Beruflich Dokumente
Kultur Dokumente
LABORATORY
The lab is equipped with all the modern and
conventional material testing equipments and
machines.
Cube testing
Slump test
Trials
6. Test on Bitumen
Fire Point
Flash Point
Softening Point
Viscosity Test
ESSEL
INFRAPROJECT
Lucknow-Raibareli
Company has awarded the National Highway
DBFOT (Annuity) Road project of Four laning of
Lucknow-Raibareli of NH -24B from km 12.700 to km
82.700 in the State of Uttar Pradesh. The existing
carriageway is generally 2 lane road.. The total
length of the project road under consideration is
70.00 kms . The concession period is 17 years
inclusive of construction period of 2.5 years and the
investment will be the tune of about Rs. 800.00
Crores .The scope of the work will broadly include
rehabilitation, up gradation and widening of the
existing two lane carriageway to four lane standard
with construction of new pavement rehabilitation of
existing pavement, construction and / or
rehabilitation of Major Bridges, ROBs , minor
Bridges, culverts, foot over bridges, road
intersection, interchanges, drains etc. and operation
and maintenance thereof.
SIEVE
ANALYSIS
We are very familiar with sieve analysis .
But the presicion & accuracy with which it is
done in plant is very different from our labs.
Different size of sieves are used there
and are weighed very accuralely. Some of
the sieves are as follows:-