PROJECT 2Q SY2014-15
CODE:
542876
X=8
Y=7
Z=6
A. TYPE OF OCCUPANCY: Z
0 to 3:
4 to 6:
7 to 9:
B. TYPE OF TRUSS: Y
even
odd
School Building
Commercial Building
Residential Building
Pratt Truss
Howe Truss
Howe Truss
Pratt Truss
Note: Number of web members may vary depending on maximum slenderness ratio
C. PROJECT LOCATION: X
0 to 3:
4 to 6:
7 to 9:
Zone 3
Zone 1
Zone 2
B-1
B-2
check if this column is
necessary
B-2
B-2
B-2
B-1
B-3
B-3
B-3
B-2
B-2
B-1
B-1
B-2
B-2
B-3
ST/2
B-1
B-2
ST/2
B-1
B-2
B-1
B-1
B-4
B-4
B-4
B-4
B-5
T-1
B-5
T-1
B-5
T-1
B-5
T-1
T-1
ST/2
ST/2
B-4
B-4
B-4
B-4
Roofing: Corrugated Galvanized Iron (G.I.) {specify your own gage #} or you can specify
your own chosen roofing specs
G. HEIGHT OF COLUMN, H
H1=H2 = [3+X/5] meters
roof apex
top of beam
H2
H1
REQUIREMENTS:
1. Plans and Drawings
a. Perspective
b. Ground Floor Plan / Second Floor Framing Plan/ Roof Framing Plan
c. Elevations (Front Elev. /Rear Elev. /Right Side Elev. /Left Side Elev.)
d. Structural Details and Specifications
2. Structural Analysis and Design
a. Basis of Design
b. Loading Computations
c. Design of Purlins, Sagrods and Tierods
d. Loadings and Analysis of Truss
e. Design of Top Chord
f. Design of Bottom Chord
g. Design of Web Members
h. Design of Beams and Girders
i. Design of Column
j. Design of Base Plate
k. Design of Connection (Bolted, Riveted or Welded)
l. Appendices
m. Acknowledgment
Guidelines:
1. All structural steel must comply with ASTM A36 steel specifications.
(Except for purlins, use only light gage lip C purlins with Fy=170MPa and
tierod & sagrod with grade40 yield strength)
2. Deadloads, Liveloads, and Windloads shall be considered. Equake Load (optional)
3. Analyze the structure based on the most critical loading combination.
4. Analyze the TRUSS structure using STAAD Program or any Design Freeware.
5. Analyze the structure (frames, beams and columns) using 2-D/3-D Frame Analysis
applying any classical method.
However, STAAD may also be used for frame analysis provided that
short but precise manual calculations be done to verify software's output.
6. Progress Reports shall be hand written in A4 sized bond papers in customized
templates and must be submitted/uploaded thru our Canvas account.
7. Final Project Report must be compiled and be submitted during the scheduled
day of oral defense (usually 1 week before the scheduled final exam).