Sie sind auf Seite 1von 7

FIT-UP DIMENSIONAL INSPECTION

REPORT
Report No.: FU-

Code: LLM18-QP-04.14/FU
Rev.: 0
Date :
Total Page: 2

Client: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-FU-

Item: GROUND SUPPORT OF DUCT

Drawing No.: AJ-2440-Z30-007

No.

Location

Drawing Dim.

L1

2400

L2

11556

10

L3

294

L4

3852

L5

3852

L6

11556

10

L7

294

L8

3852

L9

3852

10

L10

2400

11

L11

11556

10

12

L12

294

13

L13

3852

14

L14

3852

15

L15

2600

16

L16

2400

17

L17

800

18

L18

800

19

L19

2600

20

L20

2400

21

L21

800

22

L22

800

23

L23

2600

24

L24

2400

25

L25

800

26

L26

800

27

L27

2600

28

L28

2400

29

L29

800

30

L30

800

31

L31

314

32

L32

201

33

L33

201

34

L34

201

35

L35

201

36

L36

330

37

L37

330

38

L38

314

Actual Dim.

Page 1/7

Deviation

Tolerance

(attached)

Result

Remarks

Code: LLM18-QP-04.14/FU
Rev.: 0
Date :
Total Page: 2

FIT-UP DIMENSIONAL INSPECTION


REPORT
Report No.: FUClient: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-FU-

Item: GROUND SUPPORT OF DUCT

Drawing No.: AJ-2440-Z30-007

No.

Location

Drawing Dim.

39

L1
L39

201

40

L40

314

41

L41

105

42

L42

105

43

L43

105

44

L44

105

45

L45

330

46

L46

330

47

L47

314

48

L48

105

49

L49

500

50

L50

400

51

L51

500

52

L52

400

Actual Dim.

Deviation

Tolerance

(attached)

Result

Note: Application standard EN ISO 13920:1996 class B.


Measurement implement: Metal tape.
LILAMA 18
Prepared

VKS

Inspected/Reviewed

Reviewed/Approved

Sign:

Sign:

Name:
Date:

Name:
Date:
Page 2/7

Remarks

FINAL DIMENSIONAL INSPECTION


REPORT
Report No.:DI -

Code: LLM18-QP-04.14/DI
Rev.: 0
Date:
Total Page: 3

Client: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-DI-

Item: GROUND SUPPORT OF DUCT

Drawing No.: AJ-2440-Z30-007

No.

Location

Drawing Dim.

L1

11556

10

L2

3852

L3

3852

L4

314

L5

201

L6

201

L7

330

L8

330

L9

201

10

L10

201

11

L11

330

12

L12

330

13

L13

201

14

L14

201

15

L15

314

16

L16

11556

10

17

L17

3852

18

L18

3852

19

L19

314

20

L20

105

21

L21

105

22

L22

330

23

L23

330

24

L24

105

25

L25

105

26

L26

330

27

L27

330

28

L28

105

29

L29

105

30

L30

314

31

L31

11556

10

32

L32

3852

33

L33

3852

34

L34

314

35

L35

201

Actual Dim.

Deviation

Tolerance

2
Page 3/7

(attached)

Result

Remarks

FINAL DIMENSIONAL INSPECTION


REPORT
Report No.:DI -

Code: LLM18-QP-04.14/DI
Rev.: 0
Date:
Total Page: 3

Client: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-DI-

Item: GROUND SUPPORT OF DUCT

Drawing No.: AJ-2440-Z30-007

No.

Location

Drawing Dim.

36

L1
L36

201

37

L37

330

38

L38

330

39

L39

201

40

L40

201

41

L41

330

42

L42

330

43

L43

201

44

L44

201

45

L45

314

46

L46

11556

10

47

L47

3852

48

L48

3852

49

L49

314

50

L50

105

51

L51

105

52

L52

330

53

L53

330

54

L54

105

55

L55

105

56

L56

330

57

L57

330

58

L58

105

59

L59

105

60

L60

314

61

L61

2400

62

L62

800

63

L63

800

64

L64

2400

65

L65

800

66

L66

800

67

L67

2160

68

L68

90

69

L69

2000

70

L70

200

Actual Dim.

Page 4/7

Deviation

Tolerance

(attached)

Result

Remarks

Code: LLM18-QP-04.14/DI
Rev.: 0
Date:
Total Page: 3

FINAL DIMENSIONAL INSPECTION


REPORT
Report No.:DI Client: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-DI-

Item: GROUND SUPPORT OF DUCT

Drawing No.: AJ-2440-Z30-007

No.

Location

Drawing Dim.

71

L1
L71

200

72

L72

1855

73

L73

70

74

L74

1715

75

L75

928

76

L76

3900

77

L77

70

78

L78

3760

79

L79

928

80

L80

928

Actual Dim.

Deviation

LILAMA 18
Prepared

Tolerance

(attached)

Result

VKS

Inspected/Reviewed

Reviewed/Approved

Sign:

Sign:

Name:

Name:

Date:

Date:
Page 5/7

Remarks

Code: LLM18-QP-04.14/VI

VISUAL INSPECTION RECORD

Rev: 0
Date:
Total page: 2

Record No.: VIClient: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Drawing No.: AJ-2440-Z30-007

Item: GROUND SUPPORT OF DUCT

Test & Inspection


procedure

Item
No.
A

Acc.

Rej.

VISUAL CHECK FOR WELD


Fillet weld (leg length or throat
depth)

Acceptance criteria

Intermittent weld
a) Intermittent pitch
b) Weld length

Linear misalignment in
butt weld

Leg length and throat depth shall not be


less than design dimensions on drawing.
When not specified on drawing, throat
depth shall be minimum 0.7t. Where t:
thickness of a thinner plate at welded
plates.
Intermittent pitch shall be between +/-10
mm of design values on drawing.
Weld length shall be between -5 and
+10 mm of design values on drawing.
Linear misalignment shall be not excess
10% of plate thickness at welds, but
maximum 3.0mm.

Unevenness in bead surface


Depth D shall be 2 mm or less for
50mm long weld.

4
Irregularity in bead width
5

Difference in bead widths (a - b) shall be


5 mm
or less for 50 mm long weld.
a b < 3 mm

Overlap
Overlap shall be 1.5 mm. or less per 100
mm long in bead direction.

6
Undercut

Depth of undercut shall be 1.0 mm or


less.

7
Crater treatment
8

Craters shall have been treated.

Pit

No pits shall exist.

10

Slag inclusion

No included slag shall exist.

11

Crack

No cracks shall exist.

12

Spatter

Spatters shall be removed.


Conclusion

Accepted

Rejected

Remark

Code: LLM18-QP-04.14/VI

VISUAL INSPECTION RECORD

Rev: 0
Date:
Total page: 2

Record No.: VIClient: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Drawing No.: AJ-2440-Z30-007

Item: GROUND SUPPORT OF DUCT

Item
No.

Test & Inspection


procedure

Acceptance criteria

Acc.

VISUAL CHECK FOR SHAPE/SIZE

Contused wound, hammer


wound, irregularity, etc.

These wounds shall be ground for


inconspicuous and smooth surfaces.

Finished conditions after


removing temporary jigs used
during manufacture.

Smoothing shall reach the base


metal. Concave portions shall
be repaired

Contamination, stuck foreign


Cleaning has been done. No foreign
materials, and foreign materials
materials shall exist.
left in equipment.

Inclination, bend and deflection.

These defects shall not been visually


detected.

Matching marks:
1) Orientation marks
(00,900,1800,2700)
2) Center line mark

Marking shall be made.

Finished conditions at convex


and corner portions (for lined
products).

Finish shall be smooth (min. 2R).

Finished conditions at concave


and corner portions (for lined Finish shall be smooth (min. 5R).
products).

Corners in bolt holes mounting


strainers for water collecting
plates, lining attaching internal Parts to be lined shall have corners
parts, external surfaces of
chamfered (min. 1C).
flanges, and bolt holes in
flanges.
Conclusion
LILAMA 18
Prepared/Inspected

Sign
Name:
Date:

Inspected/Reviewed

Accepted

Rej.

Rejected

VKS
Reviewed/Approved

Remark