Beruflich Dokumente
Kultur Dokumente
6
Introduction
SA-T Training
November 12, 2014 | Slide 1
1MRG001847
Introduction
SA-T Training
November 12, 2014 | Slide 2
1MRG001847
Where to begin?
Introduction
PCM600 2.6
Migration tool
SA-T Training
November 12, 2014 | Slide 3
1MRG001847
600 series
Version handling
Monitoring tools
Improved performance
Application configuration
Engineering flow
SA-T Training
November 12, 2014 | Slide 4
1MRG001847
Application configuration
Signal matrix
Engineering flow
SA-T Training
November 12, 2014 | Slide 5
1MRG001847
Application configuration
Signal matrix
Parameter settings
Engineering flow
SA-T Training
November 12, 2014 | Slide 6
1MRG001847
Application configuration
Signal matrix
Parameter settings
Graphical display
Engineering flow
SA-T Training
November 12, 2014 | Slide 7
1MRG001847
Application configuration
Signal matrix
Parameter settings
Graphical display
Communication management
Engineering flow
Application configuration
Signal matrix
Parameter settings
Graphical display
Communication management
SA-T Training
November 12, 2014 | Slide 8
1MRG001847
DNP 3.0
Application configuration
Signal matrix
Parameter settings
Graphical display
Communication management
Export/Import
SA-T Training
November 12, 2014 | Slide 9
1MRG001847
Engineering IEC61850
Write to IED
Engineering flow
Application configuration
Signal matrix
Parameter settings
Graphical display
Communication management
Export/Import
SA-T Training
November 12, 2014 | Slide 10
1MRG001847
DNP 3.0
Engineering IEC61850
Write to box
File transfer
Migrate configuration
Engineering flow
Available versions
Step forward
Step back
SA-T Training
November 12, 2014 | Slide 11
1MRG001847
Monitoring
SA-T Training
November 12, 2014 | Slide 12
1MRG001847
Event viewer
Signal monitoring
Disturbance handling
PCM600 V2.6
New features and benefits / feature enhancements
SA-T Training
November 12, 2014 | Slide 13
1MRG001847
Possibility
to
view
application
configuration with all PCM600 variants
PCM600 V2.5
New features and benefits / feature enhancements
SA-T Training
November 12, 2014 | Slide 14
1MRG001847
Improved
graphical
layout
when
migrating configurations made using
PCM600 Ver. 1.5
Improved
migration
report
when
migrating a configuration to a later
version of an IED
New
communication
engineering
module for the IEC 61850 engineering
in the PCM600 Engineering Pro variant
The
communication
management
module now supports the handling of
the IEC 60870-5-101/104 and DNP3
protocols
SA-T Training
November 12, 2014 | Slide 15
1MRG001847