Beruflich Dokumente
Kultur Dokumente
2.
3.
Brief History and background of establishment of the public
Authority
The PWD is headed by a full fledged Principal Chief Engineer who is also the
Ex-Officio Additional Secretary to the Government of Goa, having its
headquarters at Altinho - Panaji. Besides, he is the Budget Controlling and
appointing authority.
The jurisdiction of the department covers the entire State of Goa.
The Department is branched into two technical wings for the smooth and efficient
functioning. The Public Health Engineering Wing (Water Supply & Sanitation) is
headed by the Chief Engineer I. The other Wing which deals with Roads &
Bridges, Buildings and Electrical & Mechanical sectors is headed by the Chief
Engineer II. Each of these wings is further divided into Administrative Units
called Circles, which are headed by Superintending Engineers. Each Circle
consists of filed units known as Works Divisions headed by Executive Engineers
who are entrusted with execution of works. They are in turn assisted by Sub
Divisional Offices headed by Assistant Engineers. The department has got 9
Circles (Circle Office I to IX), 25 Divisions (Works Divisions I to XXV) and 101
Sub-Divisions stationed throughout the State of Goa. Each Sub-Division is
provided with Technical Assistants/Junior Engineers who supervise the day to day
execution of works. The Circle Offices are located at Panaji Head Quarters except
for two circle offices via Cirle Office IV and VIII which are located at Margao.
The Works Divisions are located in various talukas depending upon the
jurisdiction of their activities, to enable them to maintain proper and efficient
control over the execution of works.
The Chief Engineer I is in charge of the Public Health Engineering Wing which
includes all the developmental works and the operation & maintenance of the
existing infrastructure related to Water Supply & Sanitation in the State of Goa.
He is also the Ex-officio Joint Secretary to the Government. As per the existing
setup, the Circle Office V (PHE-N) & Circle office VI (PHE-Project), both at
PWD Headquarters Panaji and Circle Office VIII (PHE-S) at Margao, along with
its respective Works Divisions are directly under the control of Chief Engineer I
and are responsible to him.
The Chief Engineer II is in charge of Roads & Bridges, Buildings and Electrical
& Mechanical Wing which deals with all the developmental works falling under
the purview of this Wing, in addition to the deposit works of various other
Departments of the State. He is also authorized to execute the works under
MPLAD scheme. He is also Ex-Officio Joint Secretary to the Government. As
per the existing setup the Circle Office I (Bldg), Circle Office II(Bldg), Circle
Office III (Roads-N), Circle Office IV (Roads-S), Circle Office IX (NH) and
Circle Office VII (E/M), along with the respective Works Divisions are directly
under the control of Chief Engineer II. Out of these Circle Offices, the Circle
Office IV (Roads-S) is located at Margao.
Each Superintending Engineer has under his charge two or more Works
Divisions. He is the Administrative head who exercises the control over the
activities of Divisions engaged in investigation, Planning, construction and
maintenance of various works. He also maintains liaison with the Principal Chief
Engineer and the concerned Chief Engineer I/II with regard to all technical
matters in respect of works under his purview. As per the existing setup, the
various Circle Offices in PWD have the following Works Divisions under their
respective control:
Circle Office
The Executive Engineer has under its control four to five Sub-Divisions
depending upon the work load and the area of jurisdiction. He is directly
responsible for the execution of works and further for the proper upkeep of work
accounts and smooth implementation of the various schemes entrusted to his
Works Division.
4.
Organisation Chart
A) Principal Chief Engineer
Accounts
Wing
Technical Wing
Chief
Engineer I
(Water
Supply &
Sanitation)
Chief
Architect
Chief Engineer II
(Roads & Bridges,
Buildings and
Elect/Mech)
Engineering
Officer
Superintending
Surveyor of
Works
1) E.E.(Legal)
2) Land Acqui.
Officer
Superintending
Engineer,
Monitoring &
Evaluation
Joint
Director
of
Accounts
Administrative
Wing
Dy.
Director
of Adm.
B) Chief Engineer I
C.O. V (PHE-N)
Supdt Engr. V, Panaji
W.D. III
Ex. Engr III,
St. Inez
WD XVII
Ex. Engr
XVII
Porvorim
C.O. VI (PHE-Project)
Supdt Engr VI, Panaji
WD XXIV
Ex. Engr
XXIV Panaji
AE, SD I, Bicholim
AE, SD II, Mapusa
AE, SD III, Mapusa
AE SD IV Assonora
AE SD V Porvorim
AE SD VI valpoi
AE
SD I
Panaji
WD XII
Ex. Engr.
XII
Sanguem
WD IX,
Ex. Engr IX
Marago
AE SD I
Quepem
AE SD II
Margao
AE SD III
Sanguem
AE SD IV
Xelpem
AE SD I Vasco
AE SD II
Margao
AE SD III
Margao
AE SD IV
Margao
AE SDV Verna
WD XX
Ex. Engr
Margao
WD
XXI
Ex.
Engr
XXI
Margao
AE SD I
Curchorem
AE SD II
Sanguem
AE SDIII
Quepem
AE SD IV
Xelpem
AE SD I
Margao
AE SD II
Margao
AE SD III
Margao
C) Chief Engineer II
Buildings
Elect/Mech
1) WD II
EE II
Panaji
2) WD XIII
EE XIII,
Mapusa
3) WD XVIII
EE XVIII
Ponda
4) WD XXIII
EE XXIII
Bicholim
C.O. IV (R-S)
S.E. IV
Marago
1) WD VI
EE VI
Margao
2) WD XXV
EE XXV
Margao
C.O. IX (NH)
S.E. IX
Panaji
C.O. I (Bldgs)
S.E. I
Panaji
C.O. II(Bldgs)
S..E. II
Panaji
1) WD VII
EE VII
Panaji
2) WD XIV
EE XIV
Margao
3) WD XV
EE XV
Ponda
1) WD V
EE V
Panaji
2) WD VIII
EE VIII
Margao
3) WD XVI
EE XVI
Ponda
1) WD I
EE I
Panaji
2) WD XIX
EE XIX
Bambolim
1) WD IV
EE IV
Tonca
2) WD X
EE X
Margao
3) WD XXII
EE XXII
Margao
5.
(b)
(c)
(d)
(e)
6.
List of services being provided by the Public Authority with a
brief writeup on them
(a) Release of Water Supply Connections
(b) Release of free water tap connections for backward sections of society
(c) Construction of pour flush water seal latrines for BPL families
(d) Release of sewerage connections
Public Works Department, PHE Wing has formulated a Citizens Charter for
Water Supply & Sewerage, wherein the information on the services being
provided by the department like release of water and sewerage connections has
been detailed out.
7.
Citizens interaction Expectation of the Public Authority from
the public for enhancing its effectiveness and efficiency
For enhancing the effectiveness and efficiency of the various services provided by
the department, an ON-line Complaint system has been introduced. Through this
system, the public can send their suggestions; lodge their complaints as regards
leakages in the water distribution network, water thefts, inadequate supply of
water, requirement of water by tankers, etc.
8.
Postal address of the main office, attached /subordinate
office/field units,
Sr
No
1
2
3
4
5
Office
Principal Chief Engineer
Chief Engineer I
Chief Engineer I
Chief Architect
Superintending Surveyor of
Works
Circle Office I (Bldgs)
10
Postal Address
The Principal Chief Engineer, PWD Head Office, Altinho Panaji
GOA.
The Chief Engineer I, PWD Head Office, Altinho Panaji GOA.
The Chief Engineer II, PWD Head Office, Altinho Panaji GOA.
The Chief Architect, PWD Head Office, Altinho Panaji GOA
The Superintending Surveyor of Works, PWD Head Office, Altinho
Panaji GOA
The Superintending Engineer I, Circle Office I(Bldgs), PWD Head
Office, Altinho Panaji GOA
The Superintending Engineer II, Circle Office II(Bldgs), PWD Head
Office, Altinho Panaji GOA
The Superintending Engineer III(Roads-N), Circle Office III, PWD
Head Office, Altinho Panaji GOA
The Superintending Engineer IV(Roads S), Circle Office IV, PWD
Head Office, Fatorda - Margao
The Superintending Engineer V, Circle Office V (PHE-N), PWD
Head Office, Altinho Panaji GOA
11
12
13
14
15
17
Superintending Engineer,
Monitoring & Evaluation
Dy Director of
Administration
Joint Director of Accounts
18
19
Engineering Officer
Executive Engineer (legal)
20
21
22
23
24
Executive Engineer I
Executive Engineer II
Executive Engineer III
Executive Engineer IV
25
26
Executive Engineer V
Executive Engineer VI
27
28
29
Executive Engineer IX
30
31
32
33
34
Executive Engineer X,
PWD
Executive Engineer XI
Executive Engineer XII
Executive Engineer XIII
Executive Engineer XIV
35
36
Executive Engineer XV
Executive Engineer XVI
16
Sr
No
37
38
39
40
Office
Executive Engineer XVII
Executive Engineer XVIII
Executive Engineer XIX
Executive Engineer XX
41
42
43
44
45
9.
10.