The accompanying table gives the Plinth area rates from the year 1960-to 2012.
Year
Year
1960
125
1973
510
1961
140
1974
550
1962
165
1975
600
1963
178
1976
690
1964
198
1977
720
1965
216
1978
810
1966
240
1979
920
1967
266
1980
1100
1968
300
1981
1240
1969
320
1982
1320
1970
378
1983
1468
1971
400
1984
1686
1972
455
1985
1806
1986
2085
2001
7300
1987
2209
2002
7520
1988
2463
2003
7725
1989
2572
2004
7895
1990
3047
2005
8210
1991
3360
2006
8415
1992
3716
2007
8810
1993
4140
2008
9100
1994
4623
2009
10,200
1995
5040
2010
11,400
1996
5476
2011
11,836
1997
6100
2012
12,915
1998
6550
1999
6740
2000
7100
An illustrative example of arriving the Plinth area rates with cost index for the year
The accompanying Calculation table shows the other method adopted to find out the Plinth
Area rates in the year 1961 and 1981 with the rates of 1960 and 1976 as base rate and
multiplying with the Cost Index for the year 1961 and 1981
S.no. Description
1
2
3
4
Bricks
Sand
Coarse sand 66.67%
Fine sand 33.33%
Cement OPC
Aggregate
20mm size 50%
10mm size 50%
Timber
II Class Teak wood 25%
Country hard wood 75%
Steel
8-10mm Tor Steel 50%
12-16mm Tor Steel 50%
Mason
I Class Mason 50%
II Class Mason 50%
Carpenter
I Class Carpenter 50%
II Class Carpenter 50%
Mazdoor
Male labour 50%
Female labour 50%
TRIVANDRUM
1-4-1960
New Date
Weightage
1/4/1961
New Index
Rate as
on New
Date
Cost
Index as
on New
Date
111.51
Unit
Rate as
on 1.4.60
1000
no
Cum
150.00
5.00
16.00
4.00
155.00
6.00
16.53
4.80
14.82
4.30
Qtl
Cum
11.00
12.00
19.00
4.50
12.00
13.00
20.72
4.87
18.58
4.37
Cum
425.00
9.50
450.00
10.05
9.0
Qtl
150.00
23.50
170.00
26.63
23.88
Each
5.00
8.00
5.6
8.96
8.04
Each
5.00
3.50
5.6
3.95
3.54
Each
3.0
12.00
3.75
15.0
13.45
100.00
Total
111.51
Note: New date & its rates are arbitrary, Valuer may put his own rates.
100.00
Rate as
on
01.4.76
Cost
Rate as
on New Index as
Date on New % Contri
Weighbutio
Date
1-4-1981
tage
n
16.00
17.60
550.00
9.67
S.no.
Description
Unit
Bricks
1000 no
Bricks 67%
Stone 33% (0.8976 Cum)
2
Sand
Coarse sand 67%
Fine sand 33%
3
Cement
4
Aggregate
20mm size 50%
40mm size 50%
5
Timber
11 Class Teak wood 25%
Country hard wood 75%
6
Mild Steel
8-10mm Tor Steel 50%
12-16mm Tor Steel 50%
7
Mason
1 Class Mason 50%
11 Class Mason 50%
8
Carpenter
1 Class Carpenter 50%
11 Class Carpenter 50%
9
Labour
Male labour 50%
Female labour 50%
670 no
0.8976
Cum
20.00
5.00
27.00
6.75
3.71
QtI
Cum
24.00
40.00
21.00
6.50
61.00
59.00
29.31
5.26
Cum
3000.00
18.00
3580.00
53.37
53.37 9.58
w4r3z:.14.
53.37
52.5052..5
21.48
0
7.32
20.13
500.00
QtI
300.00
10.00
400.00
Each
20.00
8.5
36.00
Each
20.00
4.0
40.00
13.33
13.33
10.92
15.30
15.30
15.3015.3
8.00
04
Each
9.00
11
30.00
36.66
100.00
Total
11.80
8.40
4.40
182.07 100.00