Sie sind auf Seite 1von 11

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:20, 1:50

DATE

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

GENERAL ARRANGEMENT FOR FOUNDATION AND


FOUNDATION DETAILS

MR. RONALD MUGAMBE, P.O.BOX

01

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:20

MR. RONALD MUGAMBE, P.O.BOX

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

FOOTING DETAILS

DATE

02

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:20

MR. RONALD MUGAMBE, P.O.BOX

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

FOOTING DETAILS

DATE

03

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:20

MR. RONALD MUGAMBE, P.O.BOX

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

FOOTING DETAILS
COLUMN DETAILS
WALL DETAILS

DATE

04

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:10, 1:20

MR. RONALD MUGAMBE, P.O.BOX

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

COLUMN DETAILS

DATE

05

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:20, 1:50

DATE

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

GENERAL ARRANGEMENT FOR SUSPENDED SLAB AND


BEAM DETAILS

MR. RONALD MUGAMBE, P.O.BOX

06

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:20, 1:50

MR. RONALD MUGAMBE, P.O.BOX

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

FLOOR SLAB DETAILS


BEAM DETAILS

DATE

07

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:20

MR. RONALD MUGAMBE, P.O.BOX

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

BEAM DETAILS

DATE

08

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:20

MR. RONALD MUGAMBE, P.O.BOX

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

BEAM DETAILS

DATE

09

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:10, 1:20

MR. RONALD MUGAMBE, P.O.BOX

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

BEAM DETAILS

DATE

10

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

NOTES:

1This drawing shall be read in conjuction with all

relevant drawings.

2 Foundations shall generally be taken down below

Concrete mixes

and filled with 1:4:8 all in concrete mix

Weak pockets of bearing strata to be dug out

existing ground level 1000mm and all excavations


to be confirmed by engineer.

(a) Mass concrete to have a minimum works


cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size

5 Reinforcement

(a) High yield bars to be square twisted cold


formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483

All dimensions must be checked on site

before cutting any reinforcement

All dimensions must be verified on site

Stub column = 50mm


Beams = 25mm
Slab = 25mm
Columns = 25mm
unless otherwise specified

6 Minimum cover to all steel in foundations = 50mm

before commencing any works.

9 Where half landing is supported by surrounding walls,

the walls shall be built first before casting the staircase.

10

MUJU CONSULTING ENGINEERS LIMITED

STRUCTURAL & CIVIL ENGINEERS

SCALE

CHECKED

DRAWN

ARCHITECT

TITLE

CLIENT

PROJECT

0032014

1:20

MR. RONALD MUGAMBE, P.O.BOX

NOVEMBER 2014

PLANTERRA CONSULT, P.O.BOX 11269 KAMPALA

WALL DETAILS
STAIRCASE DETAILS

DATE

11

ENG. DR. UMARU BAGAMPADDE AND MR. PAUL MUJUGUMBYA

RONNIE LULE

SHEET NO.

PROPOSED APARTMENTS AT PLOT , BLOCK ,

KIKUBA HOUSE
P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL O77838691,075693987,031261050

DRG NO.

Das könnte Ihnen auch gefallen