Sie sind auf Seite 1von 2

Saturday, November 15 2014 12:50 PM

Home

Services

Professional Regulation

Bienvenido !

My Account

Search Case

Mapa Web

ES | EN

Search...

Login

Services Permits Extraction Permits Simple Permit for Terrestrial Material Extraction

Simple Permit for Terrestrial Material Extraction


Description
The following are requirements to apply for a Simple Permit for Terrestrial Material Extraction:

Details
Requirements
The following are requirements to apply for a Simple Permit for Terrestrial Material Extraction:
1. Corresponding environmental document or a categorical exclusion certification, as provided in the Rules of Environmental Documents of the
Environmental Quality Board.
2. Digital polygon plan of the territorial expansion of the project geo-referenced to State Plane Coordinate System, showing the exact geographical location
of the proposed action.
3. Compelling evidence that the proponent is the owner or lessee duly authorized by the owner of the property.
4. Names, contact information and certification of the licensed professionals involved in the proposed action, showing that they are duly licensed and / or
registered in Puerto Rico, if any.
5. Names and contact information of all property owners abutting the property subject of the application, preferably including all e-mails.
6. Recommendation of any and all who apply between the Municipality and the involved agencies in Building, Infrastructure, Health and Safety,
Environment, Usage, Archaeology and Historic Preservation, as required.
7. Information on the impacted area, the method and the proposed operational sequence for the duration of the permit, the reserve available for mining area
and the equipment or machinery to be used, in addition to the description of the areas of storage, processing and distribution of terrestrial material, among
others.

Documents to be submitted
1. Digital map, in polygon, surveying the project, if the lots do not appear in GIS (DXF)*
2. Evidence of ownership, if you are creating a project or activity profile (PDF)
3. Permission from the owner of the land to the project owner to carry out the proposed action, if not the same person (PDF)

4. Project owner's permission to process the application, if owner is not the proponent (PDF)
5. Specialist certification, if a specialist certifies a component of the application (PDF)*
6. Municipal recommendation, if access to the work is through a municipal road (PDF)*
7. Photos of the property (JPEG, PDF)
8. Explanatory memorandum that describes in detail the proposed activity, its purpose, and the operational processes to b carried out (MS Word, PDF)*
9. Restoration Plan which explains the corresponding mitigation measures, as applicable (MS Word, PDF)
10. Locational sketch of the area where the proposed action will be carried out, with distinguishable reference points in the land (PDF)*
11. Certification for the Deposit of Surplus Material, when the surplus material is deposited in an outside land lot (PDF)

Cost
The cost to file a simple extraction permit is $75.

Deadline for filing


The service request will remain open for a maximum of thirty (30) days for the applicant to complete the application. Without completing the application and /
or loading all required documents after this term of 30 days, the applicant must begin the application process again.

Electronic Processing

On-Site Processing
If you will be visiting one of our offices to complete your application, review
the documents and bring the application filled out to expedite the process.
Processing

doc.petServicio
doc.formulario
doc.anejos

Terms of Use

Privacy Policy

1-855-PERMISOS

Contact center

Das könnte Ihnen auch gefallen