1

BLDG BLDG 6571 : PROJECT


MANAGEMENT
LECTURE 1
Instructor: Monica Bialski
Department of Building, Civil, and
Environmental Engineering
Concordia University

Copyright 2010. All rights reserved.


COURSE OUTLINE
2

• General Information
– Lecture time: TH 17:45 – 20:15
– Location: H – 410
– Instructor: Monica Bialski

Copyright 2010. All rights reserved.


INFORMATION
3

• Course web site: Moodle

– Access from www.myconcordia.ca

– Use netname and password to access portal

• mbialski@emanagepro.com

Copyright 2010. All rights reserved.


COURSE DESCRIPTION
4

• Fundamentals of Project Management


– Construction contracts
– Project delivery systems
• Project Management Areas
– Project planning and scheduling
– Monitoring, controlling, and measuring projects
– Cash-flow analysis
– Claims management
– Project risk management
4
Copyright 2010. All rights reserved.
COURSE MATERIALS AND WEBSITE
5

• Textbook
– “Construction Management”, 4th Edition by Daniel
W. Halpin and Bolivar A. Senior ISBN: 978-0-470-
44723-9
• Course website: Moodle

5
Copyright 2010. All rights reserved.
COURSE MATERIALS
6

• Reference
• “A Guide to the Project Management Body of
Knowledge”, 4th Edition by Project
Management Institute (PMI), PA, USA
• “Project Management for Construction”,
http://pmbook.ce.cmu.edu/
• Additional reading materials will be
announced or posted on the course website

Copyright 2010. All rights reserved.


COURSE EVALUATION
7

Criteria Weight
1. Class participation and assignments 10%
2. Case study 10%
2. Term project 25%
3. Final 55%
Total 100%

Copyright 2010. All rights reserved.


HOMEWORK AND EXAM POLICY
8

• Assignments
– Groups of 5 and presentation
– Collected on due date in class (late
submission is not acceptable)
– Solutions will be discussed in class, if
necessary

Copyright 2010. All rights reserved.


ACADEMIC CODE OF CONDUCT
9

• Plagiarism
– the presentation of the work of another person as
one’s own or without proper acknowledgement
– written work
– computer assignments
– artistic works
• Do not copy, paraphrase or translate
anything from anywhere without saying
where you obtained it!
• http://provost.concordia.ca/academicintegrity/
Copyright 2010. All rights reserved.
EXAMS
10

– Cover lectures, handouts, slides, and


homework
– Closed-book and closed notes
– No makeup exam

Copyright 2010. All rights reserved.


ATTENDANCE POLICY
11

• Regular attendance is expected and


encouraged. Participation is important.

Copyright 2010. All rights reserved.


ABOUT YOU?
12

• Where from
• Degrees have, headed for
• Construction courses taken
• Professional/Academic goal
• ……

Copyright 2010. All rights reserved.


13

INTRODUCTION – CONSTRUCTION
INDUSTRY AND PROJECT
MANAGEMENT

Copyright 2010. All rights reserved.


CONSTRUCTION INDUSTRY FACTS
14

(Image courtesy of Kleinfeldt


Consultants Ltd.)
• One of the largest and most valuable
components in Canada’s economy
– Revenue ~ $100 billion
• 12% of Gross Domestic Product (GDP)
– More than 1 million employed
• Ontario (39%), Quebec (18%), and British Columbia and
Alberta (16%).
– Over 260,000 firms in the construction
(Data from:industry
http://www.kcl.ca/projects/926-
– Small size kleinfeldt-articles/100-importance-
of-construction-in-canada.html)
• Residential: 90% ≤ 5 employees
• Non-residential: 70% ≤ 5 employees
Copyright 2010. All rights reserved.
CONSTRUCTION INDUSTRY IN QUÉBEC
15

• 14% of GDP
• 230,000 direct jobs annually
• $46 billion yearly

Commission de la Construction du Quebec


http://www.ccq.org/B_IndustrieConstruction.aspx?sc_lang=en&profil=GrandPublic

Copyright 2010. All rights reserved.


16

Copyright 2010. All rights reserved.


TYPES OF CONSTRUCTION PROJECTS
17

• Building construction
– Residential or non-residential
– Designed by architects or
architects/engineers (A/E)
– Heavily subcontracted
– Private and public owners

(Images courtesy of Montreal 2025)

Copyright 2010. All rights reserved.


TYPES OF CONSTRUCTION PROJECTS
18

• Engineering construction
– Bridges, canals, tunnels, pipelines, etc.
– Designed by professional civil engineers
– Constructed by general contractors
– Primarily public owners

(Images courtesy of Wikipedia) (Images courtesy of Montreal 2025)

Copyright 2010. All rights reserved.


TYPES OF CONSTRUCTION PROJECTS
19

• Industrial Construction
– Nuclear power plant, manufacturing plant, etc.
– Designed by process engineers
• Chemical engineers, mechanical engineers, etc.
– Design and construction by the same firm
– Constructed by general contractor with few
large subcontractors

(Images
courtesy of
Wikipedia)

Copyright 2010. All rights reserved.


BREAKDOWN OF CONSTRUCTION
PROJECTS
20

Engineering
construction
(20-25%)

Building
construction
(65-75%)

Industrial
construction
(5-10%)

Copyright 2010. All rights reserved.


CONSTRUCTION PROJECTS IN MONTREAL
21

• Le Concorde
– $36 million
• Highway 25 Bridge
– $500 million

(Image courtesy of Montreal 2025)

(Image courtesy of Montreal 2025)

21
Copyright 2010. All rights reserved.
CONSTRUCTION PROJECT DEVELOPMENT
22

• Typical life of a project - linear nature


Need Conceptual Preliminary &
Established Design Final Design

Disposal Operation Construction

Copyright 2010. All rights reserved.


Owner Designer KEY PLAYERS
23

Contractor
• Owner
– The party that pays for the facility and will own it
after construction is completed
– Public (government) or private (individual or
business)

Copyright 2010. All rights reserved.


Owner Designer KEY PLAYERS
24

Contractor
• Constructor/Contractor
– The party who contracts to perform the construction
– Prime (general) contractor, sub contractor

Copyright 2010. All rights reserved.


Owner Designer KEY PLAYERS
25

Contractor
• Designer, A/E
– The professional entity that designs the facility
– May oversee the construction as owner’s agent
– Identified in construction contracts

Copyright 2010. All rights reserved.


NATURE OF CONSTRUCTION PROJECT
26

• Each project is unique


– No mass production and batch production
• Very customer-oriented
– Not purchasing items “off-the-shelf”
• High potential for encountering unforeseen
conditions
– Not performed in controlled conditions
– Process is not as predictable
– Success is highly dependent upon the quality
of people
Copyright 2010. All rights reserved.
CONSTRUCTION ENGINEERING AND
MANAGEMENT
27

• Construction engineering Focus on Task


– What technique or method field action &
technological
should be selected for processes

placing construction Operation/Process

• Construction management
– How the resources Project
available can be best
applied to realizing a Focus on
project Organizational
constructed facility attributes

• Acceptable quality
• On time
Copyright 2010. All rights reserved.
PROJECT MANAGER
28

• Conductor of an orchestra in which every


musician is in a different union
• A strong ability in many areas
General Project Special
Management Manager Knowledge
Domain

Supporting
Disciplines

Copyright 2010. All rights reserved.


PROJECT
29

A Project is a temporary endeavor


undertaken to create a unique product,
services or result.

PMI

Copyright 2010. All rights reserved.


PROJECT
30

• Temporary
– Definite beginning and definite end.
– End is reached when:
• Project objectives are achieved.
• It’s clear that project objectives can not be met.
– Temporary is not short

Copyright 2010. All rights reserved.


PROJECT
31

• Unique
– Has not been done before.
– Even if projects are identical.
(Ex. Office buildings: owner, location, design, ….etc.)

S. El-Omari
BLDG 6571 Lecture 1 31
Copyright 2010. All rights reserved.
PROJECT MANAGEMENT
32

Project Management is the application of


knowledge, skills, tools and techniques to
project activities to meet project requirements.
Project management is accomplished through
the application and integration of the project
management processes of initiating, planning,
executing, monitoring and controlling, and
closing.

PMI
Copyright 2010. All rights reserved.
PROJECT MANAGER
33

The Project Manager is the person responsible

for accomplishing the project objectives.

PMI

Copyright 2010. All rights reserved.


PROJECT MANAGEMENT OBJECTIVES
34

To deliver a project on target:


Time, Cost, Quality

• Triangle of Values Time

Cost Quality
34
Copyright 2010. All rights reserved.
PROJECT MANAGEMENT
35

• Knowledge & skills in:


– Project integration management
– Project scope management
– Project time management
– Project cost management
– Project quality management
– Project human resource management
– Project communications management
– Project claims and changes management
– Project risk management
Copyright 2010. All rights reserved.
Project Management Knowledge Areas

36

S. El-Omari
BLDG 6571 Lecture 1 36
Copyright 2010. All rights reserved.
PROJECT MANAGEMENT KNOWLEDGE AREAS
37

• Project Integration Management


Processes required to ensure proper
coordination of various project elements and
includes:
– Project Plan Development
– Project Plan Execution
– Integration Change Control

Copyright 2010. All rights reserved.


PROJECT MANAGEMENT KNOWLEDGE AREAS
38

• Project Scope Management


Processes required to ensure that project
includes all the work required and includes:
– Initiation
– Scope Planning
– Scope Definition
– Scope Verification
– Scope Change Control

Copyright 2010. All rights reserved.


PROJECT MANAGEMENT KNOWLEDGE AREAS
39

• Project Time Management


Processes required to ensure timely completion
of the project and includes:
– Activity definition
– Activity Sequencing
– Activity Duration Estimation
– Schedule Development
– Schedule Control

Copyright 2010. All rights reserved.


PROJECT MANAGEMENT KNOWLEDGE AREAS
40

• Project Cost Management


Processes required to ensure the project is
completed within the planned budget and
includes:
– Resource Planning
– Cost Estimating
– Cost Budgeting
– Cost Control

Copyright 2010. All rights reserved.


PROJECT MANAGEMENT KNOWLEDGE AREAS
41

• Project Quality Management


Processes required to ensure the project
satisfies the needs for which it was
undertaken and includes:
• Quality Planning
• Quality Assurance
• Quality Control

Copyright 2010. All rights reserved.


PROJECT MANAGEMENT KNOWLEDGE AREAS
42

• Project Human Resource Management


Processes required to ensure most effective use
of people involved and includes:
– Organizational Planning
– Staff Acquisition
– Team Development

Copyright 2010. All rights reserved.


PROJECT MANAGEMENT KNOWLEDGE AREAS
43

• Project Communications Management


Processes required to ensure timely and
appropriate handling of project information
and includes:
– Communications Planning
– Information Distribution
– Performance Reporting
– Administrative Closure

Copyright 2010. All rights reserved.


PROJECT MANAGEMENT KNOWLEDGE AREAS
44

• Project Risk Management


Processes concerned with identifying, analyzing,
and responding to project risk and includes:
– Risk Management Planning
– Risk Identification
– Qualitative Risk Analysis
– Risk Response Planning
– Risk Monitoring and Control

Copyright 2010. All rights reserved.


PROJECT MANAGEMENT KNOWLEDGE AREAS
45

• Project Procurement Management


Processes required to acquire goods & services
from outside organization and includes:
– Procurement Planning
– Solicitation Planning
– Solicitation
– Source Selection
– Contract Administration
– Contract Closeout
Copyright 2010. All rights reserved.
PROJECT PHASES / PROJECT LIFE CYCLE
46

• Projects are divided into several phases to

ensure management control.

• All project phases represent the Project Life

Cycle

Copyright 2010. All rights reserved.


PROJECT PHASES
47

• Inception – by investor / owner – where the project is first


visualized.
• Planning and Definition - by investor / owner – rough estimate
of the project duration, budget and plan are developed.
• Design – by Architect / Engineer – components of the project
are designed.
• Procurement and production – by contractor – purchasing
necessary good and (Ex. Construction).
• Start up and commissioning – by contractor – where project is
delivered to the owner

Copyright 2010. All rights reserved.


48

S. El-Omari
BLDG 6571 Lecture 1 48
Copyright 2010. All rights reserved.
49

Copyright 2010. All rights reserved.


50

Copyright 2010. All rights reserved.


ASSIGNMENT #1
51

• Give an example of any project ( either in


your experience or from the internet)
• Explain in 10 points or less, how this project
has been - or is - managed.
• Groups of 4-6 students. Hard copy of the
presentation and the presentation due next
week.

Copyright 2010. All rights reserved.