Beruflich Dokumente
Kultur Dokumente
02
03
- 27 -
Contents
The Company 04
Manufacturing 08
EPC 10
04
The Company
VISION
> We want to be know for reliability, flexibility, responsiveness,
innovative products and services. Growth, longevity and
financial success will naturally follow. We will make this
happen in an enriching environment of trust, cooperation
and mutual respect.
MISSION
> We strive to develop superior products, through state of the
art technology, innovation, leadership and partnership.
> Maintaining a global viewpoint, we are dedicated to
supplying products and services of the highest quality, yet at
a reasonable price, to ensure customer satisfaction.
05
in house design and engineering departments, allows Zug to offer a much faster
and competitive solution to our customers, from first discussions to full project
completion. Our experience covers not only coal fired Power Plants, but renewable
energy solutions, such as Solar, Hydro, Biomass, and Heat Recovery Systems.
06
07
Our owners and managers work closely together with the client. We develop a
personal relationship with our customers. A dedicated Project Manager led by our
Project Director, is appointed for each project. You can then be assured of constant
communication, which will keep you aware of the status of your project at all times.
Our commitment to quality, and listening to customers needs, allows us to produce
steam plants tailored to your individual requirement. Custom, experimental and
challenging jobs are always welcome in ZUG.
ZUG have a fully trained team of service engineers and an extensive supply of spare
parts to ensure that after the completion of your project, we are still there to support
you into the future.
08
Manufacturing
At our new factory in Jakarta, we have facilities to manufacture the following : Boilers,
Pressure Vassels, Heat Exchangers, De-Airator Condensor, Steel Structure, Water
Treatment, Electrical and Instrument & Control, Material Handling and Balance Of
Plant.
Having our own local production facility gives us the leading edge over
our competitors. We can control the manufacture to meet our customers,
requirements, and provide a large local content to any project. Thus
complying with new and changing Government regulations. This in turn
leads to pricing benefits and scheduling advantages.
09
We can manufacture industrial boilers with a range from 2 to 110 tons per hour and
power plant boilers in the range of 20 to 250 tons per hour. With a pressure up to 130
bar, superheater temperatures up to 545C and sub critical temperature of 570C
Our total installed capacity is up to 12,000 tons per year. This is achieved by replacing
the time consuming and labour intensive jobs, such as plate/pipe bending, rolling,
cutting and welding, with automated machines. We have installed an array of heavy
automated CNC machinery along our assembly line. This cuts labour costs, speeds up
production and improves overall quality.
Our factory stands alongside our new office complex, ensuring engineering and
manufacture are in close contact. The office and manufacturing facility are set on a
total area 3 ha in prominent industrial and warehousing area. A second area of 8 ha
has now been acquired for our future expansion.
10
INDUSTRY
CIVIL CONTRACTOR
Hydro Power
Cement.
Gas Turbine & Combine Cycle.
Refinery.
Solar Power
Palm Oil.
Thermal; Solid Fuel (Coal
Petrochemical.
& Biomas), Oil & Gas, from
Food & Beverage Industry.
Waste.
Heat Recovery & Cogeneration
Power Station Division
Plant.
of Work
EPC Contractor
CIVIL WORK
HV SYSTEM
STEP UP
TRANSFORMER
CONTROL ROOM
MV & LV SWITCHGEAR
AC & DC
AUXILIARY
SYSTEMS
HV-Switchgear
Power Plant & Utility
CONTROL
SYSTEMS
AUX.
TRANS
F.
2
1
G-PROTECTION
GENERATOR
BREAKER
BOILER
SYNCHRONIZING
EXCITATION
SYSTEM
SYNCHRONOUS
GENERATOR
TURBINE
STAR
POINT
CUBICLE
STATIC
STARTER
PTs
&
CTs
EXCITATION
TRANSFORMER
HRSG
Electrical BoP
Power Island
Mechanical BoP
The companies main focus for EPC busines ranges from 20-500 tons per hour boilers,
and power plants up to 150MW. Our distinct advantage, over our competitors, comes
from choosing the right partners, in Germany and China. This combined with years of
on the job training and our continuous learning program gives us the leading edge. Our
short term target is, to achieve independent, end to end, engineering & design, to offer
our custumers a total package solution.
11