GENERAL REPORT

Distributor Of Solar Turbines

Country
Customer Name
INDONESIA TOTAL E&P
PD
Customer
Package
Number
Tag
S/N
70231
CG01823
TEG 9610
70232

TEG 9620

CG01824

FIELD REP
Andika Pratama
Yusup Armansyah

Site Name
NPU Site
Engine
Package
S/N
Starts

Report Dates
November, 2014
CSA Numbers

Package
Hours

Engine
Hours

Service Order
No.

1072H

HMI UPGRADE PROJECT


TEG 9610 & TEG 9620

PT. Indoturbine

1/11

SITE VISIT REPORT


PT. Indoturbine
Distributor of Solar Turbines

FSR NAME
Andika Pratama
Yusup Armansyah

I. Purpose of visit
The purpose of visit is Technical Services for HMI Upgrade Centaur 50 (TEG 9610 & 9620) at NPU Total E&P Indonesie
II. Engine Specification:

Package Name Plate TEG 9610 & TEG 9620

Console Name Plate TEG 9610 & TEG 9620

Engine Name Plate TEG 9610 & TEG 9620

PT.Indoturbine

2/11

SITE VISIT REPORT


PT. Indoturbine
Distributor of Solar Turbines

FSR NAME
Andika Pratama
Yusup Armansyah

4 November, 2014

Trip from Balikpapan to Handil, prepare Hand Tools requirement

5 November, 2014

Trip from Handil to NPU Site


Pre Job Meeting with Control System team Total E&P
Check aviability for parts order
Functional verification Software HMI and accessories as per procedure

6 November, 2014

Pre Job Meeting with Control System Total E&P


Dismantle old HMI Configuration TEG 9610
Set up new configuration for TEG 9610
Meachining plat and make a hole to fitting the HMI display with TCP panel
Put new Cable Tag as per customer request
Verified Communication line between PLC and HMI working properly

7 November, 2014

Pre Job Meeting with Project Engineer and Control System Total E&P
Programming additional rung PLC 5 as per mandatory for Upgrade new HMI
Start to SAT Check functional test for communication throught existing PLC program for TEG 9610

8 November, 2014

Pre Job Meeting with Project Engineer and Control System Total E&P
Continue Commisioning Functional Test with Instrument Team
Commisioning done, continue with Start Engine as per sequence

9 November, 2014

Pre Job Meeting with Project Engineer and Control System Total E&P
Give a short training for new navigation HMI TT4000 ver 5 as per Customer request
Completed Handover Document and Dosier

Punch List pending per 9 November

Provide DB-25 angel connector


Update Drawing 70231-149480 as per new configuration
Provide antivirus McAfee (customer request) for TEG 9610 & TEG 9620

10 November, 2014

Trip to Balikpapan from Handil

PT.Indoturbine

3/11

SITE VISIT REPORT

FSR NAME
Andika Pratama
Yusup Armansyah

PT. Indoturbine
Distributor of Solar Turbines

Attached Pictures during the project

Configure PLC5 with new PLC5 program due to


mandotory Solar Inc. For upgrade HMI

Install New Operating System due to Serial Package


Number and OS License on HMI Hardware.

PT.Indoturbine

Verified all parts working properly.

New HMI Display as per Solar Package

4/11

SITE VISIT REPORT


PT. Indoturbine
Distributor of Solar Turbines

Short training for change mode to start produsction


mode or configuration mode

Configure TCP TEG 9610

FSR NAME
Andika Pratama
Yusup Armansyah

Perform SAT for TEG 9610 as per procedure

Check and verify all function of existing system for


new HMI Display

Check all existing parts working prperly before HMI system installed on panel
PT.Indoturbine

5/11

SITE VISIT REPORT


PT. Indoturbine
Distributor of Solar Turbines

FSR NAME
Andika Pratama
Yusup Armansyah

Perform Commissioning as per procedure. Give a short training for operating new HMI with TT4000 ver 5
procedure

New wire configuration on TCP TEG 9610 for new HMI display with TT4000 ver 5

Handover Document & Dosier (a)

Handover Document & Dosier (b)


PT.Indoturbine

6/11

SITE VISIT REPORT


PT. Indoturbine
Distributor of Solar Turbines

FSR NAME
Andika Pratama
Yusup Armansyah

Handover Document & Dosier (c)

Found new program on HMI TT4000 ver 5 start crank button fuction visibilty was disable. Change with
new configuration to perform proper function due to PLC5 program.

Found new program on HMI TT4000 ver 5 stop crank button fuction visibilty was disable. Change with
new configuration to perform proper function due to PLC5 program.

PT.Indoturbine

7/11

SITE VISIT REPORT


PT. Indoturbine
Distributor of Solar Turbines

FSR NAME
Andika Pratama
Yusup Armansyah

Added 3 New Rung on Ladder 2 rung 2,3,4

Before change logix on ladder 11 rung 1

PT.Indoturbine

8/11

SITE VISIT REPORT


PT. Indoturbine
Distributor of Solar Turbines

FSR NAME
Andika Pratama
Yusup Armansyah

After change logix on ladder 11 rung 1

Added Logix and make new rung on ladder 11 rung 26

PT.Indoturbine

9/11

SITE VISIT REPORT


PT. Indoturbine
Distributor of Solar Turbines

FSR NAME
Andika Pratama
Yusup Armansyah

Added Logix and make new rung on ladder 11 rung 26 and change addres

Add rung and logix on ladder 143 last rung

PT.Indoturbine

10/11

SITE VISIT REPORT


PT. Indoturbine
Distributor of Solar Turbines

FSR NAME
Andika Pratama
Yusup Armansyah

ladder 34 still exist should be remove

PT.Indoturbine

11/11