grid which we request you to
provide.The proposed frequencies will be forwarded to you for your
approval from the respective agencies.
Kindly confirm the link lengths between all substation in order to decide
the output power of PLCC .We have assumed all line lengths to be less
than 300 Kms. Our present offer is based on the same.

As per the approved manufacturer ABB mentioned in the tender


document PLCC set is designed to perform within temp. range of -5C.
To +45C in normal operation. Equipment may not be operated at the
temp higher than +55 C for more than 24 hours
Part -10 (Section-II) Sub clause 5.1 )
As per approved manufacturer ABB, mentioned in the tender
Technical Specf. For SDH Module
document, we have assumed following distances for each link for
Fiber optic terminal
providing fiber optic solution without repeater- Ramgarh - Bhadla :
equipment (FOTE)
180 Kmtrs, Ramgarh - Akal : 100 Kmtrs, Bhadla - Bikaner : 180 Kmtrs
Akal - Jodhpur(new) : 225 Kmtrs
We have considered following losses for calculating power budget of
each link: Fiber loss @ 0.23dB/Km,
splice loss @ 0.077db per splice per 3 Km
Connector loss : 1 dB
Sub clause 7) Optical in order to
As per approved manufacturer ABB, mentioned in the tender
amplifier system
achivemarginns of Min 6 document, we have not provided Wavelength translator unit ,
dBm
Wavelength converter unit,Power Amplifier,Pre amplifier, Raman
amplifier for any of the linkcovered under this specification because we
do not foresee the requirment of these equipments in order to meet the
user requirment . We have offered solution for each link as following
which meets the basic criteria of RRVPNL specification, this provides a
repeater less solution for each link. Ramgarh- bhadla : 12 dBm
amplifier is provided to cover 180 Kmtrs link distance , Ramgarh - Akal
no amplifier required , Bhadla - bikaner: 12dBm amplifier is provided to
cover 180 kmtrs link distance, Akal-Jodhpur(new): Wave length
converter + 21 dBm Amplifier + pre amplifier is provided to cover a
distance of 225 Kmtrs .
Price Sechedule, D2 Note under FOTE
FOTE - Note D
point d (ramgarh Sub
Station)
Price Sechedule, F - AC Changeover
LT Switchgear A (5) Switch

We have considered FOTE for Akal Substation in price sechudule of


Akal Substation
We have quoted for 1 no. AC changeover switch as per BOQ

Cl.4.0 of Technical
Spec.,Volume-IIICivil Works - "Site
Preparation"

Page No-8

Site shall be graded


permission of
Engineer-in-charge.

We have considered that FGL May vary in respective


Yard/Yards.220KV Yard will have one FGL & for 400KV Area,the same
may be divided under One or two differenet FGL/s,as the case may
be,during Detail Engg.Retaining Wall shall be provided between two
Areas with Different Levels beyond a Level difference of 1.5M & for
Variations upto 1.5M,Profiled Slope on FGL Shall be provided subject

Cl.4.0 of Technical
Spec.,Volume-IIICivil Works - "Site
Preparation"

Page No-8

General Comments on
Clause

We have considered that the site preparation work for the areas of
towers, equipments, buildings covered under the switchyard package
only and other areas like extension under the "scope of work of
CE(MM)" and "space for residential colony" as shown in the layout
drawing with bid document are not included in our price.

General Comments on
Clause

Provision of Trench Section,in a Particular Location,on Layout shall be


deceided during Detail Engg.,solely based on Nos of Cables under
Present Scope including Provisions of Cables for Future Bays shown in
Drg.
We have considered variable Wall thickness of Cable Trenches based
on Various Depth & actual Design requirement..
Road X-ing of Cable Trenches may be Designed with Adequate
Size/Nos/Quality of RC Pipes,duly encased with Concrete.
Fixing of Cable/Cable Tray Support,as the case may be,shall be as per
the Detail Mkd "Typical Cable Support" in Drg.No. RVPN/CIVIL/DRG-5.

Cl.10.0 of Technical Page No-21


Spec.,Volume-IIICivil Works - "Cable
Trenches"
-Do- but Cl.10.03 Page No-21

-Do- but Cl.10.04

Page No-21

-Do- but Cl.10.13

Page No-22

It would be preferable
nnexure of drawing.
Cable Trench Crossing
..reactor Loading.
Cable Trays
.RVPN

3of4

Ref:WR/EPC/RRVPNL/11-12/0143
Date: 20.12.2011
10

11

12

Cl.5.11/12 of
Page No-12
Technical
Spec.,Volume-IIICivil Works - "Stone
Spreading for the
Areas of Future
Scope of Work"
Cl.5.2 of Technical
Page No-11
Spec.,Volume-IIICivil Works "Antiweed Treatment
& Stone Spreading"

The bottom Layer of 150MM Thick may be made with Filling Sand/Fine
Sand/Stone Dust.

However,.well within
safe limits

We have Considered that,As per provision of Cl.5.2 of Civil Spec.,Brick


on Edging over 150MM Thk Filling with Crusher Sand & Stone
Spreading in Future Areas within Fence Will not be required subject to
meeting the Step Potential requirement.

Page No-11

General Comments on
Clause

13

Cl.5.17 of Technical
Spec.,Volume-IIICivil Works "Cement Concrete
Block Masonary
barricades"

Page No-13

General Comments on
Clause

Chain Link Fence may be Re-routed/Added during Detail Engg. to keep


Vacant Areas(Areas Which will not be equipped under Present/Future
Scope)ouside Fence,there-by not requiring any Brick on Edging With
Stone Spreading as above.
Barricading will not be required,where the Stone Spreading can be
retained by Adjascent Drain Wall.

14

Cl.13.6 of Technical
Spec.,Volume-IIICivil Works - "Fire
Protection WallMaterials"
Cl.17.6 of Technical
Spec.,Volume-IIICivil Works - "AC
Kiosk Building"

Page No-29

General Comments on
Clause

Fire Wall may also be made of 355MM thk Masonary Wall supported
on a RC Framed Structural System as per NFPA/TAC/CBIP Norms.

Page No-35

General Comments on
Clause

Detail of Kiosk Building shall be solely as Shown in Tender Drg.

15

-Do-

a base Layer
Spread
evenly