b) Design consideration:
i.
ii.
iii.
iv.
v.
vi.
vii.
All variables and permanent actions must follow the recommendation of Eurocode.
However, any relevant assumptions can be made to calculate the wind action.
The number of story is five (5) with maximum height of floor is 3.6 m. First two floors
and the latter three floors must be designed in the separated purposes (example: floor
1-2 as lecture hall while the rest are laboratory).
The dimension of beam and thickness of slab must be designed based on relevant
requirement for the multi-story building.
The distance between two columns must not more than 4m, or 7m if supported by
secondary beam.
Foundation to ground floor (stump) has height of 2 m.
The foundation must be designed according the soil condition in Parit Raja, Batu Pahat,
Johor.
Any relevant assumptions can be employed where ever necessary.
3.0 Report
a) Report should include all information/parameters, analysis, design and drawing of structure
and structure plan arrangement.
b) Computer drawings using a CAD system are highly encouraged. Illustration of the building
can be produced using Google Skethup
c) Frame analysis can be performed using civil engineering computer application such as
Staad.Pro, Esteem, SAP and so on. However, frame analysis under wind loading must be
conducted manually.
d) Analysis and design of specific structure should be conducted as scheduled, which is can be
referred in Part 5.0.
e) A compile report must be submitted upon completing the course. Report must be submitted
in Microsoft Word format (softcopy and binding version).
f) All drawing of layout and detailing must be produced and printed in A3 paper.
4.0 Assessment
The assessment of this project will be based on three concepts, cognitive, psychomotor and
affective. Brief criteria of the assessment are:
-
02 September 2014
23 October 2014
20 November 2014
11 December
18 December
If the project is submitted late without sufficient cause, a penalty shall be applied. A
deduction of 15% of the maximum mark available from the actual mark achieved by the
group shall be imposed upon expiry of the deadline. A further deduction of 5% of the
maximum mark available from the actual achieved by the group shall then be imposed of the
next subsequence days.
6.0 Warning
Plagiarism and academic dishonesty can have some severe penalties and repercussions.
7.0 Example of layout