Item Codigo

D14

D12

D13

B11

D21

D14

D15

D13

D3

D4

10

B8

11

B10

12

E6

13

E4

14

E7

15

E2

16

E12

17

E10

18

E11

19

E8

20

E1

21

E3

22

E9

23

E5

24

C4

25

C2

26

C3

27

C1

28

C30

29

B9

30

D23

31

D22

32

D24

33

A5

34

A4

35

A3

36

A6

37

D1

38

D2

39

C17

40

C14

41

C15

42

C16

43

C19

44

C18

45

D25

46

D15

47

D16

48

B4

49

B1

50

B5

51

C22

52

C21

53

C20

54

C23

55

C28

56

D9

57

D10

58

B7

59

B6

60

B3

61

D5

62

D6

63

D11

64

D12

65

D7

66

D8

67

B17

68

D8

69

D7

70

D24

71

B14

72

B12

73

B13

74

B15

75

B23

76

B16

77

B24

78

D17

79

D18

80

A2

81

D11

82

C7

83

C10

84

C9

85

C13

86

C5

87

C6

88

C31

89

C12

90

C8

91

C11

92

D23

93

B21

94

B22

95

D27

96

C26

97

D20

98

D22

99

C32

100

C25

101

D28

102

C24

103

D20

104

B26

105

B2

106

B25

107

A1

108

D18

109

D26

110

B18

111

B19

112

D16

113

D17

114

D19

115

D21

116

B20

117

D2

118

D1

119

D3

120

C27

121

C29

122

D10

123

D9

124

D4

125

D6

126

D5

127

D19

128

C33

129

RB1

130

RB2

131

RB3

132

RB4

133

RB5

134

RB6

135

RB7

136

RB8

137

RB9

138

RB10

139

RC1

140

RC2

141

RC3

142

RC4

143

RD1

144
145
146
147
148
149
150
151
152
153
154

155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180

181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206

207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232

233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258

259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284

285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300

Descripcin
Hormigon
Fierro
Moldaje
CB/XT 8 kV 133%IL 350 MCM
CB Multiflex 0,6/1 kV 1 x 250 MCM, Negro
CB Multiflex 0,6/1 kV 1 x 350 MCM, Negro
CB / CU H500MCM clase B 37
CB / CU 2/AWG Clase B 19 H
Conduit 2" 6 mts
Conduit 4" 6 mts
Escalerilla Electrogalvanizada 250 x 100 x 2 mm

Unidad Valor $
m3

Valor
Costo

230,000 230,000

kg

3,200

3,200

m2

12,600

12,600

11,245

11,245

5,990

5,990

8,725

8,725

kg

4,650

4,650

kg

4,725

4,725

c/u

4,888

4,888

c/u

14,348

14,348

c/u

6,331

6,331

0
0
0
0
0
0
0
0
0
0
0
0
0

Flete

Handling
1

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

840 Cadena de Suspensin sencilla para conductor AAA FLINT 25,16MM

840 Cadena de Suspensin sencilla para conductor AAA FLINT 25,16MM

228 Cadena de Amarre sencilla para conductor AAA FLINT 25,16MM. S

228 Cadena de Amarre sencilla para conductor AAA FLINT 25,16MM. C

2250 Amortiguador tipo Stockbridge para conductor AAA FLINT 25,16MM

GL Empalme a compresin para conductor AAA FLINT 25,16MM

6 Cadena de Amarre para cable de guardia Ac. Galvanizado 3/8

2 Cadena de Amarre en marco de lnea para cable de guardia Ac. galva

1 Cadena de suspensin para cable de guardia Ac. Galvanizado 3/8

20 Amortiguador tipo Stockbridge para cable de guardia Ac. galvanizado

GL Empalme a compresin para cable de guardia Ac. galvanizado 3/8

6 Esferas de sealizacin diurna 600mm cable de guardia Ac. galvani

22000 Porcelain Fog type Suspension Insulators with zinc sleeve.

22000 Hardened Glass Fog type Suspension Insulators with zinc sleeve.

0
0
0
0
0
0
0
0
0
0
0

18 245kV. Porcelain Solid - Core Cylindrical Post Insulator C8-1050-II / U

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

ctor AAA FLINT 25,16MM. Con varillas de proteccin.

FOB 47,00

ctor AAA FLINT 25,16MM. Sin varillas de proteccin.

FOB 20,69

AAA FLINT 25,16MM. Sin Tensor

FOB 46,34

AAA FLINT 25,16MM. Con Tensor

FOB 71,18

or AAA FLINT 25,16MM

FOB 16,82

A FLINT 25,16MM

FOB 11,42

c. Galvanizado 3/8

FOB 21,11

cable de guardia Ac. galvanizado 3/8

FOB 13,11

a Ac. Galvanizado 3/8

FOB 28,70

e guardia Ac. galvanizado 3/8

FOB 11,40

dia Ac. galvanizado 3/8

FOB 15,63

ble de guardia Ac. galvanizado 3/8

DDP USD 195,00

th zinc sleeve.

USD 19,50 (FOB)1

ators with zinc sleeve.

Euros 9,67 (FOB)

st Insulator C8-1050-II / Up-right

USD 1300.00 (DDP)

Codigo
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

Descripcin
ANDAMIOS
CAMION PLUMA
CAMION TOLVA
COMPRESOR C/ ROMPEPAVIMENTOS
GRUA
HERRAMIENTAS MENORES
RETROEXCAVADORA
RODILLO
SOLDADORA
VETONERA
HERRAMIENTAS ELECTRICAS
HERRAMIENTAS MECANICAS
CAMIONETA
TALADRO 1"
HERRAMIENTAS MENORES
MAQUINA DE SOLDAR
ESMERIL ANGULAR DE 7"
HERRAMIENTAS MECANICAS
MULTITESTER
HERRAMIENTAS EXCAVACIN
CAMION PLUMA

Unidad
DIA
DIA
DIA
DIA
DIA
DIA
DIA
DIA
DIA
DIA
MES
MES
DIA
DIA
HORA
HORA
HORA
HORA
HORA
HORA
HORA

Costo Unit
3,500
2,000
1,250
1,000
2,000
1,000
1,250
1,250
2,500
4,500
50,000
50,000
45,000
7,000
230
2,300
2,289
3,400
2,140
1,744
22,500

51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102

103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

Codigo
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

Descripcin
Gerente de Proyecto
Ingeniero Residente
Ing Gestin de Calidad
Ing. Gestion Ambiental
Ingeniero Especialista
Ingeniero
Proyectista
Jefe Terreno
Supervisor Terreno
Prevencionista Riesgos
Capataz
Maestro Mayor
Maestro 1a
Ayudante
Chofer - Administrativo
Paolero
Tecnico A
Tecnico B
Inspector
Capataz C
Maestro Mayor C
Maestro Primera C
Maestro Segunda C
Ayudante C
Soldador C
Ayudante 1
Ayudante 2
Electromecanico 1
Electromecanico 2
Supervisor
Especialista
Capataz

Unidad Costo Unit


HH
19,840
HH
19,000
HH
9,525
HH
9,525
HH
9,525
HH
9,000
HH
8,500
HH
7,200
HH
6,800
HH
7,940
HH
5,000
HH
3,970
HH
3,700
HH
2,050
HH
3,200
HH
3,015
HH
5,900
HH
5,100
HH
9,525
HH
7,397
HH
6,612
HH
5,827
HH
5,478
HH
4,781
HH
7,025
HH
2,819
HH
2,819
HH
4,556
HH
4,556
HH
5,944
HH
8,722
HH
9,417

ANALISIS DE PRECIOS UNITARIOS


APU MAESTRO
Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31/12/07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
1

DESCRIPCION
Proyecto de Ingeniera

0
USD
520
UNIDAD
gl

CANTIDAD
1

PRECIO UNITARIO

COSTO UNIT.

SUBTOTAL

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
0.00

TOTAL COSTO
2.- MAQUINAS Y HERRAMIENTAS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
0.00

TOTAL COSTO
3.- MATERIALES Y EQUIPOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
0.00

TOTAL COSTO
4.- OTROS GASTOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1
4.2
4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)

0.00
0

39.39%
50.00%

PRECIO TOTAL PARTIDA (USD)

0
0
0

Handling 1
Handling 2
Handling 3
Handling 4

20%
20%
20%
20%

NDICE N PARTIDA

UNIDAD

CANTIDAD

Proyecto de Ingeniera

gl

Celdas 6 kV

c/u

Sistema Corrector Factor de Potencia

gl

Cables y Barras

gl

Sala Elctrica Completa

c/u

Montaje Celdas

gl

Montaje Sistema Corrector Factor de Potencia

gl

Montaje de Cables y Barras

gl

Montaje Sala Elctrica

gl

10

10

Interconexionado de equipos

gl

11

11

Pruebas y Puesta en Servicio

gl

12

12

Capacitacin

gl

13

13

14

14

15

15

16

16

17

17

18

18

19

19

20

20

21

21

22

22

23

23

24

24

25

25

26

26

27

27

28

28

29

29

30

30

31

31

32

32

33

33

34

34

35

35

36

36

37

37

DESCRIPCIN

NDICE N PARTIDA

38

38

39

39

40

40

41

41

42

42

43

43

44

44

45

45

46

46

47

47

48

48

49

49

50

50

51

51

52

52

53

53

54

54

55

55

56

56

57

57

58

58

59

59

60

60

DESCRIPCIN

UNIDAD

CANTIDAD

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
1

DESCRIPCION
Proyecto de Ingeniera

0
USD
520
UNIDAD
gl
PRECIO UNITARIO

CANTIDAD
1.00
93,763.46

1.- MANO DE OBRA


1.1

CATEGORIA

UNID.

Proyecto de Ingeniera

un

CANTIDAD

COSTO UNIT.
1

49,507.46

SUBTOTAL
49,507.46

1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
TOTAL COSTO

49,507.46

2.- MAQUINAS Y HERRAMIENTAS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
0.00

TOTAL COSTO
3.- MATERIALES Y EQUIPOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
0.00

TOTAL COSTO
4.- OTROS GASTOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1
4.2
4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

0.00
49,507.46

20.80%
26.40%

19,502.00
24,754.00
93,763.46

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
2

DESCRIPCION
Celdas 6 kV

0
USD
520
UNIDAD
c/u
PRECIO UNITARIO

CANTIDAD
1.00
133,071.31

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
0.00

TOTAL COSTO
2.- MAQUINAS Y HERRAMIENTAS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
0.00

TOTAL COSTO
3.- MATERIALES Y EQUIPOS
3.1

DESCRIPCION

UNID.

Celda Metalclad 6,6 kV

c/u

CANTIDAD
1.00

COSTO UNIT.
70,262.31

SUBTOTAL
70,262.31

3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
TOTAL COSTO

70,262.31

4.- OTROS GASTOS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1
4.2
4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

0.00
70,262.31

20.80%
26.40%

27,678.00
35,131.00
133,071.31

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
3

DESCRIPCION
Sistema Corrector Factor de Potencia

0
USD
520
UNIDAD
gl

CANTIDAD
1.00

PRECIO UNITARIO

299,223.07

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
0.00

TOTAL COSTO
2.- MAQUINAS Y HERRAMIENTAS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
0.00

TOTAL COSTO
3.- MATERIALES Y EQUIPOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1

Resistencias amortiguadoras

un

4.00

5,021.26

20,085.02

3.2

Condensador principal (C2)

un

4.00

10,287.93

41,151.72

3.3

Condensador auxiliar (C1)

un

4.00

6,865.98

27,463.90

3.4

TT / CC ( 10/5 A)

un

1.00

626.97

626.97

3.5

Reactores (L1)

un

4.00

13,458.25

53,833.00

3.6

TDA y F en baja tensin

un

1.00

2,508.56

2,508.56

3.7

TDCC

un

1.00

2,014.32

2,014.32

3.8
3.9
3.10
TOTAL COSTO

147,683.51

4.- OTROS GASTOS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1

Fletes

un

1.00

8,589.64

8,589.64

4.2

Seguros

un

1.00

1,717.93

1,717.93

4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

10,307.56
157,991.07

20.80%
26.40%

62,236.00
78,996.00
299,223.07

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
4

DESCRIPCION
Cables y Barras

0
USD
520
UNIDAD
gl

CANTIDAD
1.00

PRECIO UNITARIO

28,757.47

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
0.00

TOTAL COSTO
2.- MAQUINAS Y HERRAMIENTAS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
0.00

TOTAL COSTO
3.- MATERIALES Y EQUIPOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1

Barras de cobre de 50*10mm

mt

12.00

114.23

1,370.77

3.2

Cable de 12 kV

mt

250.00

38.08

9,519.23

3.3

Mufas de 12 kV

jgo

8.00

304.62

2,436.92

3.4

Placas de Aislacin

gl

1.00

380.77

380.77

3.5

Cable de 3 x 12 AWG

mt

300.00

1.52

456.92

3.6
3.7
3.8
3.9
3.10
14,164.62

TOTAL COSTO
4.- OTROS GASTOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1

Fletes

un

1.00

849.88

849.88

4.2

Seguros

un

1.00

169.98

169.98

4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

1,019.85
15,184.47

20.80%
26.40%

5,981.00
7,592.00
28,757.47

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
5

DESCRIPCION
Sala Elctrica Completa

0
USD
520
UNIDAD
c/u

CANTIDAD
1.00

PRECIO UNITARIO

271,823.47

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
0.00

TOTAL COSTO
2.- MAQUINAS Y HERRAMIENTAS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
0.00

TOTAL COSTO
3.- MATERIALES Y EQUIPOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1

Sala Electrica

GL

1.00

85,423.46

3.2

Estructura

kg

3,000.00

1.52

4,569.23

3.3

Parrilla de FRPV industrial

m2

60.00

279.33

16,759.94

3.4

EPC de 300 X 150 mm FRPV

mt

112.00

187.00

20,944.38

3.5

Tapa de EPC de 300 mm FRPV

mt

112.00

39.55

4,429.51

3.6

Equipo Fluorescente de 2 X 40W

un

12.00

114.23

1,370.77

3.7

Reflector Haluro metalico de 250 W

un

6.00

200.28

1,201.71

3.8

Luminaria Aviso

un

1.00

166.98

166.98

3.9
3.10

Soportes de acero inox.

un

38.00

66.00

2,508.00

TOTAL COSTO

85,423.46

137,373.98

4.- OTROS GASTOS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1

Fletes

un

1.00

5,125.41

5,125.41

4.2

Seguros

un

1.00

1,025.08

1,025.08

4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

6,150.49
143,524.47

20.80%
26.40%

56,537.00
71,762.00
271,823.47

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
6

DESCRIPCION
Montaje Celdas

0
USD
520
UNIDAD
gl

CANTIDAD
1.00

PRECIO UNITARIO

15,163.25

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1

26

Ayudante 1

HH

90

6.51

585.48

1.2

27

Ayudante 2

HH

90

6.51

585.48

1.3

28

Electromecanico 1

HH

90

10.51

946.25

1.4

29

Electromecanico 2

HH

90

10.51

946.25

1.5

30

Supervisor

HH

90

13.72

1,234.52

1.6

31

Especialista

HH

18

20.13

362.30

1.7

32

Capataz

HH

45

21.73

977.92

1.8
1.9
1.10
TOTAL COSTO

5,638.20

2.- MAQUINAS Y HERRAMIENTAS


DESCRIPCION

UNID.

2.1

Herramientas menores

gl

CANTIDAD
1

COSTO UNIT.
1,353.17

SUBTOTAL
1,353.17

2.2

Instrumentos de medicin

gl

1,014.88

1,014.88

2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
TOTAL COSTO

2,368.04

3.- MATERIALES Y EQUIPOS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
0.00

TOTAL COSTO
4.- OTROS GASTOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1
4.2
4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

0.00
8,006.25

20.80%
26.40%

3,154.00
4,003.00
15,163.25

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
7

DESCRIPCION
Montaje Sistema Corrector Factor de Potencia

0
USD
520
UNIDAD
gl

CANTIDAD
1.00

PRECIO UNITARIO

37,908.62

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1

26

Ayudante 1

HH

225

6.51

1,463.71

1.2

27

Ayudante 2

HH

225

6.51

1,463.71

1.3

28

Electromecanico 1

HH

225

10.51

2,365.62

1.4

29

Electromecanico 2

HH

225

10.51

2,365.62

1.5

30

Supervisor

HH

225

13.72

3,086.31

1.6

31

Especialista

HH

45

20.13

905.75

1.7

32

Capataz

HH

112.5

21.73

2,444.80

1.8
1.9
1.10
TOTAL COSTO

14,095.51

2.- MAQUINAS Y HERRAMIENTAS


DESCRIPCION

UNID.

2.1

Herramientas menores

gl

CANTIDAD
1

COSTO UNIT.
3,382.92

SUBTOTAL
3,382.92

2.2

Instrumentos de medicin

gl

2,537.19

2,537.19

2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
TOTAL COSTO

5,920.11

3.- MATERIALES Y EQUIPOS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
0.00

TOTAL COSTO
4.- OTROS GASTOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1
4.2
4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

0.00
20,015.62

20.80%
26.40%

7,885.00
10,008.00
37,908.62

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
8

DESCRIPCION
Montaje de Cables y Barras

0
USD
520
UNIDAD
gl

CANTIDAD
1.00

PRECIO UNITARIO

15,163.25

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1

26

Ayudante 1

HH

90

6.51

585.48

1.2

27

Ayudante 2

HH

90

6.51

585.48

1.3

28

Electromecanico 1

HH

90

10.51

946.25

1.4

29

Electromecanico 2

HH

90

10.51

946.25

1.5

30

Supervisor

HH

90

13.72

1,234.52

1.6

31

Especialista

HH

18

20.13

362.30

1.7

32

Capataz

HH

45

21.73

977.92

1.8
1.9
1.10
TOTAL COSTO

5,638.20

2.- MAQUINAS Y HERRAMIENTAS


DESCRIPCION

UNID.

2.1

Herramientas menores

gl

CANTIDAD
1

COSTO UNIT.
1,353.17

SUBTOTAL
1,353.17

2.2

Instrumentos de medicin

gl

1,014.88

1,014.88

2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
TOTAL COSTO

2,368.04

3.- MATERIALES Y EQUIPOS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
0.00

TOTAL COSTO
4.- OTROS GASTOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1
4.2
4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

0.00
8,006.25

20.80%
26.40%

3,154.00
4,003.00
15,163.25

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
9

DESCRIPCION
Montaje Sala Elctrica

0
USD
520
UNIDAD
gl

CANTIDAD
1.00

PRECIO UNITARIO

22,745.37

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1

26

Ayudante 1

HH

135

6.51

1.2

27

Ayudante 2

HH

135

6.51

878.23
878.23

1.3

28

Electromecanico 1

HH

135

10.51

1,419.37

1.4

29

Electromecanico 2

HH

135

10.51

1,419.37

1.5

30

Supervisor

HH

135

13.72

1,851.78

1.6

31

Especialista

HH

27

20.13

543.45

1.7

32

Capataz

HH

67.5

21.73

1,466.88

1.8
1.9
1.10
TOTAL COSTO

8,457.30

2.- MAQUINAS Y HERRAMIENTAS


DESCRIPCION

UNID.

2.1

Herramientas menores

gl

CANTIDAD
1

COSTO UNIT.
2,029.75

SUBTOTAL
2,029.75

2.2

Instrumentos de medicin

gl

1,522.31

1,522.31

2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
TOTAL COSTO

3,552.07

3.- MATERIALES Y EQUIPOS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
0.00

TOTAL COSTO
4.- OTROS GASTOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1
4.2
4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

0.00
12,009.37

20.80%
26.40%

4,731.00
6,005.00
22,745.37

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
10

DESCRIPCION
Interconexionado de equipos

0
USD
520
UNIDAD
gl

CANTIDAD
1.00

PRECIO UNITARIO

7,582.12

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1

26

Ayudante 1

HH

45

6.51

292.74

1.2

27

Ayudante 2

HH

45

6.51

292.74

1.3

28

Electromecanico 1

HH

45

10.51

473.12

1.4

29

Electromecanico 2

HH

45

10.51

473.12

1.5

30

Supervisor

HH

45

13.72

617.26

1.6

31

Especialista

HH

20.13

181.15

1.7

32

Capataz

HH

22.5

21.73

488.96

1.8
1.9
1.10
2,819.10

TOTAL COSTO
2.- MAQUINAS Y HERRAMIENTAS
DESCRIPCION

UNID.

2.1

Herramientas menores

gl

CANTIDAD
1

COSTO UNIT.
676.58

SUBTOTAL
676.58

2.2

Instrumentos de medicin

gl

507.44

507.44

2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
TOTAL COSTO

1,184.02

3.- MATERIALES Y EQUIPOS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
0.00

TOTAL COSTO
4.- OTROS GASTOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1
4.2
4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

0.00
4,003.12

20.80%
26.40%

1,577.00
2,002.00
7,582.12

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
11

DESCRIPCION
Pruebas y Puesta en Servicio

0
USD
520
UNIDAD
gl

CANTIDAD
1.00

PRECIO UNITARIO

13,961.15

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1

26

Ayudante 1

HH

40.5

6.51

1.2

27

Ayudante 2

HH

6.51

263.47
0.00

1.3

28

Electromecanico 1

HH

40.5

10.51

425.81

1.4

29

Electromecanico 2

HH

10.51

0.00

1.5

30

Supervisor

HH

81

13.72

1,111.07

1.6

31

Especialista

HH

81

20.13

1,630.34

1.7

32

Capataz

HH

81

21.73

1,760.25

1.8
1.9
1.10
5,190.95

TOTAL COSTO
2.- MAQUINAS Y HERRAMIENTAS
DESCRIPCION

UNID.

2.1

Herramientas menores

gl

CANTIDAD
1

COSTO UNIT.
1,245.83

SUBTOTAL
1,245.83

2.2

Instrumentos de medicin

gl

934.37

934.37

2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
TOTAL COSTO

2,180.20

3.- MATERIALES Y EQUIPOS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
0.00

TOTAL COSTO
4.- OTROS GASTOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1
4.2
4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

0.00
7,371.15

20.80%
26.40%

2,904.00
3,686.00
13,961.15

ANALISIS DE PRECIOS UNITARIOS


Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision
Moneda
Valor Moneda

ITEM
12

DESCRIPCION
Capacitacin

0
USD
520
UNIDAD
gl

CANTIDAD
1.00

PRECIO UNITARIO

2,140.20

1.- MANO DE OBRA


CATEGORIA

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

1.1

26

Ayudante 1

HH

6.51

0.00

1.2

27

Ayudante 2

HH

6.51

0.00

1.3

28

Electromecanico 1

HH

10.51

0.00

1.4

29

Electromecanico 2

HH

10.51

0.00

1.5

30

Supervisor

HH

13.72

0.00

1.6

31

Especialista

HH

27

20.13

543.45

1.7

32

Capataz

HH

27

21.73

586.75

1.8
1.9
1.10
TOTAL COSTO

1,130.20

2.- MAQUINAS Y HERRAMIENTAS


DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
0.00

TOTAL COSTO
3.- MATERIALES Y EQUIPOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
0.00

TOTAL COSTO
4.- OTROS GASTOS
DESCRIPCION

UNID.

CANTIDAD

COSTO UNIT.

SUBTOTAL

4.1
4.2
4.3
4.4
4.5
TOTAL COSTO
COSTO PARTIDA (USD)
GASTOS GENERALES (USD)
UTILIDAD (USD)
PRECIO TOTAL PARTIDA (USD)

0.00
1,130.20

20.79%
26.40%

445.00
565.00
2,140.20

FORMATO DE RESUMEN DE PRESUPUESTO


Nombre de la Licitacin:

Cliente

CODELCO

Contrato

PROY. TITULACION SA OLIVERA O

Obra

Implementacion Sist. Corrector FP


ITEM
1
2
3
4
5
6
7
8
9
10
11
12

PARTIDAS
Proyecto de Ingeniera
Celdas 6 kV
Sistema Corrector Factor de Potencia
Cables y Barras
Sala Elctrica Completa
Montaje Celdas
Montaje Sistema Corrector Factor de Potencia
Montaje de Cables y Barras
Montaje Sala Elctrica
Interconexionado de equipos
Pruebas y Puesta en Servicio
Capacitacin

Oferta
Fecha
Revision
Moneda
UNIDAD

CANTIDAD

gl
c/u
gl
gl
c/u
gl
gl
gl
gl
gl
gl
gl

1
1
1
1
1
1
1
1
1
1
1
1

MANO DE OBRA
49,507.46
0.00
0.00
0.00
0.00
5,638.20
14,095.51
5,638.20
8,457.30
2,819.10
5,190.95
1,130.20
92,476.92

EQU. Y HERR.
0.00
0.00
0.00
0.00
0.00
2,368.04
5,920.11
2,368.04
3,552.07
1,184.02
2,180.20
0.00
17,572.49

MATERIALES
0.00
70,262.31
147,683.51
14,164.62
137,373.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
369,484.41

OTROS GASTOS
0.00
0.00
10,307.56
1,019.85
6,150.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,477.91

PRECIO COSTO
PARTIDA
49,507.46
70,262.31
157,991.07
15,184.47
143,524.47
8,006.25
20,015.62
8,006.25
12,009.37
4,003.12
7,371.15
1,130.20
497,011.73

GASTOS
GRALES.
19,502.00
27,678.00
62,236.00
5,981.00
56,537.00
3,154.00
7,885.00
3,154.00
4,731.00
1,577.00
2,904.00
445.00
195,784.00

INACAP 01
31/Dec/2007
0
USD
UTILIDAD
24,754.00
35,131.00
78,996.00
7,592.00
71,762.00
4,003.00
10,008.00
4,003.00
6,005.00
2,002.00
3,686.00
565.00
248,507.00

PRECIO TOTAL
PARTIDA
93,763.46
133,071.31
299,223.07
28,757.47
271,823.47
15,163.25
37,908.62
15,163.25
22,745.37
7,582.12
13,961.15
2,140.20
941,302.73

Calculo Costos Y Margenes

Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP


Montaje y Puesta en Marcha

Revision

Moneda
Valor Moneda

Descripcin

Valor

USD
520

Porcentaje

Mano de Obra
Maquinas y Herramientas
Materiales y Equipos
Otros Gastos
Total Costo Directo

92,476.92
17,572.49
369,484.41
17,477.91
497,011.73

9.82%
1.87%
39.25%
1.86%

Gastos Generales
Utilidad

195,784.00
248,507.00

20.80%
26.40%

Total Oferta

941,302.73

100.00%

52.80%

44230.76923

92,477
17,572
369,484
17,478
497,012
0
195,784
248,506
0
941,301

Gastos Generales

Cliente

CODELCO

Oferta

INACAP 01

Contrato

PROY. TITULACION SA OLIVERA O

Fecha

31-12-07

Obra

Implementacion Sist. Corrector FP

Revision

Moneda
Valor Moneda

USD
520

Descripcin
Administracion Central BMV
Administracion Central BMV
Administracin SG Construccin
Ingeniero Control Calidad
Experto Prevencion de Riesgos
Administracion Faena
Ingeniero Residente
Administrativo
Jefe Terreno
Inspector Tecnico de Calidad
Programador y control de costos
Encargado de bodega
Prevencionista A-B
Equipos y Herramientas
Camionetas Ingeniero Residente
Combustible camioneta
Otros Gastos
Movilizacin y desmovilizacin
Equipos computacionales
Comunicaciones
Papeles e insumos
Alimentacin personal indirecto
Capacitacin personal
Viajes a Terreno
Pasajes
Alojamientos
Viaticos
Arriendo camioneta
Combustible camioneta
Seguro Medio Ambiental
Seguro Terceros
Seguro Vehiculos
Boleta de garantia

Costo
Mensual

28,846
16,788
5,000
5,000
0
0
4,808
1,442
0
2,885
2,596
1,731
1,194
2,500
0
0
2,308
1
0
17,308
1,154
192
96
5
865
0
462
81
38
87
81
0
865
962
1,538
1,923
0

%
Utilizacin

Cantidad

Duracin Faena
(meses)

8.00%
12.00%
10.00%
10.00%

1
1
1
1

6.00
6.00
6.00
6.00
6.00

13,846
12,088
3,000
3,000

100.00%
100.00%

1
1

6.00
6.00

28,846
8,654

100.00%
100.00%
100.00%
100.00%
100.00%

1
1
1
1
1

6.00
6.00
6.00
6.00
6.00

17,308
15,577
10,385
7,165
15,000

100.00%
100.00%

1
800

6.00
6.00

13,846
6,923

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1
2
1
1
40
1

1.00
1.00
6.00
6.00
6.00
1.00

17,308
2,308
1,154
577
1,200
865

100.00%
100.00%
100.00%
100.00%
100.00%

2
4
4
4
2

6.00
6.00
6.00
6.00
6.00

5,538
1,938
923
2,077
969

100.00%
100.00%
100.00%
100.00%

1
1
1
1

1.00
1.00
1.00
1.00

865
962
1,538
1,923

Total Gastos Generales

Total

195,784

PROYECTO INGENIERA

DOCUMENTO : Cuadro de precios de Ingeniera


DESCRIPCIN
DESARROLLO INGENIERA

Disciplina elctrica
Planos
Plano de Planta General con ruteo del proyecto
Diagrama unilineal de fuerza y protecciones
Plano de canalizaciones de fuerza y control plantas
Plano de canalizaciones de fuerza y control elevaciones cortes y secciones
Plano de detalles de Montaje de equipos y canalizaciones
Documentos
Mem Calculo y Dimensionamiento Alim MT 6,6 kV
Mem Calculo y Dimensionamiento Celdas MT 6,6 kV
Mem Calculo y Dimensionamiento Sala Electrica
Especificacin tecnica Alimentadores MT
Especificacin tecnica celdas MT
Especificacin tecnica Sala Electrrica
Especificacin tecnica Sistema corrector FP
Listado circuitos fuerza y control
Especificaciones tecnicas de Montaje de equipos
Manual pre operaciones y puesta en marcha
Disciplina Control e instrumentacin
Disciplina Control
Planos
Diagramas elementales de c.a. de protecciones y medidas
Diagramas elementales de control en c.c. y c.a.
Diagramas de interconexionado de equipos
Disciplina Civil
Planos
Plano disposicion de escalerillas

Plano disposicion de ductos MT


Plano camaras MT
Documentos
Memoria de calculo canalizacion subterranea
Memoria de calculo mecanica de suelo
Especificacion tecnica camaras MT
TOTAL INGENIERA

NGENIERA

Cantidad
Proponente

Precio unitario
$/documento

Valor ofertado
$

558

558

0.0112637

289,971

558

558

0.0112637

289,971

558

2,231

0.04505479

289,971

558

3,346

0.06758218

289,971

558

1,673

0.03379109

289,971

0
1

1,227

1,227

0.02478013

637,937

1,227

1,227

0.02478013

637,937

3,693

3,693

0.07459972

1,920,486

1,149

1,149

0.02320322

597,341

1,149

1,149

0.02320322

597,341

1,149

1,149

0.02320322

597,341

558

558

0.0112637

289,971

558

558

0.0112637

289,971

446

446

0.00901096

231,977

892

892

0.01802192

463,954

1,114

1,114

0.02250236

579,298

0
0
0
3

1,673

5,019

0.10137328

869,914

2,231

8,922

0.18021916

1,159,885

2,231

8,922

0.18021916

1,159,885

0
0
1

558

558

0.01126367

289,971

558

558

0.01126367

289,971

558

558

0.01126367

289,971

0
1

1,149

1,149

0.02320322

597,341

1,149

1,149

0.02320322

597,341

1,149

1,149

0.02320322

597,341

0
49,507

26230309.1

Sueldo Bruto
Sueldo liquido
Colacion
Valor dia Bruto
Valor hora Bruto
Cargo
Montaje sala elctrica
Montaje celdas MT
Montaje alimentador
Montaje condensadores filtro
Montaje resistencias filtro
Montaje inductancias filtro
Montaje condensadores FP
Interconexionado de equipos
Comisionamiento equipos
Pruebas de puesta en marcha
Puesta en Servicio
Capacitacin

3 sems
2 sems
2 sems
1 sem
1 sem
1 sem
2 sems
1 sem
1 sem
3 das
1 da
3 das

135
90
90
45
45
45
90
45
45
27
9
27

81

Ayudante 1
100%
100%
100%
100%
100%
100%
100%
100%
50%
50%
50%
0%

437,500
350,000
3,500
25,375
2,819
HH
Ayudante 2
380,625
100%
253,750
100%
253,750
100%
126,875
100%
126,875
100%
126,875
100%
253,750
100%
126,875
100%
63,438
0%
38,063
0%
12,688
0%
0
0%

437,500
350,000
3,500
25,375
2,819
HH
Electromecanico 1
380,625
100%
253,750
100%
253,750
100%
126,875
100%
126,875
100%
126,875
100%
253,750
100%
126,875
100%
0
50%
0
50%
0
50%
0
0%

750,000
600,000
3,500
41,000
4,556
HH
Electromecanico 2
615,000
100%
410,000
100%
410,000
100%
205,000
100%
205,000
100%
205,000
100%
410,000
100%
205,000
100%
102,500
0%
61,500
0%
20,500
0%
0
0%

750,000
600,000
3,500
41,000
4,556
HH
615,000
410,000
410,000
205,000
205,000
205,000
410,000
205,000
0
0
0
0

Supervisor
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%

1,000,000
800,000
3,500
53,500
5,944
HH
Especialista
802,500
20%
535,000
20%
535,000
20%
267,500
20%
267,500
20%
267,500
20%
535,000
20%
267,500
20%
267,500
100%
160,500
100%
53,500
100%
0
100%

1,500,000
1,200,000
3,500
78,500
8,722
HH
235,500
157,000
157,000
78,500
78,500
78,500
157,000
78,500
392,500
235,500
78,500
235,500

1,625,000
1,300,000
3,500
84,750
9,417
Capataz
50%
50%
50%
50%
50%
50%
50%
50%
100%
100%
100%
100%

635,625
423,750
423,750
211,875
211,875
211,875
423,750
211,875
423,750
254,250
84,750
254,250

3,029,250
2,019,500
2,019,500
1,009,750
1,009,750
1,009,750
2,019,500
1,009,750
825,938
495,563
165,188
235,500
14,848,938

1.00
30%

% Inversin 1

Periodo 0
Inversin
Inversin 1
Inversin 2 ( con Financiamiento)
Total Inversin
Ingresos
Anticipo (15%)
Estado de Avance 1 (20%)
Estado de Avance 2 (20%)
Estado de Avance 3 (20%)
Estado de Avance 4 (15%)
Estado de Avance 5 (10%)
Comisiones (Representadas)
Sub Total Ingresos
Total Ingresos
Amortizacin
Pago Intereses
Sub Total Amortizacin
Total Amortizacin
Egresos
Ingeniera
Ingeniera
Sub Total Ing
Suministros
Celdas 6 kV
Sistema Corrector Factor de Potencia
Cables y Barras
Sala Elctrica Completa
Sub Total Suministros
Montaje
Montaje Celdas
Montaje Sistema Corrector F de P
Montaje de Cables y Barras
Montaje Sala Elctrica
Interconexionado
Sub Total Montaje
Pruebas
Pruebas y Puesta en Servicio
Capacitacin
Sub Total Pruebas
Gastos Generales
Gastos Generales
Sub Total Gastos Generales
Multas
Multa por atraso en hitos
Multa por atraso en plazo total
Sub Total Multas
Depreciaciones
Depreciaciones
Sub Total Depreciaciones
Total Egresos
Saldo

Saldo Periodo Antes Impuesto Renta

(34,827)
(81,262)
(116,089)

Impuesto Renta 19%


Saldo Despus Impuesto Renta
Depreciaciones
Capital de Trabajo
Pago capital prestamo
Sub Total Capial de Trabajo
Flujo de Caja Neto

(116,089)
Horizonte de evaluacin
Periodo
Moneda
Tasa de descuento

Tasa de Impuesto a la Renta


Tasa de interes prestamo Banco
VAN (12%)
TIR
Anualidad Equivalente
Periodo de recuperacion de la inv.
Indice de Rentabilidad. (Relac.;Benef / Costo)

Amortizacin

Saldo Inicial
Pago capital prestamo
Pago Intereses
Saldo Final

USD
USD

Periodo 1

Periodo 2

Periodo 3

Periodo 4

Periodo 5

141,195
188,261
188,261
188,261
141,195

141,195
141,195

188,261
188,261

188,261
188,261

188,261
188,261

141,195
141,195

(677)
(14,221)
14,221

(559)
(14,102)
14,102

(441)
(13,985)
13,985

(325)
(13,868)
13,868

(209)
(13,753)
13,753

(49,507)
(49,507)

0
0

0
0

0
0

0
0

0
0
0
0
0

(35,131)
(52,664)
0
(35,881)
(123,676)

(35,131)
(52,664)
(7,592)
(35,881)
(131,268)

0
(52,664)
(7,592)
(35,881)
(96,137)

0
0
0
(35,881)
(35,881)

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

(4,003)
(10,008)
(4,003)
(6,005)

(24,019)

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

(14,457)
(14,457)

(14,457)
(14,457)

(14,457)
(14,457)

(50,804)
(50,804)

(50,804)
(50,804)

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

(2,891)
(2,891)
(52,635)
88,560

(2,891)
(2,891)
(126,922)
61,339

(2,891)
(2,891)
(134,632)
53,629

(10,161)
(10,161)
(143,234)
45,027

(10,161)
(10,161)
(107,112)
34,083

16,826
71,734
2,891

11,654
49,684
2,891

10,189
43,439
2,891

8,555
36,472
10,161

6,476
27,608
10,161

(13,544)
(13,544)
61,082

(13,544)
(13,544)
39,032

(13,544)
(13,544)
32,787

(13,544)
(13,544)
33,089

(13,544)
(13,544)
24,225

(67,041)
(13,544)
(559)
(52,939)

(52,939)
(13,544)
(441)
(38,954)

(38,954)
(13,544)
(325)
(25,086)

(25,086)
(13,544)
(209)
(11,333)

6
Meses
USD
12%
19%
5%
33,381
25%
36,355
3.5
1.3

(81,262)
(13,544)
(677)
(67,041)

Periodo 6

94,130
4,431
98,561
98,561
(94)
(13,638)
13,638

0
0
0
0
0
0
0
(4,003)
(10,008)
(4,003)
(6,005)
(4,003)
(28,022)
(4,003)
(1,130)
(5,133)
(50,804)
(50,804)
0
0
0
(10,161)
(10,161)
(80,482)
18,079

Anlisis de VAN v/s Tasa

3,435
14,644
10,161

Anlisis de VAN v/s Tasa


50,000

(13,544)
(13,544)
11,261
Tasa de Desc. (%)
9%
10%
11%
12%
13%
14%
15%
16%
17%
18%

(11,333)
(13,544)
(94)
2,305

19%
20%
21%
22%
23%
24%
25%
26%
27%
28%

VAN ($)

44,020
40,330
36,786
33,381
30,108
26,959
23,929
21,011
18,200
15,490
12,877
10,356
7,923
5,573
3,303
1,109
(1,013)
(3,065)
(5,051)
(6,974)

VAN (USD)

40,000
30,000
20,000

10,000
0
8%
(10,000)

Anlisis de VAN v/s Tasa Descuento

Anlisis de VAN v/s Tasa Descuento

13%

18%
Tasa de Desc. (%)

23%

28%

Descripcin
Mano de Obra
Maquinas y Herramientas
Materiales y Equipos
Otros Gastos
Total Costo Directo

Valor
48,087,998.60
9,137,694.89
185,988,156.48
9,084,598.92
252,298,448.89

Distribucin Porcentual de Costos

Otros Gastos
3%

Mano de Obra
19%

Materiales y
Equipos
74%

ual de Costos

Maquinas y
Herramientas
4%

Descripcin
Total Costo Directo
Gastos Generales
Utilidad

Valor
252,298,448.89
101,807,599.00
126,149,225.00

Distribucin Porcentual de Propuesta

Utilidad
26%
Gastos Generales
21%

centual de Propuesta

Total Costo
Directo
53%

Rf
E(RM)
B

1%
10%
E(Ri)
0
0.3
0.6
0.9
1.2
1.5
1.8
2.1
2.4
2.7
3

Ko
1%
4%
6%
9%
12%
15%
17%
20%
23%
25%
28%

TIR
9%
9%
9%
9%
9%
9%
9%
9%
9%
9%
9%

25%
25%
25%
25%
25%
25%
25%
25%
25%
25%
25%

Tasa de Descuento Esperada


30%

25%

E(Ri)

20%
15%
10%

5%
0%
0

0.5

1.5
Riesgo

2.5

3.5