PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
FS Erection Manual
Installation of Upper Guide Bearing Bracket
Rev.
Page
Description
Created by
Approved by
Date
A
B
C
D
E
F
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 1 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Table of Content
1
Overall Remarks
1.1
1.2
Objective
2.1
Reference Documents
3.1
4
5
Protocols ..................................................................................................................... 6
7
8
Installation Procedure
6.1
6.1.1
6.2
6.3
6.4
6.5
7
Bolted connections
10
Execution OU
VHH
10
Executed by
Name
16
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 2 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Overall Remarks
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 3 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Objective
This instruction describes the field assembly of the upper guide bracket and the respective
connection between the central part and the bracket arms.
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 4 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Figure 1: Upper Guide Bearing Bracket supported on the Stator Frame and at foundation (Jarret Unit)
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 5 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Reference Documents
Title
Inspection and Test Plan
Upper Guide Bearing Bracket Assembly
Upper Guide Bearing Bracket Machined
Jarret Unit for Bracket Assembly
Erection Sequence
Document-ID
FDII-240-2GAV00-0000-00720488
FDII-245-2GAV03-3490-00841208
FDII-245-2GAV03-3490-00877642
FDII-245-2GAV03-3490-00877651
FDII-240-2GAV06-7800-00841386
3.1 Protocols
Ref. 3.6
Ref. 3.7
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 6 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
For the erection process described in this document, the tools of the list below are required.
However, if necessary the items of the list may be altered by the respective Voith supervisor
according to his requirements and experience.
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 7 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
The bracket is delivered at site with 4 arms disassembled due to transport limitations. The
bracket arms must be bolted to the central part of the bracket at the pre-assembly area.
Sufficient area must be available for the complete bracket assembly for the placement of parts,
levelling, and connection of arms. Prepare an area study considering the schedule, the number
of units and the available workforce (parallel work).
Also provide some leveled base plates to keep the parts aligned during assembly. When
available, some support pedestals must be used at site to assemble the bracket arms. If
pedestal supports are not available at site, use shims over some leveled base plates in order to
assure leveling and also to protect the piece final painting.
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 8 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 9 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Installation Procedure
Check guide bracket's central part for true horizontal positioning, using a frame-type spirit level.
Place the level on the machined surfaces at four points spaced uniformly over the periphery. If
necessary, correct the bracket position by inserting shims between the bracket and the leveled
bases.
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 10 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Apply a uniform, thin coat of MOLYKOTE paste G on the keys and fitted pins and secure them
to the arm flanges with screws. Fit the parts in accordance with the markings provided.
Attach hoisting tackle of sufficient load capacity, to eyebolts screwed up to the collar into a
bracket arm. Gently lift the arm with the crane and check the horizontal position using a wooden
spirit level. If necessary, correct the rope position or length.
Apply a coat of MOLYKOTE paste G to the joint faces of the arm and the bearing faces of the
bolt hexagonal heads, bolt threads and nuts. Carefully move the arm to the bracket using the
hoisting tackle and use the fitted pins to guide the assembly. Insert the screws and nuts with the
locking elements and tighten them slightly.
Important:
The markings of the arms must correctly match. Avoid damage to the fitted pins.
For better adjustment, install a hydraulic jack or similar device in the center underneath the arm
joint flange. Tighten the arm bolts firmly in the proper sequence (example given in Fig. 3).
Figure 3: Typical scheme for tightening the joint bolts, viewed after bolt insertion
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 11 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Before transporting the Bracket to the pit, the bracket support plate located at the top of the
stator frame has to be checked for dimensional accuracy according drawings.
Also refer to the Stator Frame and the full unit drawing for details indicated in the assembly
drawings.
Attention:
Perform a survey of the already installed stator frame. Beforehand, check the level of all contact
supporting faces to conclude where and how many waiting shims shall be used between the
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 12 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
bracket arms and the contact supporting faces to level the bracket at the elevation indicated in
the project drawings. Place and position the shims before lowering the bracket.
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 13 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Move the machine part over the stator and rotor with the part freely suspended
concentrically over the shaft, and lower it over the shaft at the lowest possible speed
down to about 20 mm over the seating surfaces.
Note: Check the bracket for elevation and adjust any misalignment by means of shims.
Perform the centering of the upper bracket according to item 6.4 of this instruction.
Check and record the results.
6.4 Bracket Centering
Before centering the bracket, the rotor shaft must be aligned (plumb check) and the turbine rotor
must be already centered.
After placing down the bracket on its correct assembly elevation, verify its concentricity by
measuring the distance D between an inner machined diameter, for example the bearing
segment support, to the external diameter of the shaft. Make use of some inside micrometers.
At least 4 equally spaced points around the circumference shall be measured. Take the
measuring points in accordance to the bracket arms direction.
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 14 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 15 of 16
Frades II
PDM No.:
FDII-245-2GAV03-3490-01176161
Revision: -
The weights and dimensions are shown on the project specific component drawings and bill of
material.
Execution OU
VHH
Executed by
Name
Checked by
Signature
Stocco
Installation of Upper Guide Bracket
Stoccof
Name
Demirhan
Approved by
Signature
demir
Name
Koewilein
Issue Date
Signature
2013-11-25
koewilj
Page 16 of 16