SAP ERP Manufacturing - Production

Planning (SAP PP): Different types of Scraps


in SAP
Posted by Srini N 15 Jun, 2012

Document on Scrap

The following are the various scraps that are maintained


1. Assembly Scrap2. Component Scrap3. Operation Scrap

2.0 Assembly Scrap


Scrap that results from the production of an assembly.
-You have to maintain the assembly scrap in the material master (MRP 1 view) as a
percentage in the Assembly scrap field for the assembly header material.-The system
automatically increases the quantity to be produced by the percentage of scrap.Note:
Assembly scrap increases the order quantity of the assembly and subsequently increases
the order quantity for corresponding components. The dependent requirements of the
material components are therefore increased correspondingly.Dependency:
The system increases the quantity to be produced for

all of the assembly's components accordingly.

Assembly Scrap MRP 1 view

Generated by Jive on 2013-09-26+02:00


1

SAP ERP Manufacturing - Production Planning (SAP PP): Different types of Scraps in SAP

Component Scrap: scrap of a component that may break during production of an assembly.
-You can enter values for calculating component scrap in the material master or the BOM
in the BOM on the Item Detail Screen General Data (data block for quantity data). This
component scrap is only relevant for the individual BOM.-In the material master (view
MRP 4) in the Component scrap field. This component scrap is relevant for all BOMs.The component scrap quantity maintained for a material component in the BOM has the
higher priority.Note: Component scrap increases the dependent requirements quantity of
the component.In the BOM on the Item detail screen: basic data under Quantity data. This
component scrap is only relevant to the individual BOM.
In the material master record on the MRP 4 screen under Requirements explosion. If
the same component scrap applies to a material in a number of BOMs, then it can be
maintained in the material master record.

Component scrap is used in material requirements planning (MRP) to determine the


quantities of components required. When exploding the bill of material (BOM), the system
increases the required quantities of the components by the calculated scrap quantity
Component Scrap - Dependencies

Component scrap maintained for a material component in a BOM overrides the


component scrap maintained in the material master record.

If there is also assembly scrap for a higher-level assembly, the system adds together
the two types of scrap
BOM Item detail screen: Basic data
If the component scrap is only relevant to the
Item detail screen

individual BOM, then it can be maintained in the BOM

Operation Scrap: Before high-value components are built into an assembly, the system
carries out a quality control check of the assembly, if necessary. Faulty materials that were
taken into account in assembly scrap are not passed on to the next operation. They are
removed. Therefore, for a high-value component, you plan using operation scrap instead
of generalassembly scrap.-You can maintain the operation scrap in the BOM, on the Items
Detail Screen: General Data, under quantity data. You must also set the operations scrap
net indicator at the same time.-This scrap quantity refers to the quantity of one component
that is to be processed in an operation meaning that the planning run is more exact and
you can determine service and quantity consumption more precisely.-If the component is
contained in an assembly, for which an assembly scrap quantity has been maintained, the
system only takes the operation scrap into account.-The net indicator instructs the system

Generated by Jive on 2013-09-26+02:00


2

SAP ERP Manufacturing - Production Planning (SAP PP): Different types of Scraps in SAP

to calculate the component operation scrap without taking assembly scrap into account
(net usage scrap).Note : You should also set the net indicator, if operation scrap has not
been maintained and assembly scrap has been entered. The assembly scrap should not,
however, be taken into account.
Assembly scrap - maintained in MRP-1 view2. Component scrap - Maintained in MRP-4 &
BOM, BOM will be the first priority3. Operation scrap - maintained in BOM level.

1867 Views Tags: scrap, assembly_scrap


4 Sep, 2013 9:13 AM Aditya S

Thanks Srini for sharing ur knowledge on types of Scrap. This is a ready reference to know
on Scrap. Thanks again.

Generated by Jive on 2013-09-26+02:00


3

Das könnte Ihnen auch gefallen