Development

Report 2014/2015 edition

Burnham Place at Union Station / Akridge

BOARD MEMBERS
The Washington, DCEconomic Partnership
would like to acknowledge our corporate
sponsors whose continued financial support
has made the DC Development Report:
2014/2015 Edition possible.

Jeff Miller / Co-Chair


Deputy Mayor
Office of Deputy Mayor for Planning & Economic
Development
Richard Lake/Co-Chair
Roadside Development
Olivia Shay-Byrne/Vice Chair
Reed Smith, LLP
Doug Loescher/ DMPED Representative
Office of Deputy Mayor for Planning & Economic
Development

PUBLIC SECTOR PARTNERS

Jennifer Eugene/Secretary
Washington Gas
Joseph L. Askew, Jr., Esq.
Verizon
Steven C. Boyle
EDENS

Vincent C. Gray, Mayor

Jean-Luc Brami
Gelberg Signs
Kenneth Brewer
H St. Community Development Corporation
Sean Cahill
Property Group Partners
Donna M. Cooper
Pepco

PRIVATE SECTOR PARTNERS

Daniel Duke
Bohler Engineering
Angela Franco
Greater Washington Hispanic Chamber of Commerce
Brett Greene
American Management Corporation
Michael J. Haddad
Capital One Bank
Tonya Hill
Comcast Business
Carl Hairston
M&T Bank
Stan Jackson
Anacostia Economic Development Corporation
Norman Jemal
Douglas Development Corporation
Greg Leisch
Delta Associates
Chester McPherson
DC Department of Insurance, Securities, & Banking
Rafael Muniz
The JBG Companies
Lisa Mallory
DC Building Industry Association
Thomas Nida
United Bank
Chris Niehaus
Microsoft
Scott Nordheimer
Urban Atlantic/A&R Development Corporation
Greg ODell
Events DC
Marc Ratner
Streetsense
Eric E. Richardson
DC Office of Cable Television
Rabbiah Robbie Sabbakhan
DC Department of Consumer & Regulatory Affairs
Tara Scanlon
Holland & Knight
Michael Stevens
Capitol Riverfront BID
Robert Summers
DC Department of Small & Local Business
Development
Mitchell Weintraub
Cordia Partners, LLC

Development
Report 2014/2015 edition
Image courtesy of Akridge

Burnham Place at Union Station / Akridge

a publication of the

in partnership with

ABOUT
THE DC DEVELOPMENT REPORT
The DC Development Report is a summary of the major development and construction projects in the District of
Columbia. The Washington, DC Economic Partnership (WDCEP) began tracking development activity in 2001 with
the hope of creating a comprehensive database that would answer a number of questions in regards to the construction
activity in the city. The Report summarizes our entire database of projects, highlights major projects and what lies
ahead for development in the District of Columbia.
This update of the DC Development Report is an overview of development activity and of the expansion occurring in
DC. As a resource book, it is a compilation of nearly 14 years of data collection and research that provides an overview
of an ever-changing development and construction cycle.
The WDCEP performs an annual development census in the month of September and receives contributions from
more than 100 developers, architects, contractors and economic development organizations. This outreach results in
updates to more than 350 projects. While our database of projects is constantly being updated, for the purposes of this
publication all data reflects project status, design and information as of September 2014.
In 2014 the WDCEP partnered with CBRE to provide an economic overview of DC and in-depth analysis of the office,
retail and residential markets. Although every attempt was made to ensure the quality of the information contained in
this document, the WDCEP and CBRE makes no warranty or guarantee as to its accuracy, completeness or usefulness
for any given purpose.
For more information please see our Methodology section.

Washington, DC Economic Partnership, 2014


iv

2014 Washington, DC Economic Partnership

TABLE OF
CONTENTS

1. DEVELOPMENT OVERVIEW
6 Economic Overview
12 Summary of Projects
14 Most Active Developers, Architects & Contractors

2. DEVELOPMENT BY SECTOR
19 Office
31 Retail
45 Residential
59 Hospitality
69 Education

3. APPENDIX
82 Methodology
85 Acknowledgements

The JBG Companies and JBGR Retail


proudly support the
Washington, DC Economic Partnership
JBG.COM

JBGR.COM

TRENDS EVOLVE.
EXPERTS LEAD.
CBRE knows Washington, D.C.
As the industrys leading provider
of commercial leasing services,
investment sales and property
management, we have the insight
and perspective to anticipate whats
next and what it means for the
Washington Metropolitan community
we serve.

cbre.com/dc

DEVELOPMENT
OVERVIEW
Economic Overview / Summary of Projects / Most Active

DC Development Report 2014/2015 Edition

ECONOMIC

OVERVIEW

ECONOMIC OVERVIEW OF THE DISTRICT OF COLUMBIA


While the District of Columbia (DC) has a total population of 646,449, its population increases to more than one million each day due
to the influx of employees coming predominantly from Northern Virginia and Suburban Maryland.1 In fact, the DC metropolitan area
maintains the second highest share of public transit commuters in the country, second only to New York City. DC saw total employment
rise 11.7% between September 2004 and September 2014 with the addition of 79,400 jobs. Though the unemployment rate remains
elevated at 7.8% as of September 2014, this is a significant decline from the 10.5% rate recorded in September 2011. The table below
presents the historical change and growth in employment levels for major industry groups in DC for the past five and ten years.
September 2004-2014
Change (000s)

Change (%)

September 2009-2014
Change (000s)

Change (%)

Mining, Logging, and Construction

2.1

17.1%

3.2

28.6%

Manufacturing

-1.7

-68.0%

-0.4

-33.3%

Wholesale Trade

0.3

6.5%

0.4

8.9%

Retail Trade

3.9

22.3%

3.8

21.6%

Transportation and Utilities

-1.3

-23.6%

-0.2

-4.5%

Information

-6.8

-28.3%

-1.4

-7.5%

Financial Activities

-1.6

-5.2%

2.0

7.4%

Professional and Business Services

12.7

8.8%

12.4

8.5%

Education and Health Services

36.0

39.1%

24.7

23.9%

Leisure and Hospitality

18.9

36.6%

11.9

20.3%

Other Services

9.8

16.5%

5.0

7.8%

Federal Government

8.7

4.5%

-0.7

-0.3%

Source: U.S. Bureau of Labor Statistics

Office Employment
Office-using employment in DC continues struggling to
regain its footing as a result of the substantial cuts in federal
government employment. Between September 2013 and
September 2014, office-using employment experienced a net loss
of 700 jobs. Although the Professional and Business Services

Information
Financial Activities
Professional and Business Services
Other Services

sector, typically regarded as DCs engine of employment growth,


observed a year-over-year increase of 2,800 jobs, this was offset
by the loss of 3,600 federal government jobs. Meanwhile, the
Financial Activities, Information, and Other Services sectors
added a combined 200 jobs.

September 2013

September 2014

Change (000s)

Change (%)

17.1

17.2

0.1

0.6%
0.3%

28.8

28.9

0.1

155.0

157.8

2.8

1.8%

69.2

69.1

-0.1

-0.1%

Federal Government

204.5

200.9

-3.6

-1.8%

TOTAL OFFICE EMPLOYMENT

474.6

473.9

-0.7

-0.1%

Source: U.S. Bureau of Labor Statistics

1. U.S. Census

2014 Washington, DC Economic Partnership

Economic Overview

POPULATION GROWTH
Young Professionals
Young professional aged 25 to 44 years continue to constitute a growing share of the population in DC. According to the U.S. Census
Bureau, between 2004 and 2013, the share of the population within that age group grew by 3.6 percentage points, and now represents
36.5% of the overall population.

Birth Rate
The birth rate in DC has been on a downward trajectory over the past five years, but has remained elevated relative to the U.S. In the
past ten years, DC saw the highest birth rate level in 2008, when there were 15.4 births per 1,000 population. The latest available data
show this number has declined to 14.9 births per 1,000 in 2012.

Birth Rate
(# of Births per 1,000)

U.S. Birth Rate

Total Population (Ths.)

Age 25 to 44

Age 25 to 44, (%)

14.3
14.5
14.7
15.1
15.4
15.1
15.2
15.0
14.9
n/a

14.0
14.0
14.2
14.3
13.9
13.5
13.0
12.7
12.6
n/a

567.8
567.1
570.7
574.4
580.2
592.2
605.1
619.6
633.4
646.5

186.6
185.7
188.0
190.2
193.0
199.1
208.0
218.5
227.7
235.8

32.9
32.7
32.9
33.1
33.3
33.6
34.4
35.3
36.0
36.5

2004
2005
2006
2007
2008
2009
2010
2011
2012
2013

Sources: U.S. Census Bureau, Moodys Analytics

EMPLOYMENT TRENDS
Public vs. Private Sector
DCs public and private sectors have seen divergent employment trends during the past several years. When the U.S. economy was
rocked by the financial crisis, the private sector saw declining job growth. Since the recession, however, the private sector has made
great strides to reach pre-recession levels of employment, growing 13.5% between September 2009 and September 2014. Meanwhile,
public sector employment experienced large job gains in the aftermath of the recession due to the federal governments stimulus plan.
Since 2009, however, public sector employment has dropped about 0.1% per annum, or 0.5% over the span of five years.

Legal Services
Employment in the Legal Services sector in DC reached its peak in July 2008 with almost 38,000 employees, though it quickly
plummeted thereafter with the onset of the Great Recession. Since 2012, employment has leveled and hovered around the 30,000
employee mark. A subsector of the Professional and Business Services sector, Legal Services has observed dwindling employment with
a 14.7% drop over the ten-year period from September 2004 to September 2014. Most of this employment decline is concentrated in
the latter five years during which the average annual rate of decline measured 2.4%. Law firms are among the top tenants in DCs 125
million-sq.-ft. office market, occupying approximately one-third of the entire market.

DC Development Report 2014/2015 Edition

ECONOMIC

OVERVIEW

Educational Services
The Educational Services sector has observed a significant boost in employment over the past ten- and five-year periods. Between
September 2004 and September 2014, employment rose 54.7% with the addition of almost 22,000 jobs. Most of this employment growth
has been concentrated in the past five years, during which 17,700 people were added to the sectors payroll. Although not an occupier
of office space, the Education sector is expected to continue expanding with the boom in eds and meds, particularly in DC and the
surrounding metropolitan area.

Health Care and Social Assistance


The Health Care and Social Assistance sector has experienced strong employment growth of 2.4% per annum between September 2009
and September 2014. However, the addition of 14,000 jobs between September 2004 and September 2014 has not led to a direct increase
in demand in the office market as the sector is not regarded as office-using.
September 2004-2014

September 2009-2014

Change (000s)

Change (%)

AAGR (%)

Change (000s)

Change (%)

AAGR (%)

Total Private

72.3

16.2%

1.6%

61.4

13.5%

2.7%

Total Public

7.1

3.1%

0.3%

-1.2

-0.5%

-0.1%

Legal Services

-5.0

-14.7%

-1.5%

-3.9

-11.9%

-2.4%

Educational Services

22.0

54.7%

5.5%

17.7

39.8%

8.0%

Health Care and Social Assistance

14.0

27.0%

2.7%

7.0

11.9%

2.4%

Source: U.S. Bureau of Labor Statistics (AAGR=average annual growth rate)

INVESTMENT SALES
Foreign Purchasers
Foreign office real estate investment in DC has seen a steady increase over the past two years. The following chart represents foreign
capital investment in DC over the past five years. Over 50% of foreign investment purchases were concentrated in the last two of five
years. The capital has stemmed from a diverse group of investors encompassing Asia, the Middle East, and Europe. Israel has consistently
been a leader with regard to the total number of properties purchased.
The year-to-date numbers through Q3 2014 further emphasize the continued interest in DCs office market. Year-to-date, eight properties
totaling over $1.6 billion worth of foreign capital and 3.0 million sq. ft. of space have been purchased. As Europe continues to show signs
of weakness and instability plagues areas of the Middle East and Asia, these figures are expected to remain stable as foreign investors
search for stronger and safer yield.

2014 Washington, DC Economic Partnership

Economic Overview

ORIGIN OF CAPITAL (January 2009September 2014)


Country

Total Properties Purchased

Germany

Total Volume ($M)


$1,159.20

Japan

$813.60

Canada

$739.70

Norway

$719.20

South Korea

$596.00

UK

$586.00

Kuwait

$516.00

Israel

$305.00

Italy

$93.50

Other

$111.10

Total

44

$5,639.40

Source: Real Capital Analytics

Foreign Sellers
Over the past two years, foreign capital has been among the least active when it comes to disposition of office assets in DC. Year-to-date
there has only been one disposition in DC from a foreign seller. In 2013, there was a handful, a majority of which came from Wereldhave
N.V.s sale of 1401 New York Avenue and 701 8th Street, NW.

DC Development Report 2014/2015 Edition

ECONOMIC

OVERVIEW

NOTABLE OFFICE SALES COMPS (4Q 20133Q 2014)


Property Address

Sale Price ($M)

Price Per SF

Buyer (True) Company

Seller (True) Company

1401 New York Ave NW

$950.0

555 12th St NW

Transaction Date

$450

Heitman LLC, Minshall Stewart Properties, NPS

Loan Star Funds

4Q 2013

$505.0

$640

MetLife, Inc.

Manulife Financial Corporation

1Q 2014

700 13th St NW

$220.1

$851

Kuwait Investment Authority

Beacon Capital Partners

1Q 2014

1333 H St NW

$127.2

$473

MRP Realty, Inc.

Miller Global Properties

3Q 2014

801 17th St NW

$148.8

$948

Morgan Stanley Real Estate Advisor, Inc.

Property Group Partners

1Q 2014

1110 Vermont Ave NW

$162.5

$530

European Property Investment Corporation

Tishman Speyer

1Q 2014

2550 M St NW

$156.0

$753

Mirae Asset Global Investments

Tishman Speyer

1Q 2014

55 M St SE

$141.5

$529

Hines Global REIT, Inc.

Monument Realty LLC

4Q 2013

2001 Pennsylvania Ave NW

$107.8

$699

Carr Properties

Property Group Partners

3Q 2014

1775 Eye St NW

$104.5

$564

Washington Real Estate Investment Trust

Lincoln Property Company

2Q 2014

Source: CoStar; Real Capital Analytics

NOTABLE APARTMENT SALES COMPS (4Q 20133Q 2014)


Property Address

Sale Price ($M)

Price Per Unit

Buyer (True) Company

Seller (True) Company

2700 Woodley Pl NW

$195.0

3828 Georgia Ave NW

$919,811

TIAA-CREF

The JBG Companies

2Q 2014

$75.0

$344,037

Principal Global Investors LLC

Duball, LLC

3Q 2014

443 New York Ave NW

$73.0

$337,963

Washington Real Estate Investment Trust

Greenfield Partners LLC

1Q 2014

2900 Connecticut Ave NW

$39.0

$295,455

Commonwealth Cooperative

Calomiris Associates

2Q 2014

325 P St SW

$34.9

$156,285

Somerset Development Company LLC

HDF&B Realty Advisors, LLC

4Q 2013

301 G St SW

$34.0

$117,647

Urban Investment Partners, LP

Capitol Park Associates

4Q 2013

1921 Kalorama Rd NW

$19.8

$324,590

Goldman, Sachs & Co.

Urban Investment Partners, LP

2Q 2014

1616 16th St NW

$16.0

$280,702

Van Metre Companies

Carmel Partners

2Q 2014

1706 G St NW

$8.0

$333,333

Goldman, Sachs & Co.

Urban Investment Partners, LP

4Q 2013

4000-4016 47th St NW

$7.6

$269,643

47th Street LLC

Urban Investment Partners, LP

4Q 2013

Source: CoStar; Real Capital Analytics

10

2014 Washington, DC Economic Partnership

Transaction Date

Enhancing communities and creating dynatic places since 1985

Douglas Development Corporation is one of the most


dominant and successful real estate developers in the
Washington area controlling nearly 9 million square feet.
The Company and its principals have earned a national
reputation as a leader in redevelopment of historical
properties. Douglas Developments most notable, visible
and well known projects are in the East End of
Washington, and have served as the catalyst for the
redevelopment of the entire area.
With a current portfolio of nearly 9 million leasable
square feet and over 8 million square feet of
developable real estate in the pipeline, Douglas
Development is well established as one of the most
dominant and successful real estate developers in the
Washington area.

CONTACT US:

702 H Street NW, Suite 400


Washington, DC 20001
202.638.6300
www.douglasdevelopment.com

DEVELOPMENT

Summary of Projects

OVERVIEW

DC DEVELOPMENT GROUNDBREAKINGS (September 2014, sq. ft. in millions)1

13.4

12.7

13.1

11.1

10.7

10.4

10.3

10.6
10.4

9.4

9.6

10.3

7.5

4.3

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014
YTD

SUMMARY OF PROJECTS (September 2014)


Projects

Sq. Ft.

Estimated Cost ($B)

1,084

143,308,246

$43.4

2001

79

10,863,811

$2.2

2002

85

9,189,374

$2.2

2003

96

11,436,328

$3.1

2004

97

11,591,945

$2.8

2005

87

10,153,302

$2.4

2006

102

12,933,180

$3.7

2007

73

11,621,355

$3.6

2008

82

12,178,351

$4.1

2009

86

12,248,868

$4.4

2010

52

7,977,660

$2.5

2011

57

5,944,403

$2.3

2012

66

7,512,581

$2.4

2013

79

11,667,858

$4.8

2014 YTD

43

7,989,230

$2.9

Completed

Under Construction

149

23,095,189

$9.2

2014 delivery

31

2,518,958

$1.2

2015 delivery

82

10,292,102

$3.6

2016 delivery

30

6,236,275

$2.3

4,047,854

$2.1

Pipeline

339

131,692,249

$38.2

Near Term

102

17,432,652

$4.9

Medium Term

104

16,902,091

$4.8

Long Term

133

97,357,506

$28.5

2017+ delivery

1. all projects

12

2014 Washington, DC Economic Partnership

10.2
MILLION
average square feet of
groundbreakings per year
from 20102013

Summary of Projects

PROJECTS COMPLETED (20013Q 2014)


# OF PROJECTS

Office
Retail
Residential
Hospitality
Education

236
286
501
166
159

SQ. FT.

51,159,364
6,288,615
53,330,182
16,858,596
13,107,526

UNITS

ROOMS

143.3 MILLION

52,792
12,804

Square Feet Completed

Total Estimated Value of Projects: $43.4 billion

PROJECTS UNDER CONSTRUCTION


# OF PROJECTS

Office
Retail
Residential
Hospitality
Education

17
62
87
22
21

SQ. FT.

3,227,871
1,786,853
10,985,135
2,924,757
3,515,317

UNITS

ROOMS

23.1 MILLION

11,937
2,320

Square Feet Under Construction

Total Estimated Value of Projects: $9.2 billion

PROJECTS NEAR TERM1


# OF PROJECTS

Office
Retail
Residential
Hospitality
Education

24
53
63
21
7

SQ. FT.

UNITS

8,241,631
1,062,165
7,532,460
1,063,449
492,047

8,826

ROOMS

17.4 MILLION
1,207

Square Feet Near Term

Total Estimated Value of Projects: $4.9 billion

PROJECTS MEDIUM TERM1


# OF PROJECTS

Office
Retail
Residential
Hospitality
Education

22
50
69
23
6

SQ. FT.

UNITS

5,419,613
946,108
8,276,012
2,006,455
84,000

8,790

ROOMS

16.9 MILLION
1,514

Square Feet Medium Term

Total Estimated Value of Projects: $4.8 billion

PROJECTS LONG TERM1


# OF PROJECTS

Office
Retail
Residential
Hospitality
Education

58
78
70
29
20

SQ. FT.

34,540,568
3,541,754
35,293,065
2,303,896
4,061,975

UNITS

ROOMS

97.4 MILLION

35,258
2,129

Square Feet Long Term

Total Estimated Value of Projects: $28.5 billion


1. For further explanation of these terms please see the Appendix

DC Development Report 2014/2015 Edition

13

DEVELOPMENT

Most Active
Developers/Architects/Contractors

OVERVIEW

Completed

The figures below list the developers, architects and contractors that have been the most
active in contributing to DCs development activity since January 2010.

Under Construction
Pipeline

MOST ACTIVE DEVELOPERS SINCE 2010 (# of projects)1


The JBG Companies
10

24

WC Smith
7

23

JAIR LYNCH Development Partners


13

20

Douglas Development Corporation


3

11

18

Forest City Washington


6

14

MOST ACTIVE ARCHITECTS SINCE 2010 (# of projects)1


Shalom Baranes Associates
15

23

43

Bonstra Haresign Architects


17

11

31

Eric Colbert & Associates PC


12

27

Hickok Cole Architects


8

12

24

WDG
7

10 24

Torti Gallas & Partners


6

22

MOST ACTIVE GENERAL CONTRACTORS SINCE 2010 (# of projects) 1


Clark Construction Group LLC
26

12

Hamel Builders
17

29

Forrester Construction Company


19

4 1

24

Grunley Construction
15

23

WCS Construction LLC


7

22

1. projects completed since 2010, under construction or in the pipeline (excludes government agencies and colleges/universities)

14

2014 Washington, DC Economic Partnership

42

DEVELOPMENT
BY SECTOR
Office / Retail / Residential / Hospitality / Education

DC Development Report 2014/2015 Edition

17

Developing Great Places


Developing Great Partnerships
Developing Great Ideas
3050 K Street, NW Suite 125 Washington, DC 20007 main 202.719.9000 MRPRealty.com

Development by Sector

OFFICE
DC Development Report 2014/2015 Edition

19

office

Office Development in the District of Columbia

According to a CoreNet Global Real Estate


survey in 2012, the national average of
sq. ft. occupied per person dropped from
225 sq. ft. in 2010 to 175 sq. ft. in 2012 and
is expected to reach 151 sq. ft. by 2017.
DC OFFICE MARKET SNAPSHOT (3Q 2014)1
INVENTORY

125.4 Million

TOTAL VACANCY RATE

Square Feet

11.3%

NET ABSORPTION

OVERALL AVG. ASKING RENTAL RATE

823,741

Square Feet (4Q 133Q 14)


As office-using employment growth in DC lags behind
the national average, DCs office market continues to
experience subdued velocity. Leasing activity for deals
over 10,000 sq. ft. totaled approximately 2.1 million sq.
ft. in Q3 2014. Although eight out of the top 10 largest
deals were renewalsincluding some contractionsno
new growth was observed in DC. As of Q3 2014, CBRE
tracked the overall vacancy rate for the city at 11.3%, an
increase of 90 basis points over the past year.
The 12-month trailing total net absorption was negative
824,000 sq. ft., emphasizing the current lackluster
environment in the DC office market. Though nearly
50% of the decrease in occupied space is due to one
large tenant relocating from DC to Virginia (Intelsat),
the number reflects the manner in which todays
tenants are using office space.
In an attempt to reduce costs, firmsespecially law
firmslook to real estate costs to bump up their bottom
line. Space efficiency trends such as free-address
workstations and telecommuting are allowing for a more
1. CBRE Research

2014 Washington, DC Economic Partnership

$53.17

per square foot (full service)


flexible work environment and reducing the need for
office space. Over the past year, seven out of the top 10
largest law firm leases involved a contraction in space,
decreasing the occupancy by an average of 22%.
As the DC office market continues to grapple with
uncertainty, landlords are looking to stabilize their
assets by renewing tenants of all sizes before their lease
expiration dates. Over the past 12 months, renewals
accounted for 43% of lease transactions over 10,000 sq.
ft. This number jumps to 63% when analyzing deals
50,000 sq. ft. or larger.
New construction in DC remains limited, as the current
under construction square footage is well below DCs
five-year annual average of 1.9 million sq. ft. There
are currently 1.6 million sq. ft. of private sector space
currently under construction, with a preleasing rate of
38%, mostly to legal firms.1 Venable LLP recently agreed
to occupy 245,000 sq. ft. at 600 Massachusetts Avenue,
NW, which broke ground in the third quarter of 2014.
660 North Capitol Street, NW, a 200,000-sq.-ft., trophy

Office Development

project in NoMa, also broke ground in the third quarter, though


on a speculative basis. The project is the third building to break
ground in DC on a speculative basis over the past 18 months,
suggesting developers growing sense of confidence that leasing
activity will strengthen in the coming years.
Investment sales held steady across DC in 2014. During the first
nine months of 2013, sales volume totaled $2.85 billion, compared
to $2.86 billion during the same time period this year. The largest
sale year to date was 555 12th Street, NW, which sold for $505
million, or approximately $640 per sq. ft.2 Over the past 20 years,
the price per sq. ft. for Class A and B buildings over 50,000 sq.
ft. has grown 7.6%, as institutional investors continue to seek a
historically stable real estate market.
While employment plays an important role in swaying office
space demand, firms are focused on reducing overhead costs
by employing greater efficiency in space use. As companies
continue consolidation and densification, the expected increase
in employmentparticularly in the office-using sectorover the
next two years will not lead to a well-defined expansion in their
corporate footprint.
Approximately 1.3 million sq. ft. of private sector office space is
scheduled to deliver by 2015, and while demand is expected to
strengthen, overall vacancy rates will remain elevated at above
11%. The trophy segment of the market, however, will continue
to outperform other product types, as the development pipeline
remains limited and a high demand for trophy space continues.

Trends in Square Footage per Employee


An emerging trend in the global office market, space
efficiency has been substantially present in DC. A major
driver of this trend is firms emphasis on maximizing their
bottom line by cutting overhead costs. Firms, particularly in
the legal services sector within DC, are focusing on reducing
their overall space requirement as well as the average sq.
ft. per employee. Meanwhile, advancements in technology
have enabled for a paper-less environment due to laptops,
mobile devices, and wireless internet. This has led to greater
flexibility in the workplace due to the reduced need for
permanent offices or dedicated office space.
Open floor plans have reduced the amount of space needed
by large offices while simultaneously creating a more
collaborative environment; this is considered a win-win in
todays increasingly dynamic workplace. The trend is especially
evident among the federal government and law firms, two of
DCs largest demand drivers.
According to a CoreNet Global Real Estate survey in 2012, the
national average of sq. ft. occupied per person dropped from
225 sq. ft. in 2010 to 175 sq. ft. in 2012 and is expected to reach
151 sq. ft. by 2017. Considering the benefits, it is no surprise
this trend has gained notoriety and prominence. As firms
have turned to more collaborative space use, their real estate
strategy has become more efficient while proving beneficial to
their bottom line.

DC OFFICE LEASES: TOP 30 DEALS SIGNED (1Q 2014 3Q 2014)1

42% Government

Telecommunications
Technology

Renewal +
Expansion

1.3%

Renewal
70%

3%

1.5%

Other

1.7%

BY INDUSTRY

BY DEAL TYPE

Business Services

4.0%

(Total Sq. Ft.)

(YTD 2014)

Non-profits/
Business Associations

Creative Industries

1. CBRE Research

26%

4.7%
6.1%

New/Relet
38.7% Legal

2. 800 17th Street was sold to TIAA-CREF and Norges Bank Investment Management for $1,075 per sq. ft. ($392 million) in 4Q 2014 (Washington, Business Journal, 10/31/14)

DC Development Report 2014/2015 Edition

21

OFFICE

DEVELOPMENT

DC OFFICE LEASES: TOP 30 DEALS SIGNED (1Q 2014 - 3Q 2014)


TENANT

LOCATION

SUBMARKET

SQ. FT.

DATE

TYPE

Federal Energy Regulatory Commission (GSA)

888 First St., NE

NoMa

503,997

3Q 2014

Renewal

Hogan Lovells

555 13th St., NW

East End

384,650

2Q 2014

Renewal

Department of Justice (GSA)

600 E St., NW

East End

298,179

3Q 2014

Renewal

Morgan, Lewis & Bockius LLP

1111 Pennsylvania Ave., NW

East End

268,866

3Q 2014

Renewal

The Washington Post

1301 K St., NW

East End

249,898

2Q 2014

New

Venable LLP

600 Massachusetts Ave., NW

East End

245,000

3Q 2014

New

Latham & Watkins

555 11th St., NW

East End

238,300

1Q 2014

Renewal

National Park Service (GSA)

1201 Eye St., NW

East End

220,000

2Q 2014

Renewal

The Department of Veterans Affairs (GSA)

1800 G St. NW

CBD

163,917

2Q 2014

Renewal

White & Case LLP

701 13th St., NW

East End

147,999

2Q 2014

Renewal

National Labor Relations Board (GSA)

1015 Half St., NE

Capitol Riverfront

145,000

1Q 2014

New

OMelveny & Myers LLP

1625 Eye St., NW

CBD

100,087

3Q 2014

Renewal

Millennium Challenge Corp.

1099 14th St., NW

East End

96,894

1Q 2014

New

Reed Smith LLP

1301 K St., NW

East End

79,692

2Q 2014

Renewal

PhRMA

950 F St., NW

East End

73,452

3Q 2014

Renewal

European External Action Service (EU)

2175 K St., NW

CBD

71,055

3Q 2014

Renewal

USAO (GSA)

501 3rd St., NW

Capitol Hill

70,000

2Q 2014

Renewal

World Resources Institute

10 G St., NE

NoMa

65,609

3Q 2014

Renewal

Norton Rose Fulbright

799 9th St., NW

East End

65,000

1Q 2014

New

Boies Schiller & Flexner

5301 Wisconsin Ave., NW

Uptown

63,241

2Q 2014

Renewal/Expansion

DC Courts

616 H St., NW

East End

63,000

1Q 2014

Renewal

Palantir Technology

1025 Thomas Jefferson St., NW

Georgetown

61,000

3Q 2014

New

FCC (GSA)

1250 Maryland Ave., SW

Southwest

56,500

1Q 2014

Renewal

Mercer Inc

1050 Connecticut Ave., NW

CBD

56,460

1Q 2014

New

IBM

800 K St., NW

East End

56,269

1Q 2014

Renewal

SSA (GSA)

500 E St., SW

Southwest

55,745

1Q 2014

Renewal

U.S. Department of the Treasury (GSA)

1722 EYE St., NW

CBD

54,771

2Q 2014

New

Verizon

1300 Eye St., NW

East End

54,035

3Q 2014

Renewal

National Cable & Telecommunications Association

25 Massachusetts Ave., NW

Capitol Hill

52,944

1Q 2014

Renewal

Accenture

370 LEnfant Promenade, SW

Southwest

52,878

3Q 2014

Renewal

Source: CBRE Research

22

2014 Washington, DC Economic Partnership

Development Overview

OFFICE PROJECTS (September 2014, office sq. ft. in millions)


GROUNDBREAKINGS

Private
3.1

2000

3.3

0.5 3.8

2002

3.3

0.8

2.2

0.6

2001
4.1

2006

3.0

2010

0.9

1.1

2005

4.1

2006

2012
2013
2014
YTD

1.3
1.1
1.3

0.4

3.5

1.2

3.2
3.6

3.6
4.4

3.7

2008

2.0

3.6

1.2

0.2 1.6

2012

0.2 1.2

1.3
0.7

1.2

2014

0.6 4.3

3.2

2016

0.7

3.4

2.4

2.4

2.1 4.5

0.5 0.4 0.1 1.0


1.3 0.1

20151
1

5.9

0.9 1.5

2013
1.8

1.5

5.6 0.4 6.0


2.7

2010
2011

6.3

2.8

2007

1.6

0.5

2.0

2.3

3.0

2009
2.9

1.2

4.7

2.8

2004

3.8 0.4

2.0

0.7

2011

0.5

5.3

4.2

4.7

2009

0.4

1.4

2007
2008

3.0

2003
4.9

2.8

4.1

2002

2.9

2004
2005

Government
Government (projected)

3.1

2001

2003

Private
Private (projected)

COMPLETED

Government

0.7

0.3

1.3

0.9

OFFICE DEVELOPMENT (September 2014)


PROJECTS

Completed
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014 YTD

OFFICE SQ. FT.

236
27
23
19
12
17
25
16
20
23
10
10
8
20
6

51,159,364
6,331,725
3,013,280
2,769,592
3,201,153
3,622,716
5,903,380
4,276,463
3,236,473
6,033,060
3,408,455
2,442,869
1,531,946
4,469,239
919,013

17
1
9
4
3

3,227,871
80,549
1,345,312
938,592
863,418

Pipeline
Near Term
Medium Term
Long Term

104
24
22
58

48,201,812
8,241,631
5,419,613
34,540,568

TOTAL

357

102,589,047

Under Construction
2014 delivery
2015 delivery
2016 delivery
2017+ delivery

3.86
MILLION

average office sq. ft. delivered


per year (20012013)

1. projections based on targeted delivery dates of projects under construction as of September 2014

DC Development Report 2014/2015 Edition

23

DEVELOPMENT MAP

OFFICE

22

E
AV

14TH ST.

UT

GEORGIA AVE

TIC

EC

NN

CO
ROCK
CREEK
PARK

U ST.

VE
DA

LAN

E IS

OD

RH

VE
KA

OR

GE

WY

OR

NE

GE

W
AS
HI

G
TO
N

M
E

AL
RI
O
M
Y
W
PK

13
30 23

16

VIRGINIA

66

20

14

10

27

18
21
9

4 28
7 12
15
UNION
17
26 STATION
5

1
25

H ST.

E. CAPITOL ST.

NATIONAL MALL
VIRGINIA

U.S. CAPITOL

11

24

19

FORT DUPONT
PARK

NATIONALS
PARK
M

395

M NATIONAL
AIRPORT

Alexandria

Completed
Under Construction
Pipeline

29

M A RTIN LUTHER KING

JR.
AV
E.

Development Pipeline

PROJECT

WARD LOCATION

DEVELOPER(S)

OFFICE SF

EST. VALUE
($M) 1

DELIVERY2

TOP OFFICE PROJECTS COMPLETED (4Q 20133Q 2014)


1

CityCenterDC

9th, 10th, 11th, H, & I Sts., NW

Hines/The First Investor

515,000

$700

4Q 13

GSA Headquarters (Ph I)

1800 F St., NW

GSA

387,824

$161

4Q 13

3 Constitution Square

175 N St., NE

StonebridgeCarras LLC/
Walton Street Capital

344,000

$140

4Q 13

Sentinel Square (Ph II)

1050 1st St., NE

Trammell Crow Company

265,480

$110

4Q 13

440 1st Street

440 1st St., NW

First Potomac Realty Trust

134,000

$40

4Q 13

1700 New York Avenue

1700 New York Ave., NW

Carr Development

124,000

$80

4Q 13

Association of American Medical Colleges

655 K St., NW

Hines/JM Zell

273,200

$115

2Q 14

Sidney Yates Building Renovation

14th St. & Independence Ave., SW

GSA

180,000

$24

2Q 14

U.S. Department of Commerce - Herbert Hoover


Building (Ph III)

14th & Constitution Ave., NW

GSA

246,813

$58

3Q 14

10

1200 17th Street

1200 17th St., NW

Akridge/Mitsui Fudosan America

162,000

$120

3Q 14

TOP OFFICE PROJECTS UNDER CONSTRUCTION


11

National Square

500 D St., SW

Trammell Crow Company

342,000

$140

3Q 15

12

601 Massachusetts Avenue

601 Massachusetts Ave., NW

Boston Properties

460,500

$150

4Q 15

13

2001 M Street

2001 M St., NW

Brookfield Properties

285,000

14

Department of the Interior (Ph VI)

1849 C St., NW

GSA

250,000

$60

1Q 16

15

Republic Square (Ph II)

660 North Capitol St., NW

Republic Properties Corporation

185,000

$65

1Q 16

16

900 16th Street

900 16th St., NW

The JBG Companies

122,000

17

600 Massachusetts Avenue

600 Massachusetts Ave., NW

Gould Property Company/


Oxford Properties Group

381,592

$206

3Q 16

18

Lafayette Building

811 Vermont Ave., NW

GSA

466,818

$112

1Q 17

19

The Wharf (Ph I)

Southwest Waterfront

Hoffman-Madison Waterfront

230,000

$806

4Q 17

20

Harry S. Truman Building Modernization

2201 C St., NW

GSA

166,600

$97

2Q 18

1,648,821

$63

2016

4Q 15

1Q 16

TOP OFFICE PROJECTS PIPELINE (Near Term)


21

U.S. Department of Commerce - Herbert Hoover


Building (Ph IV)

14th & Constitution Ave., NW

GSA

22

4000 Connecticut Avenue

4000 Connecticut Ave., NW

The 601 W Companies

620,000

$45

2016

23

1800 K Street

1800 K St., NW

Deutsche Asset & Wealth Management

185,000

$40

2016

24

Hine Junior High School

700 Pennsylvania Ave., SE

Stanton Development Corp./EastBanc/


Dantes Partners/Jarvis Co.

160,000

$190

2016

25

1000 F Street

1000 F St., NW

Douglas Development Corporation

94,000

$32

2016

26

Capitol Crossing (North Block)

I-395 at 3rd St. &


Massachusetts Ave., NW

Property Group Partners/Center Place


Holdings LLC

936,000

27

Consumer Financial Protection Bureau HQ


Modernization

1700 G St., NW

GSA

503,000

28

Storey Park

1005 1st St., NE

Perseus Realty/First Potomac Realty Trust

350,000

29

Center Building (DHS HQ)

St. Elizabeths West Campus

GSA

270,000

30

2100 K Street

2100 K St., NW

Blake Real Estate

150,000

1. may include non-office components & pipeline values may include additional phases ($ in millions)

2017
$139

2017
2017

$139

2017
2018

2. delivery date may reflect phase I delivery or final phase delivery for pipeline projects

DC Development Report 2014/2015 Edition

25

OFFICE

Development Highlights

DEVELOPMENT
Image courtesy of CoStar

Image courtesy of Akridge

1200 17th Street

WARD

900 16th Street

WARD

LOCATION:

1200 17th Street, NW


Akridge/Mitsui Fudosan America
ARCHITECT(S):
ZGF Architects LLP
CONTRACTOR(S):
Balfour Beatty Construction
LEED: Platinum
EST. COST: $120 million
STATUS: Completed
TARGETED DELIVERY: 3Q 2014

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

900 16th Street, NW


The JBG Companies
ARCHITECT(S):
Cooper Carry Inc
CONTRACTOR(S):
James G Davis Construction Corporation
LEED:
Gold
STATUS: Under Construction
TARGETED DELIVERY: 1Q 2016

SPECS: The 169,000 sq. ft. trophy office building was built on the site of the

SPECS: The former Brutalist-style Third Church of Christ, Scientist building was

former headquarters building for the National Restaurant Association. The


building offers floor-to-ceiling glass, column-free interiors and up to 6,000 sq.
ft. of retail/restaurant space. Pillsbury Winthrop Shaw Pittman is the anchor
office tenant.

demolished and will be replaced by a 140,000 sq. ft. office building with 5,100 sq.
ft. of retail space and a new 11,722 sq. ft. church.

Image courtesy of CoStar

1000 F Street

WARD

2235 Shannon Place

WARD

LOCATION:

1000 F Street, NW
Douglas Development Corporation
ARCHITECT(S):
Shalom Baranes Associates
CONTRACTOR(S):
James G Davis Construction Corporation
LEED: Gold EST. COST: $32 million
STATUS:
Near Term
TARGETED DELIVERY: 3Q 2016

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: 1000 F Street will be an 11-story, 100,000 sq. ft. office building with 7,000

SPECS: The existing four-story building will undergo a gut-rehabilitation, receive

sq. ft. of ground floor retail, anchored by American Eagle. An existing two-story
historic structure on the site will be incorporated into the development.

26

2014 Washington, DC Economic Partnership

2235 Shannon Place, SE


Curtis Development/Four Points LLC
ARCHITECT(S):
PGN Architects PLLC
CONTRACTOR(S):
Forrester Construction Company
EST. COST:
$25 million
STATUS: Under Construction
TARGETED DELIVERY: 4Q 2014
a new glass faade and a new penthouse. The 82,000 sq. ft. office building will
be home to the DC Taxicab Commission, DC Lottery and DDOTs Business
Opportunity & Workforce Development Center. The building was a former
evidence warehouse.

Development Highlights

The Lumber Shed

WARD

Association of American Medical Colleges (AAMC)

WARD

LOCATION:

301 Water Street, SE


Forest City Washington
ARCHITECT(S):
Gensler
CONTRACTOR(S):
Monarc Construction
EST. COST:
$13 million
STATUS: Completed
TARGETED DELIVERY: 3Q 2013

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: The Lumber Shed project is an adaptive reuse of a former Navy Yard

SPECS: The AAMCs new 290,000 sq. ft. headquarters includes 14,300 sq.

ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

industrial building used for storing and drying lumber. The two-level 29,500
sq. ft. building was transformed into restaurant space on the first floor (Osteria
Morini, Agua 301, Ice Cream Jubilee) and office space on the second floor (Forest
City Washington).

655 K Street, NW
Hines/JM Zell
Shalom Baranes Associates
Clark Construction Group LLC
Gold
EST. COST: $115 million
Completed
TARGETED DELIVERY: 2Q 2014

ft. of retail space. The four existing buildings on the site were renovated and
incorporated into the final design.

Image courtesy of the Trammell Crow Company

Image courtesy of First Potomac Realty Trust

Storey Park

WARD

National Square

WARD

LOCATION:

1005 1st Street, NE


Perseus Realty/First Potomac Realty Trust
ARCHITECT(S):
HKS PC
LEED:
Gold
STATUS:
Near Term
TARGETED DELIVERY: 2017

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: A 683,000 sq. ft. mixed-use development will be built on the former

SPECS: National Square will be a new 12-story, 342,000 sq. ft. highly secure office

Greyhound Station site in NoMa. Plans call for 350,000 sq. ft. of office space,
65,000 sq. ft. of retail space and 300 residential units. Construction could
start in 2015.

ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

500 D Street, SW
Trammell Crow Company
Gensler
Clark Construction Group LLC
Silver
EST. COST: $140 million
Under Construction TARGETED DELIVERY: 3Q 2015

building located at the corner of 6th & D Streets, SW across the street from the
LEnfant Metrorail Station. The existing 134,000 sq. ft. Class-B office building on
the site was demolished.

DC Development Report 2014/2015 Edition

27

OFFICE

Development Highlights

DEVELOPMENT

Image courtesy of Boston Properties

601 Massachusetts Avenue


LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

GSA Headquarters (Phase I)

601 Massachusetts Avenue, NW


Boston Properties
Duda Paine Architects
Clark Construction Group LLC
Gold
EST. COST: $150 million
Under Construction TARGETED DELIVERY: 4Q 2015

LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):


LEED:
STATUS:

SPECS: This eleven-story office building will offer 460,500 sq. ft. of office space

(anchored by Arnold & Porter) and 18,300 sq. ft. of retail/restaurant space. The
main lobby includes a nine-story atrium, scaling down to a two-story space prior
to reaching the West Tower and East Tower elevator lobbies.

WARD

1800 F Street, NW
GSA
Shalom Baranes Associates
Whiting-Turner Contracting Company/
Walsh Construction
Gold
EST. COST: $161 million
Completed
TARGETED DELIVERY: 4Q 2013

SPECS: Phase I involved the complete renovation of 388,326 sq. ft. (gross) of

existing office space and the addition of 102,000 sq. ft. (gross) as new courtyard
infill office space. GSA workers started moving back into the building in 2Q 2013.

Image courtesy of Akridge

Burnham Place at Union Station


LOCATION:
DEVELOPER(S):
ARCHITECT(S):
EST. COST:
STATUS:

WARD

Union Station Air Rights


Akridge
Shalom Baranes Associates
$1.3 billion
Long Term
TARGETED DELIVERY: 2022 (Ph I)

Burnham Place is a three million square foot development that will create a
new neighborhood above the rail yards north of Union Station. Plans call for 1.5
million sq. ft. of office space, 100,000 sq. ft. of retail space, 400 hotel rooms and
1,300 residential units.

28

2014 Washington, DC Economic Partnership

1728 14th Street

WARD

LOCATION:

1728 14th Street, NW


Perseus Realty
ARCHITECT(S):
Bonstra|Haresign Architects
CONTRACTOR(S):
Turner Construction Company
EST. COST:
$10 million
STATUS: Completed
TARGETED DELIVERY: 3Q 2014
DEVELOPER(S):

SPECS: 1728 14th Street is a new four-story, 28,500 sq. ft. office building with

14,500 sq. ft. of ground floor and second floor retail space anchored by West Elm.
Bonstra Haresign Architects will occupy the third-floor office space.

Development Highlights

Image courtesy Gould Property Company

600 Massachusetts Avenue


LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

900 G Street

600 Massachusetts Avenue, NW


Gould Property Company/Oxford Properties Group
CORE
Clark Construction Group LLC
Platinum
EST. COST: $206 million
Under Construction TARGETED DELIVERY: 3Q 2016

LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

SPECS: 600 Massachusetts Avenue will be a 10-story, 401,000 sq. ft. class-A office

WARD

900 G Street, NW
MRP Realty/ASB Real Estate
Gensler
James G Davis Construction Corporation
Gold
EST. COST: $65 million
Under Construction TARGETED DELIVERY: 1Q 2015

SPECS: The former YWCA building was demolished and will be replaced by

building with 19,418 sq. ft. of retail space. Venable will be the anchor office tenant.
The project involves renovating and moving two row houses on the site.

nine-story, 110,000 sq. ft. office building with 6,500 sq. ft. of retail space.

Image courtesy of City Partners LLC

Image courtesy of Property Group Partners

Capitol Crossing

WARD

I-395 at 3rd St. & Massachusetts Avenue, NW


Property Group Partners/Center Place Holdings LLC
ARCHITECT(S):
Kevin Roche John Dinkeloo & Associates LLC/SOM/

Kohn Pedersen Fox & Associates
CONTRACTOR(S):
Balfour Beatty Construction
LEED:
Platinum
EST. COST: $1.3 billion
STATUS:
Under Construction (Platform)
TARGETED DELIVERY: 2017 (Ph I)

Square 5914

LOCATION:

LOCATION:

DEVELOPER(S):

DEVELOPER(S):
ARCHITECT(S):
LEED:
STATUS:

WARD

1290 Alabama Avenue, SE


City Partners LLC/Sanford Capital
Maurice Walters
Gold
EST. COST: $95 million
Medium term
TARGETED DELIVERY: 2017

SPECS: The project is adjacent to the Congress Heights Metrorail Station and will

be developed into a 236,000 sq. ft. office building with 8,600 sq. ft. retail space
and a 206-unit apartment building with 6,500 sq. ft. of retail space.

SPECS: Capitol Crossing will be a 2.2 million sq. ft. mixed-use development

built above I-395. Upon full built-out the project will offer 1.9 million sq. ft. of
office space, 63,000 sq. ft. of retail space, 150 residential units and a new Jewish
Historical Society Synagogue. Utility work began in 1Q 2014 with the delivery of
the office buildings (954,000 sq. ft.) in the North Block expected in 2017.
DC Development Report 2014/2015 Edition

29

Holland & Knights


Real Estate Practice
we are here to help you
reach new heights.
We dont just know the law,
we know the business.

www.hklaw.com
Tara Scanlon | Partner
Practice Group Leader Mid-Atlantic Region Real Estate
Washington, DC | 202.457.7150
Northern Virginia | 703.720.8600

Copyright 2014 Holland & Knight LLP All Rights Reserved

Development by Sector

RETAIL
DC Development Report 2014/2015 Edition

31

retail

Retail Development in the District of Columbia

The citys estimated median


household income is projected
to rise 15.0% over the next
five years to $77,143 in 2019.
DC RETAIL MARKET SNAPSHOT (3Q 2014)
TAXABLE RETAIL & RESTAURANT
SALES (2013)
1

$11.5 billion

RETAIL SF UNDER CONSTRUCTION

1.8 million
square feet

(13.8% increase since 2010)


POPULATION GROWTH2

+6.8%
20102013

Retail sales in the District of Columbia account for


approximately 79% of the $13 billion in total consumer
expenditures, creating a retail opportunity gap of an
estimated $2.8 billion.3 This strong retail demand is
related in-part to DCs high volume of tourists. A
record-breaking 19.0 million tourists traveled to DC in
2013. These millions of tourists spent a total of $6.69
billion during their visits, which comprised 8.9% and
5.9% increases in domestic and international tourist
spending, respectively.4
DestinationDC expects total visitor volume to grow
by 2 to 3% each year through 2017.4 Local purchasing
capacity also influences retail demand in DC. The
citys estimated median household income is projected

NEW GROCERY STORES7

under construction

to rise 15.0% over the next five years to $77,143 in 2019.


In comparison, the U.S. is projected to see a 4.0%
increase from the current year median household
income of $51,352. The statistics detailed above show
DCs potential for growth in retail demand.5
The DC retail market has experienced several
significant shifts, one of which is the expansion of the
restaurant scene. A host of restaurants have opened
in recent years in areas such as the 14th Street and
H Street corridors, and have played an instrumental
role in transforming DCs retail sector. This trend has
continued in 2014, as indicated in the graph on the
following page by the projected 4.5% jump in sales for
food services and drinking places.6

1. Office of the Chief Financial Officer (FY 2015 Proposed Budget & Financial Plan) 2. U.S. Census 3. Nielson 4. Destination DC (2013)
5. Nielson 6. Moodys Analytics 7. Harris Teeter (1212 4th St., SE), Giant (3336 Wisconsin Ave., NW) and MOMs (1501 New York Ave., NE) opened in 4Q 2014

2014 Washington, DC Economic Partnership

Retail Development

DC RETAIL SALES GROWTH (Q2 2014 over Q2 2013, trailing four quarters)
27.3%

General merchandise stores


18.6%

Electronics & applicance stores


14.7%

Health & personal care stores

12.7%

Furniture & home furnishing stores


9.5%

Food & beverage stores


6.0%

Clothing & clothing accessories stores

5.4%

Total Retail Sales

4.5%

Food services and drinking places

1.8%

Sporting goods; hobby; book; & music stores


-4.4%

Gasoline stations
Nonstore retailers

Source: Moodys Analytics

-25.5%

-25%

-20

-15

-10

The openings of DBGB, Del Friscos Double Eagle Steakhouse


and Le Diplomate illustrate this restaurant-centric trend. Roses
Luxury, which recently opened in DC, was ranked as the number
one restaurant in the U.S. in 2014.8 These high-end openings
coincided with numerous quick-serve openings. DC claimed
the third best growth market for quick service restaurants in a
2014 study that examined quick-serve restaurant traffic growth
forecasts for 2013 to 2018.9 The restaurant industrys growth
indicates the ever-evolving character of DCs retail landscape.
While sales increased for food services and drinking places, the
increase was even more dramatic for other sectors, including:
clothing & clothing accessories, food & beverage, general
merchandise, furniture, and health & personal care stores.
Over the past year, retail sales for general merchandise have
increased an estimated 27.3%, by roughly the same percentage
that non-store retailer sales have declined. Thus, DC retail sales
have experienced an overall increase from 2013 to 2014, but
performance has varied considerably according to segment.10

-5

10

15

20

25

30%

AVERAGE RETAIL RENTAL RATES PER SUBMARKET


SUBMARKET

PER SQ. FT. RANGE

Capitol Hill

High $30s - $65

Capitol Riverfront

$35 - $50

CBD

$45 - $125

East End

$45 - $125

Georgetown

$55 - $200

H St. NE

$35 - $55

NoMa

$35 - $50

Northeast

$30 High $40s

Southwest

Low $30 - $55

Uptown

$35 - $70

West End

$40 - $55

Source: CBRE Research

Finally, the opening of CityCenterDC, a 1.6 million-sq.-ft.,


mixed-use development (with 185,000 sq. ft. of retail space), was a
capstone event for DCs growing urban retail market. In planning
and design since 2003, CityCenterDC has provided a highend retail anchor in the downtown with retailers such as Allen
Edmonds, Hugo Boss, Burberry, Longchamp and Arcteryx.

8. Bon Appetit (8/19/14)


9. The NPD Group/QSR
10. Moodys Analytics

DC Development Report 2014/2015 Edition

33

RETAIL

Development Highlights

DEVELOPMENT

TOP RETAIL LEASES (YTD 2014)


COMPANY NAME

ADDRESS

BUILDING/PROJECT NAME

Lowes2
Walmart
Whole Foods
Marshalls
Saks Fifth Avenue3
Walgreens
Planet Fitness
Old Navy
MOMs Organic Market
GAP
Petco
Theodores3
CVS Caremark
One to One Fitness, Inc.
Momofuku
Paul Stuart
Texas de Brazil
Passion Food Hospitality, LLC
Hugo Boss
Mindful Restaurant Group
Ferragamo

33rd Street & South Dakota Avenue, NE


58th & East Capitol Streets, NE
600 H Street, NE
5333 Wisconsin Avenue, NW
5300 Wisconsin Avenue, NW
1155 F Street, NW
1401 New York Avenue, NE
5335 Wisconsin Avenue, NW
1401 New York Avenue, NE
1155 F Street, NW
1401 New York Avenue, NE
2233 Wisconsin Avenue, NW
1275 Pennsylvania Avenue, NW
1750 K Street, NW
850 10th Street, NW
875 10th Street, NW
455 Massachusetts Avenue, NW
700 6th Street, NW
800 10th Street, NW
1401 New York Avenue, NE
1001 H Street, NW

Shops at Dakota Crossing


Capitol Gateway Marketplace
Apollo
Friendship Center
Mazza Gallerie
Hecht Warehouse District
Chevy Chase Pavilion
Hecht Warehouse District
Hecht Warehouse District

CityCenterDC
CityCenterDC

CityCenterDC
Hecht Warehouse District
CityCenterDC

SQ. FT. 1

NEIGHBORHOOD

136,000
135,000
39,000
29,000
22,055
19,500
19,000
18,000
16,000
14,000
12,000
11,000
10,000
9,000
9,000
8,000
8,000
8,000
6,500
6,000
4,000

Fort Lincoln/Dakota Crossing


East Capitol Street/Capitol Gateway
H Street, NE
Chevy Chase/Friendship Heights
Chevy Chase/Friendship Heights
Downtown DC
New York Ave/Bladensburg Road
Uptown
New York Avenue/Bladensburg Road
Downtown DC
Northeast
Glover Park
Downtown DC
Golden Triangle
Downtown DC
Downtown DC
Mt. Vernon Triangle
Downtown DC
Downtown DC
New York Avenue/Bladensburg Road
Downtown DC

1. rounded to nearest thousand 2. purchased a pad site for $3.58 million (Washington Business Journal, 8/21/14) 3. renewal

O, the view from the top.

800 P STREET, NW WASHINGTON, DC 20001 CITYMARKETATO.COM


Its the view to one of DCs most iconic neighborhoodsthe birthplace
of Duke Ellington and the local jazz scenewhich also happens to be a
modern cultural gem. Its the view to life at City Market at O. Start your
day with a grande at Starbucks. Grocery shop at the reimagined O Street
Market, now home to Giant. Dine at Convivial, opening this spring. Take
your pooch and head out of your luxe apartment for a stroll that ends up
in your very own dog park. Take a swim in the rooftop innity pool. Then
settle in with a nightcap by the outdoor repit. Youre in your element. And
on top of the world.

34

2014 Washington, DC Economic Partnership

Maxwell Mackenzie

the new element of style.

Development Overview
RETAIL PROJECTS (September 2014, retail sq. ft.)
GROUNDBREAKINGS
2000

Projected

COMPLETED

111,800

2001
2002

555,610

2003
2004

570,488

2008
2009
2010

711,923

2005
911,203

2006

262,547

294,862

2007

239,150

378,658

2008

265,276

867,131

2009

301,840

265,943

2010
654,230

2012
2013

369,208

2004

439,866

2011

347,229

2003

2006
2007

311,800

2002

293,481

2005

226,178

2001

323,849

1,035,426
694,485

330,700

2011

312,345

2012

314,324

2013

2014
YTD

1,050,839

1,067,236

20141

491,078

20151
2016

192,337 683,415
841,157

229,359

RETAIL DEVELOPMENT (September 2014)


PROJECTS

Completed
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014 YTD

RETAIL SQ. FT.

286
18
22
19
22
26
24
22
22
27
10
11
16
28
19

6,288,615
226,178
311,800
347,229
369,208
711,923
294,862
378,658
867,131
265,943
330,700
312,345
314,324
1,067,236
491,078

62
13
31
14
4

1,786,853
192,337
841,157
229,359
524,000

Pipeline
Near Term
Medium Term
Long Term

181
53
50
78

5,550,027
1,062,165
946,108
3,541,754

TOTAL

529

13,625,495

Under Construction
2014 delivery
2015 delivery
2016 delivery
2017+ delivery

28

In 2014 DC will open


its 28th new grocery store
since 2000.

1. projections based on targeted delivery dates of projects under construction as of September 2014

DC Development Report 2014/2015 Edition

35

DEVELOPMENT MAP

RETAIL

22

3
14
18

10

CO
E
AV

24
13
U ST.

14TH ST.

UT

ROCK
CREEK
PARK

GEORGIA AVE

TIC

EC

NN

11

15

VE
DA

LAN

E IS

OD

RH

GE

WY

OR

NE

E
AV
RK

12

GE

W
AS
HI

G
TO
N

M
E

AL
RI
O
M
Y
W
PK

5
27 1
29
VIRGINIA

66

28
30
26
4 UNION

17

H ST.

STATION

E. CAPITOL ST.

NATIONAL MALL
VIRGINIA

U.S. CAPITOL

23
19

16
FORT DUPONT
PARK
NATIONALS
PARK

25
M

395

M NATIONAL
AIRPORT

Alexandria

Completed
Under Construction
Pipeline

M A RTIN LUTHER KING

JR.
AV
E.

20

21

Development Pipeline

PROJECT

WARD LOCATION

DEVELOPER(S)

RETAIL SF

EST. VALUE
($M)1

DELIVERY2

TOP RETAIL PROJECTS COMPLETED (4Q 20133Q 2014)


1 The Shops at Georgetown Park

3222 M St., NW

AG Georgetown Park Holdings/Vornado/CES

330,000

$32

4Q 13

2 CityCenterDC

9th, 10th, 11th, H, & I Sts., NW

Hines/The First Investor

185,000

$700

4Q 13

3 Walmart on Georgia Avenue

5929 Georgia Ave., NW

Foulger-Pratt

106,000

4 77 H

1st & H Sts., NW

The JBG Companies/Bennett Group

86,000

$90

4Q 13

5 CityMarket at O (Ph I - Giant)

1400 7th St., NW

Roadside Development

75,000

$35

4Q 13

6 LEnfant Plaza Redevelopment (Ph II)

950 LEnfant Plaza, SW

The JBG Companies

93,000

$17

2Q 14

7 Twelve12

1212 4th St., SE

Forest City Washington

88,000

$100

2Q 14

8 Monroe Street Market

700 - 800 blocks of Monroe St., NE Abdo Development/Bozzuto Group/Catholic University

56,915

$150

2Q 14

9 The Louis at 14th

1420 U St., NW

The JBG Companies/Georgetown Strategic Capital

44,000

$100

2Q 14

10 The Swift

3830 Georgia Ave., NW

Duball LLC/Safeway

62,000

$65

3Q 14

$130

4Q 14

4Q 13

TOP RETAIL PROJECTS UNDER CONSTRUCTION


11

Cathedral Commons

3336 & 3400-3430 Wisconsin


Ave., NW

Giant Food/Bozzuto Group/Southside Investment Partners

125,000

12

Hecht Warehouse District

1401 New York Ave., NE

Douglas Development Corporation

200,800

13

2251 Wisconsin Avenue

2251-2255 Wisconsin Ave., NW

Altus Realty Partners/Chesapeake Realty Partners

28,277

$32

1Q 15

14

Fort Totten Square

South Dakota Ave. & Riggs Rd., NE

The JBG Companies/Lowe Enterprises

130,000

$120

2Q 15

15

The Shops at Dakota Crossing (Ph II)

New York Ave. &


South Dakota Ave., NE

Fort Lincoln New Town Corporation/Trammell Crow


Company/CSG Urban Partners

266,000

$40

3Q 15

16

800 New Jersey Avenue

New Jersey Ave. & H St., SE

WC Smith

35,000

$135

3Q 16

17

Apollo

610 H St., NE

Insight Property Group LLC

75,000

$190

4Q 16

18

ART Place at Fort Totten (Ph I)

5180 South Dakota Ave., NE

Cafritz Foundation

104,000

$117

2Q 17

19

The Wharf (Ph I)

Southwest Waterfront

Hoffman-Madison Waterfront

190,000

$806

4Q 17

20

Skyland Town Center (Ph I)

Alabama Ave. & Naylor Rd., SE

Rappaport/WC Smith/Marshall Heights CDO

220,000

$150

2017/18

167,450

$120

2016

4Q 14/2015

TOP RETAIL PROJECTS PIPELINE (Near Term)


21

Capitol Gateway Marketplace

58th & East Capitol Sts., NE

A&R Development/DCHA/Henson Dev. Co.

22

Georgia Eastern

7828 Georgia Ave., NW

Douglas Development Corporation

60,000

23

Hine Junior High School

700 Pennsylvania Ave., SE

Stanton Development Corp./EastBanc/Dantes Partners/


Jarvis Co.

40,000

$190

2016/17

24

The Line DC

1780 Columbia Rd., NW

Friedman Capital Advisors/Foxhall Partners/Sydell Group

20,903

$100

2016/17

25

The Riverfront

100 Potomac Ave., SE

FRP Development Corp./MRP Realty

18,650

$100

2016/17

26

Storey Park

1005 1st St., NE

Perseus Realty/First Potomac Realty Trust

65,000

27

Prospect Place

3220 Prospect St., NW

McCaffery Interests

27,600

28

Gateway Market

340 Florida Ave., NE

LCOR Inc./EDENS

27,410

29

CityCenterDC (Conrad Hotel)

10th & New York Ave., NW

Hines

70,000

30

Uline Arena

1140 3rd St., NE

Douglas Development Corporation

50,000

2016/17

2017
2017
$55

2017
2018

$120

1. may include non-retail components & pipeline values may include additional phases ($ in millions) 2. delivery date may reflect phase I delivery or final phase delivery for pipeline projects

DC Development Report 2014/2015 Edition

37

RETAIL

Development Highlights

DEVELOPMENT
Image courtesy of Urban Atlantic

CityCenterDC
LOCATION:
DEVELOPER(S):
ARCHITECT(S):

CONTRACTOR(S):
LEED:
STATUS:

WARD

9th, 10th, 11th, H, & I Streets, NW


Hines/The First Investor
Foster & Partners/Shalom Baranes Associates/Lee
and Associates Inc
Clark Construction Group LLC/Smoot Construction
Gold
EST. COST: $700 million
Completed
TARGETED DELIVERY: 4Q 132Q 14

SPECS:The redevelopment of the southern portion (Parcel A) of the former

convention center site includes 515,000 sq. ft. of office space, 185,000 sq. ft. of
retail space and 674 apartments and condominiums.

The Parks at Walter Reed

WARD

LOCATION:

6800 Georgia Avenue, NW


Hines/Urban Atlantic/Triden Development Group/
DMPED
EST. COST:
$1 billion
STATUS:
Long Term
DEVELOPER(S):

SPECS: 66.57 acres of the 110.1-acre campus will be redeveloped into

approximately 3.1 million sq. ft. of mixed-use development. The proposed


development includes 2,097 residential units, up to 250,000 sq. ft. of retail space,
770,000 sq. ft. of office/medical/education space and 20 acres of open space.

Image courtesy of Douglas Development

Hecht Warehouse District

WARD

1401 New York Avenue, NE


Douglas Development Corporation
ARCHITECT(S):
Shalom Baranes Associates/Antunovich Associates
CONTRACTOR(S):
Clark Construction Group LLC/McCullough

Construction LLC
STATUS:
Under Construction
TARGETED DELIVERY: 4Q 142015

The Louis at 14th

LOCATION:

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: The redevelopment plan calls for 330 apartments and 200,800 sq. ft. of

retail space on the 9.8-acre site. The historic Hechts Warehouse will be converted
into apartments and retail. An adjacent building will include one floor of retail
below a parking garage. MOMs Organic Market opened a 16,000 sq. ft. store in
November 2014.

38

2014 Washington, DC Economic Partnership

ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

1420 U Street, NW
The JBG Companies/Georgetown Strategic Capital LLC
Eric Colbert & Associates PC
Balfour Beatty Construction
Silver
EST. COST: $100 million
Completed
TARGETED DELIVERY: 2Q 2014

SPECS: The Louis at 14 is a nine-story, mixed-use building with 268 apartments

and 44,000 sq. ft. of retail space (anchored by a Trader Joes grocery store). JBG
sold the project to TIAA-CREF in June 2014.

Development Highlights

Image courtesy of Rappaport

Image courtesy of EDENS

1270 4th Street

WARD

Skyland Town Center (Phase I)

1270 4th Street, NE


EDENS/Level 2 Development
ARCHITECT(S):
Shalom Baranes Associates
STATUS:
Near Term
TARGETED DELIVERY: 2017
LOCATION:

LOCATION:

DEVELOPER(S):

DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

SPECS: This proposed 11-story, 408,000 sq. ft., 420 to 520-unit residential

building will offer up to 40,000 sq. ft. of retail space. The project is part of the
eight million sq. ft. Union Market District proposed redevelopment vision.

WARD

Alabama Avenue & Naylor Road, SE


Rappaport/WC Smith/Marshall Heights CDO
Torti Gallas & Partners
WCS Construction LLC/L. F. Jennings Inc.
Silver
EST. COST: $150 million
Under Construction TARGETED DELIVERY: 2017-2018

SPECS: The planned redevelopment of the 18.5-acre Skyland Shopping Center will

occur in phases and result in up to 323,000 sq. ft. of retail space, 485 residential
units and nearly 1,700 parking spaces. Phase I is scheduled to include 220,000 sq.
ft. of retail space (120,000 sq. ft. Walmart) and 250-270 apartments.

Image courtesy of SK & I Architectural Design Group

Image courtesy of Walmart

Capitol Gateway Marketplace


LOCATION:
DEVELOPER(S):

ARCHITECT(S):

CONTRACTOR(S):
EST. COST:
STATUS:

WARD

58th & East Capitol Streets, NE


A&R Development/DC Housing Authority/
Henson Development Company
Bignell Watkins Hasser Architects/
Massa Montalto Architects/
WCS Construction LLC
$120 million
Near Term
TARGETED DELIVERY: 2016

SPECS: The 12-acre site will be redeveloped into approximately 167,000 sq. ft. of

retail space, anchored by a 135,000 sq. ft. Walmart, and 304 apartments.

800 New Jersey Avenue

WARD

LOCATION:

New Jersey Avenue & H Street, SE


WC Smith
ARCHITECT(S):
SK & I Architectural Design Group LLC
CONTRACTOR(S):
WCS Construction LLC
LEED:
Silver
EST. COST:
$135 million
STATUS: Under Construction
TARGETED DELIVERY: 3Q 2016
DEVELOPER(S):

SPECS: 800 New Jersey Avenue will consist of 336 loft-style apartments with 10-

foot ceilings and a 35,000 sq. ft. Whole Foods with two levels of grocery parking
above the store. It is the second phase of the 1.4 million sq. ft. mixed-use Square
737 development.

DC Development Report 2014/2015 Edition

39

RETAIL

Development Highlights

DEVELOPMENT

Image courtesy of Hoffman-Madison Waterfront

The Wharf (Phase I)


LOCATION:
DEVELOPER(S):
ARCHITECT(S):

CONTRACTOR(S):
LEED:
STATUS:

WARD

77 H

Southwest Waterfront
Hoffman-Madison Waterfront
Perkins Eastman/BBG-BBGM/
Cunningham|Quill Architects PLLC
Gilford Corporation/Clark Construction Group LLC
Gold
EST. COST: $806 million
Under Construction TARGETED DELIVERY: 4Q 2017

LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

1st & H Streets, NW


The JBG Companies/Bennett Group
MV+A Architects/Preston Partnership LLC
Clark Construction Group LLC
Silver
EST. COST: $90 million
Completed
TARGETED DELIVERY: 4Q 2013

SPECS: A former parking lot was redeveloped into 86,000 sq. ft. of retail space,

anchored by a 76,000 sq. ft. Walmart (with 40,000 sq. ft. for groceries), 303
apartments and 9,800 sq. ft. of additional retail/restaurant space. JBG sold the
project to Clarion Partners in early 2014.

SPECS: The 1.86 million sq. ft. Phase I redevelopment of the Southwest

Waterfront will include 230,000 sq. ft. of office space, 190,000 sq. ft. of retail
space, 872 residential units, 683 hotel rooms, 140,000 sq. ft. of cultural and
entertainment space and 1,475 underground parking spaces.

Image courtesy of Douglas Development Corporation

Image courtesy of The JBG Companies

Fort Totten Square


LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

South Dakota Avenue & Riggs Road, NE


The JBG Companies/Lowe Enterprises
Hickok Cole Architects
Clark Builders Group
Certified
EST. COST: $120 million
Under Construction TARGETED DELIVERY: 2Q 2015

SPECS: The first phase of the Ft. Totten Square development will deliver 345

apartments, 130,000 sq. ft. of retail space (anchored by a 120,000 sq. ft. urbanformat LEED certified Walmart) and 750 parking spaces.

40

2014 Washington, DC Economic Partnership

Uline Arena
LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
EST. COST:
STATUS:

WARD

1140 3rd Street, NE


Douglas Development Corporation
GTM Architects
James G Davis Construction Corporation
$120 million
Near Term

SPECS: The Uline Arena project will include the adaptive reuse of the

existing 110,000 sq. ft. masonry arena building and adjacent Ice House. The
redevelopment plan calls for 150,000 sq. ft. of office space and 50,000 sq. ft. of
retail space.

Development Highlights

Visualization by Interface Multimedia

Cathedral Commons
LOCATION:
DEVELOPER(S):

ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

Monroe Street Market

3336 & 3400 - 3430 Wisconsin Avenue, NW


Giant Food/Bozzuto Group/Southside
Investment Partners
JCA Architects
Bozzuto Construction
Silver
EST. COST: $130 million
Under Construction TARGETED DELIVERY: 4Q 2014

LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

700 - 800 blocks of Monroe Street, NE


Abdo Development/Bozzuto Group/Catholic University
Torti Gallas & Partners/KTGY
Bozzuto Construction
Certified
EST. COST: $150 million
Completed
TARGETED DELIVERY: 2Q 2014

SPECS: This mixed-use project delivered 57,000 sq. ft. of retail space and 562

apartments in Blocks A1, B and C. Project anchors include The Arts Walk (27
artist studios), Busboys & Poets, Brookland Pint and &pizza. Some portions of
the project started to deliver in 4Q 2013.

SPECS: The former Giant on the site was demolished in 2012 and a new 56,000

sq. ft. store will be built along with an additional 69,000 sq. ft. of retail space and
145 residential units on two separate parcels. The Giant grocery store opened in
November 2014.

Image courtesy of Foulger-Pratt

Twelve12
LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

1212 4th Street, SE


Forest City Washington
Shalom Baranes Associates
Walsh Construction
Silver
EST. COST: $100 million
Completed
TARGETED DELIVERY: 2Q 2014

SPECS: Twelve12 features a 218-unit apartment building above 88,000 sq. ft. of

retail space, including a 50,000 sq. ft. Harris Teeter (November 2014 opening)
and a 28,000 sq. ft. VIDA Fitness.

Walmart on Georgia Avenue

WARD

LOCATION:

5929 Georgia Avenue, NW


Foulger-Pratt
ARCHITECT(S):
Massa Montalto Architects
CONTRACTOR(S):
Foulger-Pratt
STATUS:
Completed
TARGETED DELIVERY: 4Q 2013
DEVELOPER(S):

SPECS: The former 3.56-acre Curtis Chevrolet dealership was redeveloped into a

106,000 sq. ft. Walmart with approximately 40,000 sq. ft. dedicated to groceries,
348 parking space and 37 bicycle spaces.

DC Development Report 2014/2015 Edition

41

RETAIL

Development Highlights

DEVELOPMENT

Image courtesy of Insight Property Group LLC

Apollo
LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

The Swift

610 H Street, NE
Insight Property Group LLC
SK & I Architectural Design Group LLC
John Moriarty & Associates of Virginia LLC
Silver
EST. COST: $190 million
Under Construction TARGETED DELIVERY: 4Q 2016

LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

SPECS: The Apollo will be a 431-unit apartment building with 75,000 sq. ft. of

WARD

3830 Georgia Avenue, NW


Duball LLC/Safeway
Torti Gallas & Partners
Bozzuto Construction
Silver
EST. COST: $65 million
Completed
TARGETED DELIVERY: 3Q 2014

SPECS: The former site of a 21,000 sq. ft. Safeway was redeveloped into a new

retail space, anchored by a 39,000 sq. ft. Whole Foods. There will also be 442
underground parking spaces and about 165 bicycle parking spaces.

60,000 sq. ft. Safeway grocery store (June 2014 opening) and 218 apartments. A
two-level underground parking garage was also built on the site. Duball LLC sold
the project to Principal Real Estate Investors for $75 million in July 2014.

Image courtesy of Foulger-Pratt

ART Place at Fort Totten (Phase I)


LOCATION:
DEVELOPER(S):
ARCHITECT(S):

CONTRACTOR(S):
LEED:
STATUS:

WARD

5180 South Dakota Avenue, NE


Cafritz Foundation
EE&K Architects/MV+A Architects/
Shalom Baranes Associates
Foulger-Pratt
Silver
EST. COST: $117 million
Under Construction TARGETED DELIVERY: 2Q 2017

SPECS: Phase I will deliver 104,000 sq. ft. of retail space (on two levels) and 520

apartments (121 141 affordable units) in three buildings.

42

2014 Washington, DC Economic Partnership

Brentwood Park

LOCATION:


DEVELOPER(S):
LEED:
STATUS:

WARD

Rhode Island Avenue, NE & 4th Street &


Edgewood Street, NE
Mid-City Financial Corporation
Silver
Long Term

SPECS: The 20-acre site that currently encompasses the Brentwood Village

Shopping Center and the 535-unit Brookland Manor (Section 8 Housing) will be
redeveloped into a mixed-use neighborhood with 200,000 sq. ft. of retail space
and 2,200 residential units (20% affordable).

Natural Gas. Efficient by Nature.

Including natural gas in


our project was a very
smart decision.

Plan Early Sell Faster with Natural Gas.


If you dont incorporate natural gas as a primary energy source into your plans, youre missing a big opportunity.
Savvy builders know that their clients prefer natural gas because of the comfort, cost savings, reliability and environmental
benefits it affords.

Its easier than ever to include natural gas.


Attractive design alternatives are available through the use of the industrys latest meters. Theyre smaller, allowing for their
placement in aesthetically pleasing locations.
Innovative piping options such as 2 psi delivery systems, and flexible copper and corrugated stainless steel piping help to
reduce first costs.
Distributed Meter Rooms (DMR) provide the flexibility for individual unit meters to be installed in vertically stacked central gas
meter rooms on each floor in a high rise multifamily building.

Call Washington Gas for a free consultation.


The Engineered Sales Team at Washington Gas is the resource you can count on for all multifamily development natural gas applications.
Our representatives include a variety of professionals with the technical skills to understand your requirements and walk you through each
stage of the process.
To learn more about incorporating natural gas into your next project, email our Engineered Sales Team at EngineeredSales@washgas.com
or visit PlanEarlySellFaster.com.

Pepco DC Econ Part Ad:Layout 1

9/12/13

9:40 AM

Page 1

ENERGY CREATES

OPPORTUNITIES
We're proud to support the
Washington, D.C. Economic Partnership.

COMING 2017
At the intersection of First and L streets, NE, Storey Park will be at the center of NoMa in every way.

Development by Sector

RESIDENTIAL
DC Development Report 2014/2015 Edition

45

residential

Residential Development in the District of Columbia

DC continues to see robust


population growth, while the
share of young professionals has
grown at an even faster pace.

DC RESIDENTIAL MARKET SNAPSHOT


TOTAL HOUSEHOLDS1

283,172
UNITS UNDER CONSTRUCTION

11,937

The District of Columbia has recorded strong prospects


for expansion in the residential real estate market due
to its population, employment, and income growth.
DC continues to see robust population growth, while
the share of young professionals has grown at an
even faster pace.
Between 2012 and 2013, DCs population increased
2.1% to 646,500, while the 25 to 44 year old cohort
expanded by 3.5% to 235,800. During the same time
period, the labor market in DC observed overall
growth, albeit at a slower pace. DC added 10,400
jobs in 2013, an increase of 1.4%. Meanwhile, the

1. District of Columbia Economic & Revenue Trends (October 2014)


2. District of Columbia Economic & Revenue Trends/Delta Associates (October 2014)

2014 Washington, DC Economic Partnership

CONDOS UNDER CONSTRUCTION

1,425
MARKET RATE APARTMENT
NET ABSORPTION2 (4Q133Q14)

2,731
unemployment rate continued along a downward
trajectory, dropping 90 basis points over the year to
8.3% in 2013.
The median home sales price in DC rose 3.0%
over the year from $461,000 in August 2013 to
$475,000 in August 2014. Meanwhile, according
to a report by CoreLogic, DC observed a 7.1%
increase in foreclosure activity between September
2013 and September 2014. During the same month,
DC recorded the 9th highest share of homes in
foreclosures among U.S. states, at 2.3% of inventory.

Residential Development

DC POPULATION GROWTH RATE (year-over-year)


5.0%
5%

Age 2544
DC Population

4.5%

4%

4.2%
3.5%

3.2%

3%

2.1%
2%

1.0%

2.2%

2.4%

2.2%

2.1%

1.4%

1%
0.00

2008

2009

2010

Looking ahead, the population, employment, and income


of the region are forecast to grow. DC is projected to see its
population increase by 10.2% between 2014 and 2019, while
median household income is projected to rise by 15.0% to
$77,143 during the same time frame.3 According to Moodys
Analytics, total metropolitan employment as well as officeusing employment is expected to gain traction between 2015
and 2017.

DC Apartment Size
The average size of a one-bedroom apartment in DC has been
on a downward trajectory over the past decade. While the
previous unit average was approximately 850 sq. ft. through the
early 2000s, this figure has dropped to around 725 to 750 sq. ft.,
excluding the new phenomenon of micro-units. Renters have
become more interested in assessing the total monthly rent,
rather than the quoted rent per sq. ft. Moreover, the size of
apartments is a function of both the proximity to the Metrorail
as well as the overall monthly rent.

DC Supply and Absorption


There are approximately 12,000 units set to deliver in the next
36 months in DC, compared to about 10,000 units during the
same time last year.4 Though most new product is concentrated
in new marketsincluding Capitol Riverfront, H Street, Mt.
Vernon Triangle and NoMathe developed markets continue
to see new projects coming online. Given the recent surge in
DCs population, absorption has remained stable.

2011

2012

2013

DC Average Rents per Neighborhood


According to Axiometrics, the Downtown-Logan Circle
neighborhood had the highest asking and net effective rents
during Q3 2014 at $2,498 and $2,474, respectively. Meanwhile,
the Howard University-Mt. Pleasant-Brightwood neighborhood
had the highest occupancy rate at 97.2%, followed closely behind
by Capitol Hill-SW with 97.1% occupancy. Brookland-Ft. Totten,
located in northeast DC, observed the lowest asking and effective
rents, while Anacostia-NE DC recorded the lowest occupancy
rate of 93.0%.

APARTMENT RENTAL RATES (Q3 2014)


ASKING RENT

EFFECTIVE
RENT

OCCUPANCY
RATE

Anacostia-NE DC

$1,755

$1,738

93.0%

Brookland- Ft. Totten

$1,675

$1,655

96.3%

Capitol Hill-SW

$1,954

$1,951

97.1%

Downtown-Logan Circle

$2,498

$2,474

95.7%

Dupont- Adams Morgan

$2,004

$1,999

96.8%

Howard UniversityMt. Pleasant-Brightwood

$1,815

$1,767

97.2%

NW DC- Georgetown

$1,948

$1,940

94.3%

Woodley Park- Cleveland Park- Van Ness

$2,190

$2,176

96.0%

NEIGHBORHOOD

Source: Axiometrics

3. Nielson
4. Washington, DC Economic Partnership

DC Development Report 2014/2015 Edition

47

6T
HS

NORTH CAPITOL ST

1ST ST

FL
OR
ID

K ST

I ST

AA
VE

MO
R

SE
ST

Apollo
H ST

13TH ST

12TH ST

11TH ST

E
AV

F ST

1ST ST

map not to scale

H STREET, NE
1ST ST

EE
AV
E

Stanton
Square

specific nodes, with an arts and entertainment district on the


east end (anchored by the Atlas Performing Arts Center2005
opening), residential on the western end and a heavy
concentration of retail in the middle (Whole Foods set to open
in 2016/2017).

The vision for the development that is occurring today can be


traced back to the 2004 H Street NE Strategic
Development
INDEPENDENCE AVE
Plan. The plan recommended the corridor be developed around
H
RT
NO

CA

C ST

UNDER CONSTRUCTION

1,335,300

D ST

E ST

Retail SF

829

42,700

1,238

111,700

Market

647,175

623

84,600

3,028,975

2,690

239,000

HALF ST

400

2ND PL

2ND ST

1,500,000

1,500,000

1,300
K ST

3,990
L ST

138

100,000

44
0

16

K ST

2007 2008 2009 2010 2011 2012 2013 2014* 2015* 2016*

339,000

L ST

*projections based on projects under construction (as of September 2014)

M ST

Navy Yard

2014 Washington, DC Economic Partnership


1ST ST

DELA
WAR
E AV
E

N ST

E
Y AV

48

5,943,975

400

M Potomac Ave

I ST

I ST

4TH ST

ERSE

18

2,915,000

E ST

215

395

PIPELINE (BURNHAM PLACE AT UNION STATION)

D ST

484

8TH ST

J
NEW

SOUTH CAPITOL ST

17

St
C ST

738

Condo

G ST

TOTALS

GRAND TOTAL

Rental

432

UTH

Unit deliveries bySOyear

PIPELINE

VE
AA

N
OLI
H Eastern
STREET RESIDENTIAL
CAR

VE
YA

Capitol
South 1,046,500

COMPLETED (SINCE 2007)

Office SF

K
UC

Total SF

Residential
Units

NT
KE

Projects

Hotel
Rooms

14TH ST

C ST

AV
E

16TH ST

Lincoln
Park

As of September 2014 829 new residential units had been built


since 2007 within two blocks of H Street, withManother 1,238 units
AS
SA to delivery
(90% apartments) under construction and anticipated
CH
US
ET
by late 2016 or early 2017. Average asking rents for new rental
TS
E
AV
V
A
E
A
product
is
expected
to
be
more
than
$3
per
sq.
ft.
IN
L
O

15TH ST

TE
NN
ES
S

The H Street, NE corridor is about one mile in length from the


AVE
Hopscotch Bridge to the intersection ofCONSTITUTION
H Street, Maryland
Avenue, Bladensburg Road and Benning Road. It is anchored
to the west by Union Station, a multimodal transportation hub,
which attracts 32 million visitors and passengers each year. In
addition the corridor will be serviced by the H Street/Benning
EAST CAPITOL ST
Road streetcar.

14TH ST

Plaza

7TH ST

A
SI
UI
LO

8TH ST

E
AV

G
TO
N

10TH ST

ND
LA
RY
A
M

The Maryland

E ST

Union
A
Development
Summary
N
Station

W
AS
HI
N

G ST

6TH ST

5TH ST

2ND ST

2ND ST

Union
Station

Atlas
Arts
Center

Woolworth

625 H
9TH ST

Burnham
Place

AV
E

4TH ST

TT
S

Station
House

3RD ST

HU
SE

HO
LB
RO
OK
ST

NE
AL
ST

L ST

SA
C

H Street, NE
AV
E

SPOTLIGHT

TR
IN I
DA
D

RESIDENTIAL

AV
E

Noma/Gallaudet U

LO

MO
NT
EL

E
AV
RK

YO

5T
HS
T

1ST ST
N ST

295
TINGEY ST

i
R
ia

Development Overview
RESIDENTIAL DEVELOPMENT (September 2014, units)
GROUNDBREAKINGS
2000

2,272

Rental

3,538

2002

2004

2,390

2,531

2005

2007
2008
2009

1,460
753

240

758

2006

4,365

1,767

2,817

2005

5,837

3,020

2,598

3,575

1,700

3,524

2011

5,004

2012
2013
2014
YTD

3,454

1,399

499
5,672

4,384
4,099

748
911

5,503
556

2,584

2008

2,564

1,574 369

1,718
912

3,428

3,633

482

3,910

3,913 567 4,480

2014*

5,010

4,282

1,943

2013

5,132

5,133

1,909

2012

6,228

3,983
2,586

2,721
1,385 524

4,665

3,956

2,128

2,547

2011

635 4,089
1,837

1,828

2007

2010

3,970

446

3,511

591

2,828

2009

173 926

2010

2,920

2004

3,535

2,670

920

2003

4,014

2,817

2006

1,750

2002

6,052

1,914

1,624

1,004

2001

4,686

1,148

4,138

2003

H.O.
H.O. (projected)

2,558

286

2001

Rental
Rental (projected)

COMPLETED

HO

4,499

2015*

3,830

2016*

2,660

42

129

2,161

1,483

119 6,908

5,313

2,702

RESIDENTIAL DEVELOPMENT (September 2014)


PROJECTS

SQ. FT.

UNITS2

APTS

H.O.3

CONDOS

501
29
32
47
47
45
46
50
41
35
21
22
30
35
21

53,330,182
2,837,032
3,750,300
3,936,855
4,630,970
4,170,870
4,340,551
5,825,803
4,229,734
3,589,130
2,186,187
1,899,277
3,983,523
3,746,803
4,203,147

52,792
2,670
3,511
4,089
4,665
3,956
3,983
5,133
4,282
3,633
1,909
1,943
3,910
4,480
4,628

36,810
1,750
2,920
3,454
2,828
1,828
1,399
2,547
2,564
2,721
1,385
1,574
3,428
3,913
4,499

15,982
920
591
635
1,837
2,128
2,584
2,586
1,718
912
524
369
482
567
129

12,725
409
173
546
1,640
2,061
2,335
2,083
1,649
718
146
269
173
463
60

87
22
48
14
3

10,985,135
2,011,987
4,781,021
2,726,127
1,466,000

11,937
2,280
5,313
2,702
1,642

10,072
2,161
3,830
2,660
1,421

1,865
119
1,483
42
221

1,425
119
1,085

Pipeline
Near Term
Medium Term
Long Term

202
63
69
70

51,101,537
7,532,460
8,276,012
35,293,065

52,874
8,826
8,790
35,258

21,671
6,406
5,791
9,474

5,532
1,190
1,038
3,304

4,566
1,076
671
2,819

TOTAL

790

115,416,854

117,603

68,553

23,379

18,716

Completed
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014 YTD
Under Construction
2014 delivery
2015 delivery
2016 delivery
2017+ delivery

221

1. projections based on targeted delivery dates of projects under construction as of September 2014 2. apartments & homeownership may not total to residential units due to lack of information for pipeline
projects 3. includes condo, single-family, co-op and other for-sale units

DC Development Report 2014/2015 Edition

49

DEVELOPMENT MAP

RESIDENTIAL
25

16
19

E
AV

14TH ST.

UT

GEORGIA AVE

TIC

EC

NN

CO
ROCK
CREEK
PARK

4 26

15

U ST.

GE

VE
DA

29

LAN

E IS

D
HO

GE

W
AS
HI

10

M
E

AL
RI
O
M
Y
W
PK

5
12

27
1

VIRGINIA

9
3

66

VE
KA

OR

WY

NE

OR

30

11

17 13 18

H ST.

UNION
STATION

8
E. CAPITOL ST.

NATIONAL MALL
VIRGINIA

U.S. CAPITOL

28
20

21

14

FORT DUPONT
PARK

22

NATIONALS
PARK

23
M

395

JR.
AV
E.

M NATIONAL
AIRPORT

Alexandria

Completed
Under Construction
Pipeline

M A RTIN LUTHER KING

G
TO
N

24

Development Pipeline

PROJECT

WARD LOCATION

DEVELOPER(S)

UNITS

TYPE1

EST. VALUE
($M)2

DELIVERY

TOP RESIDENTIAL PROJECTS COMPLETED (4Q 20133Q 2014)


1

CityCenterDC

9th, 10th, 11th, H, & I Sts., NW

Hines/The First Investor

674

Apt/HO

$700

4Q 13

Camden NoMa

60 L St., NE

Camden Property Trust

321

Apt

$100

4Q 13

77 H

1st & H Sts., NW

The JBG Companies/Bennett Group

303

Apt

$90

4Q 13

Monroe Street Market

700 - 800 blocks of Monroe St., NE

Abdo Development/Bozzuto Group/Catholic University

562

Apt

$150

2Q 14

CityMarket at O Street (Ph I)

1400 7th St., NW

Roadside Development/Dantes Partners

497

Apt

$265

2Q 14

The Louis at 14th

1420 U St., NW

The JBG Companies/Georgetown Strategic Capital LLC

268

Apt

$100

2Q 14

Elevation at Washington
Gateway

100 Florida Ave., NE

MRP Realty

400

Apt

$130

3Q 14

Park 7

Minnesota Ave. & Benning Rd., NE

Donatelli Development/Blue Skye Development LLC

376

Apt

$60

3Q 14

2 M Street

North Capitol & M Sts., NE

WC Smith/Warrenton Development Group

314

Apt

$95

3Q 14

1550 7th St., NW

The Jefferson Apartment Group

281

Apt

$80

3Q 14

10 Jefferson at Market Square

TOP RESIDENTIAL PROJECTS UNDER CONSTRUCTION


11

Fairway Park Apartments

21st, 22nd St. and Maryland Ave., NE

WC Smith/Enterprise Community Partners

406

Apt

$54

4Q 14

12

415 L Street

415 L St., NW

Steuart Investment Company/Paradigm


Development

393

Apt

$100

4Q 14

13

Station House

701 2nd St., NE

Fisher Brothers

375

Apt

$100

1Q 15

14

Park Chelsea

880 New Jersey Ave., SE

WC Smith

429

Apt

$150

2Q 15

15

Atlantic Plumbing (Parcel


A & B)

2030 & 2112 8th St., NW

The JBG Companies/Walton Street Capital

372

Apt/HO

$124

2Q 15

16

Fort Totten Square

South Dakota Ave. & Riggs Rd., NE

The JBG Companies/Lowe Enterprises

345

Apt

$120

2Q 15

17

Camden NoMa (Ph II)

60 L St., NE

Camden Property Trust

406

Apt

$130

1Q 16

18

Apollo

610 H St., NE

Insight Property Group LLC

431

Apt

$190

4Q 16

19

ART Place at Fort Totten (Ph I)

5180 South Dakota Ave., NE

Cafritz Foundation

520

Apt

$117

2Q 17

20

The Wharf (Ph I)

Southwest Waterfront

Hoffman-Madison Waterfront

872

Apt/HO

$806

4Q 17

TOP RESIDENTIAL PROJECT PIPELINE (Near Term)


21

1001 4th Street

4th & K Sts., SW

Waterfront Associates/Forest City Washington/


Vornado/CES

365

Apt

22

Ballpark Square

1st & N Sts., SE

Grosvenor USA/McCaffery Interests

325

Apt

$150

2016

23

The Riverfront

100 Potomac Ave., SE

FRP Development Corporation/MRP Realty

321

Apt

$100

2016

24

Capitol Gateway Marketplace

58th & East Capitol Sts., NE

A&R Development/DCHA/Henson Development Co.

304

Apt

$120

2016

25

Georgia Eastern

7828 Georgia Ave., NW

Douglas Development Corporation

220

Apt

26

Arcadia at Brookland Station

901 Monroe St., NE

The Menkiti Group/Horning Brothers

213

Apt

$50

2016

27

West End Square 37

24th & L Sts., NW

EastBanc/Dantes Partners/Warrenton Dev. Group

164

Apt/HO

$150

2016

28

Hine Junior High School

700 Pennsylvania Ave., SE

Stanton Development Corp./EastBanc/Dantes


Partners/Jarvis Co.

156

HO

$190

2016

29

Rhode Island Avenue


Gateway

2313 - 2321 4th St., NE

H Street CDC/E&G Group

116

Apt

$37

2016

30

Gateway Market

340 Florida Ave., NE

LCOR Incorporated/EDENS

188

Apt

$55

2017

2016

2016

1) APT = rental; HO = home ownership/condos 2) may include non-residential components ($ in millions);


3) delivery date may reflect phase I delivery or final phase delivery

DC Development Report 2014/2015 Edition

51

RESIDENTIAL

DEVELOPMENT

Development Highlights

Image courtesy of Community Three Development

The Harper

WARD

1011 M Street

WARD

LOCATION:

1919 14th Street, NW


Level 2 Development/Keener & Squire Properties
ARCHITECT(S):
Eric Colbert & Associates PC
CONTRACTOR(S):
Grunley Construction
STATUS:
Completed
TARGETED DELIVERY: 1Q 2014

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: The Harper is a seven-story, 144-unit apartment building with 6,000 sq.

SPECS: An existing parking lot on the northeast corner of 11th & M Streets will

1011 M Street, NW
Community Three Development
ARCHITECT(S):
Torti Gallas & Partners
EST. COST:
$30 million
STATUS:
Near Term
TARGETED DELIVERY: 1Q 2016

ft. of ground floor retail. Units feature studios and one-bedrooms and range in
size from 350 - 600 sq. ft.

be transformed into a six-story building with 71 condominium units (550 1,400


sq. ft.) and 4,100 sq. ft. of retail space. A sheeting & shoring permit was issued in
October 2014.

Image courtesy of The JBG Companies

Atlantic Plumbing (Parcel A & B)

WARD

2030 & 2112 8th Street, NW


The JBG Companies/Walton Street Capital
ARCHITECT(S):
Morris Adjmi Architects/Eric Colbert & Associates PC
CONTRACTOR(S):
HITT Contracting
EST. COST:
$124 million
STATUS:
Under Construction
TARGETED DELIVERY: 2Q 2015

Park 7

LOCATION:

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: Parcels A & B of the former Atlantic Plumbing site will be redeveloped

into two mixed-use buildings totaling 310 apartments, 62 condos and 23,700 sq.
ft. of retail space. The retail will be anchored by a six-screen Landmark Theater
and seven art studios.

52

2014 Washington, DC Economic Partnership

WARD

Minnesota Avenue & Benning Road, NE


Donatelli Development/Blue Skye Development LLC
ARCHITECT(S):
Eric Colbert & Associates PC
CONTRACTOR(S):
Blue Skye Construction LLC/

McCullough Construction LLC
EST. COST:
$60 million
STATUS:
Completed
TARGETED DELIVERY: 3Q 2014
SPECS: The five-acre site (previously vacant), located adjacent to the Minnesota

Avenue Metrorail Station, was redeveloped into 376 apartments and 22,000 sq. ft.
of retail space.

Development Highlights

Image courtesy of the Peterson Companies

Image courtesy of BF Saul

Park Van Ness

WARD

4455 Connecticut Avenue, NW


BF Saul
ARCHITECT(S):
Torti Gallas & Partners
EST. COST:
$75 million
STATUS:
Under Construction
TARGETED DELIVERY: 1Q 2016

Ontario 17

LOCATION:

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: Park Van Ness will replace a seven-story office and retail building with an

11-story residential building with 271 apartments, 10,000 sq. ft. of retail space and
224 underground parking spaces.

WARD

2550 17th Street, NW


Peterson Companies
ARCHITECT(S):
Eisen Group
CONTRACTOR(S):
Ellisdale Construction & Development
EST. COST:
$30 million
STATUS:
Under Construction
TARGETED DELIVERY: 2Q 2015
SPECS: The former site of the Ontario Theater at the corner of 17th & Columbia

Road is being redeveloped into 80 condominium units and 9,000 sq. ft.
of retail space.

Image courtesy of MissionFirst HDC

Trinity Plaza

WARD

Lyric

WARD

LOCATION:

Atlantic & South Capitol Streets, SW


Far SW-SE CDC/MissionFirst HDC
ARCHITECT(S):
Grimm + Parker & Associates
CONTRACTOR(S):
Hamel Builders
LEED:
Silver
EST. COST:
$17 million
STATUS:
Under Construction
TARGETED DELIVERY: 1Q 2015

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: Trinity Plaza will be a new development consisting of 49 affordable rental

ft. of retail space in early 2014. Baked & Wired will open a 4,231 sq. ft.
cafe/bakery in 2015.

units and 6,000 sq. ft. of retail space.

440 K Street, NW
The Wilkes Company/Quadrangle Development
ARCHITECT(S):
Davis, Carter, Scott Ltd
CONTRACTOR(S):
HITT Contracting Inc
EST. COST:
$65 million
STATUS: Completed
TARGETED DELIVERY: 1Q 2014
SPECS: 440 K Street delivered 234 market rate apartments and 9,500 sq.

DC Development Report 2014/2015 Edition

53

RESIDENTIAL

DEVELOPMENT

Sky House I & II

WARD

Development Highlights

The Colonel

WARD

LOCATION:

1150 & 1151 4th Street, SW


Urban Atlantic/The JBG Companies
ARCHITECT(S):
Wiencek + Associates Architects + Planners
CONTRACTOR(S):
Hamel Builders
LEED:
Gold
EST. COST: $120 million
STATUS:
Completed/Under Construction
TARGETED DELIVERY: 2Q 14 - 4Q 14

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: Sky House I and II convereted two office buildings into apartment units.
Each building consists of 264 apartments with Sky House I (1150 4th Street, SW)
delivering in 2Q 2014 and Sky House II (1151 4th Street, SW) scheduled to open
in 4Q 2014.

SPECS: The Colonel will be a 70-unit apartment building with 8,200 sq. ft.

1250 9th Street, NW


CAS Riegler/Douglas Development Corporation/

City Interests
ARCHITECT(S):
PGN Architects PLLC
CONTRACTOR(S):
Donohoe Companies
EST. COST:
$24 million
STATUS: Under Construction
TARGETED DELIVERY: 4Q 2014
ground-floor retail space at the corner of 9th & N Streets, NW. The project
incorporates an existing 1923 apartment building on the site.

Image courtesy of H Street CDC

Takoma Central

WARD

2321 4th Street

LOCATION:

235 - 255 Carroll Street, NW


Level 2 Development/Federal Capital Partners
ARCHITECT(S):
SGA Companies
CONTRACTOR(S):
Hamel Builders
LEED:
Silver
EST. COST:
$38 million
STATUS:
Under Construction
TARGETED DELIVERY: 4Q 2014

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: Takoma Central will consist of 150 apartments and 9,500 sq. ft. of retail

into 116 affordable residential units and 5,100 sq. ft. of retail space.

space. A 6,500 sq. ft. Busboys and Poets will anchor the retail space.

54

2014 Washington, DC Economic Partnership

WARD

2321 4th Street, NE


H Street CDC/E&G Group
ARCHITECT(S):
Bonstra|Haresign Architects
CONTRACTOR(S):
Harkins Builders Inc
EST. COST:
$37 million
STATUS:
Near Term
TARGETED DELIVERY: 2Q 2016
SPECS: The vacant site near 4th and Rhode Island Avenue, NE will be developed

Development Highlights

Image courtesy of WDG

Gallery at Capitol Riverfront


LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

1421 Euclid Street

1111 New Jersey Avenue, SE


Donohoe Companies
WDG
Donohoe Construction
Silver
EST. COST: $50 million
Under Construction TARGETED DELIVERY: 3Q 2016

WARD

LOCATION:

1421 Euclid Street, NW


Dantes Partners/The Menkiti Group
ARCHITECT(S):
Grimm + Parker & Associates
CONTRACTOR(S):
Hamel Builders/Capital Construction Enterprises
EST. COST:
$12 million
STATUS: Completed
TARGETED DELIVERY: 3Q 2014
DEVELOPER(S):

SPECS: The vacant site adjacent to the Navy Yard Metorail Station will be

SPECS: 1421 Euclid Street is a five-story, 28-unit affordable apartment community,

developed into a 13-story, 342-unit apartment building with about 11,000 sq. ft. of
retail space.

located on the former Justice Park site.

Image courtesy of Roadside Development

Image courtesy of R2L Architects PLLC

82 Eye Street

WARD

1336 8th Street

WARD

LOCATION:

82 I Street, NW
Greystar Development/RCP Development Company
ARCHITECT(S):
R2L Architects PLLC
CONTRACTOR(S):
Moriarty
STATUS:
Near Term
TARGETED DELIVERY: 4Q 2016

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: Plans call for a 220 to 234-unit residential building with the potential for

SPECS: Plans call for 70 condominiums and 6,900 sq. ft. of retail space.

4,000 to 8,000 sq. ft. of retail space.

8th & O Streets, NW


Roadside Development/Dantes Partners
ARCHITECT:
Shalom Baranes Associates
LEED:
Gold
STATUS:
Medium Term
TARGETED DELIVERY: 2017
The project was awarded to the development team in September 2014
by the DC government.

DC Development Report 2014/2015 Edition

55

RESIDENTIAL

DEVELOPMENT

The Villages at Dakota Crossing (Phase III)

WARD

LOCATION:

Fort Lincoln Drive & Commodore Joshua


Barney Drive, NE
DEVELOPER(S):
Fort Lincoln New Town Corporation
CONTRACTOR(S):
Ryan Homes
EST. COST:
$20 million
STATUS:
Under Construction
TARGETED DELIVERY: 3Q 2015

City Homes at the Hampshires & Towns of Hampshires

WARD

6000 New Hampshire Avenue, NW


Four Points LLC/Comstock Homes
ARCHITECT(S):
Franck & Lohsen
EST. COST:
$45 million
STATUS:
Under Construction
TARGETED DELIVERY: 2013 - 2015
DEVELOPER(S):

SPECS: The 11-acre site surrounding the former Medstar Nursing Home is being

developed into 38 single family dwellings (up to 2,700 sq. ft.) and 73 townhomes
(1,800 1,900 sq. ft.). Residents started to move into the single-family homes in
early 2013.

SPECS: The Villages at Dakota Crossing consists of 322 townhome and

townhome-style condominiums ranging from 1,680 - 3,024 sq. ft. in size. Phase
III consists of 167 units and is part of the 362-acre Fort Lincoln New Town
mixed-use urban renewal area.

WARD

Elevation at Washington Gateway

WARD

LOCATION:

1550 7th Street, NW


The Jefferson Apartment Group
ARCHITECT(S):
Lessard Design
CONTRACTOR(S):
SE Foster Construction Company
EST. COST:
$80 million
STATUS: Completed
TARGETED DELIVERY: 3Q 2014

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: The former Kelsey Gardens site was redeveloped into an eight-story, 281

SPECS: Phase I of the three-acre, 1.0 million sq. ft. Washington Gatway project

mixed-income apartment building with 13,400 sq. ft. of retail space.

56

2014 Washington, DC Economic Partnership

LOCATION:

Jefferson at Market Square

Development Highlights

100 Florida Avenue, NE


MRP Realty
ARCHITECT(S):
SK & I Architectural Design Group LLC
CONTRACTOR(S):
James G Davis Construction Corporation
EST. COST:
$130 million
STATUS: Completed
TARGETED DELIVERY: 3Q 2014
delivered 400 apartments and 5,200 sq. ft. of retail space. Union Social will
occupy the entire retail/restaurant space.

lets get creative


Bring Your
Imagination

We believe imagination is the most powerful planning tool.


Make your next meeting or event a true original, visit:
EvEntsdc.com/plan

EDC_UMB_7_25x4_75_v2.indd 1

11/13/14 5:10 PM

DELTA A S SOCI ATE S

INNOVATIVE

DC

Leading advisor and information provider


to the commercial real estate industr y

Land Development

SOLUTIONS
SERVING THE
EAST COAST

Delta Associates is a firm of


experienced professionals offering
consulting, valuation, and data
services to the commercial real

DC CERTIFIED
BUSINESS
ENTERPRISE

estate industry for over 30 years.


Services Include:
Market Studies

SITE CIVIL AND CONSULTING ENGINEERING


LAND SURVEYING
URBAN PLANNING
LANDSCAPE ARCHITECTURE
PERMITTING SERVICES
TRANSPORTATION SERVICES
BOHLERENGINEERING.COM

Repositioning Analyses
Asset Valuations
Feasibility Studies
Litigation Support
Market Data and Publications
Boardroom Presentations

CONTACT US
Gregory H. Leisch, CRE
Chief Executive
Greg.Leisch@DeltaAssociates.com

David Weisel, CRE


President
David.Weisel@DeltaAssociates.com

Alexander (Sandy) Paul, CRE


Executive Vice President
Alexander.Paul@DeltaAssociates.com

1717 K STREET, SUITE 1010 | WASHINGTON, DC 20006


P: 202.778.3100 | WWW.DELTAASSOCIATES.COM |

At Capital One Bank, we believe that when you create strong businesses, theres a ripple effect one
thriving enterprise can generate jobs, spur local economic growth and anchor a community. Thats why
were investing our time, money and expertise to better the places we call home.
Were proud to support organizations like the Washington, DC Economic Partnership, that dedicate their
time to helping people and their communities succeed.

capitalone.com/investingforgood
2014 Capital One. All rights reserved.

facebook.com/capitaloneinvestingforgood

Development by Sector

HOSPITALITY
DC Development Report 2014/2015 Edition

59

hospitality

Hospitality Development in the District of Columbia

Since 2001, the average hotel


occupancy rate for DC has
fluctuated between 69% and
76% and remained consistently
between 74% to 76% since 2008.
DC HOSPITALITY MARKET SNAPSHOT
ANNUAL VISITORS1

HOTEL ROOMS2

19.0 million

~29,000

HOTEL OCCUPANCY RATE1

AVG. DAILY ROOM RATE1

76%

$209

The opening of the 1,175-room Marriott Marquis in


May 2014 was a watershed moment for the DC hotel
and hospitality sector. The hotel by itself represents
the largest number of net new rooms to deliver to the
market in any given year since the WDCEP began
tracking development projects in 2001.
Since 2001, the average hotel occupancy rate for DC
has fluctuated between 69% and 76%. Even with the
addition of 848 net new hotel rooms to the market
since the beginning of 2008, the DC occupancy rate has
remained consistent ranging from 74% to 76%1.
Given DCs market stability hotel developers appear
to be undeterred by the opening of the Marriott
Marquis as there are another 2,320 hotel rooms under
construction and scheduled to deliver by 2017. These
10 projects will add 1,908 new rooms to the market.
In addition, there are another four hotel projects
that could break ground in the next six to 12 months,
representing an additional 1,314 net new rooms.
1. DestinationDC (2013 Visitor Statistics) 2. REVPAR
3. Opened a three-screen pop-up theater in 2014 at Union Market

2014 Washington, DC Economic Partnership

While hotel projects make up the majority of the


hospitality development sector, there were several
notable non-hotel groundbreakings in the past year.
The construction of the 47,000 sq. ft. Barry Farm
Recreation Center started in Q4 2013 (site demolition
started in Q2 2013), the new Williams Arena at the
Southeast Tennis and Learning Center broke ground
in Q2 2014 (phase I delivered in Q4 2014) and the $800
million Museum of the Bible started the renovation of
300 D Street, SW in Q3 2014.

NOTABLE THEATERS Entering/Expanding in DC


THEATER

SCREENS

NEIGHBORHOOD

TARGET OPENING

Angelica Film Center

Union Market

2016/2017

Landmark Theaters

14th & U Streets/


Shaw

2015

Landmark Theaters

10

NoMa

2016/2017

Showplace Icon

16

Capitol Riverfront

TBD

Development Overview

HOTEL PROJECTS (September 2014, rooms)


GROUNDBREAKINGS
2000

Projected

COMPLETED

237

2001
2002

2005

895
515

2004

500
1,106
754
538

2008

1,991

2,159

2009

544

2010

2013

490

2007

962

2008

2012

2003

2006

2,053

2007

2011

1,416

2005

550

2006

2009

411

2002

1,007

2003
2004

2001

925

1,324

2011

659

2012

594

2013

608

2014
YTD

1,035

2010

1,614
204
356
426

20141

1,712

2015

2016

1,795
1,039
598

HOSPITALITY DEVELOPMENT (September 2014)2


PROJECTS

SQ. FT.

ROOMS

NET NEW ROOMS

166
11
17
16
13
16
14
7
10
12
12
9
9
11
9

16,858,596
683,718
931,600
3,106,707
1,776,381
1,089,564
1,009,386
758,500
3,162,093
820,746
1,052,328
241,255
163,985
498,070
1,564,263

12,804
411
1,416
490
500
1,106
754
538
2,159
1,035
1,614
204
356
426
1,795

4,831
175
409
86
400
890
238
-10
132
207

305
1,795

Under Construction
2014 delivery
2015 delivery
2016 delivery
2017 delivery

22
1
13
6
2

2,924,757
48,000
1,017,900
783,357
1,075,500

2,320

1,908

1,039
598
683

627
598
683

Pipeline
Near Term
Medium Term
Long Term

73
21
23
29

5,373,800
1,063,449
2,006,455
2,303,896

4,850
1,207
1,514
2,129

4,480
1,207
1,514
1,759

261

25,157,153

19,974

11,219

Completed
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014 YTD

TOTAL

204

1,908
net new rooms added to
the market by 2017

1. projections based on targeted delivery dates of projects under construction as of September 2014 2. includes community, entertainment, museum and hotel projects

DC Development Report 2014/2015 Edition

61

DEVELOPMENT MAP

HOSPITALITY

E
AV

14TH ST.

UT

GEORGIA AVE

TIC

EC

NN

CO
ROCK
CREEK
PARK

21
U ST.

VE
DA

LAN

E IS

OD

RH
GE

OR
GE

W
AS
HI

M
E

AL
RI
O
M
Y
W
PK

8
24 25

16
6
30 27 26

12

14

VIRGINIA

66

15

NE

H ST.

UNION
1 STATION

18

NATIONAL MALL
VIRGINIA

13
23

VE
KA

OR

WY

5
E. CAPITOL ST.

10

U.S. CAPITOL

20
4

19

FORT DUPONT
PARK

22
17

NATIONALS
PARK

29

395

JR.
AV
E.

M NATIONAL
AIRPORT

Alexandria

Completed
Under Construction
Pipeline

M A RTIN LUTHER KING

G
TO
N

11

28

Development Pipeline

PROJECT

WARD LOCATION

DEVELOPER(S)

HOSPITALITY SF ROOMS

EST. VALUE
($M)1 DELIVERY2

TOP HOSPITALITY PROJECTS COMPLETED (4Q 20133Q 2014)


1

Central Union Mission

65 Massachusetts Ave., NW

Central Union Mission

34,000

Eagle Center (Ph II)

3400 Wheeler Rd., SE

Eagle Academy Public Charter School

27,000

House of Lebanon

27 O St., NW

Urban Matters Development Partners/MissionFirst HDC/


Mount Lebanon CDC

10,000

$23

4Q 13

Nationals Youth Baseball Academy

3675 Ely Pl., SE

DC Government/Washington Nationals Dream


Foundation

15,000

$18

1Q 14

Northeast Neighborhood Library

330 7th St., NE

DC Public Library

14,900

$11

1Q 14

Marriott Marquis

901 Massachusetts Ave., NW

Quadrangle/Capstone Development/ING Clarion/Marriott

1,076,363

1,175

$520

2Q 14

Hyatt Place Hotel

New York Ave. & North Capitol Morgan Stanley/The JBG Companies/MacFarlane
St., NE
Partners

125,000

200

$40

2Q 14

Hilton Garden Inn

2201 M St., NW

Perseus Realty/OTO Development LLC/


Starwood Capital Group

115,000

238

$33

2Q 14

CityMarket at O Street (Cambria


Suites)

1400 7th St., NW

Roadside Development

113,000

182

$265

2Q 14

10

Arts & Industries Building

900 Jefferson Drive, SW

Smithsonian Institution

102,000

$55

2Q 14

$18

4Q 14

$40

1Q 15

$12

4Q 13
4Q 13

TOP HOSPITALITY PROJECTS UNDER CONSTRUCTION


11

Williams Arena

701 Mississippi Ave., SE

DC Dept. of Parks & Recreation/Dept. of General Services

48,000

12

Hyatt Place

1522 K St., NW

Songy Partners

91,000

164

13

Homewood Suites & Hampton Inn

501 New York Ave., NE

Baywood Hotels

160,000

230

14

The Watergate

2650 Virginia Ave., NW

Euro Capital Properties

265,000

348

15

National Museum of AfricanAmerican History & Culture

The National Mall

Smithsonian Institution

322,600

16

Homewood Suites

465 New York Ave., NW

IBG Partners LLC/Magna Hospitality

103,000

160

2Q 16

17

Hampton Inn & Suites


Washington, DC Ballpark

1st & N Sts., SE

Buccini Pollin Group

98,000

168

3Q 16

18

Trump International Hotel (Old


Post Office)

1100 Pennsylvania Ave., NW

Trump Hotel Collection

536,000

270

19

The Wharf (Ph I)

Southwest Waterfront

Hoffman-Madison Waterfront

645,500

683

20

Museum of the Bible

300 D St., SW

Museum of the Bible

430,000

2Q 15
$85

3Q 15

$309

4Q 15

$200

4Q 16

$806

4Q 17

$800

4Q 17

TOP HOSPITALITY PROJECT PIPELINE (Near Term)


21

The Line DC

1780 Columbia Rd., NW

Adams Morgan Church Hotel LLC/Friedman Capital


Advisors LLC/Foxhall Partners/Sydell Group

176,671

220

$100

2016

22

Ballpark Square

1st & M Sts., SE

Grosvenor USA/McCaffery Interests

125,600

170

$150

2016

23

South Building

1325 5th St., NE

EDENS

38,000

24

West End Square 37

24th & L Sts., NW

EastBanc Inc/Dantes Partners/Warrenton Development


Group

20,000

25

Hyatt Place Hotel

2121 M St., NW

Renaissance Centro

26

5th & Eye

901 5th St., NW

Peebles Corporation/MacFarlane Partners

27

The H Street Hotel

627 - 631 H St., NW

Modus Hotels

28

THE ARC (Ph III)

18th St. & Mississippi Ave., SE WC Smith/Building Bridges Across the River

29

DC United Stadium

1st St. & Potomac Ave., SW

DC United/DC Government

30

CityCenterDC (Conrad Hotel)

10th & New York Ave., NW

Hines

2016

168
100,000

198

36,750

245

34,000
270,308

$150

2016

$37

2016
2017
2017

$20

2017

$287

2017

370

2018

1. may include non-hospitality components ($ in millions) 2. delivery date may reflect phase I delivery or final phase delivery for pipeline projects

DC Development Report 2014/2015 Edition

63

HOSPITALITY

CityMarket at O Street (Cambria Suites)


LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

Development Highlights

DEVELOPMENT

WARD

Marriott Marquis

1400 7th Street, NW


Roadside Development/Dantes Partners
Shalom Baranes Associates/Lee and Associates Inc
Clark Construction Group LLC
Silver
EST. COST: $330 million
Completed
TARGETED DELIVERY: 2Q 2014

LOCATION:
DEVELOPER(S):

ARCHITECT(S):

CONTRACTOR(S):
LEED:
STATUS:

SPECS: Phase I includes 87,000 sq. ft. of retail space, anchored by a 75,000 sq. ft.

Giant Food grocery store (4Q 2013 opening), 497 residential units, a 182-room
Cambria Suites Hotel (2Q 2014 opening) and about 490 parking spaces. Phase II
calls for 145 residential units.

WARD

901 Massachusetts Avenue, NW


Quadrangle Development/Capstone Development/
ING Clarion/Marriott
Thompson Ventulett Stainbeck/Cooper Carry Inc/
Lee and Associates
Hensel Phelps Construction Company
Silver
EST. COST: $520 million
Completed
TARGETED DELIVERY: 2Q 2014

SPECS: The new 1.1 million sq. ft. hotel includes 1,175 rooms, 25,000 sq. ft. of

retail, 100,000 sq. ft. of meeting space and a 30,000 sq. ft. Grand Ballroom, two
10,800 sq. ft. junior ballrooms and 53,000 sq. ft. of additional meeting rooms.

Image courtesy of 11th Street Bridge Park

Image courtesy of EDENS

Union Market (South Building)

WARD

1325 5th Street, NE


EDENS
ARCHITECT(S):
Shalom Baranes Associates
STATUS:
Medium Term
TARGETED DELIVERY: 2018

Anacostia Crossing

LOCATION:

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: The redevelopment plan calls for a 38,000 42,000 gross sq. ft. Angelika

theater built above the existing Market building (home to 40+ artisanal vendors)
and 104,000 112,000 gross sq. ft. of office or residential space to be built above
the theater.

64

2014 Washington, DC Economic Partnership

WARD

6&8

11th Street Bridge


11th Street Bridge Park
ARCHITECT(S):
OMA/Olin
EST. COST:
$40 million
STATUS:
Medium Term
TARGETED DELIVERY: 2018
SPECS: The 11th Street Bridge Park is designed to connect the two communities

on each side of the Anacostia River. The project will build new spans using
the previous piers that supported the former 11th Street Bridge. The park is
envisioned to include outdoor performance spaces, playgrounds, fruit orchards,
classrooms to teach students about river systems, and kayaks and paddle boats.

Development Highlights

Hyatt Place Hotel

WARD

Barry Farm Recreation Center

WARD

LOCATION:

New York Avenue & North Capitol Street, NE


Morgan Stanley/The JBG Companies/

MacFarlane Partners
ARCHITECT(S):
Shalom Baranes Associates/Cooper Carry Inc
CONTRACTOR(S):
Whiting-Turner Contracting Company
LEED:
Silver
EST. COST: $40 million
STATUS:
Completed
TARGETED DELIVERY: 2Q 2014

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

1230 Sumner Road, SE


Department of General Services/

DC Department of Parks & Recreation
ARCHITECT(S):
Torti Gallas & Partners
CONTRACTOR(S):
Whiting-Turner Contracting Company
LEED:
Silver
EST. COST: $23 million
STATUS:
Under Construction
TARGETED DELIVERY: 1Q 2015

SPECS: Phase I of the 2.0 million sq. ft. N Street NoMa development is a

SPECS: The new 47,000 sq. ft. recreation center will feature indoor and outdoor

200-room Hyatt Place hotel. The hotel fronts both New York Avenue and
N Street, NE.

enhancements such as a gymnasium, indoor swimming pool, dance facilities,


football field and basketball court.

Image courtesy of WDG

Hilton Garden Inn


LOCATION:
DEVELOPER(S):

ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

2201 M Street, NW
Perseus Realty/OTO Development/
Starwood Capital Group
Shalom Baranes Associates
Turner Construction Company
Silver
EST. COST: $33 million
Completed
TARGETED DELIVERY: 2Q 2014

SPECS: A new 238-room Hilton Garden Inn with about 4,500 sq. ft. of retail/

restaurant space was built at the corner of 22nd and M Streets, NW.

West End Square 37

LOCATION:
DEVELOPER(S):

ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

24th & L Streets, NW


EastBanc/Dantes Partners/
Warrenton Development Group
TEN Arquitectos/WDG
James G. Davis Construction
Gold
EST. COST: $150 million
Near Term
TARGETED DELIVERY: 2016

SPECS: The West End Square 37 development includes a 322,000 sq. ft. mixed-use

building with 164 residential units (71 apartments & 93 condos), 7,600 sq. ft. of
retail space, and a 20,000 sq. ft. public library.

DC Development Report 2014/2015 Edition

65

HOSPITALITY

DEVELOPMENT

Development Highlights

Image courtesy of the Trump International Organization

Image courtesy of SmithGroupJJR

National Museum of African-American History & Culture


LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

Trump International Hotel (The Old Post Office)

The National Mall


Smithsonian Institution
SmithGroupJJR/Freelon Group/Adjaye Associates
Smoot Construction/Clark Construction Group LLC
Gold
EST. COST: $309 million
Under Construction TARGETED DELIVERY: 4Q 2015

WARD

1100 Pennsylvania Avenue, NW


Trump Hotel Collection
ARCHITECT(S):
Beyer Blinder Belle Architects & Planners LLP
CONTRACTOR(S):
Lend Lease
LEED: Certified
EST. COST:
$200 million
STATUS: Under Construction
TARGETED DELIVERY: 2016
LOCATION:

DEVELOPER(S):

SPECS: The 325,000 sq. ft. museum will include a dining facility, museum store,

SPECS: In February 2012, the GSA selected the Trump Hotel Collection to

cafe, auditorium and exhibit areas. The museum will be located on a five-acre
plot of land adjacent to the Washington Monument and the National Museum of
American History on Constitution Avenue.

renovate the Old Post Office Building and Annex (536,000 total sq. ft.) into a 270room luxury hotel with restaurants, retail, a spa and fitness center, and meeting
and conference facilities.

Image courtesy of the Capitol Riverfront BID

American Veterans Disabled for Life Memorial

WARD

2nd & C Streets, NW


Disabled Veterans LIFE Memorial Foundation Inc
ARCHITECT(S):
Michael Vergason Landscape Architects/

Shalom Baranes Associates
CONTRACTORS:
Tompkins Builders
STATUS:
Under Construction
TARGETED DELIVERY: 4Q 2014

Hampton Inn & Suites Washington, DC Ballpark

LOCATION:

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: The memorial will feature a star-shaped reflecting pool, with a single

eternal flame. A grove of trees will stand sentry beside the pool, signifying
the persistence of hope. The memorial officially opened to the public in
October 2014.

66

2014 Washington, DC Economic Partnership

WARD

1st & N Streets, SE


Buccini Pollin Group
ARCHITECT(S):
BBG-BBGM
CONTRACTOR(S):
Sigal Construction Corporation
LEED:
Silver
STATUS: Under Construction
TARGETED DELIVERY: 3Q 2016
SPECS: The 13-story, 168-room Hampton Inn & Suites plans to open in 3Q 2016.

The site is located across N Street from Nationals Park.

Development Highlights

Image courtesy of WDG

Nationals Youth Baseball Academy

WARD

5th & Eye

LOCATION:

LOCATION:

DEVELOPER(S):

3675 Ely Place, SE


DC Government/Washington Nationals

Dream Foundation
ARCHITECT(S):
Devrouax & Purnell Architects-Planners PC
CONTRACTOR(S):
Turner Construction Company
EST. COST:
$18 million
STATUS: Completed
TARGETED DELIVERY: 1Q 2014

DEVELOPER(S):

WARD

901 5th Street, NW


Peebles Corporation/MacFarlane Partners
ARCHITECT(S):
WDG
LEED:
Silver
STATUS: Medium Term
TARGETED DELIVERY: 2017
SPECS: Plans call for a 13-story, 198-room Standard International hotel and 59

residential units. As part of the RFP proposal, the development team will build
100 affordable units off-site and provide $2 million for local park improvements.

SPECS: The Washington Nationals Youth Baseball Academy includes three fields

for softball and baseball and a two-story, 18,000 sq. ft. education/recreation
building that contains batting cages, classrooms and a teaching kitchen.

Image courtesy of Friedman Capital Advisors

Image courtesy of D.C. United

D.C. United Stadium

WARD

1st Street & Potomac Avenue, SW


D.C. United/DC Government
LEED:
Certified
EST. COST:
$287-$300 million
TARGETED DELIVERY: 2017

The Line DC
LOCATION:

DEVELOPER(S):

DEVELOPER(S):

along Potomac Avenue, SW. The proposed plan calls for the DC Government to
facilitate land assemblage and all infrastructure work and D.C. United to build
the stadium.

1780 Columbia Road, NW


Adams Morgan Church Hotel LLC/

Friedman Capital Advisors LLC/Foxhall Partners/

Sydell Group
ARCHITECT(S):
OPX
LEED: Silver
EST. COST:
$100 million
STATUS: Near Term
TARGETED DELIVERY: 2016

LOCATION:

SPECS: D.C. United plans on building a 20,000 - 25,000 seat soccer stadium

WARD

SPECS: This adaptive reuse project involves the the restoration and preservation

of the First Church of Christ, Scientist and the construction of a nine-story


addition. There will be a total of 220 hotel rooms and 21,000 sq. ft. of retail/
amenity space.

DC Development Report 2014/2015 Edition

67

JOIN BY DECEMBER 31

THE ROAD AHEAD

2015

2 Year Special Rate

dcbia.org

ALL of your employees


become members

EDUCATION AND NETWORKING

JOIN to attend strategically-focused real estate development


seminars and events that get the right people in the room.

COMMITTEES
JOIN to learn the latest industry developments & create industry
reform strategies. Plus, we have the best young real estate
development leaders programming in the City!

STAY INFORMED

JOIN to stay In the Know - receive timely information impacting the


industry right now. Also pen industry articles that reach 90,000
Washington Business Journal readers.

Development by Sector

EDUCATION
DC Development Report 2014/2015 Edition

69

education

Education Development in the District of Columbia

From 20012013, DC has averaged


about 946,000 square feet of
deliveries per year, a total that will
be surpassed in 2014, 2015 and 2016.
DC EDUCATION MARKET SNAPSHOT
TOTAL COLLEGE ENROLLMENT1

DC PUBLIC SCHOOL ENROLLMENT2

~80,000

47,651

DC PUBLIC CHARTER SCHOOL


ENROLLMENT2

HOSPITALS3

38,302
Since 2001, more than 13.1 million square feet of
education (primary/secondary, college/university) and
medical space has been built or modernized in DC,
with another 3.5 million square feet currently under
construction. During this time DC has averaged about
946,000 square feet of deliveries per year, a total that
will be surpassed in 2014, 2015 and 2016.
While DC is internationally known for its colleges,
universities and hospitals, it has been the primary and
secondary schools (public and private) that have built
the most facilities, accounting for nearly half of the 16.6
million square feet completed since 2001 and currently
under construction. This trend has continued over the
past six years.

15
With enrollment and competition increasing, colleges
and universities have built more than 4.7 million
square feet of new dorms and academic centers in
DC since 2001, with another 1.7 million square feet
under construction. By far the most active (by square
feet) has been George Washington University, which
is responsible for nearly 40% of all college/university
development starts since January 2008.

EDUCATION PROJECTS UNDER


CONSTRUCTION & COMPLETED4

12% Medical

Of the 8.7 million square feet of education and


medical space that started construction since 2008,
more than half can be attributed to new primary and
secondary schools.

Primary 52%

PROJECTS
STARTED
SINCE 2008
36% Colleges/
Universities

1. DC schools belonging to the Consortium of Universities of the Washington Metropolitan Area and UDC Community College, NYU Washington, DC
and University of Californias Washington Center 2. Washington Post, D.C. public schools enrollments continue to climb (10/8/14) 3. U.S. News & World
Report/Wikipedia 4. Projects started since January 2008 and under construction (as of September 2014)

2014 Washington, DC Economic Partnership

Development Overview
EDUCATION DEVELOPMENT (September 2014, sq. ft. in thousands)
GROUNDBREAKINGS

Schools

2000

1,258

2001

1,033

2002
2003

608

2004

476

2005
2006

420

13

2001

1,306

2002

1,131
1,237

574
996

676

996

676

2010

125 1,151
210

1,902

2011

1,284
551

448
859

2012

93 541
2,335
26

10

1,237
561 13

2009

130 814

1,692

839

1,121

2008

607

2013

1,120

2007 38 138 176

1,030

2011

2014
YTD

414

2006

811

1,026

449

773

706

2005

1,030

684

36

2004

448

607

737

2003

420

2010

2012

1,458

621

2007

2009

10 1,043
152

Medical
Medical (projected)

1,694

476

363

2008

436

Schools
Schools (projected)

COMPLETED

Medical

439

2,774

2013
2014*

865

999

227
1,074

840
811

267
191

1,284

1,086
64 1,138
1,107
1,002

2015*
2016*

1,885 26 1,911
974

439 1,413

EDUCATION DEVELOPMENT (3Q 2014)2


PROJECTS

EDUCATION SQ. FT.

159
14
14
12
17
12
13
2
8
18
7
10
14
11
7

13,107,526
773,158
1,119,500
1,130,970
1,237,481
573,944
995,820
176,004
675,570
1,283,875
999,490
1,086,032
1,137,594
1,106,988
811,100

Under Construction
2014 delivery
2015 delivery
2016 delivery

21
2
13
6

3,515,317
191,112
1,910,760
1,413,445

Pipeline
Near Term
Medium Term
Long Term

33
7
6
20

4,638,022
492,047
84,000
4,061,975

213

21,260,865

Completed
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014 YTD

TOTAL

946
THOUSAND
average eduation sq. ft.
delivered per year
(20012013)

1. projections based on targeted delivery dates of projects under construction as of September 2014
2. includes K-12, colleges & university and medical projects

DC Development Report 2014/2015 Edition

71

DEVELOPMENT MAP

EDUCATION
10

13

15

CO

18

TIC
UT

ROCK
CREEK
PARK

E
AV

14TH ST.

17

GEORGIA AVE

EC

NN

14

26
6

U ST.

24

VE
DA

LAN

E IS

OD

RH

VE
KA

OR

GE

WY

OR

NE

GE

W
AS
HI

G
TO
N

23 22
20 9

M
E

AL
RI
O
M
Y
W
PK

16
4 28

VIRGINIA

30

11 19

66

7
3

H ST.
UNION
STATION

29
E. CAPITOL ST.

NATIONAL MALL
VIRGINIA

U.S. CAPITOL

27
FORT DUPONT
PARK

21
NATIONALS
PARK

395

JR.
AV
E.

M A RTIN LUTHER KING

M NATIONAL
AIRPORT

Alexandria

25
12

Completed
Under Construction
Pipeline

Development Pipeline

PROJECT

WARD LOCATION

DEVELOPER(S)

EDUCATION SF

EST. VALUE
($M)1

DELIVERY2

$25

4Q 13

TOP EDUCATION & MEDICAL PROJECTS COMPLETED (4Q 20133Q 2014)


1

The Conway Health & Resource Center

4 Atlantic St., SE

JAIR LYNCH Development Partners/


Community of Hope

50,000

Carlos Rosario Charter School

514 V St., NE

Carlos Rosario Charter School

48,000

Unity Health Care - Parkside Health Center

765 Kenilworth Terrace, NE

JAIR LYNCH Development Partners

42,588

$24

4Q 13

Milken Institute School of Public Health

950 New Hampshire Ave., NW

George Washington University

115,000

$75

1Q 14

McKinley Hall Renovation for School of


Communication

4400 Massachusetts Ave., NW

American University

62,000

$16

1Q 14

Howard University Dorms

4th & Bryant Sts., NW

Howard University/Campus Apartments LLC

393,812

$107

3Q 14

KIPP

1375 Mount Olivet Road, NE

KIPP DC

100,000

$25

3Q 14

Friendship Technology Preparatory Academy

2705 Martin Luther King Jr.


Ave., SE

Friendship Public Charter Schools/JAIR LYNCH


Development Partners

59,000

$36

3Q 14

Healey Family Student Center (South


Student Center)

3700 O St., NW

Georgetown University

45,000

$23

3Q 14

10

Lowell School Parkside Building

1640 Kalmia Road, NW

Lowell School

36,298

$7

3Q 14

4Q 13

TOP EDUCATION & MEDICAL PROJECTS UNDER CONSTRUCTION


11 Science & Engineering Hall

22nd & H Sts., NW

George Washington University/Boston Properties

290,000

$275

1Q 15

12 Ballou Senior High School

3401 4th St., SE

Department of General Services/DC Public Schools

365,000

$413

2Q 15

13 Paul Public Charter School

5800 8th St., NW

JAIR LYNCH Development Partners

150,000

$19

2Q 15

14 Theodore Roosevelt High School

4301 13th St., NW

Department of General Services/DC Public Schools

332,000

$113

3Q 15

15 Washington College of Law

Tenley Campus

American University

322,300

$125

3Q 15

16 KIPP DC

1401 Brentwood Parkway, NE

KIPP DC

125,000

$45

3Q 15

17 New Sibley

5255 Loughboro Rd., NW

Sibley Memorial Hospital

439,000

$242

3Q 16

18 AU East Campus

3501 Nebraska Ave., NW

American University

340,000

$100

3Q 16

19 New Residence Hall on Square 77

2121 H St., NW

George Washington University

330,000

$130

3Q 16

20 John R. Thompson Jr. Intercollegiate


Athletic Center

Georgetown University

Georgetown University

144,000

$62

3Q 16

TOP EDUCATION & MEDICAL PROJECTS PIPELINE (Near & Medium Term)
21

Van Ness Elementary School

1150 5th St., SE

DC Public Schools

49,000

$15

2015

22

Duke Ellington School of the Arts

3500 R St., NW

DC Public Schools

294,900

$110

2016

23

Northeast Triangle Residence Hall

Georgetown University

Georgetown University

74,147

$46

2016

24

Lab School of Washington

4759 Reservoir Road, NW

Lab School of Washington

30,000

$16

2016

25

THE ARC (Phase III)

18th St. & Mississippi Ave., SE

WC Smith/Building Bridges Across the River

41,000

$20

2017

26

McMillan Sand Filtration Site

North Capitol St. &


Michigan Ave., NW

Vision McMillan/EYA LLC/JAIR LYNCH Development


Partners/Trammell Crow Company

1,000,000

$720

2018

27

New Fort Dupont Ice Arena

3779 Ely Pl., SE

Department of General Services

3,000

$20

2018

28

Stevens Place

2100 L St., NW

Akridge/Argos Group LLC

29

Benning & East Capitol Gateway

45th St. & Benning Road, NE

SOME

30

Franklin School

13th & K Sts., NW

EastBanc Inc/Institute for Contemporary Expression

2018
36,000
$24

1. may include non-education & medical components ($ in millions) 2. delivery date may reflect phase I delivery or final phase delivery for pipeline projects

DC Development Report 2014/2015 Edition

73

EDUCATION

Development Highlights

DEVELOPMENT

Image courtesy of Bowie Gridley Architects

Ballou Senior High School


LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):

LEED:
STATUS:

WARD

Howard University Dorms

3401 4th Street, SE


Department of General Services/DC Public Schools
Bowie Gridley Architects/Perkins+Will
HESS Construction + Engineering Services/
Chiaramonte Construction Company
Gold
EST. COST: $143 million
Under Construction TARGETED DELIVERY: 2Q 2015

WARD

LOCATION:

4th & Bryant Streets, NW


Howard University/Campus Apartments LLC
ARCHITECT(S):
McKissack & McKissack
CONTRACTOR(S):
Clark Construction Group LLC
LEED:
Silver
EST. COST: $107 million
STATUS:
Completed
TARGETED DELIVERY: 3Q 2014
DEVELOPER(S):

SPECS: The new 365,000 sq. ft. school will replace the existing facility and

SPECS: The new two dormitories (394,000 sq. ft.) can accommodate 1,360 beds

includes an auditorium, cafeteria, library/multi-media center, gymnasium,


outdoor athletic fields, and a community accessible fitness facility and
daycare center.

for students, a 200-person multipurpose room, classrooms, academic advisory


offices and a new home for the Universitys Office of Residence Life.

Image courtesy of Bowie Gridley Architects

Howard University Interdisciplinary Research Building


LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

2201 Georgia Avenue, NW


Howard University
Lance Bailey & Associates/HDR Architecture
Turner Construction Company
Silver
EST. COST: $70 million
Under Construction TARGETED DELIVERY: 4Q 2014

SPECS: The new 81,670 sq. ft. HUIRB is a key research facility that will support

both the core and collaborative functions of a wide range of interdisciplinary


research programs. It will also offer 3,000 sq. ft. of retail space on the first floor.

74

2014 Washington, DC Economic Partnership

Lowell School Parkside Building

WARD

LOCATION:

1640 Kalmia Road, NW


Lowell School
ARCHITECT(S):
Bowie Gridley Architects
CONTRACTOR(S):
Keller Brothers, Inc.
EST. COST:
$7 million
STATUS: Completed
TARGETED DELIVERY: 3Q 2014
DEVELOPER(S):

SPECS: The 20,360 sq. ft. Parkside building will undergo a full renovation and

a 16,000 sq. ft. addition will be built. It will be home to academic classrooms,
science labs, a middle school library, visual arts studios, music classrooms, a
studio theater, and administrative space.

Development Highlights

Image courtesy of Bowie Gridley Architects

Image courtesy of American University

Washington College of Law


LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

American University (Tenley Campus)


American University
SmithGroupJJR
Whiting-Turner Contracting Company
Gold
EST. COST: $125 million
Under Construction TARGETED DELIVERY: 3Q 2015

LOCATION:
DEVELOPER(S):
ARCHITECT(S):
LEED:
STATUS:

Avenue to its Tenley Campus. Plans call for a new 322,300 sq. ft. building and
renovation of the Capital Hall and Dunblane House (62,800 sq. ft.).

LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):

LEED:
STATUS:

WARD

4200 Connecticut Avenue, NW


University of the District of Columbia
Cannon Design/Marshall | Moya Design
Forrester Construction Company/
Parkinson Construction
Platinum
EST. COST: $40 million
Under Construction TARGETED DELIVERY: 3Q 2015

SPECS: The University of the District of Columbias new 87,000 sq. ft. student

WARD

Georgetown University
Georgetown University
Bowie Gridley Architects/Populous
Silver
EST. COST: $62 million
Under Construction TARGETED DELIVERY: 3Q 2016

SPECS: The 144,000 sq. ft. athletic center will occupy the parking lot area in front

SPECS: American University is relocating its law school from 4801 Massachusetts

UDC Student Center

John R. Thompson Jr. Intercollegiate Athletic Center

of McDonough Arena and offer new practice courts, team meeting rooms, weight
training facility and sports medicine/training rooms and the new home for the
Georgetown Athletic Hall of Fame.

Carlos Rosario Charter School

WARD

514 V Street, NE
Carlos Rosario Charter School
ARCHITECT(S):
Shinberg Levinas
STATUS:
Completed
TARGETED DELIVERY: 4Q 2013
LOCATION:

DEVELOPER(S):

SPECS: The new urban campus is a three-story, 48,000 sq. ft. building. It

can accomodate 400 - 500 students and offers culinary classes as part of
its curiculium.

center will include new construction and renovated space. The center will feature
a cafeteria, student lounges, recreation area, a 10,000 sq. ft. fitness facility, a
ballroom and conference space.

DC Development Report 2014/2015 Edition

75

EDUCATION

Friendship Technology Preparatory Academy


LOCATION:
DEVELOPER(S):

ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

Development Highlights

DEVELOPMENT

WARD

Science & Engineering Hall (SEH)

2705 Martin Luther King Jr. Avenue, SE


Friendship Public Charter Schools/
JAIR LYNCH Development Partners
Architecture Inc
Turner Construction Company
Silver
EST. COST: $36 million
Completed
TARGETED DELIVERY: 3Q 2014

LOCATION:
DEVELOPER(S):
ARCHITECT(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

22nd & H Streets, NW


George Washington University/Boston Properties
Ballinger Architects
Clark Construction Group LLC
Silver
EST. COST: $275 million
Under Construction TARGETED DELIVERY: 1Q 2015

SPECS: The eight-story, 600,000 gross sq. ft. SEH will house the science and

engineering schools. The building will feature 290,000 sq. ft. of teaching and
research space and contain six underground floors (two for programs and four
for parking).

SPECS: The three-story, 59,000 sq. ft. building includes 25 classrooms, a smart

lab, an engineering lab, two biology labs, two chemistry labs, and a greenhouse. It
was built on the site of a former McDonalds.

Image courtesy of EYP

Image courtesy of American University

American University East Campus

WARD

Trinity Academic Center

WARD

LOCATION:

3501 Nebraska Avenue, NW


American University
ARCHITECT(S):
Little Diversified Architecture
CONTRACTOR(S):
Skanska
LEED:
Gold
EST. COST: $100 million
STATUS:
Under Construction
TARGETED DELIVERY: 3Q 2016

LOCATION:

DEVELOPER(S):

DEVELOPER(S):

SPECS: American University plans on building a total of six buildings (340,000

academic building on campus in more than 50 years. The building will offer
23 classrooms, eight science labs and four labs for the Nursing and Health
Professions program.

sq. ft.) on an existing 900-space parking lot (8.1 acres) near Nebraska and New
Mexico Avenues, NW. There will be three residence halls (590 students) and three
academic/administrative buildings.

76

2014 Washington, DC Economic Partnership

125 Michigan Avenue, NE


Trinity College
ARCHITECT(S):
EYP Architects
CONTRACTOR(S):
Clark Construction Group LLC
EST. COST:
$40 million
STATUS: Under Construction
TARGETED DELIVERY: 3Q 2016
SPECS: The four-story, 80,000 sq. ft. academic center will be the first new

Development Highlights

Image courtesy of SOME

Visualization by Interface Multimedia

McMillan Sand Filtration Site


LOCATION:
DEVELOPER(S):


ARCHITECT(S):


CONTRACTOR(S):
LEED:
STATUS:

WARD

North Capitol Street & Michigan Avenue, NW


Vision McMillan/EYA/
JAIR LYNCH Development Partners/Trammell Crow
Perkins Eastman/Shalom Baranes Associates/
MV+A Architects
EYA LLC
Silver
EST. COST: $720 million
Medium Term
TARGETED DELIVERY: 2018

Benning & East Capitol Gateway


LOCATION:
DEVELOPER(S):
STATUS:

WARD

45th Street & Benning Road, NE


SOME
Medium Term

SPECS: The proposed project calls for 202 affordable residential units, workforce

& senior housing, a sit-down deli, SOMEs Center for Employment Training,
36,000 sq. ft. for a medical/dental clinic and administrative offices.

SPECS: The 24.1-acre site will be redeveloped into a 2.0 million sq. ft. mixed-use

development. Plans call for 1.0 million sq. ft. of office/healthcare space, up to 670
residential units (for-sale and rental), 80,000 sq. ft. of retail space and 12-acres
of public open spaces, anchored by an eight-acre central park with a 17,500 sq. ft.
community center.

Image courtesy of WC Smith

THE ARC (Phase III)


LOCATION:
DEVELOPER(S):
CONTRACTOR(S):
LEED:
STATUS:

WARD

18th Street & Mississippi Avenue, SE


WC Smith/Building Bridges Across the River
WCS Construction LLC
Silver
EST. COST: $20 million
Near Term
TARGETED DELIVERY: 2Q 2017

SPECS: The new 75,000 sq. ft. building will provide space for the Bishop Walker

School, an expanded clinic run by Childrens National Medical Center, Lift DCs
local and national offices, and a black box theater.

Brookland Middle School

WARD

1150 Michigan Avenue, NE


DC Public Schools/Department of General Services
ARCHITECT(S):
Hartman-Cox Architects
LEED:
Gold
EST. COST: $590 million
STATUS:
Under Construction
TARGETED DELIVERY: 3Q 2015
LOCATION:

DEVELOPER(S):

SPECS: The Brookland Middle School is a modernization of and addition to the

former Brookland Elementary School (closed in 2008). The new school will be
100,000 sq. ft. (grades 6-8) with a capacity of 540 students. It will include a fullsize gymnasium, practice spaces, and media center.

DC Development Report 2014/2015 Edition

77


Celebrating 30 Years
of
Community Revitalization

Support our Global Scholars Foundation www.globalscholarsfoundation.org

Envision your business

strong, healthy
and flourishing.

Cordia Partners brings


it all to life.
CORDIA PARTNERS.
SUP PORTING THE GROWTH OF Y OUR B US INESS .

Cordia Partners provides the solid foundation


your business needs to thrive, innovate and grow.
Whether its through our outsourced accounting,
consulting, or our recruiting and staffing services, our
proactive, client-centered approach allows you to
focus on your core competencies, and
ultimately, the overall success of your business.
www.CordiaPartners.com
8229 Boone Blvd., Suite 300, Vienna, VA 22182
(703) 462-6200

APPENDIX
Methodology / Acknowledgements

DC Development Report 2014/2015 Edition

81

APPENDIX
APPENDIX

Methodology

The goal of the Washington, DC Economic Partnership was to create a comprehensive database of development activity that would
help us find answers to the following questions:

What is the make-up of development activity?


Where is the development activity occurring?

What are the trends?


How much is being invested in our community?

However, before we could begin to collect development information we had to create a methodology to give us guidance on what data to
assemble on each project and which projects to include in our database. The following is a brief explanation of what types of data we try
to obtain for each development and how we gather that information. While our database of projects is constantly being updated, for the
purposes of this publication, all data reflects project status, design and information as of September 2014.

Architect

General Contractor

As one of our primary sources of information, we maintain


information on the architects involved in the design of
the project.

As one of our primary sources of information, we maintain


information on the general contractors involved in the
construction of the project.

Construction Type

Green Development

Components of each project are categorized as one of the


following: New Construction, Renovation or Infrastructure. If a
project includes both new construction and renovation we try to
record each portion separately.

If a project contains green elements or sustainable design


features it is considered a green project.

Delivery
The delivery date is an estimate of when a project is scheduled
to be completed. For completed projects, this is the date that the
first certificate of occupancy was issued for the project. If no
certificate of occupancy was issued then we use the date supplied
by a primary or secondary source.

Description
Complex projects and mixed-use developments include a
description that highlights key components and other points of
interest about the development project.

Developer
As one of our primary sources of information, we maintain
information on developers and other controlling interests in
development projects.

Financing Sources
Whenever possible, we identify public and private
funding sources.

82

2014 Washington, DC Economic Partnership

Groundbreaking
The groundbreaking date is an estimate of when a project is
scheduled to start. For projects that are under construction
or completed the groundbreaking date can be the date of a
groundbreaking event or the date that a building permit was
issued on a project.

Hotel Rooms
For hotel projects, we track the number of new and renovated
rooms. The number of rooms does not necessarily reflect net
new rooms because it does not account for rooms taken out of
the inventory.

Imagery
Many of the projects in our database include one or more photos,
renderings, elevations or other illustrations. In most cases these
images are provided by either a primary or secondary source or
are photos taken by the WDCEP. In many cases renderings and
illustrations are concepts and may not reflect the final design.

Lead Tenant
The lead tenant could be the first lease signed in a new or
renovated building or the tenant that occupies the most space.

APPENDIX

Methodology

LEED

Status

When possible we track the LEED (Leadership in Energy


& Environmental Design) certification level that has either
been obtained or planned to achieve. The level listed may
reflect the entire project or one component of a mixed-use or
multi-phased project.

Each development project is tracked by status and defined by one


of the following categories:

Location

Medium Term: Projects that have the potential to break


ground in 1836 months. These projects are considered part
of DCs pipeline.

The physical address is used when possible; however when no


address is possible the closest intersection is used.

Project Cost
We track total development costs including both hard and soft
costs associated with a project as well as land costs. Whenever
possible, we use actual costs provided by primary sources.
Sometimes, however, it is necessary to estimate project costs
based on historical information. Because of the tremendous
amount of construction activity and staff resources required to
maintain the data, we established a minimum threshold of $5
million to be included in the database (from 20018/2009 the
minimum was $1 million).

Project Name
Project names are generally the name of the building or the
development. However, when projects are referenced by different
sources with different names, we use the most commonly
referenced name of the project. When there is no name for the
project, projects are referenced by address.

Residential Units
For residential projects, we track the number of units of both
new construction and renovation. The number of new residential
units does not necessarily reflect the net new units on the market
because it does not account for units taken out of the inventory.

Square Footage
Whenever possible, we try to obtain the total square footage
of the project. For mixed-use projects, we break out the square
footage associated with each major use.

Long Term: Projects that are not expected to break ground


for at least 36 months or longer. These projects are considered
part of DCs pipeline.

 Near Term: Projects that have the potential to break ground


in the next 18 months. These projects are considered part of
DCs pipeline.
Under Construction: Projects are defined as under
construction once a building permit has been issued on the
project or a primary source has indicated that construction
has begun.
 Completed: Projects are defined as completed once the
first certificate of occupancy is issued on a project, except in
the case of a multi-phase project, in which each phase of the
project is tracked separately. If no certificate of occupancy
was issued, then we use the date supplied by a primary or
secondary source.

Use
Each project is categorized by type of use. For mixed-use
developments, we capture the square footage or units/rooms for
each of the following:
Community1
Industrial4
Residential

Education2
Medical5
Retail

Entertainment3
Museum6

Hotel
Office

Ward
The Ward identified for each project is based off of the 2012 Ward
boundaries.

Zip Code
Zip codes are tracked for mapping purposes as defined by data
from our geographic information system (GIS) and may not
reflect the actual U.S. Postal zip code for that address.

1. e.g. library, recreational center, place of worship 2. e.g. K12, colleges, universities 3. e.g. movie theaters, live performance venues
4. industrial & warehouse 5. e.g. hospitals, clinics 6. museums & memorials

DC Development Report 2014/2015 Edition

83

APPENDIX
APPENDIX

Methodology

Where do we get our information?

Adding or Updating Information

To capture the most comprehensive inventory, we use a variety


of sources to gather information about development activity, and
whenever possible, we contact the developers directly to get the
most up-to-date and accurate information available and do site
location visits to verify the projects status. Often our research
uncovers discrepancies in available data on project information
such as square footage, cost, number of units, etc. When
this occurs, we try to reconcile the differences by speaking
directly with parties involved in the development. Some of our
sources include:

If you are looking for information about a specific project and


you do not see it on our list, it may have been omitted for one of
the following reasons.
u

It did not meet the $5 million threshold. There is simply


too much activity for us to keep accurate information about
every improvement made in the District of Columbia.
Therefore, we only collect data for projects valued over $5
million.

We are missing a key piece of information. Generally we


will include projects in our database even if we do not have
a complete set of data available. However, some projects are
omitted from our reports and analysis if they are missing
key data that we use to query or analyze the database.

We have questions about the validity of the data. We


make every effort to acquire data from multiple and
primary sources to validate our information. Frequently,
we encounter discrepancies in project details. Whenever
possible we try to reconcile those discrepancies.
Sometimes, we are unable, and we may exclude the project
because of an unresolved question about the data.

We may not know about it. Although our data collection


methods are comprehensive, we may miss projects. We
discover new information almost every day, and we are
constantly adding projects as we become aware of them.

Primary Sources
Architects
Building Permit Data
Certificates of Occupancy
Developers
DC Office of Planning
DC Office of the Deputy Mayor for Planning &
Economic Development
DC Office of the Chief Financial Officer
General Contractors
Project Managers

Secondary Sources
Brokers
CoStar
Business Improvement Districts
Media & Newspapers
Neighborhood Newsletters & Blogs

If you have information about a development that you would


like included in our database or if you have discovered errors in
our data, please let us know. We rely on your feedback to keep
our database accurate.

To add or update a record in our database, please contact:

Chad Shuskey
Senior Vice President, Research & Visual Communications
202.661.8674 / cshuskey@wdcep.com

84

2014 Washington, DC Economic Partnership

Matt Kruczlnicki
Research Analyst
202.661.8683 / mkruczlnicki@wdcep.com

APPENDIX

Acknowledgements

The Washington, DC Economic Partnership would like to thank the following organizations for their
contributions to this years DC Development Report.

Abdo Development

Donohoe Companies

Paramount Group

Adams Investment Group

Downtown BID

PERS Development

Akridge

EDENS

Peterson Companies

Architect of the Capitol

Ellis Development Group

PGN Architects

Avalon Bay

Ennead Architects

PN Hoffman

Balfour Beatty Construction

Equity Residential

Property Group Partners

BELL Architects

Euro K Street Properties, Inc.

R2L Architects

BISNOW

EYA

Rappaport

Blue Skye Development & Construction

First Potomac Realty Trust

Roadside Development

Bonstra|Haresign Architects

Forest City Washington

Ruben Company

Boston Properties

Forrester Construction Company

Shalom Baranes Associates

Bozzuto

Fort Lincoln New Town Corporation

Skanska

Brook Rose Development

Foulger-Pratt Companies

SK & I Architectural Design Group

Camden Living

George Washington University

SmithGroup

Capitol Riverfront BID

Giant

Smoot Construction Company

CAS Riegler

GlobeSt.com

Steuart Investment Company

CBRE

Grunley Construction

Studios Architecture

City Partners LLC

GSA

Tishman Speyer

Clark Construction

H Street CDC

Trammell Crow Company

Clark Realty Capital LLC

H&R Retail

Trump Hotels

Community Three Development

Hargreaves Associates

Union

Cooper Cary

Hickok Cole Architects

Urban Turf

Concordia Group

Insight Property Group

VOA Associates

CoStar

Jair Lynch Development Partners

Walker Development

Dantes Partners

James G. Davis Construction Corporation

Washington Business Group

Davis, Carter, Scott

The JBG Companies

Washington Business Journal

DC Department of Consumer

JD Land

Washington Post

Jefferson Apartment Group

WCS Construction

DC Department of General Services

Lincoln Property Company

WC Smith

DC Housing Authority

Madison Marquette

WDG Architecture

DC Housing Finance Agency

Manna, Inc.

Wiencek & Associates

DC Department of Parks & Recreation

Mill Creek Residential Trust

The Wilkes Company

DC GIS

MissionFirst Development

DC Office of the Chief Technology Officer

Monument Realty, LLC

DC Office of Planning

MRP Realty

DC Public Library

Neighborhood Development Company

DCRealEstate.com

NoMa BID

Department of General Services

OTO Development

Donatelli Development

Paradigm

& Regulatory Affairs

DC Development Report 2014/2015 Edition

85

It is the mission of the Washington, DCEconomic


Partnership, a 501(c)3 organization to promote business
opportunities throughout the District of Columbia and to
contribute to business retention and attraction activities.
2014 Washington, DC Economic Partnership

Washington, DC Economic Partnership 1495 F Street, NW Washington, DC 20004 202.661.8670 www.wdcep.com