WEEKLY ACMV MEETING

01 Jul 2011, 0930HR, SITE OFF HDEC MEETING ROOM

Attendance
Present
M N Naing AHPL FM
Md Noor AHPL FM (AC)
Din AHPL FM (AC)
Narendran AHPL FM (MV)
Chen Han CPG
Sam Limbo HDEC
Mahesh CNA
David KW
Absent with apology

No

Description

Access Panel Issue (Sam will update the


latest access panel issue)
a) 19 nos of FCU Blocked by M&E Services
(See below list)

Action By

CPG/HDEC/
KW

Complete
Date

a) ?

Remarks

a) Sam will update.


Maintenance team will arrange with
users for item 4, 5 and 8.
Item 6,7 & 8 = additional

1) Clinical lab Servicing (High FCU)


2) A82 Corridor Relocate strainer
3) Wire centre, B1 sector C
4) A82(Rm 2,3,4,7,) Servicing and block
with pipes
5) A51 (Rm 25) Relocate strainer &
motorize valve
6) B55 (Pre room, sensor rm and pre cool)Relocate the motorize valve
7) B65(Duty room 1,2,3)
8) B75(duty room 1&2, Room1,pre room &
pre cool)
b) UVC Access panels by CNA
1) A52 (Rm 1,3) patient
2) A82 (Rm 1,2,5,7) patient

b) 6 rooms with patients


Maintenance team will arrange with
users.

CNA

b) ?

a) ALL SENSORS, VAV thermostats


calibration, Graphic errors and etc.

CNA

a) ?

a) Service Reports submitted to


HDEC

b) BMS system for AHU power meter

CNA

b)

b) Outstanding for B1 & B2 area

CNA/FM

c) 28 Jun

c) Intraco vendor will come down


and check with CNA.

d) FCU Return Air / Room Temperature Sensor


reading display in HMI.

CNA

d) 30 Jun

d) CNA will update the inspection


schedule.

e) Retrieve of last 12 months trending data


from IHEMS Workstation.

CNA

a) Kitchen ACMV Issue(after relocation of


ceiling, not much improvement)

CPG,
HDEC&KW

a) ?

b) B 66, 2 Positive pressure rooms Fresh air


Fan Installation

KW

b) ?

c) SOC C 52, 2 Negative pressure rooms Not


achieve -2.5 pa when using 2 rooms
combined for the negative pressure

KW

c) ?

KW

d) 31 Jul

KW

e) 30 Jun

KW/HDEC

f)

CPG/HDEC

g) ?

KW

h) 8 Jul

KW/CAN

i)

c)

A82 patients room window switch interlock


with FCU intraco thermostat

d) Portering Office(24hrs) install FCU

e) Schedule for Annual shut down on 5 nos


WCC trane chillers.

f)

HEPA Filters replacement schedule.

g) 3 Retail Kiosk air con and access issue


h) Cooling tower drain pan and flung leak issue
i)

Non chemical water pump trip alarm


terminal to provide

e) 30 Jun

7 Jul

e) CNA will update

a) CPG/David will update the next


action plan.(Replace 4 way
diffusers to egg crate for
preparation area)
b) KW will update T&C schedule.

c) Chen han will check with Mr Toh.

d) David will update the schedule

e) David will update the schedule

f)

David will update schedule and


Sam will follow up with Quest

g) Pauline and Sam will update


h) David will update
i)

Testing

MV ISSUE

a) MV LCP access panel above ATM

HDEC/KW

a) 30 Jun

a) HDEC/KW will update

b) Endoscopy Decon rooms Stuffy Issue(to


install VSD, modification of LCP and
recalibration)

KW

b) 30 Jun

b) KW will update schedule

c) MV fan cable to terminate @ A&E area


Room-3

CNA

c) ?

c) FM will arrange escort for CNA on


Monday.

d) Tidy up wires and servicing for PLC panels

CNA

d) ?

e) Assist Baths stuffy

CPG/KW

d) Done,Service reports submitted to


HDEC
e) ?

e) CPG Arch will install door louver.


f)

Platform for LCP panel at Tower A, Roof top

g) MV fan maintenance access for near the


bus stop shelter.

CPG/HDEC

f)

?
f)

CPG

HDEC will update

g) ?
g) CPG Arch to advice by email