of a column 300mm x 300mm. Adopt M-35 grade concrete and Fe-415 HYSD bars. Sketch
the details of reinforcement details.
DATA:
Assume the load as factored load
Factored load
= Fv = 500KN
= av = 200 mm
= 59.52 mm
Therefore provide a minimum width of 100 mm and adopt a bearing plate 100 x 300
mm
Estimation of depth:
c,max =
concrete)
d=
=
= 450.45 mm
Adopt effective depth,
= 475 mm
Df = (0.5 Ds)
= (0.5 x 525)
= 263 mm
=
= 0.42 < 0.6 , Hence acts as a corbel
Where,
Kv =
=
= 0.114
= 0.42
= 0.79
)( )
= 0.213
Substituting, we have
( )
Solving we get,
Therefore
0.74
z = 0.74 x d
= 0.74 x 475
= 351.5mm
d z = 0.4x
475 351.5 = 0.4x
x = 308.75 mm
Therefore
=
= 0.65 > the limiting value of 0.48 for Fe-415 bars (pg 70 IS 456)
= 284.5
= 250 kN
= 285.5 kN
= 0.0035 x
= 0.00188
From fig 3 of SP-16 or T.A pg 6 of SP-16 read out stress corresponding to strain s =
0.00188 , fs = 322 N/mm2
But Fh = 0
= 882.71 mm2
Use 5 bars of 16mm diameter (Ast = 1005.31 mm2)
Check for minimum and maximum reinforcement:
=
= 502.66mm2
Spacing of links = Sv =
= 75mm
= 2.55 N/mm2
= 363.71 kN
Shear Capacity of Steel
=
= 359 kN
Total Shear Capacity
= 363.71 + 359
= 722.71 kN > 500 kN
Design a corbel to support a factored load of 250KN at a distance of 200mm from the face
of a column 300mm x 300mm. Adopt M-25 grade concrete and Fe-415 HYSD bars. Sketch
the details of reinforcement details.
DATA:
Assume the load as factored load
Factored load
= Fv = 250KN
= av = 200 mm
= 41.67 mm
Therefore provide a minimum width of 100 mm and adopt a bearing plate 100 x 300
mm
Estimation of depth:
c,max =
concrete)
d=
=
= 268.82 mm
Adopt effective depth,
= 350 mm
Df = (0.5 Ds)
= (0.5 x 300)
= 200 mm
=
= 0.57 < 0.6 , Hence acts as a corbel
Where,
Kv =
=
= 0.108
)( )
= 0.57
= 0.84
= 0.16
Substituting, we have
( )
Solving we get,
Therefore
0.77
z = 0.83x d
= 0.77 x 350
= 269.5mm
d z = 0.4x
350 269.5 = 0.4x
x = 201.25 mm
Therefore
=
= 0.575 < the limiting value of 0.48 for Fe-415 bars (pg 70 IS 456)
Ft =
= 185.53
= 125 kN
= 185.53 kN
= 0.0035 x
= 0.00259
From fig 3 of SP-16 or T.A pg 6 of SP-16 read out stress corresponding to strain s =
0.00259 , fs = 347.43 N/mm2
But Fh = 0
= 524 mm2
Use 3 bars of 16mm diameter (Ast = 603.19 mm2)
Check for minimum and maximum reinforcement:
=
= 301.6 mm2
Spacing of links = Sv =
= 58.33mm = 50 mm
= 1.8 N/mm2
Shear Capacity of Concrete, Vc =
= 188.79 kN
Shear Capacity of Steel
=
= 396.8 kN
Total Shear Capacity
= 188.79 + 396.8
= 585.59 kN > 500 kN