These are the basic configuration settings you need to maintain.

Apart from this, as per user's requirement you may need do configure more.

Factory Calendar
Configuring SAP calendar
Define Public Holidays
Define Hoiliday Calendar
Creation of Factory Calendar
Basic Data
Bill of Material
Define Modification Parameters
Define BOM Usages
Define Material Types For BOM Header
Define Item Categories used for Item Data
Define allowed Material Types for BOM Items
Define Order of priority for alternative BOM usages
Work center
Define WorkCenter Category
Define Field Selection for Work Center
Define Task List Usage for Workcenters
Define Parameters for Standard Value Key
Define Standard Value Key
Define Person Responsible for work Centers
Define Move time Matrix
Define Default Work Center
Default Control Keys
Define Capacity Categories
Define Capacity Planners
Define Shift Sequence
Define Worcenter Formulas
Define Work Center Formulas for Costing
Routing
Define Number Ranges for Routings
Define Field Selection
Define Material Type Assignments
Select Automatically (Routing Selection)
Define Task List Usage
Configure Planner Group
Configure Control Keys
Define Reduction Strategy
Define Relevancy to Costing
Define (Standard) Trigger Point Usage
Define Automatic Selection of Routings
Production Planning
Demand Management
Define number ranges for planned independent requirements
Configuring Requirement Types and Requiremtent Classes
Define Strategy
Define Strategy Group
Define version numbers
Maintain consumption mode and period of adjustment

CRP

Define layout keys


Define layout
Define profile for capacity planning table
Define Overall profile

Material Requirement Planning Plant Parameters


Carry Out Overall Maintenance of Plant Parameters
Scheduling Parameters for Purchasing
Number Range for Planned orders
Number Range for Puchase Requisitions
Define MRP Controllers
Define Missing Parts MRP Controller
Define Special Procurement Type
Maintain Planning Calendar
Define MRP Areas
Define Scope of Planning for Total Planning
Define Planning Horizon
Activate BOM Expllosion characteristics
Define Planning Time Fence and Roll Forward Period
Define Floats (Scheduling Margin Key)
Define Parallel processing for MRP
Define Receipt days Supply
Parameters for Determining the Basic Dates
Define scheduling parameters for planned orders
Define availability stock in Transfer/Blocked stock/Restricted stock
Define External Procurement
Define BOM Explosion Control

Define BOM Explosion for Sales Orders


Define BOM and Routing Selection
Activate MRP and Set Up Planning File
Define Planning File Entries for Goods Movements
Convert Planning File Entries for MRP Areas

Shop Floor Control Master Data


Define Order Types
Define order type-dependent parameters
Production Status Profile
Define number ranges for orders
Define number ranges for confirmations
Define number ranges for reservations
Define production scheduler
Define production scheduling profile
Define Confirmation Parameters
Define Time for Confirmation Processes
Define Reasons for Variances
Define single screen entry
Define Field Selection for Confirmation
Define Reduction Strategies
Define Print Control
Batch Status Mangement
Batch Search Strategy to Production
Activate Batch Management
Availability Check
Define Checking Group
Define Checking Rule
Define Scope of Check
Define Checking Control
Checking Rule for Back order Processing
Scheduling
Specify Scheduling Type
Define Scheduling Parameters for Planned Orders
Define Scheduling Parameters for Production Orders

Pls. find the list of PP configuration as below:

List of PP Transport Request and their IMG Path


1) Define Distribution Keys
IMG > Production Planning for Process Industries > Master Data > Material List > Item Data > Item Data from related areas > Define Distribution Keys
2) Determine Person responsible for Resource u2013
IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Determine Person responsible
3Define Planner GroupIMG > Production Planning for Process Industries > Master Data > Master Recipe > Define Capacity Planner
4) Define Capacity Planner u2013
IMG > Production Planning for Process Industries > Master Data > Resource > Capacity Requirement Planning > Determine Capacity Planner
5) Determine Standard Value Parameter u2013
IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Standard Value > Define Parameter
6) Define Setup Groups and Setup Group Categories
Define set up groups and set up categories u2013
IMG > Production Planning for Process Industries > Master Data > Master Recipe > Data for operations and phases > Define set up groups and set up group categories
7) Define copy setting between plants-Process
IMG > Production Planning for Process Industries > Process Management > Tools > Define copy setting between plants
8) Define Set Up Control Recipe destination u2013
IMG > Production Planning for Process Industries > Process Management > Control Recipe/PI sheet > Set up control recipe destination
9Define MRP controller u2013
IMG > Material Management > Consumption based Planning > Master Data > Define MRP controller
10) Special Procurement u2013
IMG > Material Management > Consumption based Planning > Master Data > Define Special procurement types
11) Define Floats (Scheduled Margin Key)IMG > Material Management > Consumption based Planning > Planning > Define Floats (Scheduled Margin Key)
12Define Splitting of Forecast requirements for MRPIMG > Material Management > Consumption based Planning > Evaluation > Forecast > Define Splittng of forecast requirements of MRP
13) Maintain Correction Factors for Forecast

IMG > Material Management > Consumption based Planning > Planning > Procurement > Maintain Correction factors for forecast
14 Carry Out Overall Maintenance of Plant Parameters
Maintaining plant parameters in MRP u2013
IMG > Material Management > Consumption based Planning > Plant Parameters > Carry out overall maintenance of plant parameters
15) Define Planning Horizon
Define Planning Horizon u2013
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define Planning Horizon
16) Activate Requirement Planning u2013
IMG > Material Management > Consumption based Planning > Planning > Activate Requirement Planning
17) Define Range of Coverage Profiles (Dynamic Safety Stock)
Range of coverage profile u2013
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define range of coverage profile (Dynamic Safety Stock)
18) Define Stock in Transfer and Blocked Stock Availability
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define Stock in transfer and blocked stock
19) Define MRP Areas
IMG > Material Management > Consumption based Planning > Master Data > MRP areas > Define MRP areas
20) Carry out maintenance of MRP groups
IMG > Material Management > Consumption based Planning > MRP groups> Carry out maintenance of MRP groups
21) Define Scope of total Planning - MRP
IMG > Material Management > Consumption based Planning > Planning > Define Scope of total Planning
22 Define Order Types
Define Order TypeIMG > Production Planning for Process Industries > Process Order > Master Data > Order > Define Order Type
23Define Order Type Dependent parameters u2013
IMG > Production Planning for Process Industries > Process Order > Master Data > Order > Define Order Type Dependent parameters
24) Define Production Scheduler u2013
IMG > Production Planning for Process Industries > Process Order > Master Data > Bill of Material > Define Production Scheduler
25 Define Checking Control - Process Order
Define Availability Check u2013 Define Checking Control u2013
IMG > Production Planning for Process Industries > Process Order > Operations > Availabilty Check > Define Checking Control
26) Define Checking Rule for backorder processing u2013
IMG > Production Planning for Process Industries > Process Order > Operations > Availabilty Check > Define Checking rule for back order processing
27Define Stock and batch determination for good movement u2013
IMG > Production Planning for Process Industries > Process Order > Operations > Define Stock and batch determination for good movement
28) Specify Scheduling Parameters
Specify Scheduling Parameters u2013
IMG > Production Planning for Process Industries > Process Order > Operations > Scheduling > Specify Scheduling Parameters
29) Define Reduction Strategies
Define Reduction Strategy u2013
IMG > Production Planning for Process Industries > Process Order > Operations > Scheduling > Resource data > Define Reduction Strategy
30) Define Confirmation Parameters
Define Order Confirmation u2013
IMG > Production Planning for Process Industries > Process Order > Operations >
Confirmation > Define Confirmation Parameters
31) Define Valuation of Goods Received
Define valuation of goods receive u2013
IMG > Production Planning for Process Industries > Process Order > Integration > Define Valuation of goods received
32) MRP creation indicator u2013
IMG > Material Management > Consumption based Planning > Planning > Define creation indicator
33) Define safety stock u2013
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define Safety Stocks
34) Define alternative determination of Production u2013
IMG > Production Planning for Process Industries > Process Order > Operations > BOM selection > Define alternate determination of production
35) Define no. ranges u2013
IMG > Production Planning for Process Industries > Process Order > Master data > Order > Number Ranges > Define number ranges for orders
Further you need to do Manual Configuration in PP after Transport Request transfer in Production Server:
1) Define Distribution Keys
2) Determine Person responsible for Resource
3Define Planner Group4) Define Capacity Planner
5) Determine Standard Value Parameter u2013
6) Define Setup Groups and Setup Group Categories

7) Define copy setting between plants-Process


8) Define Set Up Control Recipe destination
9Define MRP controller u2013
10) Special Procurement
11) Define Floats (Scheduled Margin Key)
12Define Splitting of Forecast requirements for MRP
13) Maintain Correction Factors for Forecast
14 Carry Out Overall Maintenance of Plant Parameters
15) Define Planning Horizon
16) Activate Requirement Planning
17) Define Range of Coverage Profiles (Dynamic Safety Stock)
18) Define Stock in Transfer and Blocked Stock Availability
19) Define MRP Areas
20) Carry out maintenance of MRP groups
21) Define Scope of total Planning - MRP
22 Define Order Types
23Define Order Type Dependent parameters
24) Define Production Scheduler
25 Define Checking Control - Process Order
26) Define Checking Rule for backorder processing
27Define Stock and batch determination for good movement
28) Specify Scheduling Parameters
29) Define Reduction Strategies
30) Define Confirmation Parameters
31) Define Valuation of Goods Received
32) MRP creation indicator
33) Define safety stock
34) Define alternative determination of Production
35) Define no. ranges
Following Number ranges you need to define :
In OPPQ you need to define Number Ranges for :
Planned Orders
Reservations / Dependent Requirements
Purchase Requisitions
MRP Lists
Simulative Dependent Requirements
Similarly you need to define Number Range for :
Production Order in CO82
Confirmations in CO80
Reservations in CO83
Operations in CO81
Capacity Requirements in CO84
Same way you need to maintain all other number ranges in Production Server manually. However first you need to transfer Number range object through Transport Request.
Hope this helps.
Award points if useful.