Date:
Time:
Atrendees:
Prolecr:
os-03-012-11-os
10:00 a.m.
Locatlon:
Project Ste
Ml:
l3,ll;y:f,rr':ffi"'..3'iiiLimited
Dlstribution:
Prepared
By:
ThosePresent
Ghris Wilson, P.Eng.
The following items were discussed at the Construction Site Meeting #6 for the contract for the anaerobic
treatment of septage/corn stover and biosolids to produce biogas, lectrical power and treated biosolids
for the Township of Georgian Bluffs and the Township of Chatsworth:
Action Bv:
The Minutes from Construction Site Meeting #S were reviewed and the
following comments were provided in reference to the items in the
Minutes.
GENIVAR
to CHFour.
The revised application package for the Air & Noise Approval was
submitted to the Ministry of Environment on July 21 , ZO1O. To date,
no Air & Noise C of A has been receved.
.
r
GENIVAR
OWEN SOUND 945 Third Avenue East, Suite 212, Owen Sound, Ontario N4K
2Kg
GENIVAR
Paqe 2
concerning
The Project Team was informed that the opening ceremony for the
biogas project would be sometime in October, 2010. The otficial
date would be provided at a later date.
a
Maple
bower building.
Revised MCC component layout drawings were provided by CHFour
to
modified within the MCC Room and where equipment can be located
outside of the Control Building. GENVAR is to review and provde
comment to CHFour.
a
a
GENIVAR
Mr. Rick Winters stated that the municipal operator would be Mr.
Troy Unruh.
GENIVAR
provided by GENIVAR.
construction on-site.
Maple was confident that the remainng construction was proceeding to
be complete be the end of September,2010.
There was discussion concerning the Ontario Sales Tax after July 2,
2010. Money has been held back in the interim (starting at Payment
Certificate #6) until the finalized value for recovery of the embedded
retailsales tax is calculated and submitted by Maple.
Request for Payment Cerlificate #6 was submitted to the Municipality of
Georgian Bluffs on September 10, 2010.
4.
Bahler
6. Hydro one noted that the Protection Phitosophy proposal to mitigate the
requirement for transfer trip has not been provided. GENIVAR
commented that s in the process of being completed.
to be submitted to Mr.
Paranuik, Hydro One and Ms. Jackie Bradley, Hydro One (FBC) once
completed. Mr. Paranuik noted that S working days would be required
once the ESA approval is received to schedule the transformer install
and load connection.
8.
9.
10. lt was noted by Hydro One that a Draft DCA document would be ready
by September 17,2O10.
lf there are any errors or omissions in the above minutes, please contact the
undersigned.
Prepared by:
GENIVAR Consultants LP
Paqe 4