Item
Description
Unit
Qty.
Rate
m3
2,132
m2
3,877
m2
3,877
m2
3,877
m2
3,877
50mm thick
Crusher run
375mm thick
Approved bituminous tack coat spread on top premix road
generally
Premix surfacing
Premix 'Asphaltic concrete' surfacing compound wearing/ binder
course; spread, levelled and rolled to the required chambers and
gradient
m2
3,877
m2
3,877
To Collection
RM
Item
Description
ROAD AND HARDSTANDING (Cont'd)
Road kerb
Cast in-situ concrete Grade 20 kerb including all necessary bend,
curves and intersection; finished fair on all exposed surfaces bedded
jointed in Grade 15 concrete haunching of 450mm width x 325mm
high including all necessary excavation, concrete & formwork etc, all
as detailed in Engineer's Drawing No.:PL/SJKC/101018/RD/DT/01
722
No
111
722
227
Prepare and apply one sealer coat and two finishing coat of acrylic
pint to concrete kerb
C
225mm diameter
Road Marking (Provisional)
Preparing; applying two coats of hot applied thermoplastic road
marking paint; on concrete / premix surfaces areas; all detailed in
Engineer's Drawing No. PL/SJKC/101018/RD/DT/04
No
25
No
No
No
722
518
147
To Collection
RM
Item
Description
Unit
200mm wide
17
100mm wide
11
189
No
No
No
No
No
No
Making good
Allow for reinstatement of the public road and making good all works
disturbed after completion of the road works, to comply the
Authorities' requirement
K
Generally
Item
To Collection
Item
Description
Unit
RM
Approved 75mm thick coarse clean sand blanket with 50mm thick
approved black vegetable soil, spread, levelled, well rolled and
compacted to receive turfing (measured separately)
m2
3,000
m2
3,000
item
Allow for all other works not listed above but shown on the drawing
or referred to in the Specification or Preambles or which are
necessary to ensure completion of the works in this bill (item to be
specified)
To Collection
Item
Description
Unit
RM
To Final Summary
Item
Description
RM
12
156
89
63
147
No
Sump
Reinforced concrete sump; construct of 150mm thick wall and base
with Y10-150 c/c both way; with and including 50mm thick lean
concrete, formwork, excavating pits, part returning and compacting;
removing surplus excavated materials from site and building in ends
of drains and culvert; as detailed in Engineer's Drawing No.:
PL/SJKC/101018/RD/DT/03
1500mm x 1500mm internally
F
To Collection
Item
Description
RM
No
No
item
item
Trash screen
Trash screen consisting of top & side member 50mm x 12mm thk.
Galvanised m.s flat, bottom member 75mm x 12mm thk. Galvanised
m.s flat and verical member consisting of T12 diameter galvanised
m.s bar welded to galvanised m.s flat at 50mm c/c with 250mm high
x 150mm width x 100mm thk. 1:3:6 concrete mix stopper at both
ends : as detailed in Engineer's Drawing No.
PL/SJKC/101018/RD/DT/05
B
Allow for new drainage connection to the existing main drain / sump;
including all necessary fitting, excavation, backfilling, etc; making
good all work disturbed; all as per Engineer's specification
Testing
Allow for all other works not listed above but shown on the drawings
or referred to in the Specification or Preambles or which are
necessary to ensure completion of the works in this bill (item to be
specified)
.
.
.
To Collection
Item
Description
RM
To Final Summary
Item
Description
RM
The words "as described" where used in tis Bill mean as described
in the above documents
The quantities given for piling works are Provisional and Payment
sall be made based on site measurement of actual work done
The Contractor may carry out his own soil investigation in addition to
the information that may be given. All cost in connection there with
shall be deemed to be included in the piling rates
Payable length for piles shall be as follows
(a) Driving of piles shall be measured and paid for in linear metre
measured from the toe of the pile when pitched to the toe of the
pile when driven
(b) The supply of piles shall be measured and paid for in linear
metre measured from the toe of the pile when pitched to the toe of
the pile when driven
Piling Equipment
Provide all necessary plant, equipment and tools; including
transporting to the site, assembling, dismantling and removing from
site after conmpletion of the works
A
item
item
item
handling and moving piling plant and equipment about the site;
including all necessary temporary work in conection therewith
B
To Collection
Item
Description
RM
No
125
No
125
No
250
No
125
No
125
No
250
2,250
No
375
No
125
No
To Collection
Item
Description
RM
m3
379
m3
253
m2
319
m2
208
m2
208
m3
65
m2
334
1000mm thick
Hardcore bed consisting of hard, dry broken brick or stone, spread
and levelled and well consolidated
150mm thick
retaining base
Vibrated reinforced concrete Grade C30 as descibed
Retaining wall base
generally
Retaining walls
225mm thick
To Collection
Item
Description
RM
kg
5,979
kg
2,083
Retaining walls
C
kg
12,681
kg
2,074
300
retaining walls
m2
668
No
130
Weep hole
To supply and install 75mm diameter weep hole comlete with
300mm x 300mm x 300mm agregate wrapped with 1 layer of
geotextile; all detailed in Enginner's Drawing No.:
PL/SJKC/101018/EW/DT/04
G
225mm long
Allow for all other works not listed above but shown on the drawings
or referred to in the Specifications or Preambles or which are
necessary to ensure completion of the works in this bill (items to be
specified)
.
.
.
To Collection
Item
Description
RM
To Collection
Item
Description
RM
The words "as described" where used in tis Bill mean as described
in the above documents
The quantities given for piling works are Provisional and Payment
sall be made based on site measurement of actual work done
The Contractor may carry out his own soil investigation in addition to
the information that may be given. All cost in connection there with
shall be deemed to be included in the piling rates
Payable length for piles shall be as follows
(a) Driving of piles shall be measured and paid for in linear metre
measured from the toe of the pile when pitched to the toe of the
pile when driven
(b) The supply of piles shall be measured and paid for in linear
metre measured from the toe of the pile when pitched to the toe of
the pile when driven
Piling Equipment
Provide all necessary plant, equipment and tools; including
transporting to the site, assembling, dismantling and removing from
site after conmpletion of the works
A
item
item
item
handling and moving piling plant and equipment about the site;
including all necessary temporary work in conection therewith
B
To Collection
Item
Description
RM
No
78
No
78
No
156
No
78
No
78
No
156
1,404
No
234
No
78
No
To Collection
Item
Description
RM
m3
569
m3
2,788
m2
583
m2
358
m2
358
m3
288
m2
583
1000mm thick
Hardcore bed consisting of hard, dry broken brick or stone, spread
and levelled and well consolidated
150mm thick
retaining base
Vibrated reinforced concrete Grade C30 as descibed
Retaining wall base
generally
Retaining walls
225mm thick
To Collection
Item
Description
RM
kg
24,363
kg
7,432
kg
7,507
Retaining walls
D
kg
37,549
kg
11,543
kg
9,517
kg
380
143
retaining walls
m2
1,289
No
99
Weep hole
To supply and install 75mm diameter weep hole comlete with
300mm x 300mm x 300mm agregate wrapped with 1 layer of
geotextile; all detailed in Enginner's Drawing No.:
PL/SJKC/10108/EW/DT/04
K
225mm long
Allow for all other works not listed above but shown on the drawings
or referred to in the Specifications or Preambles or which are
necessary to ensure completion of the works in this bill (items to be
specified)
.
.
.
To Collection
Item
Description
RM
To Final Summary
RM
1/1
ROAD AND HARDSTANDING
Amount
1/2
ROAD AND HARDSTANDING
Amount
1/3
ROAD AND HARDSTANDING
Amount
1/4
ROAD AND HARDSTANDING
Amount
1/5
ROAD AND HARDSTANDING
Amount
2/1
ORM WATER DRAINAGE SYSTEM
Amount
2/2
ORM WATER DRAINAGE SYSTEM
Amount
2/3
ORM WATER DRAINAGE SYSTEM
Amount
3/1
CTURE (CH 225.00 TO CH 275.00)
Amount
3/2
CTURE (CH 225.00 TO CH 275.00)
Amount
3/3
CTURE (CH 225.00 TO CH 275.00)
Amount
3/4
CTURE (CH 225.00 TO CH 275.00)
Amount
3/5
CTURE (CH 225.00 TO CH 275.00)
Amount
4/1
RUCTURE (CH 0.00 TO CH 25.00)
Amount
4/2
RUCTURE (CH 0.00 TO CH 25.00)
Amount
4/3
RUCTURE (CH 0.00 TO CH 25.00)
Amount
4/4
RUCTURE (CH 0.00 TO CH 25.00)
Amount
4/5
RUCTURE (CH 0.00 TO CH 25.00)
Amount