ETAP
OTI (Operation Technology Inc)
12
0.0
Windows 7 / 64 Bit
CPU @1.80GHz RAM: 2.00GB
ETAP CASE-0011
Analysis
Analysis detail
Issue
Reason
Proposed solution
2 conductors/phase
Observation
First we run load flow with Adaptive Newton Raphson method.
Length of cable-001 is 49.975 m, and then we have following voltages:
Cable-001 Length
(meter)
49.975
Bus-002
96.19%
Bus-003
94.92%
Bus-004
93.49%
Bus-007
93.58%
2 conductors/phase
Figure 2: Adaptive Newton Raphson Load flow method, Length of cable-001 is 49.975 m
Bus-008
94.31%
We run load flow with Adaptive Newton Raphson method, length of cable-001 is 49.945 m, and then we have following
voltages:
Cable-001 Length
(meter)
49.975
49.945
Bus-002
96.19%
96.46%
Bus-003
94.92%
95.41%
Bus-004
93.49%
110.26%
Bus-007
93.58%
93.58%
2 conductors/phase
Figure 3: Adaptive Newton Raphson Load flow method, Length of cable-001 is 49.945 m
Bus-008
94.31%
94.8%
We run load flow with Adaptive Newton Raphson method, length of cable-001 is 49.897 m, and then we have following
voltages:
Cable-001 Length
(meter)
49.975
49.945
49.897
Bus-002
96.19%
96.46%
124.8%
Bus-003
94.92%
95.41%
131.1%
Bus-004
93.49%
110.26%
110.3%
Bus-007
93.58%
93.58%
142.16%
2 conductors/phase
Figure 4: Adaptive Newton Raphson Load flow method, Length of cable-001 is 49.897 m
Bus-008
94.31%
94.8%
133.18 %
We run load flow with Adaptive Newton Raphson method, length of cable-001 is 49.895 m, and then we have following
voltages:
Cable-001 Length
(meter)
49.975
49.945
49.897
49.895
Bus-002
96.19%
96.46%
124.8%
55.71 %
Bus-003
94.92%
95.41%
131.1%
54.1%
Bus-004
93.49%
110.26%
110.3%
10.3%
Bus-007
93.58%
93.58%
142.16%
42.16%
2 conductors/phase
Figure 5: Adaptive Newton Raphson Load flow method, Length of cable-001 is 49.895 m
Bus-008
94.31%
94.8%
133.18 %
53.48 %
We run load flow with Adaptive Newton Raphson method, length of cable-001 is 49.889 m, and then we have following
voltages:
Cable-001 Length
(meter)
49.975
49.945
49.897
49.895
49.889
Bus-002
96.19%
96.46%
124.8%
55.71 %
90.37 %
Bus-003
94.92%
95.41%
131.1%
54.1%
84.76%
Bus-004
93.49%
110.26%
110.3%
10.3%
10.31%
Bus-007
93.58%
93.58%
142.16%
42.16%
75.93%
2 conductors/phase
Figure 6: Adaptive Newton Raphson Load flow method, Length of cable-001 is 49.889 m
Bus-008
94.31%
94.8%
133.18 %
53.48 %
84.08 %
We run load flow with Adaptive Newton Raphson method, length of cable-001 is 49.789 m, and then we have following
voltages:
Cable-001 Length
(meter)
49.975
49.945
49.897
49.895
49.889
49.789
Bus-002
96.19%
96.46%
124.8%
55.71 %
90.37 %
95.4 %
Bus-003
94.92%
95.41%
131.1%
54.1%
84.76%
93.56%
Bus-004
93.49%
110.26%
110.3%
10.3%
10.31%
38.15%
Bus-007
93.58%
93.58%
142.16%
42.16%
75.93%
91.21%
2 conductors/phase
Figure 7: Adaptive Newton Raphson Load flow method, Length of cable-001 is 49.789 m
Bus-008
94.31%
94.8%
133.18 %
53.48 %
84.08 %
92.93 %
We run load flow with Adaptive Newton Raphson method, length of cable-001 is 49.611 m, and then we have following
voltages:
Cable-001 Length
(meter)
49.975
49.945
49.897
49.895
49.889
49.786
49.611
Bus-002
96.19%
96.46%
124.8%
55.71 %
90.37 %
95.4 %
95.72 %
Bus-003
94.92%
95.41%
131.1%
54.1%
84.76%
93.56%
94.12%
Bus-004
93.49%
110.26%
110.3%
10.3%
10.31%
38.15%
60.56%
Bus-007
93.58%
93.58%
142.16%
42.16%
75.93%
91.21%
92.18%
2 conductors/phase
Figure 8: Adaptive Newton Raphson Load flow method, Length of cable-001 is 49.611 m
Bus-008
94.31%
94.8%
133.18 %
53.48 %
84.08 %
92.93 %
93.5 %
We run load flow with Adaptive Newton Raphson method, length of cable-001 is 50 m, then we have following voltages:
Cable-001 Length
(meter)
49.975
49.945
49.897
49.895
49.889
49.786
49.611
50
Bus-002
96.19%
96.46%
124.8%
55.71 %
90.37 %
95.4 %
95.72 %
96.08 %
Bus-003
94.92%
95.41%
131.1%
54.1%
84.76%
93.56%
94.12%
94.73%
Bus-004
93.49%
110.26%
110.3%
10.3%
10.31%
38.15%
60.56%
85.75%
Bus-007
93.58%
93.58%
142.16%
42.16%
75.93%
91.21%
92.18%
93.25%
2 conductors/phase
Bus-008
94.31%
94.8%
133.18 %
53.48 %
84.08 %
92.93 %
93.5 %
94.12%
We run load flow with Adaptive Newton Raphson method, length of cable-001 is 50.125 m, and then we have following
voltages:
Cable-001 Length
(meter)
49.975
49.945
49.897
49.895
49.889
49.786
49.611
50
50.125
Bus-002
96.19%
96.46%
124.8%
55.71 %
90.37 %
95.4 %
95.72 %
96.08 %
95.88 %
Bus-003
94.92%
95.41%
131.1%
54.1%
84.76%
93.56%
94.12%
94.73%
94.39%
Bus-004
93.49%
110.26%
110.3%
10.3%
10.31%
38.15%
60.56%
85.75%
72.31%
Bus-007
93.58%
93.58%
142.16%
42.16%
75.93%
91.21%
92.18%
93.25%
92.66%
2 conductors/phase
Figure 10: Adaptive Newton Raphson Load flow method, Length of cable-001 is 50.125 m
10
Bus-008
94.31%
94.8%
133.18 %
53.48 %
84.08 %
92.93 %
93.5 %
94.12%
93.78%
We run load flow with Adaptive Newton Raphson method, length of cable-001 is 50.725 m, and then we have following
voltages:
Cable-001 Length
(meter)
49.975
49.945
49.897
49.895
49.889
49.786
49.611
50
50.125
50.725
Bus-002
96.19%
96.46%
124.8%
55.71 %
90.37 %
95.4 %
95.72 %
96.08 %
95.88 %
95.76 %
Bus-003
94.92%
95.41%
131.1%
54.1%
84.76%
93.56%
94.12%
94.73%
94.39%
94.16%
Bus-004
93.49%
110.26%
110.3%
10.3%
10.31%
38.15%
60.56%
85.75%
72.31%
63.8%
Bus-007
93.58%
93.58%
142.16%
42.16%
75.93%
91.21%
92.18%
93.25%
92.66%
92.26%
2 conductors/phase
Figure 11: Adaptive Newton Raphson Load flow method, Length of cable-001 is 50.725 m
11
Bus-008
94.31%
94.8%
133.18 %
53.48 %
84.08 %
92.93 %
93.5 %
94.12%
93.78%
93.54%
We run load flow with Adaptive Newton Raphson method, length of cable-001 is 49.959 m, and then we have following
voltages:
Cable-001 Length
(meter)
49.975
49.945
49.897
49.895
49.889
49.786
49.611
50
50.125
50.725
49.959
Bus-002
96.19%
96.46%
124.8%
55.71 %
90.37 %
95.4 %
95.72 %
96.08 %
95.88 %
95.76 %
96.3 %
Bus-003
94.92%
95.41%
131.1%
54.1%
84.76%
93.56%
94.12%
94.73%
94.39%
94.16%
95.12%
Bus-004
93.49%
110.26%
110.3%
10.3%
10.31%
38.15%
60.56%
85.75%
72.31%
63.8%
101.65%
Bus-007
93.58%
93.58%
142.16%
42.16%
75.93%
91.21%
92.18%
93.25%
92.66%
92.26%
93.93%
2 conductors/phase
Figure 12: Adaptive Newton Raphson Load flow method, Length of cable-001 is 49.959 m
12
Bus-008
94.31%
94.8%
133.18 %
53.48 %
84.08 %
92.93 %
93.5 %
94.12%
93.78%
93.54%
94.51%
49.975 (m)
49.945 (m)
49.897 (m)
49.895 (m)
49.889 (m)
49.786 (m)
49.611 (m)
50 (m)
50.125 (m)
50.725 (m)
49.959 (m)
Bus-002
96.19%
Bus-003
94.92%
96.46%
95.41%
124.8%
131.1%
55.71 %
54.1%
90.37 %
84.76%
95.4 %
93.56%
95.72 %
94.12%
96.08 %
94.73%
95.88 %
94.39%
95.76 %
94.16%
96.3 %
95.12%
Bus-004
93.49%
110.26%
110.3%
10.3%
10.31%
38.15%
60.56%
85.75%
72.31%
63.8%
101.65%
Bus-007
93.58%
Bus-008
94.31%
94.8%
95.41%
93.58%
94.8%
133.49%
134.1%
142.16%
133.18 %
53.49%
54.1%
42.16%
53.48 %
84.08%
84.75%
75.93%
84.08 %
92.94%
93.55%
91.21%
92.93 %
93.5%
94.11%
92.18%
93.5 %
94.12%
94.73%
93.25%
94.12%
93.78%
94.39%
92.66%
93.78%
93.55%
94.16%
92.26%
93.54%
94.52%
95.12%
93.93%
94.51%
If we look at above table, we can see that there is an instability of voltage around 50th meter of length of cable-001
These problems regarding to instability of voltage in boarding exist in both Newton Raphson and adaptive Newton
Raphson Algorithm in ETAP load flow analysis.
We strongly recommend to ETAP support to clear this issue as soon as possible.
13