Conducted By (Date)
Company
Task
Approved By (Date)
21/06/2006
2. Risk Evaluation
Existing Risk Control
Risk Level
Possible
Accident/III
Health &
Persons-atrisk
Likelihood
1. Hazard Identification
Hazard
Severity
21/06/2009
3. Risk Control
Action Officer
Additional
(Follow-up Date)
Risk Control
Measure
-Lack of
oxygen
Asphyxiation
-Lack of
lighting
Bodily Injury
-Gas leak
Unconscious
-Tripping &
falling
Bodily Injury
-Barricade of opening
-Ensure passageway
clear of obstruction
Group 1
Reference
Document for
Reference
Lifting of plate
Cutting of damage
bulkhead
Removal of cut
steel plate to shore
-Double check
hot work area
before start
work
-
-Supervisor incharge
-Safety Officer
-To check
lifting gear
before lifting
-Supervisor incharge
-To check
combustible
matter around
hot work area
-Supervisor incharge
-Barricade
affect lifting
area
-Fire &
explosion
Bodily Injury
-Falling
Bodily Injury
-Falling
object
Bodily Injury
-Qualify rigger
-Inspection of valid and
good condition of lifting
gear
-Caught inbetween
Bodily Injury
-Fire
explosion
Bodily Injury
-Falling
hazard
Bodily Injury
-Falling
Hazard
Bodily Injury
Risk Level
Action Officer
(Follow-up Date)
Possible
Accident/III
Health &
Persons-atrisk
Likelihood
Additional
Risk Control
Measure
Hazard
Severity
-Supervisor Incharge
Document for
Reference
-Caught inbetween
Bodily Injury
-Wear glove
-Used tag line
-Keep people away form
lifting area
-Falling
Hazard
Bodily Injury
-Qualify Rigger
-Lifting Supervisor
-Valid lifting gear and in
good working condition
-Barricade
affect lifting
area
-Caught inbetween
Bodily Injury
-Wear glove
-Used tag line
-Keep people away form
lifting area
-Fire &
explosion
Bodily Injury
-Falling
Bodily Injury
-Double check
hot work area
before start
work
-
Supervisor Incharge
-Supervisor incharge
-Safety Officer
Company
Marine Pacific
Task
Approved By (Date)
Steelwork
-Marking
-Cutting
-Fitting
-Welding
-Grinding
-Lifting
Testing / NDT
(Vacuum Test,
X-ray Visual)
Risk Level
2. Risk Evaluation
Existing Risk Control
Likelihood
1.
1. Hazard Identification
Task Step
Hazard
Possible
Accident/III
Health &
Persons-at-risk
Severity
No.
-Fire,
Explosion
Bodily Injury
-Qualified personnel to do
work
-Hot work tools must be
checked and tested
-Falling
object
Bodily Injury
-Falling
Bodily Injury
-Apply permit
-Barricade the area
-Hose
Burst
Bodily Injury
-Radiation
Bodily Injury
20/06/2009
3. Risk Control
Action Officer
Additional
Follow-up Date)
Risk Control
Measure
Barricade the
area (both in
and out of
tank)
Hull Supervisor/
Lifting Supervisor/
Safety Officer
Reference
Document for
Reference
Company
Group 3
Task
Approved By (Date)
-Fire/
Explosion
-Asphyxiation
-Smoke
and Fumes
-Falling
object
-Burns (sparks)
-Struck by
object
-Bodily Injury
-Bodily Injury
-Fire watch
-Valid hot-work tools
-Good ventilation
-General lighting
-Remove combustible
materials
-Trained signal and rigging
man
-Presence of lifting
supervisor
-Cordon off affected area
-Tag-line
-Trained rigging and
signalman
-Lifting gear in good
condition
-Presence of lifting
supervisor
-Cordon off affected area
Risk Level
Crop out
damaged plate
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/III
Health &
Persons-at-risk
Severity
No.
3. Risk Control
Action Officer
Additional
Follow-up Date)
Risk Control
Measure
Additional
access to be
provided
Production
Supervisor/
Hull Supervisor/
Contractor
Supervisor
Additional
marshals to
clear off the
area
Lifting Supervisor /
Contractor
Supervisor
Provide the
right fitters, do
not crowd
around work
area
Production
Supervisor/
Hull Supervisor/
Contractor
Supervisor
Reference
Document for
Reference
Welding of new
plate
-Strong ventilation
-Good condition of tool
-Fire watch
-Eyes protection
-Electric Shock
Electrocution
-Hand gloves
-Good earthing for welding
set
-Fire/ Fumes
-Asphyxiation
-Burns
-Ventilation
-Filter mask to wear
-Hand gloves
-Excessive
noise
-Noise induced
deafness
-Ear plugs
-Noise
-Noise induced
deafness
-Ear plugs
-Flying
sparks
Bodily Injury
-Safety glasses
-Dust masks
-Face shield
-Grinder protective
Gouging
Grinding
-Fire/ Fumes
-Asphyxiation
-Burns
Risk Level
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/ Ill
Health &
Persons-at-risk
Severity
No.
3. Risk Control
Additional
Action Officer
Risk Control
(Follow-up Date)
Measure
-Visual checks
on welding
tools before
commence
-Good
ventilation in
tank
-Ensure good
housekeeping/
cleaning
-Visual checks
on welding
tools before
commence
Site Supervisor
-Good
ventilation in
tank
-Ensure good
housekeeping/
cleaning
-Check on
workers PPE
(ear plugs)
-Check on
workers PPE
(ear plugs)
-Good
ventilation in
tank
-Ensure good
housekeeping/
cleaning
Site Supervisor
Site Supervisor
Site Supervisor
Site Supervisor
Site Supervisor
Reference
Document for
Reference
Company
Group 5
Task
Approved By (Date)
ABC
Cleaning E/R
Bottom
Cutting, fitting
and welding of
platform
support.
Risk Level
Remove
platform
(portable)
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/III
Health &
Persons-at-risk
Severity
No.
21/06/2009
3. Risk Control
Action Officer
Additional
Follow-up Date)
Risk Control
Measure
-Material
handling
Bodily Injury
-Barrication
-Install
signboard
-Tripping
Bodily Injury
-Barrication
-Fire and
explosion
Bodily Injury
-Falling /
Tripping
-Fire and
explosion/
fumes
Bodily Injury
-Material
handling
Bodily Injury
-PPE
-No hotwork at surrounding
vicinity
-Barrication
-Good safety shoe (sole)
-Valid Hotwork Permit
-Firewatch
-Fire clothes/Lines
-Ventilation/Lighting
-Tag lines
-Hand gloves
-Friction floor
mat
-
-Falling/
tripping
Bodily Injury
Bodily Injury
-Barrication
-Signboard
XYZ
-Hull Supervisor
Reference
Document for
Reference
Risk Level
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/ Ill
Health &
Persons-at-risk
Severity
No.
3. Risk Control
Additional
Action Officer
Risk Control
(Follow-up Date)
Measure
Falling
object
Bodily Injury
-Qualified signalman
-Lifting gears checked
-Use guide ropes
-Keep clear from path
Cordon off
affected area
Install new
platform
(change plate)
-Material
handling
Bodily Injury
-Tag line
-Barrication
-Tripping/
Falling
Bodily Injury
-Barrication
Supervisor
Reference
Document for
Reference
Company
Group 6
Task
Approved By (Date)
Preparation for
hot work
-Lack of
oxygen
Asphyxiation
-Toxic gas
-Defective
tools
Overcome by gas
-Fire expose by
gas leak and
oxygen
enrichment
-Explosion
-Bodily Injury
-Lifting
tools
Risk Level
Pre-job
inspection and
marking
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/III
Health &
Persons-at-risk
Severity
No.
1
1
M
M
-Elevation of
gas hoses and
separation of
hoses/ cables
-Trade Supervisor
Reference
Document for
Reference
Fitting, welding
and grinding off
new plate
-PTW System
-Zinc sheet,
fibre cloth and
additional
watchman,
equipment
-Hand glove
Nil
-Falling
from height
-Multiple injury
-Body harness
-Valid scaffold tag (OK tag)
-Proper accessing to
location
Nil
-Falling
from height
-Multiple injuries
-Noise inducted
deafness
-Burst of air line
Nil
Vacuum test
-Fire and
explosion
-Burn to person
Risk Level
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/ Ill
Health &
Persons-at-risk
Severity
No.
3. Risk Control
Additional
Action Officer
Risk Control
(Follow-up Date)
Measure
-Trade Supervisor
Reference
Document for
Reference
Company
Group 7
Task
Approved By (Date)
Risk Level
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/III
Health &
Persons-at-risk
Severity
No.
Group 7
21/6/2009
3. Risk Control
Action Officer
Additional
Follow-up Date)
Risk Control
Measure
Remove
Insulation
- Contact
with
hazardous
substance
- Skin Irritation
- Asbestosis
Cordon off
area
Hull supervisor
Cutting of
existing BHD
Fire
-Damaging of
EQs
-Injury cause by
fire
-Permit to work
-Provide firecloth to protect
EQ
-Fire watch men
Additional fire
watch men
with radio
Hull supervisor
Removal of
scraps
Falling
materials
Bodily injuries
PPE (Handgloves)
Refer to SWP
Hull supervisor
Reference
Document for
Reference
Risk Level
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/ Ill
Health &
Persons-at-risk
Severity
No.
3. Risk Control
Additional
Action Officer
Risk Control
(Follow-up Date)
Measure
Transportation
of new BHD to
site
Falling
materials
-Body injury
-Property
damage
Lifting Supervisor
-Cordon off
area when
lifting in
progress
-Alert men
working nearby
Installation
Falling
material
-Body injury
-Cordon off
area
Hull Supervisor
Welding /
Grinding
Fire
-Eye injury
-Bodily injury
-Property
damage
-PPE (headshield,
goggles)
-Hot work permit
-Fire watchmen
Housekeeping
Hull Supervisor
Electrocution -Electrocuted
Reference
Document for
Reference
Company
Group 8
Task
Approved By (Date)
21/06/2006
Check or mark
hotwork area
Prepare
hotwork / lifting/
hand tools
Risk Level
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/III
Health &
Persons-at-risk
Severity
No.
Group 8 (21/6/2006)
20/06/2009
3. Risk Control
Action Officer
Additional
Follow-up Date)
Risk Control
Measure
-Falling
-Minor injury /
Sprain
-Overcome
by CO2
-May become
unconcisous
-Gas Check
- Contact
with hot
surface
-Trip or fall
-Burnt injury
-Wear handgloves
-Bodily injuries /
sprain
-Good housekeeping
-Safe staging with check
list
-Bodily Injuries
-Bodily Injuries
-Bodily Injuries
-Safe staging
-Use handgloves
2
2
1
2
L
L
-Caught inbetween
Cut and remove -Fire
the plate as
marked
-Fall
-Hit by
-Finger injury
M
-Tool box
briefing
Cordon off
area
Supervisor
Supervisor
Reference
Document for
Reference
Risk Level
Likelihood
2. Risk Evaluation
Existing Risk Control
Severity
No.
1. Hazard Identification
Task Step
Hazard
Possible
Accident/ Ill
Health &
Persons-at-risk
-Handling
hazard
-Major injury
-Falling
object
-Caught inbetween
-Bodily Injuries
-Bodily injuries
-Flying
particles
-Minor injuries
3. Risk Control
Action Officer
Additional
(Follow-up Date)
Risk Control
Measure
Cordon off
area
Supervisor
Supervisor
Reference
Document for
Reference
Company
Group 9 Technology
Task
Approved By (Date)
21/06/2006
2. Risk Evaluation
Existing Risk Control
Inspection &
Marking
Risk Level
1. Hazard Identification
Task Step
Hazard
Possible
Accident/III
Health &
Persons-at-risk
Likelihood
18/06/2006
Severity
No.
Mr C.Y. Wong
Mr Steven Koh
Mr Daniel
Mr Gilbert
-Falling
from height
-Bodily Injuries
-Body harness
-Falling
objects
-Bodily Injuries
-Tool container
20/06/2009
3. Risk Control
Action Officer
Additional
Follow-up Date)
Risk Control
Measure
-Strong and
proper
anchoring
points
-
-Steelwork
supervisor
Gas cutting
-Fire and
explosion
-Bodily Injuries
-Property
damage
-Fibre-cloth to
contain
straying sparks
-Fire
extinguisher
-Steelwork
supervisor
Removal of
existing plate
and lifting of
new plate
-Falling
from height
-Bodily Injuries
-Cordon off
area and
signboards
-Steelwork
Supervisor
-Lifting Supervisor
-Falling
objects
-Bodily Injuries
-Qualified signalman
-Check lifting appliances
Reference
Document for
Reference
Welding,
Gouging and
Grinding
Risk Level
Fit-up of new
plate
Likelihood
2. Risk Evaluation
Existing Risk Control
Severity
No.
1. Hazard Identification
Task Step
Hazard
Possible
Accident/ Ill
Health &
Persons-atrisk
3. Risk Control
Action Officer
Additional
(Follow-up Date)
Risk Control
Measure
-Falling from
height
-Bodily Injuries
-Body harness
-Falling object
-Bodily Injuries
-Toxic fumes
-Long term
sickness
-Noise induce
-Eye injury
-Deafness
-Loss of
eyesight
-Death
3
3
4
4
M
M
-Electrocution
-Cordon off
area and
signboards
-Steelwork
Supervisor
Reference
Document for
Reference
-Fire
explosion
-Falling
5
3
2
1
Risk Level
Closed back
access
Likelihood
2. Risk Evaluation
Existing Risk Control
Severity
No.
1. Hazard Identification
Task Step
Hazard
Possible
Accident/ Ill
Health &
Persons-atrisk
H
L
3. Risk Control
Action Officer
Additional
(Follow-up Date)
Risk Control
Measure
-Double check
hotwork area
before work
start
Supervisor in
charge
Reference
Document for
Reference
Company
Group 10
Task
Approved By (Date)
21/06/2006
Inspection of
work and mark
out with owner
Cutting/Welding
upper deck
plate
Lifting of upper
deck plates
-Lack of
oxygen
-Suffocation
-Falling
hazard
Fire
-Bodily Injuries
Object
falling from
height
Bodily Injuries
Bodily Injuries
Risk Level
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/III
Health &
Persons-at-risk
Severity
No.
Group 10
20/06/2009
3. Risk Control
Action Officer
Additional
Follow-up Date)
Risk Control
Measure
Buddy System
Supervisor
Supervisor
Individual torch
light
Cordon off
area
Barricade area
(cordoned off)
Supervisor
Lifting Supervisor
Reference
Document for
Reference
Grinding of
work pieces
Flying object
-Wear shield
-Grinder disc guard
Good lighting
Supervisor
Welding of new
plate
Fire
Bodily Injuries
Supervisor
Place of work
free from
combustible
materials
Place of work
is dry
Tripping and
falling
Housekeeping
Risk Level
No.
Likelihood
2. Risk Evaluation
Existing Risk Control
Severity
1. Hazard Identification
Task Step
Hazard
Possible
Accident/ Ill
Health &
Persons-at-risk
3. Risk Control
Action Officer
Additional
(Follow-up Date)
Risk Control
Measure
Supervisor
Supervisor
Reference
Document for
Reference
Company
Group 11
Task
Approved By (Date)
ASMI
Removal of
plating and
installation of
new plating
Fire/
Explosion
Bodily injuries
Falling
objects
Bodily Injuries
Falling
objects
Risk Level
2. Risk Evaluation
Existing Risk Control
Likelihood
1. Hazard Identification
Task Step
Hazard
Possible
Accident/III
Health &
Persons-at-risk
Severity
No.
21/06/2009
3. Risk Control
Action Officer
Additional
Follow-up Date)
Risk Control
Measure
-Hull Supervisor
To put up
warning sign to
keep clear
-Hull Supervisor
Reference
Document for
Reference